Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Software Schedules Missions, Aids Project Management

NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

Source record↗

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

Nuclear electric propulsion systems overview

The topics are presented in viewgraph form and include the following: nuclear propulsion background; schedule for the nuclear electric propulsion (NEP) project; NEP for the Space Exploration Initiative; NEP on-going systems tasks; 20KWe mission/system study; and agenda.

Doherty, Michael P.↗

Analysis of EDP performance

The objective of this contract was the investigation of the potential performance gains that would result from an upgrade of the Space Station Freedom (SSF) Data Management System (DMS) Embedded Data Processor (EDP) '386' design with the Intel Pentium (registered trade-mark of Intel Corp.) '586' microprocessor. The Pentium ('586') is the latest member of the industry standard Intel X86 family of CISC (Complex Instruction Set Computer) microprocessors. This contract was scheduled to run in parallel with an internal IBM Federal Systems Company (FSC) Internal Research and Development (IR&D) task that had the goal to generate a baseline flight design for an upgraded EDP using the Pentium. This final report summarizes the activities performed in support of Contract NAS2-13758. Our plan was to baseline performance analyses and measurements on the latest state-of-the-art commercially available Pentium processor, representative of the proposed space station design, and then phase to an IBM capital funded breadboard version of the flight design (if available from IR&D and Space Station work) for additional evaluation of results. Unfortunately, the phase-over to the flight design breadboard did not take place, since the IBM Data Management System (DMS) for the Space Station Freedom was terminated by NASA before the referenced capital funded EDP breadboard could be completed. The baseline performance analyses and measurements, however, were successfully completed, as planned, on the commercial Pentium hardware. The results of those analyses, evaluations, and measurements are presented in this final report.

Source record↗

Turbulent Methane-Air Combustion

This study is aimed at enhancing the understanding of turbulent premixed methane-air combustion. Such understanding is essential since: (1) many industries are now pursuing lighter hydrocarbon alternative fuels and the use of premixed flames to reduce pollutant emissions, and (2) the characteristic dimensions and flow rates of most industrial combustors are often large for flows to be turbulent. The specific objectives of the study are: (1) to establish the effects of process variables (e.g., flow rate, fuel/air ratio, chlorinated hydro-carbons, and pressure) on the emissions and flow structure (velocity distribution, streamlines, vorticity and flame shape), and (2) to develop a mechanistic model to explain the observed trends. This includes the acquisition of Dantec FlowMap Particle Image Velocimeter. The design and fabrication of the premixed burner has also been completed. The study is now at the stage of testing of equipment and analytical instruments. The presentation will give details on the tasks completed and on the current and future plans. The project is progressing well and all activities are on schedule. The outlook for the success of the project is bright.

Yaboah, Yaw D.↗

In Situ Water Vapor Measurements Using Coupled UV Fragment Fluorescence/Absorption Spectroscopy in Support of CRYSTAL-FACE

Understanding the coupling of dynamics, chemistry, and radiation within the context of the NASA Earth Science Enterprise (ESE) and the national Climate Change Science Program (CCSP) requires, as a first-order priority, high spatial resolution, high-accuracy observations of water in its various phases. Given the powerful diagnostic importance of the condensed phases of water for dynamics and the impact of phase changes in water on the radiation field, the accurate, in situ observation of water vapor is of central importance to CRYSTAL FACE (CF). This is clear both from the defined scientific objectives of the NRA and from developments in the coupled fields of stratosphere/troposphere exchange, cirrus cloud formation/removal and mechanisms for the distribution of water vapor in the middle/upper troposphere. Accordingly, we were funded under NASA Grant NAG5-11548 to perform the following tasks for the CF mission: 1. Prepare the water vapor instrument for integration into the WB57F and test flights scheduled for Spring 2002. 2. Calibrate and prepare the water vapor instrument for the Summer 2002 CF science flights based in Jacksonville, Florida. 3. Provide both science and engineering support for the above-mentioned efforts. 4. Analyze and interpret the CF data in collaboration with other mission scientists. 5. Attend the science workshop in Spring 2003. 6. Publish the data and analysis in peer-reviewed journals.

Anderson, James G.↗

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

Multi-agent planning and scheduling, execution monitoring and incremental rescheduling: Application to motorway traffic

This article describes a planning method applicable to agents with great perception and decision-making capabilities and the ability to communicate with other agents. Each agent has a task to fulfill allowing for the actions of other agents in its vicinity. Certain simultaneous actions may cause conflicts because they require the same resource. The agent plans each of its actions and simultaneously transmits these to its neighbors. In a similar way, it receives plans from the other agents and must take account of these plans. The planning method allows us to build a distributed scheduling system. Here, these agents are robot vehicles on a highway communicating by radio. In this environment, conflicts between agents concern the allocation of space in time and are connected with the inertia of the vehicles. Each vehicle made a temporal, spatial, and situated reasoning in order to drive without collision. The flexibility and reactivity of the method presented here allows the agent to generate its plan based on assumptions concerning the other agents and then check these assumptions progressively as plans are received from the other agents. A multi-agent execution monitoring of these plans can be done, using data generated during planning and the multi-agent decision-making algorithm described here. A selective backtrack allows us to perform incremental rescheduling.

Mourou, Pascal↗

Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

scheduling↗

Space station data system analysis/architecture study. Task 5: Program plan

Cost estimates for both the on-board and ground segments of the Space Station Data System (SSDS) are presented along with summary program schedules. Advanced technology development recommendations are provided in the areas of distributed data base management, end-to-end protocols, command/resource management, and flight qualified artificial intelligence machines.

Source record↗

Manual Crew Override of Vehicle Landings Following G-Transitions

BACKGROUND Manual control during exploration spaceflight consists of both planned automated supervisory control and unplanned crew override. This crew override capability is critical to enable overall mission success during landing contingencies. However, the introduction of manual override capabilities must be implemented to enable crews to mitigate risks introduced by human error. Adaptive changes in the sensorimotor system can manifest during g-transitions as spatial disorientation. While training and landing aids enable successful landing through disorientation, these adaptive changes may increase cognitive demand that needs to be accounted for in the manual control strategy. It is important to characterize these effects as soon as possible following the G-transition to develop appropriate countermeasures. METHODS The following study seeks to inform the risk associated with altered sensorimotor and vestibular function impacting critical mission tasks. We aim to characterize the effects of short and long-duration weightlessness on manual control following G-transitions using simulated lunar landing on a six-degree-of-freedom (6DOF) motion base, a fixed base simulation, and a supervisory control tablet task. The primary goal is to understand the impact of spaceflight on crew ability to perform manual crew override and supervisory control. This aim will be assessed by comparing pre- versus postflight simulation performance in crewmembers assigned to either short duration (< 30 day) or long duration (~6- month) missions to the International Space Station (ISS). We hypothesize there will be postflight increases in the percent time that pilots are outside of the acceptable range for recommended vehicle state parameters and the reaction time for secondary cognitive tasks. Ground-based control subjects, who are demographically matched to the crew considering age (± 5 years) and gender, will undergo the same testing schedule as the crew to examine the effects of flight phase independent of microgravity exposure. The second aim is to examine how adaptive changes in vestibular and cognitive function relate to changes in manual crew override proficiency. Crew performance for a sensorimotor perceptual test battery will evaluate motion perception tracking, roll nulling, and/or vection sensitivity using the 6DOF motion base. We hypothesize that a higher severity of vestibular alterations will be associated with increased percent time outside of guidance limits. Motion sickness severity and sleepiness will also be evaluated. To determine the impact of “just-in-time” training, the third aim seeks to compare performance during on-board lunar landing tasks conducted late in-flight to early postflight. We hypothesize that proficiency on the “just-in-time” laptop trainer late in mission will be positively correlated with early postflight proficiency on the same task. The final aim will establish assessments of performance, training protocols, and the learning progression in a ground-control cohort of first-time users. RESULTS The assessment of the learning progression associated with the piloting task on the motion base system with thirty ground subjects will be reported. Learning curves will be established across four distinct sessions and within session considering trial difficulty. The difficulty of the landing task can be modulated with the landing divert distance and cross or downrange difficulty. Results may include changes in performance across multiple trials of a multi-attribute lunar tablet supervisory control task. Preliminary investigations of eighteen subjects who completed vestibular threshold and motion perception tasks offer expected performance ranges for upcoming preflight crew evaluations. The results yielded an average roll threshold of 0.46 ± 0.30 deg/s and an average roll nulling root mean square error performance of 2.52 ± 0.52 deg/s. RELEVANCE This project will deliver an operational demonstration of crew monitoring capability following spaceflight and identify potential deficits that may require remediation. Comparison of individual vestibular and cognitive changes with crew performance will help better characterize the manual control risks associated with sensorimotor alterations. Ground testing will evaluate learning progression, refine training protocols, and serve as a control cohort for comparisons to crew performance. ACKNOWLEDGEMENTS: The authors acknowledge contributions from Draper, the Dynamic Skills Trainer (DST) Lab, and the Software, Robotics, and Simulation Division toward the development of the lunar landing simulation platforms. This project is funded by the Human Health Countermeasures Element.

Hannah M. Weiss↗

Modular space station phase B extension period executive summary

A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.

Tischler, A. A.↗

Space shuttle solid rocket booster cost-per-flight analysis technique

A cost per flight computer model is described which considers: traffic model, component attrition, hardware useful life, turnaround time for refurbishment, manufacturing rates, learning curves on the time to perform tasks, cost improvement curves on quantity hardware buys, inflation, spares philosophy, long lead, hardware funding requirements, and other logistics and scheduling constraints. Additional uses of the model include assessing the cost per flight impact of changing major space shuttle program parameters and searching for opportunities to make cost effective management decisions.

Forney, J. A.↗

Autonomous power expert fault diagnostic system for Space Station Freedom electrical power system testbed

The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control to the Space Station Freedom Electrical Power System (SSF/EPS) testbed being developed and demonstrated at NASA Lewis Research Center. The objectives of the program are to establish artificial intelligence technology paths, to craft knowledge-based tools with advanced human-operator interfaces for power systems, and to interface and integrate knowledge-based systems with conventional controllers. The Autonomous Power EXpert (APEX) portion of the APS program will integrate a knowledge-based fault diagnostic system and a power resource planner-scheduler. Then APEX will interface on-line with the SSF/EPS testbed and its Power Management Controller (PMC). The key tasks include establishing knowledge bases for system diagnostics, fault detection and isolation analysis, on-line information accessing through PMC, enhanced data management, and multiple-level, object-oriented operator displays. The first prototype of the diagnostic expert system for fault detection and isolation has been developed. The knowledge bases and the rule-based model that were developed for the Power Distribution Control Unit subsystem of the SSF/EPS testbed are described. A corresponding troubleshooting technique is also described.

Truong, Long V.↗

Planning and Resource Management in an Intelligent Automated Power Management System

Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

Morris, Robert A.↗

Scripting Module for the Satellite Orbit Analysis Program (SOAP)

This add-on module to the SOAP software can perform changes to simulation objects based on the occurrence of specific conditions. This allows the software to encompass simulation response of scheduled or physical events. Users can manipulate objects in the simulation environment under programmatic control. Inputs to the scripting module are Actions, Conditions, and the Script. Actions are arbitrary modifications to constructs such as Platform Objects (i.e. satellites), Sensor Objects (representing instruments or communication links), or Analysis Objects (user-defined logical or numeric variables). Examples of actions include changes to a satellite orbit ( v), changing a sensor-pointing direction, and the manipulation of a numerical expression. Conditions represent the circumstances under which Actions are performed and can be couched in If-Then-Else logic, like performing v at specific times or adding to the spacecraft power only when it is being illuminated by the Sun. The SOAP script represents the entire set of conditions being considered over a specific time interval. The output of the scripting module is a series of events, which are changes to objects at specific times. As the SOAP simulation clock runs forward, the scheduled events are performed. If the user sets the clock back in time, the events within that interval are automatically undone. This script offers an interface for defining scripts where the user does not have to remember the vocabulary of various keywords. Actions can be captured by employing the same user interface that is used to define the objects themselves. Conditions can be set to invoke Actions by selecting them from pull-down lists. Users define the script by selecting from the pool of defined conditions. Many space systems have to react to arbitrary events that can occur from scheduling or from the environment. For example, an instrument may cease to draw power when the area that it is tasked to observe is not in view. The contingency of the planetary body blocking the line of sight is a condition upon which the power being drawn is set to zero. It remains at zero until the observation objective is again in view. Computing the total power drawn by the instrument over a period of days or weeks can now take such factors into consideration. What makes the architecture especially powerful is that the scripting module can look ahead and behind in simulation time, and this temporal versatility can be leveraged in displays such as x-y plots. For example, a plot of a satellite s altitude as a function of time can take changes to the orbit into account.

Carnright, Robert↗

Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan

A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.

Klus, W. L.↗

Parallel Directionally Split Solver Based on Reformulation of Pipelined Thomas Algorithm

In this research an efficient parallel algorithm for 3-D directionally split problems is developed. The proposed algorithm is based on a reformulated version of the pipelined Thomas algorithm that starts the backward step computations immediately after the completion of the forward step computations for the first portion of lines This algorithm has data available for other computational tasks while processors are idle from the Thomas algorithm. The proposed 3-D directionally split solver is based on the static scheduling of processors where local and non-local, data-dependent and data-independent computations are scheduled while processors are idle. A theoretical model of parallelization efficiency is used to define optimal parameters of the algorithm, to show an asymptotic parallelization penalty and to obtain an optimal cover of a global domain with subdomains. It is shown by computational experiments and by the theoretical model that the proposed algorithm reduces the parallelization penalty about two times over the basic algorithm for the range of the number of processors (subdomains) considered and the number of grid nodes per subdomain.

Povitsky, A.↗