Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

Reliability evaluation methodology for NASA applications

Liquid rocket engine technology has been characterized by the development of complex systems containing large number of subsystems, components, and parts. The trend to even larger and more complex system is continuing. The liquid rocket engineers have been focusing mainly on performance driven designs to increase payload delivery of a launch vehicle for a given mission. In otherwords, although the failure of a single inexpensive part or component may cause the failure of the system, reliability in general has not been considered as one of the system parameters like cost or performance. Up till now, quantification of reliability has not been a consideration during system design and development in the liquid rocket industry. Engineers and managers have long been aware of the fact that the reliability of the system increases during development, but no serious attempts have been made to quantify reliability. As a result, a method to quantify reliability during design and development is needed. This includes application of probabilistic models which utilize both engineering analysis and test data. Classical methods require the use of operating data for reliability demonstration. In contrast, the method described in this paper is based on similarity, analysis, and testing combined with Bayesian statistical analysis.

Taneja, Vidya S.↗

PEM-INST-001: Instructions for Plastic Encapsulated Microcircuit (PEM) Selection, Screening, and Qualification

Potential users of plastic encapsulated microcircuits (PEMs) need to be reminded that unlike the military system of producing robust high-reliability microcircuits that are designed to perform acceptably in a variety of harsh environments, PEMs are primarily designed for use in benign environments where equipment is easily accessed for repair or replacement. The methods of analysis applied to military products to demonstrate high reliability cannot always be applied to PEMs. This makes it difficult for users to characterize PEMs for two reasons: 1. Due to the major differences in design and construction, the standard test practices used to ensure that military devices are robust and have high reliability often cannot be applied to PEMs that have a smaller operating temperature range and are typically more frail and susceptible to moisture absorption. In contrast, high-reliability military microcircuits usually utilize large, robust, high-temperature packages that are hermetically sealed. 2. Unlike the military high-reliability system, users of PEMs have little visibility into commercial manufacturers proprietary design, materials, die traceability, and production processes and procedures. There is no central authority that monitors PEM commercial product for quality, and there are no controls in place that can be imposed across all commercial manufacturers to provide confidence to high-reliability users that a common acceptable level of quality exists for all PEMs manufacturers. Consequently, there is no guaranteed control over the type of reliability that is built into commercial product, and there is no guarantee that different lots from the same manufacturer are equally acceptable. And regarding application, there is no guarantee that commercial products intended for use in benign environments will provide acceptable performance and reliability in harsh space environments. The qualification and screening processes contained in this document are intended to detect poor-quality lots and screen out early random failures from use in space flight hardware. However, since it cannot be guaranteed that quality was designed and built into PEMs that are appropriate for space applications, users cannot screen in quality that may not exist. It must be understood that due to the variety of materials, processes, and technologies used to design and produce PEMs, this test process may not accelerate and detect all failure mechanisms. While the tests herein will increase user confidence that PEMs with otherwise unknown reliability can be used in space environments, such testing may not guarantee the same level of reliability offered by military microcircuits. PEMs should only be used where due to performance needs there are no alternatives in the military high-reliability market, and projects are willing to accept higher risk.

Teverovsky, Alexander↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An economic assessment of behind-the-meter photovoltaics paired with batteries on the Hawaiian Islands.

Due to natural variability and uncertainty, the ever-increasing penetration of solar generation in Hawaii presents challenges to power grid operators to maintain reliable system operation. Demand response (DR) has the potential to be a cost-effective tool for Hawaii to reach its aggressive renewable energy goals while maintaining the reliability of power grids. The Hawaii Public Utilities Commission has approved the Hawaiian Electric Company's revised portfolio of DR programs. The companies have released a grid services purchase agreement and subscribed an initial tranche of load into their DR programs. This paper presents innovative analytical methods and comprehensive economic assessment for distributed photovoltaics (PV) paired with battery energy storage systems (BESSs) for two new DR programs, including fast frequency response and capacity grid service. Optimal dispatch and sizing methods are proposed for the paired system considering different tariff schedules and PV compensation programs across five islands. It was found that while the best resource configuration and potential economic benefits vary with tariff structure, a BESS paired with PV can be optimally dispatched to generate multiple value streams simultaneously. Compensation from DR programs is an important value stream to help increase the cost-effectiveness of the integrated system.

Battery energy storage system↗

ETARA PC version 3.3 user's guide: Reliability, availability, maintainability simulation model

A user's manual describing an interactive, menu-driven, personal computer based Monte Carlo reliability, availability, and maintainability simulation program called event time availability reliability (ETARA) is discussed. Given a reliability block diagram representation of a system, ETARA simulates the behavior of the system over a specified period of time using Monte Carlo methods to generate block failure and repair intervals as a function of exponential and/or Weibull distributions. Availability parameters such as equivalent availability, state availability (percentage of time as a particular output state capability), continuous state duration and number of state occurrences can be calculated. Initial spares allotment and spares replenishment on a resupply cycle can be simulated. The number of block failures are tabulated both individually and by block type, as well as total downtime, repair time, and time waiting for spares. Also, maintenance man-hours per year and system reliability, with or without repair, at or above a particular output capability can be calculated over a cumulative period of time or at specific points in time.

Hoffman, David J.↗

The Plant Water Management Experiments: Soil

A simple means of watering plants in the low-g environment aboard orbiting spacecraft is not obvious. Since the beginning of spaceflight, numerous approaches have been pursued to water plants that seek to maximize plant viability and system reliability, while minimizing crew time and system complexity. We are not there yet. The Plant Water Management (PWM) Soil experiments seek to apply recent advances in low-g capillary fluidics phenomena to the challenges faced by plant growth operations aboard spacecraft. The primary challenge is to establish earth-like flows minimizing low-g specific adaptations required of the plants. This is difficult due to the ever-present fluid physics challenges of poorly-wetting multiphase inertial-visco-capillary flows in geometrically complex conduits and containers. In this paper, we present recent flight results for the PWM Soil experiments where arcillite ‘soil reservoirs’ are arranged in a non-wetting host soil that serves as an O2-breathing wetting barrier. In this way, a largely terrestrial water-soil environment is mimicked where, as liquid is evapo-transpired through the growing plant foliage, the effective water table passively ‘falls’ reducing viscous lengths and increasing water uptake for the plant. We present data from 6 days of 24-7 experiments on the ISS testing 3 different plant root models. We also present and correlate a capillary flow model which captures the primary features of the flow. Our summary is valued for the assessment of current and future low-g plant watering systems employing soil media.

microgravity↗

ARIES Annual Report FY25

Advanced Research on Integrated Energy Systems (ARIES) at the National Laboratory of the Rockies (NLR) is the U.S. Department of Energy's (DOE's) test bed for energy system demonstration and de-risking. ARIES comprises the largest collection of physical and digital assets in the DOE laboratory complex, supporting flexible configuration across a broad range of energy scenarios. In Fiscal Year 2025, ARIES provided a platform for system-level research to anticipate and address future energy needs in energy security, system reliability, and technology deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Orbiter Autoland reliability analysis

The Space Shuttle Orbiter is the only space reentry vehicle in which the crew is seated upright. This position presents some physiological effects requiring countermeasures to prevent a crewmember from becoming incapacitated. This also introduces a potential need for automated vehicle landing capability. Autoland is a primary procedure that was identified as a requirement for landing following and extended duration orbiter mission. This report documents the results of the reliability analysis performed on the hardware required for an automated landing. A reliability block diagram was used to evaluate system reliability. The analysis considers the manual and automated landing modes currently available on the Orbiter. (Autoland is presently a backup system only.) Results of this study indicate a +/- 36 percent probability of successfully extending a nominal mission to 30 days. Enough variations were evaluated to verify that the reliability could be altered with missions planning and procedures. If the crew is modeled as being fully capable after 30 days, the probability of a successful manual landing is comparable to that of Autoland because much of the hardware is used for both manual and automated landing modes. The analysis indicates that the reliability for the manual mode is limited by the hardware and depends greatly on crew capability. Crew capability for a successful landing after 30 days has not been determined yet.

Welch, D. Phillip↗

A latent fault Markov model for a highly reliable triplex computer system

A Markov model of a highly reliable triplex system was constructed to evaluate the probability of system failure as a function of the propagation of latent faults. It is found that if the propagation rate of latent faults is extremely high, they do not significantly affect the probability of system failure, while if the propagation rate is extremely low, the survivability of the system is improved. The propagation rate that is most harmful to the survivability of the system is determined as a function of the duration of the flight. A decrease in the probability of system failure due to latency is noted if the probability of any two faults giving the same output is extremely low.

Swern, Frederic L.↗

Probabilistic Vulnerability Assessment Based on Power Flow and Voltage Distribution

Risk assessment of large scale power systems has been an important problem in power system reliability study. Probabilistic technique provides a powerful tool to solve the task. In this paper, we present the results of a study on probabilistic vulnerability assessment on WECC system. Cumulant based expansion method is applied to obtain the probabilistic distribution function (PDF) and cumulative distribution function (CDF) of power flows on transmission lines and voltage. Overall risk index based on the system vulnerability analysis is calculated using the WECC system. The simulation results based on WECC system is used to demonstrate the effectiveness of the method. The methodology can be applied to the risk analysis on large scale power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Going beyond reliability to robustness and resilience in space systems

The words reliability, robustness, and resilience, are often used interchangeably to describe tough and dependable systems but the distinctions between them suggest how to design more serviceable space systems. Reliability is simply the quality of consistently performing well. A system that dependably meets its design requirements in the specified environments is reliable. The designers may not consider themselves responsible for failures under unanticipated conditions. Robustness is the capability of performing without failure under a wide range of conditions, which can go beyond the expected range to include possible off-nominal conditions. Resilience is the ability to recover from or adapt to damaging events, such as failures, accidents, external disruptions, and repurposing. Such changes are usually unanticipated. They often invalidate the usual operating assumptions and cause system failure. Reliability, robustness, and resilience describe dependable performance under increasingly difficult conditions, first the specified environment, then a wider possible environment, and finally unanticipated damaging events. These three are increasingly desirable and increasingly difficult to achieve. Engineering for resilience would design systems that can ignore or repair failures, survive accidents, and recover from disruptions. Increasing the resilience of space systems, the ability to perform after unanticipated events, would greatly increase space crew safety. Improving reliability and robustness can be done by dealing with known sources of problems, but improving resilience requires implementing a general approach to reducing the impact of unknown future events. Two contrasting approaches are reducing system complexity and adding supervisory control. The need for resilience has been claimed for decades but little has been accomplished. Systems designers assume that they understand requirements, technologies, designs, architectures, integration, testing, operations, and environments. The potential problems of changes, failures, accidents, unknown environments, and unknown unknowns are ignored. Systems designers are typically overconfident and ignore the need for robustness and resilience.

Harry W Jones↗

A Survey of Techniques for Modeling and Improving Reliability of Computing Systems

Recent trends of aggressive technology scaling have greatly exacerbated the occurrences and impact of faults in computing systems. This has made `reliability' a first-order design constraint. To address the challenges of reliability, several techniques have been proposed. In this study, we provide a survey of architectural techniques for improving resilience of computing systems. We especially focus on techniques proposed for microarchitectural components, such as processor registers, functional units, cache and main memory etc. In addition, we discuss techniques proposed for non-volatile memory, GPUs and 3D-stacked processors. To underscore the similarities and differences of the techniques, we classify them based on their key characteristics. We also review the metrics proposed to quantify vulnerability of processor structures. Finally, we believe that this survey will help researchers, system-architects and processor designers in gaining insights into the techniques for improving reliability of computing systems.

3D-stacked processors↗

Choosing reliability level for Shuttle-carried payloads

The paramount importance of high payload reliability is questioned in the light of payload recoverability in Spacelab and Space Shuttle experiments, and cost effectiveness through less stringent reliability requirements backed up by recovery and reflight of the experiment if necessary is considered. Ground rules and parameters for assessing reliability and recoverability in relation to mission cost effectiveness are advanced. Mission success probability (for one or several flights), experiment hardware cost, design reliability, cost of orbiting the experiment, support system reliability, and other relevant parameters are identified and discussed, and graphs of experimental total cost envelope are plotted. It is proposed that reliability and quality assurance standards be weighed against failure costs and penalties in the case of recoverable space systems.

Campbell, J. W.↗

Scalable I/O Systems via Node-Local Storage: Approaching 1 TB/sec File I/O

In the race to PetaFLOP-speed supercomputing systems, the increase in computational capability has been accompanied by corresponding increases in CPU count, total RAM, and storage capacity. However, a proportional increase in storage bandwidth has lagged behind. In order to improve system reliability and to reduce maintenance effort for modern large-scale systems, system designers have opted to remove node-local storage from the compute nodes. Today's multi-TeraFLOP supercomputers are typically attached to parallel file systems that provide only tens of GBs/s of I/O bandwidth. As a result, such machines have access to much less than 1GB/s of I/O bandwidth per TeraFLOP of compute power, which is below the generally accepted limit required for a well-balanced system. In a many ways, the current I/O bottleneck limits the capabilities of modern supercomputers, specifically in terms of limiting their working sets and restricting fault tolerance techniques, which become critical on systems consisting of tens of thousands of components. This paper resolves the dilemma between high performance and high reliability by presenting an alternative system design which makes use of node-local storage to improve aggregate system I/O bandwidth. In this work, we focus on the checkpointing use-case and present an experimental evaluation of the Scalable Checkpoint/Restart (SCR) library, a new adaptive checkpointing library that uses node-local storage to significantly improve the checkpointing performance of large-scale supercomputers. Experiments show that SCR achieves unprecedented write speeds, reaching a measured 700GB/s of aggregate bandwidth on 8,752 processors and an estimated 1TB/s for a similarly structured machine of 12,500 processors. This corresponds to a speedup of over 70x compared to the bandwidth provided by the 10GB/s parallel file system the cluster uses. Further, SCR can adapt to an environment in which there is wide variation in performance or capacity among the individual node-local storage elements.

99 GENERAL AND MISCELLANEOUS↗

National launch system core vehicle

A new launch system is being defined to provide significant improvements in the national launch capability. The most challenging requirements are to reduce operational cost and increase system reliability, dependability, responsiveness while maintaining acceptable mission performance. System architecture studies have established that a family of vehicles is required to launch the required range of payloads. The vehicle design approach implements a design process that identifies the system design criteria and design concepts that enable the vehicle to meet the objectives of cost, reliability, safety and performance. The vehicle design features for the 50 to 100 K payload capability will utilize cost effective elements derived from existing vehicles, emerging technology and lessons learned to enable the system to be developed at a reasonable investment and to deliver payloads in an operationally efficient manner with high reliability.

Worlund, Armis L.↗

Failure Mode and Effects Analysis for a Photovoltaic Inverter

While PV panel reliability continues to increase, PV inverters become the limiting factor for PV system reliability. Consequently, it is critical to have a generic tool from a third party for PV inverter reliability assessment to help 1) utilities/PV farm operators schedule maintenance in advance, and 2) inverter developers improve the next-generation design. However, these two things cannot be accomplished without first understanding the reasons behind inverter failure. Following this idea, as the first step, it is essential to identify and investigate the most failure-prone components within a PV inverter system. After all, any system is only as reliable as the components that are contained within it. This motivates the failure mode and effects analysis (FMEA) work presented for this workshop. The FMEA is conducted as follows: first, the overview of the methodology on the development of the FMEA is presented; then, based on a top-down approach starting from the PV inverter system, critical inverter components with high failure rates are identified and summarized; afterward, a thorough FMEA study at a component-level is performed and its results, including failure modes, failure mechanisms, and critical stressors, are tabulated; finally, according to three rankings (chance of occurrence, severity of occurrence, and ease of detection prior to failure) for each failure mechanism provided by the FMEA, risk priority numbers are calculated and the failure mechanisms along with the critical stressors are ranked in terms of their potentially detrimental effect on the PV inverter.

Brown, Buck↗