Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transforms”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Summary of Factory Fueling and Testing Risks to Support the Transformation of Regulatory Requirements for Microreactors

Microreactors have the potential to open new markets and applications for nuclear energy. New manufacturing and operational regimes, such as factory fueling and testing prior to site installation, are being proposed to meet these new markets. The radiological hazards associated with traditional commercial power reactors are not the same as the hazards of a reactor being constructed in a factory. Currently, a reactor operating license specified under 10 CFR Part 50, Part 52, or (in the near future) Part 53 is required prior to loading fuel in the reactor. This is logical for plants that are immediately to begin full-power operations soon after fuel loading. However, for microreactors, this may not be the case. Some deployment concepts may stage reactors as “ready to go” in a factory prior to site installation and startup. This approach is being considered in the case of diesel generator replacements, mobile or roaming mining operations, and emergency response situations, such as after a major disaster event. Therefore, it is necessary to evaluate hazards assuming low power operation for a short irradiation time. This report investigates the primary hazards unique to microreactors associated with low power reactor and physics tests necessary to confirm core safety assumptions, neutronic and core design performance parameters, and other assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Transforming Aeration Energy in Water Resource Recovery Facilities (WRRFs) through Suboxic Nitrogen Removal (Final Report)

The objective of this project was to advance two key technological components—aeration control strategies and process design methodologies—to support the development and broader adoption of suboxic biological nitrogen removal (SBNR). The project focused on achieving the following three goals: • Enhance Model Predictive Control (MPC) Technology: Advance the DO/Nmaster MPC platform from its initial 2018 pilot deployment at the Chico Water Resource Recovery Facility in California to full-scale integration. This included partnering with a blower technology commercialization partner and incorporating machine learning (ML) capabilities to enable nationwide deployment. • Bridge Knowledge Gaps in SBNR Process Design: Address fundamental gaps in SBNR process understanding through controlled pilot-scale testing at a dedicated pilot facility. These efforts supported the development of robust kinetic models to inform reliable SBNR control, operational strategies, and design frameworks. • Demonstrate Full-Scale Implementation of Low DO/SBNR with ML: Transition low dissolved oxygen (DO)/SBNR coupled with ML from pilot-scale trials to full-scale demonstration in flow-through biological nutrient removal (BNR) systems, with the goal of enabling scalable, nationwide adoption in activated sludge treatment processes. The project included demonstration of SBNR at the pilot scale as performed by Hampton Roads Sanitation District (HRSD) and at the full-scale as performed by the Los Angeles County Sanitation Districts' (LACSD) Pomona Water Reclamation Plant (POWRP).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗