At least 451 records · Page 25

Experimentally Validated Computational Modeling of Creep and Creep-Cracking for Nuclear Concrete Structures

In a Nuclear Power Plant, one of the most important components is the concrete nuclear reactor cavity, which serves both a structural and protective function as the biological radiation shield. Given that creep has been identified as a major knowledge gap in the assessment of nuclear structures (NUREG/CR-7153), this work helps to further the understanding of creep behavior of massive concrete containment structures for decades to enable safe and long-term operation of these facilities. This project has developed a robust, experimentally validated model to predict creep in nuclear concrete structures for up 60 years using short-term creep data thereby enabling a longer service life of critical facilities and early detection of structural failure. The work presented in this report is a pairing of computational and experimental methods. For the first time, the time temperature superposition (TTS) principle was successfully used to generate a uniaxial creep compliance master curve to predict mortar creep response for up to 22,500 days (nearly 60 years) at a reference temperature of 20°C. These data were used as input into finite element analysis (FEA) codes that use highly realistic random, 3D concrete microstructures from reconstructed coarse limestone aggregates. Finite element analysis performed provides the ability to quickly upscale mortar viscoelastic behavior to long-term concrete creep/relaxation data. A master creep compliance curve, constructed from the TTS principle, spanning 27 years, was used to validate two and a half decades of simulated concrete creep. Concurrently, three different simulated wall specimens were designed to mimic the behavior of post-tensioned concrete nuclear containment facility vessel walls over time as a result of concrete creep. The specimens were designed with different thicknesses, transverse and longitudinal reinforcement ratios, and level of post-tensioning stress. Each specimen contained various instrumentation to measure internal concrete temperature, concrete strain, and post-tensioning strain hourly for over 3 years. The concrete creep model developed in this project, based on the FEA concrete simulations, was applied to simulate the structural-scale experiments of prestressed concrete walls conducted in this project using the Grizzly code. These models can represent the effects of reinforcing and prestressing. Although there are some discrepancies with the experimental data, the model can predict the overall trends of the creep response in these experiments. One of these experimental models was also applied to an extended time to demonstrate how the findings from this study can be used to predict the behavior of actual structures of interest that have been in service for extended periods of time.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A METHODOLOGY FOR DETERMINING THE DOSE RATE FOR BOUNDING MASS LIMITS IN A 9977 PACKAGING

The Small Gram Quantity (SGQ) concept is based on the understanding that the hazards associated with the shipment of a radioactive material are directly proportional to its mass. This study describes a methodology that estimates the acceptable masses for several neutron and gamma emitting isotopes that can be shipped in a 9977 Package compliant with the Title 10 of the Code of Federal Regulations, Part 71 (10CFR71) external radiation level limits. 10CFR71.33 states that a shipping application identifies the radioactive and fissile materials at their maximum quantity and provides an evaluation demonstrating compliance with the external radiation standards. Since rather small amounts of some isotopes emit sufficiently strong radiation to produce a large external dose rate, quantifying of the dose rate for a proposed content is a challenging issue for the SGQ approach. It is essential to quantify external radiation levels from several common gamma and neutron sources that can be safely placed in a specific packaging, to ensure compliance with federal regulations. A methodology was established for determining the dose rate for bounding mass limits for a set of isotopes in the Model 9977 Shipping Package. Calculations were performed to estimate external radiation levels using the MCNP radiation transport code to develop a set of response multipliers (Green's functions) for 'dose per source particle' for each neutron and photon spectral group. The source spectrum from one gram of each isotope was folded with the response multipliers to generate the dose rate per gram of each isotope in the 9977 shipping package and its associated shielded containers. The maximum amount of a single isotope that could be shipped within the regulatory limits for dose rate at the surface was determined. For a package containing a mixture of isotopes, the acceptability for shipment can be determined by a sum of fractions approach. Furthermore, the results of this analysis can be easily extended to additional radioisotopes by simply evaluating the neutron and/or photon spectra of those isotopes and folding the spectral data with the Green's functions provided.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Performance Simulation of Iron-Chrome-Aluminum Cladding during Steady-State LWR Operation

During a severe accident scenario, such as a loss-of-coolant accident, a nuclear reactor may lose its capacity to cool its fuel. The fuel rod temperatures begin to increases, quickly reaching temperatures where the coolant begins to evaporate. This lowers the coolant level in the core and eventually uncovers the fuel. Without sufficient heat transfer from the fuel rods to the coolant, the temperature of the fuel and cladding will increase dramatically. In the case of traditional zirconium-based alloys, as the temperature of the cladding reaches ∼1200 deg. C the zirconium rapidly begins to oxidize with H{sub 2}O in the coolant and steam. This oxidation reaction causes both thinning of the Zr-alloy cladding as the metal reacts and releases large amounts of H{sub 2} gas into the reactor pressure vessel. In order to increase the safety margin of LWR fuel in severe accident scenarios, several alternative cladding materials have been proposed to replace the currently used zirconium-based alloys. Of these materials, there is a particular focus on select iron-chrome-aluminum (FeCrAl) alloys because of slower oxidation Kinetics in high temperature steam than zirconium-based alloys. This increased oxidation resistance may provide additional coping time to mitigate any further damage resulting from an accident. However, by changing the cladding material, the neutronic characteristics of the core will change. FeCrAl alloys exhibit thermal neutron absorption cross sections nearly ∼12-16 x greater than Zr-alloys. This decreases the reactivity of the core, subsequently decreasing the potential cycle length for operation. To counteract this, fissile material may be added in the form of increased enrichment or increased fuel mass or the cladding thickness might be decreased, effectively reducing the neutronic penalty from using the alloy. In this study, all three changes are considered. To assess the viability of FeCrAl as an alternative cladding to Zr-alloys, engineering-scale fuel performance analysis is used to monitor the cladding and integral fuel rod behavior through its operation. Ongoing work is being performed to identify key parameters essential to modeling FeCrAl alloys for LWR applications and properly model fuel compliance and stress relief mechanisms for UO{sub 2} fuel. To improve the predictive capability of fuel performance codes for FeCrAl cladding under normal operation, high-fidelity mechanistic/physics-based material models are needed. This information can be generated and improved by access to experimental data on targeted FeCrAl alloys. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment of Unabated Facility Emission Potentials for Evaluating Airborne Radionuclide Monitoring Requirements at Pacific Northwest National Laboratory - 2010

Assessments were performed to evaluate compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants ([NESHAP]; U.S. Code of Federal Regulations, Title 40, Part 61, Subpart H) and Washington Administrative Code 246-247: Radiation Protection - Air Emissions. In these NESHAP assessments, potential unabated off-site doses were evaluated for emission locations at buildings that are part of the consolidated laboratory campus of the Pacific Northwest National Laboratory. This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in 2010.

Air Monitoring↗

Technical Basis for PNNL Beryllium Inventory

The Department of Energy (DOE) issued Title 10 of the Code of Federal Regulations Part 850, “Chronic Beryllium Disease Prevention Program” (the Beryllium Rule) in 1999 and required full compliance by no later than January 7, 2002. The Beryllium Rule requires the development of a baseline beryllium inventory of the locations of beryllium operations and other locations of potential beryllium contamination at DOE facilities. The baseline beryllium inventory is also required to identify workers exposed or potentially exposed to beryllium at those locations. Prior to DOE issuing 10 CFR 850, Pacific Northwest Nuclear Laboratory (PNNL) had documented the beryllium characterization and worker exposure potential for multiple facilities in compliance with DOE’s 1997 Notice 440.1, “Interim Chronic Beryllium Disease.” After DOE’s issuance of 10 CFR 850, PNNL developed an implementation plan to be compliant by 2002. In 2014, an internal self-assessment (ITS #E-00748) of PNNL’s Chronic Beryllium Disease Prevention Program (CBDPP) identified several deficiencies. One deficiency is that the technical basis for establishing the baseline beryllium inventory when the Beryllium Rule was implemented was either not documented or not retrievable. In addition, the beryllium inventory itself had not been adequately documented and maintained since PNNL established its own CBDPP, separate from Hanford Site’s program. This document reconstructs PNNL’s baseline beryllium inventory as it would have existed when it achieved compliance with the Beryllium Rule in 2001 and provides the technical basis for the baseline beryllium inventory.

Beryllium, 10 CFR 850↗

Aging Management Considerations for Dry Cask Storage Canisters - 18472

Dry cask storage systems (DCSSs) are used to store used nuclear fuel (UNF) at independent spent fuel storage installations (ISFSIs) prior to final geologic storage or reprocessing. As storage durations increase beyond the twenty-year period commonly implemented for licensing the storage sites, it is important to consider aging related degradation issues for DCSS components. A large portion of the DCSS designs used throughout the world employ a ventilated concrete overpack with a welded stainless steel canister that confines the UNF. This paper explores key issues related to aging management for these canister components, including: (1) canister environment, (2) inspection limitations, and (3) aging management program guidance and requirements. While the austenitic stainless steel used for the canisters are generally resistant to most forms of environmental attack, it is possible for conditions to arise that lead to pitting and even stress corrosion cracking of the canister systems. A large number of studies related to canister degradation have been performed by industry groups and government researchers, both in the US and worldwide. These advances in the collective knowledge provide insight into risk factors for DCSS. Such information is beneficial to improve ISFSI siting decisions and ensure successful relicensing of existing ISFSIs. This paper highlights relevant research and also discusses applicability to degradation of other equipment and containers used to process and isolate UNF and other nuclear waste streams from the public and the environment. Inspection of the canister surface is an important tool to investigate and evaluate the potential for degradation. Existing DCSS designs typically do not offer ready access to the canister surface in order to perform the inspection. Further complicating inspection efforts are the surface conditions present on the sheltered canisters after extended storage times, including atmospheric debris such as dust and pollen. Given ongoing development efforts, inspection capabilities and associated limitations should be assessed at multiple points in time over the course of an aging management program to incorporate new advances in the field. This paper explores the limitations of currently available capabilities in inspection and delivery, and provides insight into the gaps remaining to be filled to permit an effective inspection program. Recommendations and requirements related to programs for aging management of canisters have been published or are in progress from a variety of groups, including industry groups, regulatory authorities, and Codes and Standards. An effective aging management program should consider the technical bases of these various inputs and maintain compliance with requirements. Given multiple sources, decisions will be required when considering conflicting guidance, and this paper will include discussion of the relative merits of the various approaches. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Fallout Composition Modeling: Improvements and Applications of the Defense Land Fallout Interpretive Code

This paper outlines several improvements to the Particle Activity Module of the Defense Land Fallout Interpretive Code (DELFIC). The modeling of each phase of the fallout process is discussed within DELFIC to demonstrate the capabilities and limitations with the code for modeling and simulation. Expansion of the DELFIC isotopic library to include actinides and light elements is shown. Several key features of the new library are demonstrated, including compliance with ENDF/B-VII standards, augmentation of hardwired activated soil and actinide decay calculations with exact Bateman calculations, and full physical and chemical fractionation of all material inventories. Improvements to the radionuclide source term are demonstrated, including the ability to specify heterogeneous fission types and the ability to import source terms from irradiation calculations using the Oak Ridge Isotope Generation (ORIGEN) code. Additionally, the dose, kerma, and effective dose conversion factors are revised. Finally, the application of DELFIC for consequence management planning and forensic analysis is presented. For consequence management, DELFIC is shown to provide disaster recovery teams with simulations of real-time events, including the location, composition, time of arrival, activity rates, and dose rates of fallout, accounting for site-specific atmospheric effects. The results from DELFIC are also demonstrated for use by nuclear forensics teams to plan collection routes (including the determination of optimal collection locations), estimate dose rates to collectors, and anticipate the composition of material at collection sites. These capabilities give mission planners the ability to maximize their effectiveness in the field while minimizing risk to their collectors.

54 ENVIRONMENTAL SCIENCES↗

A thorough assessment of China’s standard for energy consumption of buildings

China's Design Standard for Energy Efficiency of Public Buildings (the Design Standard) is widely used in the design phase to regulate the energy efficiency of physical assets (envelope, lighting, HVAC) in buildings. However, the standard does not consider many important factors that influence the actual energy use in buildings, and this can lead to gaps between the design estimates and actual energy consumption. To achieve the national energy savings targets defined in the strategic 12th Five-Year Plan, China developed the first standard for energy consumption of buildings GB/T51161-2016 (the Consumption Standard). This study provides an overview of the Consumption Standard, identifies its strengths and weaknesses, and recommends future improvements. The analysis and discussion of the constraint value and the leading value, two key indicators of the energy use intensity, provide insight into the intent and effectiveness of the Consumption Standard. The results indicated that consistency between China's Design Standard GB 50189-2015 and the Consumption Standard GB/T51161-2016 could be achieved if the Design Standard used the actual building operations and occupant behavior in calculating the energy use in Chinese buildings. The development of an outcome-based code in the U.S. was discussed in comparison with China's Consumption Standard, and this revealed the strengths and challenges associated with implementing a new compliance method based on actual energy use in buildings in the U.S. Overall, this study provides important insights into the latest developments of actual consumption-based building energy standards, and this information should be valuable to building designers and energy policy makers in China and the U.S.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NEAMS Experimental Support for Code Validation, INL FY2009

The goal is for all modeling and simulation tools to be demonstrated accurate and reliable through a formal Verification and Validation (V&V) process, especially where such tools are to be used to establish safety margins and support regulatory compliance, or to design a system in a manner that reduces the role of expensive mockups and prototypes. Whereas the Verification part of the process does not rely on experiment, the Validation part, on the contrary, necessitates as many relevant and precise experimental data as possible to make sure the models reproduce reality as closely as possible. Hence, this report presents a limited selection of experimental data that could be used to validate the codes devoted mainly to Fast Neutron Reactor calculations in the US. Emphasis has been put on existing data for thermal-hydraulics, fuel and reactor physics. The principles of a new “smart” experiment that could be used to improve our knowledge of neutron cross-sections are presented as well. In short, it consists in irradiating a few milligrams of actinides and analyzing the results with Accelerator Mass Spectroscopy to infer the neutron cross-sections. Finally, the wealth of experimental data relevant to Fast Neutron Reactors in the US should not be taken for granted and efforts should be put on saving these 30-40 years old data and on making sure they are validation-worthy, i.e. that the experimental conditions and uncertainties are well documented.

97 MATHEMATICS AND COMPUTING↗

Poster — Thur Eve — 54: Radiotherapy and Non-Radiotherapy Safety Practices Beyond Licensing Expectations

The Canadian Nuclear Safety Commission (CNSC) regulates the use of nuclear energy and materials to protect the health, safety and security of Canadians and the environment, and to implement Canada's international obligations on the peaceful use of nuclear energy. In order to perform this regulatory activity, the CNSC issue licences and has its staff perform inspections to verify conformity to the aspects of those licences. Within the CNSC, the Accelerators and Class II Facilities Division (ACFD) is responsible for the regulatory oversight of Class II Prescribed Equipment used in medical, academic, and industrial sectors in Canada. In performing inspections, ACFD has encountered licensees with practices that are either below, meet or exceed regulatory expectations in specific areas. Unfortunately, none of these practices are ever communicated to the broader Class II community to help other licensees avoid the same problem or achieve high standards. In this poster, ACFD will highlight safety practices that go beyond expectations. These practices are taken from observations during site inspections between 2007 and 2013 and will be presented in six areas: Procedures, Participation, Awareness, Equipment, Servicing and Software. Each area briefly discusses a number of practices that the CNSC feels went beyond the expectations dictated by the licence. Where possible, names are added of the contact people at the centres who can be reached for full details of their implementations. It is hoped that this communication will assist other licensees to achieve these same high levels of compliance and possibly go beyond.

07 ISOTOPE AND RADIATION SOURCES↗

A Preliminary Feasibility Assessment of the RESNET HERS Index as an Alternative Compliance Path for the IECC

This analysis provides a limited evaluation of the relationship between the Residential Energy Services Network (RESNET) Home Energy Rating System (HERS) Index and the simulation-based performance approach used in the 2012 International Energy Conservation Code (IECC). Not all differences between the approaches are analyzed here; only a few distinctions considered likely to result in quantifiable differences in the outcomes of the two approaches and for which available studies have not quantified those differences. This analysis establishes, for a single-family residence with gas heat and a crawlspace foundation, a set of climate-zone-specific, complying HERS Index values that could be used to inform the development of a HERS-based compliance path in the IECC.

Taylor, Zachary T.↗

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP PA Sensitivity Studies in Support of CRA-2014 Completeness Determination and Compliance Decision - 18209

The Waste Isolation Pilot Plant (WIPP) has been developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of transuranic (TRU) waste. Containment of TRU waste at the WIPP is regulated by the U.S. Environmental Protection Agency (EPA). The DOE demonstrates compliance with the containment requirements by means of performance assessment (PA) calculations. WIPP PA calculations estimate the probability and consequence of potential radionuclide releases from the repository to the accessible environment for a regulatory period of 10,000 years after facility closure. Since TRU waste was first received at the WIPP in 1999, compliance recertification applications (CRAs) have been required by the EPA on five-year cycle. The latest CRA (CRA-2014) was submitted by the DOE to the EPA in 2014. As part of the application, a formal set of PA calculations (CRA-2014 PA) was performed and results were documented in detail. The CRA-2014 PA incorporated several parameter updates based on new data, as well as the implementation of a different model for panel closures, barriers planned for the opening of each waste panel. The results presented as part of the CRA-2014 showed via the required complementary cumulative distribution function (CCDF) release curves that the estimated releases were within compliance limits. As part of their process for reviewing the completeness of the CRA-2014 [1], the EPA formally requested that the DOE perform sensitivity studies based on EPA-requested changes to model parameters. The DOE performed and documented the results of three sensitivity studies described below: CRA14-SEN2 [2], CRA14-SEN3 [3], and CRA14-SEN4 [4]. In each case, the new analysis results were compared to CRA- 2014 PA (CRA14) results to determine the impact of the EPA-requested changes. CRA14-SEN2: the application of EPA-requested modified parameters in the operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model resulted in increased pressures and decreased brine saturations in waste areas and increased pressures and brine saturations in the operations and experimental areas. However, the overall effects on total high-probability mean releases from the repository were entirely insignificant. It was concluded that the modeling assumptions associated with the operations and experimental areas of the repository have an insignificant effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN3: the application of EPA-requested modified parameters in the panel closure areas and operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model predominantly result in increased pressures and decreased brine saturations in waste areas, increased pressures and brine saturations in the operations and experimental areas, and decreased brine and gas flows across all panel closures. The pressure increases in repository waste regions yielded slightly decreased brine saturations (on average) in those areas. However, the overall effects on total high-probability mean releases from the repository are entirely insignificant. It was concluded that the modeling assumptions made for this sensitivity study which were associated with the panel closures and north end areas of the repository have only a small effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN4: the application of several changes to the current WIPP PA model (CRA14), including: parameter changes, use of an updated code, and a revised computational grid for the BRAGFLO code. The modifications to the repository model resulted in increased releases in all primary release mechanisms. The impacts of each EPA-requested change to CRA14 were analyzed with respect to each release mechanism in the CRA14-SEN4 study. Overall, total high-probability predicted mean releases from the repository were increased by about 15%. Total low-probability predicted mean releases were increased by about 107%. It was concluded that the EPA-requested changes to the CRA14 result in increases to the predicted total releases from the repository. However, releases calculated in the CRA14-SEN4 analysis remained below regulatory limits, demonstrating continued compliance of the WIPP. In January 2017, the EPA determined that CRA-2014 was complete and then began a technical evaluation of CRA-2014 to determine whether the WIPP continued to comply with the radiation protection standards for disposal. During their evaluation, the EPA utilized the sensitivity study results to inform their ultimate determination in July 2017 that the WIPP continues to comply with regulatory standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Code for Photocathode Design

The Phase I activity demonstrated that PhotoQE could be upgraded and modified to allow input using a graphical user interface. Specific calls to platform-dependent (e.g. IMSL) function calls were removed, and Fortran77 components were rewritten for Fortran95 compliance. The subroutines, specifically the common block structures and shared data parameters, were reworked to allow the GUI to update material parameter data, and the system was targeted for desktop personal computer operation. The new structures overcomes the previous rigid and unmodifiable library structures by implementing new, materials library data sets and repositioning the library values to external files. Material data may originate from published literature or experimental measurements. Further optimization and restructuring would allow custom and specific emission models for beam codes that rely on parameterized photoemission algorithms. These would be based on simplified and parametric representations updated and extended from previous versions (e.g., Modified Fowler-Dubridge, Modified Three-Step, etc.).

43 PARTICLE ACCELERATORS↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated offsite doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL Richland Campus) and in Sequim, Washington, (PNNL Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in 2017.

61 RADIATION PROTECTION AND DOSIMETRY↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H↗

Capturing Energy-Saving Opportunities: Improving Building Efficiency in Rajasthan through Energy Code Implementation

India adopted the Energy Conservation Building Code (ECBC) in 2007. Rajasthan is the first state to make ECBC mandatory at the state level. In collaboration with Malaviya National Institute of Technology (MNIT) Jaipur, Pacific Northwest National Laboratory (PNNL) has been working with Rajasthan to facilitate the implementation of ECBC. This report summarizes milestones made in Rajasthan and PNNL's contribution in institutional set-ups, capacity building, compliance enforcement and pilot building construction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗