Search NASASearch

SEARCH · Search NASA

Results for “first principles”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

438 records · Page 25

ARCTRON: A Rapid Experimental Proving Ground for TPS Experiments and Arcjet Technology Development

Innovation in high-enthalpy facilities is fundamentally limited by the cost and risk of experimentation. New concepts for plasma control, diagnostics, facility components, and plasma-material interaction often require repeated iterations that are impractical to perform in production arcjets. As a result, promising ideas may remain unexplored or reach operational facilities only after significant development effort. ARCTRON is being developed as a rapid experimental proving ground where new ideas in plasma science, arcjet engineering, diagnostics, and material response can be conceived, tested, and quantitatively evaluated before transition to large-scale facilities. The platform combines radio-frequency (RF) and DC arc plasma generation, externally applied magnetic fields, configurable gas composition, reduced-pressure operation, laser heating, electrical biasing, and modular diagnostic access. These capabilities permit the plasma source, applied forcing, test article, and measurement configuration to be modified independently, allowing individual physical mechanisms to be isolated more readily than in a traditional test environment. One class of investigations addresses fundamental plasma-surface interaction physics. Conventional material tests often expose a specimen simultaneously to convective heating, reactive species, pressure, shear, radiation, and surface-current effects. The resulting material response may be measured accurately, while the contribution of each mechanism remains difficult to identify. ARCTRON is designed to vary these effects selectively. Plasma chemistry can be changed independently through configurable gas mixtures; magnetic fields and electrical biasing can modify charged-particle transport; laser heating can provide a non-plasma thermal input; and pressure, flow, and discharge mode can be varied over a broad operating space. This enables controlled tests of hypotheses involving surface catalycity, reactive-species transport, plasma-assisted oxidation, electromagnetic effects, shear, and the relative contributions of thermal and chemical loading. A second class of investigations enabled by this approach concerns the engineering of high-enthalpy facilities themselves. Arc-heated facilities are limited by electrode erosion, unstable arc attachment, localized heating, and damage to nozzles and other plasma-facing components. ARCTRON provides a lower-cost environment for testing concepts intended to mitigate these limitations. Candidate investigations include the use of applied magnetic fields to alter current paths and reduce plasma interaction with nozzle walls, ExB forcing to introduce controlled plasma rotation, magnetic or geometric approaches for distributing arc attachment, and alternative electrode or discharge configurations intended to reduce erosion and improve stability. Because the platform is reconfigurable, these concepts can be evaluated through repeated design--build--test cycles before they are considered for implementation in operational facilities. The platform also supports the development and validation of diagnostics that may be difficult to introduce initially into a large arcjet. Current and planned measurements include spatially resolved optical emission spectroscopy, electrostatic probes, fast imaging, pyrometry, calorimetry, laser-induced fluorescence, and absorption spectroscopy. These diagnostics are intended not merely to document a nominal operating condition, but to constrain the local plasma state and its relationship to component or material response. The modular facility geometry allows diagnostic concepts to be tested, calibrated, and compared under repeatable conditions before deployment in more demanding environments. ARCTRON is also supported by an integrated software suite. Automated control and data acquisition allow discharge parameters, gas composition, magnetic fields, diagnostic timing, and test configuration to be recorded as part of each experiment (STARDAC - Software for Testing, Analysis, Research Data, and Control). The Backend for Experiment Analysis, Storage, and Traceability (BEAST) is a database that provides the infrastructure needed to associate heterogeneous measurements with facility configuration, specimen identity, calibration state, geometry, and analysis provenance. This backend is particularly important for exploratory campaigns, in which many related configurations may be tested, and the value of an individual experiment depends on its connection to earlier and subsequent iterations. Complementary analysis capabilities, including computer-vision-based transient response measurements (arcjetCV), three-dimensional surface reconstruction (STARSCAN), and model-based Bayesian inference (SHIELD), and tomography data analysis (TOMATO, PuMA) can be incorporated when required by a specific hypothesis without becoming the focus of every campaign. The central objective of ARCTRON is therefore not to maximize heat flux or reproduce a complete flight environment. Its purpose is to reduce the cost and time required to ask consequential questions about plasma behavior, plasma-facing materials, diagnostics, and arcjet technology. By providing a controlled environment for rapid reconfiguration, mechanism isolation, quantitative measurement, and iterative engineering, ARCTRON can help mature concepts that would otherwise remain too speculative or too risky for evaluation in production facilities. The resulting knowledge can then guide the design of material models, focus test objectives in larger arcjets, reduce facility-development risk, and improve the physical basis of high-enthalpy ground testing. This work will present the ARCTRON architecture, operating modes, diagnostic suite, and digital experimental workflow. Initial experimental results from the first integrated operation of the facility will be presented, including flow characterization, power limitations, and deployment of the initial diagnostic suite. Ongoing development efforts aimed at catalycity characterization, magnetic plasma control, and advanced optical diagnostics will also be discussed, illustrating how the platform supports rapid iteration from concept to experiment.

experimental diagnostics

ARCTRON: A Rapid Experimental Proving Ground for TPS Experiments and Arcjet Technology Development

Innovation in high-enthalpy facilities is fundamentally limited by the cost and risk of experimentation. New concepts for plasma control, diagnostics, facility components, and plasma-material interaction often require repeated iterations that are impractical to perform in production arcjets. As a result, promising ideas may remain unexplored or reach operational facilities only after significant development effort. ARCTRON is being developed as a rapid experimental proving ground where new ideas in plasma science, arcjet engineering, diagnostics, and material response can be conceived, tested, and quantitatively evaluated before transition to large-scale facilities. The platform combines radio-frequency (RF) and DC arc plasma generation, externally applied magnetic fields, configurable gas composition, reduced-pressure operation, laser heating, electrical biasing, and modular diagnostic access. These capabilities permit the plasma source, applied forcing, test article, and measurement configuration to be modified independently, allowing individual physical mechanisms to be isolated more readily than in a traditional test environment. One class of investigations addresses fundamental plasma-surface interaction physics. Conventional material tests often expose a specimen simultaneously to convective heating, reactive species, pressure, shear, radiation, and surface-current effects. The resulting material response may be measured accurately, while the contribution of each mechanism remains difficult to identify. ARCTRON is designed to vary these effects selectively. Plasma chemistry can be changed independently through configurable gas mixtures; magnetic fields and electrical biasing can modify charged-particle transport; laser heating can provide a non-plasma thermal input; and pressure, flow, and discharge mode can be varied over a broad operating space. This enables controlled tests of hypotheses involving surface catalycity, reactive-species transport, plasma-assisted oxidation, electromagnetic effects, shear, and the relative contributions of thermal and chemical loading. A second class of investigations enabled by this approach concerns the engineering of high-enthalpy facilities themselves. Arc-heated facilities are limited by electrode erosion, unstable arc attachment, localized heating, and damage to nozzles and other plasma-facing components. ARCTRON provides a lower-cost environment for testing concepts intended to mitigate these limitations. Candidate investigations include the use of applied magnetic fields to alter current paths and reduce plasma interaction with nozzle walls, ExB forcing to introduce controlled plasma rotation, magnetic or geometric approaches for distributing arc attachment, and alternative electrode or discharge configurations intended to reduce erosion and improve stability. Because the platform is reconfigurable, these concepts can be evaluated through repeated design--build--test cycles before they are considered for implementation in operational facilities. The platform also supports the development and validation of diagnostics that may be difficult to introduce initially into a large arcjet. Current and planned measurements include spatially resolved optical emission spectroscopy, electrostatic probes, fast imaging, pyrometry, calorimetry, laser-induced fluorescence, and absorption spectroscopy. These diagnostics are intended not merely to document a nominal operating condition, but to constrain the local plasma state and its relationship to component or material response. The modular facility geometry allows diagnostic concepts to be tested, calibrated, and compared under repeatable conditions before deployment in more demanding environments. ARCTRON is also supported by an integrated software suite. Automated control and data acquisition allow discharge parameters, gas composition, magnetic fields, diagnostic timing, and test configuration to be recorded as part of each experiment (STARDAC - Software for Testing, Analysis, Research Data, and Control). The Backend for Experiment Analysis, Storage, and Traceability (BEAST) is a database that provides the infrastructure needed to associate heterogeneous measurements with facility configuration, specimen identity, calibration state, geometry, and analysis provenance. This backend is particularly important for exploratory campaigns, in which many related configurations may be tested, and the value of an individual experiment depends on its connection to earlier and subsequent iterations. Complementary analysis capabilities, including computer-vision-based transient response measurements (arcjetCV), three-dimensional surface reconstruction (STARSCAN), and model-based Bayesian inference (SHIELD), and tomography data analysis (TOMATO, PuMA) can be incorporated when required by a specific hypothesis without becoming the focus of every campaign. The central objective of ARCTRON is therefore not to maximize heat flux or reproduce a complete flight environment. Its purpose is to reduce the cost and time required to ask consequential questions about plasma behavior, plasma-facing materials, diagnostics, and arcjet technology. By providing a controlled environment for rapid reconfiguration, mechanism isolation, quantitative measurement, and iterative engineering, ARCTRON can help mature concepts that would otherwise remain too speculative or too risky for evaluation in production facilities. The resulting knowledge can then guide the design of material models, focus test objectives in larger arcjets, reduce facility-development risk, and improve the physical basis of high-enthalpy ground testing. This work will present the ARCTRON architecture, operating modes, diagnostic suite, and digital experimental workflow. Initial experimental results from the first integrated operation of the facility will be presented, including flow characterization, power limitations, and deployment of the initial diagnostic suite. Ongoing development efforts aimed at catalycity characterization, magnetic plasma control, and advanced optical diagnostics will also be discussed, illustrating how the platform supports rapid iteration from concept to experiment.

experimental diagnostics

Preliminary Assessment of the Impact on the V-Band Oxygen Channels From Satellite Communication Uplinks

We calculate the percentage of time that an ATMS-like instrument [1] will be illuminated by the uplink beam of one of the proposed V-band communication system and estimate the damage resulting from such exposure. Using a combination of openly available information and educated guesses about the location and characteristics of the up/down link terminals, we constructed the ground segment of a hypothetical high-speed communication network. The space segment of the network was constructed from the orbital data of the existing Starlink constellation [2] of 6223 communication satellites (comsats) which is used as strawman to represent any other possible constellation of communication satellites. It is shown that without a very delicate balance of frequency allocations (science vs telecommunications), coupled with extremely steep and deep bandpass-defining filters, and strict adherence to the agreed limits (i.e. no out-of-band transmissions) the deployment of the telecommunication network leads to almost-complete loss of some important geophysical data. For the analysis we use the spectral characteristics of the ATMS instrument with the ephemeris for the NOAA-21 satellite [3]. The analysis is conducted for the USA and the simulation covers 8 consecutive days in July 2024. Effective and accurate microwave remote sensing of the atmosphere depends on the availability of interference-free spectrum windows at frequencies which are prescribed by physical processes [e.g. 4]. The family of resonant lines of the oxygen molecule near 60 GHz provides a unique opportunity to sample the vertical distribution of temperature and density from space, and it has been exploited for weather and climate studies from polar-orbiting satellites since 1978 (MSU on TIROS-N [5]). It remains a staple in the payloads operated by Russia, China, USA, Japan, France, India, UK, Ukraine [6] which are built around a common blueprint: a few wide-band (hundreds of MHz) channels around 50 GHz to sample the atmosphere and the surface while several more channels with high spectral resolution (few MHz) sample the individual resonant lines. Accurate retrieval of the environmental parameters depends upon the data provided by both sets of channels, and the their location in frequency space is not arbitrary and cannot be altered at will [7, 8]. The introduction of 5G technology in 2019 has driven telecommunication companies to request more bandwidth to be dedicated to their devices. This additional bandwidth is only available in spectral regions traditionally reserved for environmental and astrophysical research, such as the V-band between 50 and 60 GHz for up/downlink between satellites in low-earth orbits and terminals connected to fiberoptics network for distribution to high-speed local internet services. The power broadcast by the uplink communication leg is many orders of magnitude greater than the natural thermal signal emitted from the Earth scene. If the ground antenna were to perfectly align with the passive instrument’s antenna, the spaceborne receiver would suffer permanent, irreparable damage. While a direct boresight-to-boresight conjunction is extremely unlikely (even with a large constellation of satellites the fraction of the celestial sphere occupied by the satellites remains minuscule) the finite size of the ground station’s antenna beam in the sky suggests that the ATMS will be in the near background (as seen from the ground station) of one of the communication satellites and will be illuminated by either the main lobe or the near sidelobes of the uplink antenna more often than it is desirable. For our analysis we first calculate the position of the ATMS with respect to each of the ground stations at a resolution of 0.2 sec, then calculate the position of each of the comsats which are at least 25 deg above the station’s local horizon; finally we calculate the angle between the line-of-sight of the ATMS and the line-of-sight of the comsat. We assume that the gain pattern of the ground station is circularly symmetric; the angle-off-station-boresight then provides an attenuation of the uplink power which we use to assess the likely effect upon the passive instrument’s operations. We assume that each ground station can communicate with all the comsats in its field of view; this implies that, on average, a ground station can engage with 46 comsats simultaneously. The analysis is repeated for the case when the uplink broadcast within the ATMS passive channels (in-band scenario) and for the case when the uplink is limited to frequencies adjacent to the ATMS channels (out-of-band scenario). The antenna of the ground station is modelled as having a HPBW (Half-Power Beam Width) of 0.16 deg and EIRP (Equivalent Isotropic Radiated Power) of 70 dBW. We account for the geometric dissipation of the signal caused by the satellite orbital altitude, the attenuation induced by atmospheric gasses at 51 GHz and the mismatch between the circular polarization of the ground-based transmitting antenna and the linear polarization of the satellite-borne receiving antenna. The damages on ATMS are estimated from bench-level measurement conducted at the ATMS’ manufacturer facilities [unpublished].

passive microwave

Evidence for large baryonic feedback at low and intermediate redshifts from kinematic Sunyaev-Zel’dovich observations with ACT and DESI photometric galaxies

Recent advances in cosmological observations have provided an unprecedented opportunity to investigate the distribution of baryons relative to the underlying matter. In this work, we show that the gas is more extended than the dark matter, and the amount of baryonic feedback at $z \lesssim 1$ disfavors low-feedback models such as that of state-of-the-art hydrodynamical simulation IllustrisTNG compared with high-feedback models such as that of the original Illustris simulation. This has important implications for bridging the gap between theory and observations and understanding galaxy formation and evolution. Furthermore, a better grasp of the baryon-dark matter link is critical to future cosmological analyses, which are currently impeded by our limited knowledge of baryonic feedback. Here, we measure the kinematic Sunyaev-Zel'dovich (kSZ) effect from the Atacama Cosmology Telescope (ACT), stacked on the luminous red galaxy (LRG) sample of the Dark Energy Spectroscopic Instrument (DESI) imaging survey. This is the first analysis to use photometric redshifts for reconstructing galaxy velocities. Due to the large number of galaxies comprising the DESI imaging survey, this is the highest signal-to-noise stacked kSZ measurement to date: we detect the signal at 13$σ$, finding strong evidence that the gas is more spread out than the dark matter, as well as a preference for larger feedback compared to some commonly used state-of-the-art hydrodynamical simulations. Here, our work opens up the possibility of recalibrating large hydrodynamical simulations using the kSZ effect. In addition, our findings highlight the importance of properly accounting for baryonic feedback with future surveys such as LSST through direct probes such as the kSZ, and shed light on long-standing enigmas in astrophysics, such as the “missing baryon” problem.

79 ASTRONOMY AND ASTROPHYSICS

Reconstruction of cosmic-ray muon events with CUORE

We report the in-situ 3D reconstruction of through-going muons in the CUORE experiment, a cryogenic calorimeter array searching for neutrinoless double beta (0vββ) decay, leveraging the segmentation of the detector. Due to the slow time response of the detector, time-of-flight estimation is not feasible. Therefore, the track reconstruction is performed using a multi-objective optimization algorithm that relies on geometrical information from the detector as a whole. We measure the integral flux of cosmic-ray muons underground at the Laboratori Nazionali del Gran Sasso, and find our value to be in good agreement with other experiments that have performed a similar measurement. To our knowledge, this work represents the first demonstration of 3D particle tracking and reconstruction of through-going muons with per-event angular determination in a millikelvin cryogenic detector array. The analysis performed for this work will be critical for validating the muon-related background in CUPID, a next-generation 0vββ experiment, and for follow-up studies on detector response and on delayed products induced by cosmic-ray muons.

Adams, D. Q. [University of South Carolina]

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI