Search NASA⌕ Search

SEARCH · Search NASA

Results for “operator decision support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Long Term Integration and Implementation of ATD-2 Phase 3 Capabilities

Topics include review of recommendations from an earlier Surface CDM (Collaborative Decision Making) Team (SCT) & Flow Evaluation Team (FET) meeting, support of alternative work flows, and software integration in operational systems. The briefing also identifies incorporation of ATD-2 Phase 3 capabilities into the alternative work flows.

ATD-2, IADS↗

Upgrading Fermilab’s accelerator control system with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗

A Community Energy Operations and Planning System: Concept, Use cases, Metrics, and Benefits

Community and city leaders are interested in achieving sustainability goals, providing resilient energy infrastructure, and improving economic competitiveness. Community-level data acquisition and analysis can provide energy and associated benefits that are not possible at the single building level. However, there is a lack of organizational structure, common semantic data models, interoperable systems, and methods to support data-driven decision-making for community-scale energy supply and demand systems. We explored the need and opportunity for a Community Energy Operations and Planning System (Community EOPS), a potential data exchange platform. We conducted “customer discovery” interviews, and reviewed literature, public tools, and technology platforms to identify key energy data “users” and use cases in communities. The key users of the Community EOPS could be developers of mixed-use districts, corporate, defense and university campus energy managers, and city managers of cities that own their energy utility. The value could be for community planning and reporting (for energy data-integrated land use planning and community infrastructure investments in microgrids, storage, district heating and cooling), energy efficiency (leveraging optimizations for community scale energy supply and demand), flexible load management (grid-edge load management to offset, shift, and flatten loads for multiple buildings and EV fleets), cost savings and revenue generation (participating in grid services), and social benefits such as energy resilience, equity, and awareness. We developed a conceptual Community EOPS architecture with recommendations for streamlined and prioritized data acquisition, sharing, and integration driven by prioritized use cases, common metrics, and actionable visualizations that can provide value to a community’s users.

Singh, Reshma↗

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

Space Technology - Game Changing Development NASA Facts: Autonomous Medical Operations

The AMO (Autonomous Medical Operations) Project is working extensively to train medical models on the reliability and confidence of computer-aided interpretation of ultrasound images in various clinical settings, and of various anatomical structures. AI (Artificial Intelligence) algorithms recognize and classify features in the ultrasound images, and these are compared to those features that clinicians use to diagnose diseases. The acquisition of clinically validated image assessment and the use of the AI algorithms constitutes fundamental baseline for a Medical Decision Support System that will advise crew on long-duration, remote missions.

Autonomous Medical Operations Project↗

Source Data Applicability Impacts on Epistemic Uncertainty for Launch Vehicle Fault Tree Models

Launch vehicle systems are designed and developed using both heritage and new hardware. Design modifications to the heritage hardware to fit new functional system requirements can impact the applicability of heritage reliability data. Risk estimates for newly designed systems must be developed from generic data sources such as commercially available reliability databases using reliability prediction methodologies, such as those addressed in MIL-HDBK-217F. Failure estimates must be converted from the generic environment to the specific operating environment of the system where it is used. In addition, some qualification of applicability for the data source to the current system should be made. Characterizing data applicability under these circumstances is crucial to developing model estimations that support confident decisions on design changes and trade studies. This paper will demonstrate a data-source applicability classification method for assigning uncertainty to a target vehicle based on the source and operating environment of the originating data. The source applicability is determined using heuristic guidelines while translation of operating environments is accomplished by applying statistical methods to MIL-HDK-217F tables. The paper will provide a case study example by translating Ground Benign (GB) and Ground Mobile (GM) to the Airborne Uninhabited Fighter (AUF) environment for three electronic components often found in space launch vehicle control systems. The classification method will be followed by uncertainty-importance routines to assess the need to for more applicable data to reduce uncertainty.

Al Hassan, Mohammad↗

Orbit determination support for Hiten's aerobraking in the Earth's atmosphere

Two passes of the ISAS (Japan's Institute of Space and Astronautical Science) Hiten spacecraft through the Earth's atmosphere, at perigee altitudes of 125 km and 120 km, during Mar. 1991 marked the first aerobraking technology demonstrations for an object in cis-lunar orbit traveling at near Earth escape velocity. Prediction and control of perigee altitude to better than 1 km was desired to assure spacecraft survival. Covariance analysis provided confidence that prediction accuracy better than 200 m for support of final trim maneuver design was achievable with NASA DSN (Deep Space Network) tracking support. ISAS used orbit determination results in their decisions to cancel final trim maneuvers. Post flight reconstructions, marking the first combined use of DSN and ISAS tracking data, yielded perigee altitude solutions which agree with the near real time mission operations support predictions to better than 50 m.

Efron, L.↗

Exploration Technologies for Operations

Although the International Space Station (ISS) assembly has been completed, the Operations support teams continue to seek more efficient and effective ways to prepare for and conduct the ISS operations and future exploration missions beyond low earth orbit. This search for improvement has led to a significant collaboration between the NASA research and advanced software development community at NASA Ames Research Center and the Mission Operations community at NASA Johnson Space Center. Since 2001, NASA Ames Research Center has been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for several of the unmanned Mars missions operations. Since 2006, NASA Ames Research Center has also been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for manned operations support with the Mission Operations Directorate at NASA Johnson Space Center. This paper discusses the completion of the development and deployment of a variety of intelligent and human systems technologies adopted for manned mission operations. The technologies associated with the projects include advanced software systems for operations and human-centered computing. Human-centered computing looks to the processes and procedures that people do to perform any given job, then attempts to identify opportunities to improve these processes and procedures. In particular, for mission operations, improvements are quantified by specifically identifying how a tool can increase a persons efficiency, enhance a persons functional capability, andor improve the assurance of a persons decisions. The Ames development team has collaborated with the Mission Operations team to identify areas of efficiencies through technology infusion applications in support of the Plan, Train, and Fly activities of human-spaceflight mission operations. The specific applications discussed in this paper are in the areas of mission planning systems, mission operations design modeling and workflow automation, advanced systems monitoring, mission control technologies, search tools, training management tools, spacecraft solar array management, spacecraft power management, and spacecraft attitude planning. We discuss these specific projects between the Ames Research Center and the Johnson Space Centers Mission Operations Directorate, and how these technologies and projects are enhancing the mission operations support for the International Space Station. We also discuss the challenges, problems, and successes associated with long-distance and multi-year development projects between the research team at Ames and the Mission Operations customers at Johnson Space center. Finally, we discuss how these technology infusion applications and underlying technologies might be used in the future to support on-board operations of the crew and spacecraft systems as human exploration expands beyond low earth orbit to destinations in the solar system where communications delays will require more on-board autonomy and planning by the crew. Longer communications delays will require that the ground mission operations support will be primarily strategic in nature, while the tactical level of planning, systems monitoring and control, and failure analysisisolationrecovery will be the responsibility of both the spacecraft autonomous systems and the crew. Our expectation is that the technologies

mission operations↗

Framework for a space shuttle main engine health monitoring system

A framework developed for a health management system (HMS) which is directed at improving the safety of operation of the Space Shuttle Main Engine (SSME) is summarized. An emphasis was placed on near term technology through requirements to use existing SSME instrumentation and to demonstrate the HMS during SSME ground tests within five years. The HMS framework was developed through an analysis of SSME failure modes, fault detection algorithms, sensor technologies, and hardware architectures. A key feature of the HMS framework design is that a clear path from the ground test system to a flight HMS was maintained. Fault detection techniques based on time series, nonlinear regression, and clustering algorithms were developed and demonstrated on data from SSME ground test failures. The fault detection algorithms exhibited 100 percent detection of faults, had an extremely low false alarm rate, and were robust to sensor loss. These algorithms were incorporated into a hierarchical decision making strategy for overall assessment of SSME health. A preliminary design for a hardware architecture capable of supporting real time operation of the HMS functions was developed. Utilizing modular, commercial off-the-shelf components produced a reliable low cost design with the flexibility to incorporate advances in algorithm and sensor technology as they become available.

Hawman, Michael W.↗

Denver TMA assessment

This report describes the assessment of the Traffic Management Advisor (TMA) conducted at the Denver Center and TRACON, January 11-February 5, 1993. The assessment addressed the effectiveness of TMA for supporting various traffic management activities. At the Center, traffic management coordinators (TMC's) shadowed traffic operations, using TMA to make metering time and internal release decisions. At the TRACON, TMC's accessed TMA in an advisory mode for different planning activities such as staffing, distributing the traffic load, and changing the airport acceptance rate. These different opportunities for assessing TMA provide insight into TMA as a potential communication aid and planning tool. Findings from this assessment indicate that TMA can be used to support traffic management planning and decisions. TMC's at the center were able to use information provided by TMA to determine metering times as well as internal release times. At the TRACON, TMA supported decisions on airport configuration, airport acceptance rate, load distribution, proactive coordination with the center, and staffing. While findings of TMA use are generally positive, it must be kept in mind that this assessment is a snapshot in time. Not all TMA capabilities were assessed, nor were TMC's fully trained and knowledgeable on all features. Feature use will continue to evolve and strategies emerge as the TMC's gain experience with TMA over a variety of traffic situations and their understanding of TMA capabilities broadens with continued training.

Harwood, Kelly↗

The reusable Space Shuttle Main Engine prepares for long life

Attention is given to Space Shuttle Main Engine (SSME) life extension and logistical systems that support launch and ground operations. The operations and maintenance tasks involved in this aspect of SSME development include turnaround requirements, ground support equipment, and control documentation. A discussion is presented on the spare parts provisioning system, which emphasizes the source of decision-making data and encompasses the hardware tracking system, usage data from ground testing and launch operations, and current and projected life limits. The life extension test program leads the launch program, offering comfortable life limit margins. Planned overhauls for the extension of useful hardware life beyond the 55-mission requirement, a turnabout improvement program, and a continuous training program contribute to launch cost reductions, reliable operations, and long life.

Klatt, F. P., Jr.↗

Flight Deck Robustness/Conformance Testing with a Surface Management System: An Integrated Pilot-Controller Human-in-the-Loop Surface Operations Simulation

An integrated flight deck and controller human-in-the-loopsimulation was conducted with a total of 120 Dallas-Ft.Worth (DFW) taxi-out operations. In this first integratedPilot-Controller Spot and Runway Departure Advisor(SARDA) simulation, ATC Ground and Local Controllersused the SARDA decision support tool to plan and issuespot release clearances and departure clearances. TheAirport and Terminal Area Simulator (ATAS), a simulatedB737NG piloted, in turn, by 10 commercial transportparticipant pilots, was integrated into the realisticsimulation traffic environment. In the simulation,controllers used SARDA advisories to issue spot release,taxi route, and runway/departure radio voice clearances toall aircraft on the airport surface. Simulation resultsindicated that under a variety of observed pilot/aircraftperformance variations, SARDA yielded controlleradvisories that were: Supportive of current-day time-basedoperations; Compatible with controllers’ expectations;Predictive of actual take-off times; and, Adaptable to offnominalevents. An Information Sharing Display, thatpresented SARDA sequence and timing information on theflight deck, was considered useful for both NextGenoperations and current-day time-based Traffic ManagementInitiative (TMI) operations.

Foyle, David C.↗

A path to intelligent watersheds: coordinating the data to decision pipeline

Operations of multi-reservoir systems are challenged in-part by the interplay of complex physical processes functioning within the watershed. The employment of intelligent systems can be of aid by linking environmental sensing, information technology, data analytics, simulation and decision support to achieve a data-to-decision flow of information. A further challenge is that watershed resources are managed for multiple purposes requiring some level of coordination among numerous resource managers, asset operators and users. System intelligence in this context relies on shared community platforms (data portals, community models), and coordinated communication between decision makers. Opportunities to enrich watershed intelligence has been the subject of a roadmapping exercise for the Department of Energy’s Water Power Technologies Office which has relied on broad stakeholder engagement. Initial phases of engagement involved personal interviews and a series of virtual group meetings, which focused on identifying opportunities to improve the intelligence of the physical infrastructure within our watersheds—examples of feedback include improved sensing of snowpack and runoff, data standards for facilitated data sharing, and better forecasting tools. The latter phase of engagement involved the conduct of a case study in the Upper Colorado River basin where key stakeholders were interviewed to map how their decisions are informed by intelligence from other basin stakeholders. Our presentation will highlight the interdisciplinary flow of information in complex watershed systems and identify physical and institutional opportunities toward the strategic operation of water infrastructure.

Colorado River↗

Refinements in the Design of the Ares V Cargo Launch Vehicle for NASA's, Exploration Strategy

NASA is developing a new launch vehicle fleet to fulfill the national goals of replacing the shuttle fleet, completing the International Space Station (ISS), and exploring the Moon on the way to eventual exploration of Mars and beyond. Programmatic and technical decisions during early architecture studies and subsequent design activities were focused on safe, reliable operationally efficient vehicles that could support a sustainable exploration program. A pair of launch vehicles was selected to support those goals the Ares I crew launch vehicle and the Ares V cargo launch vehicle. They will be the first new human-rated launch vehicles developed by NASA in more than 30 years (Figure 1). Ares I will be the first to fly, beginning space station ferry operations no later than 2015. It will be able to carry up to six astronauts to ISS or support up to four astronauts for expeditions to the moon. Ares V is scheduled to be operational in the 2020 timeframe and will provide the propulsion systems and payload to truly extend human exploration beyond low-Earth orbit. (LEO).

Creech, Steve↗

AI-Science for Performance Optimization and Diagnosis of Science Instrument Federations

Next generation of science workflows are expected to be executed over complex federations composed of supercomputers, science instruments, storage systems and networks, with new additions of the edge and cloud systems and services. The sheer complexity of these multi-domain federations makes it hard to manage them and optimize their performance, as small impedance mismatches (that can dynamically develop between systems) could drastically degrade the entire federation performance. Recent proliferation of Software Defined Everything (SDX) technologies combined with containerization frameworks provide custom instruments that can monitor and collect critical measurements at various levels to support diagnoses and performance optimization; but their data too enormous for human operators and analysts to process and generate decisions. Machine Learning (ML) methods that extract critical parameters, relationships and trends from the data offer general solutions. Artificial Intelligence (AI) and ML methods must be custom-developed for these problems based on solid, rigorous foundations, since black-box approaches are often ineffective and unsound.We propose to develop comprehensive AI-Science for the performance of science federations to (i) monitor and control storage, networks, experiments, and computing systems across multiple domains via softwarization layers, at speeds and scales orders of magnitude superior to current practice, (ii) optimally realize and orchestrate complex workflows with high performance by using dynamic state and performance estimation methods, and (iii) aggregate measurements across sites and time to develop infrastructure-level profiles, optimizations and diagnoses using AI-Science based on foundational principles from ML, game theory, and information fusion areas.

Rao, Nageswara↗

Post-Shuttle EVA Operations on ISS

The EVA hardware used to assemble and maintain the ISS was designed with the assumption that it would be returned to Earth on the Space Shuttle for ground processing, refurbishment, or failure investigation (if necessary). With the retirement of the Space Shuttle, a new concept of operations was developed to enable EVA hardware (EMU, Airlock Systems, EVA tools, and associated support equipment and consumables) to perform ISS EVAs until 2016 and possibly beyond to 2020. Shortly after the decision to retire the Space Shuttle was announced, NASA and the One EVA contractor team jointly initiated the EVA 2010 Project. Challenges were addressed to extend the operating life and certification of EVA hardware, secure the capability to launch EVA hardware safely on alternate launch vehicles, and protect EMU hardware operability on orbit for long durations.

West, Bill↗

Source Data Impacts on Epistemic Uncertainty for Launch Vehicle Fault Tree Models

Launch vehicle systems are designed and developed using both heritage and new hardware. Design modifications to the heritage hardware to fit new functional system requirements can impact the applicability of heritage reliability data. Risk estimates for newly designed systems must be developed from generic data sources such as commercially available reliability databases using reliability prediction methodologies, such as those addressed in MIL-HDBK-217F. Failure estimates must be converted from the generic environment to the specific operating environment of the system in which it is used. In addition, some qualification of applicability for the data source to the current system should be made. Characterizing data applicability under these circumstances is crucial to developing model estimations that support confident decisions on design changes and trade studies. This paper will demonstrate a data-source applicability classification method for suggesting epistemic component uncertainty to a target vehicle based on the source and operating environment of the originating data. The source applicability is determined using heuristic guidelines while translation of operating environments is accomplished by applying statistical methods to MIL-HDK-217F tables. The paper will provide one example for assigning environmental factors uncertainty when translating between operating environments for the microelectronic part-type components. The heuristic guidelines will be followed by uncertainty-importance routines to assess the need for more applicable data to reduce model uncertainty.

Al Hassan, Mohammad↗

PHM Enabled Autonomous Propellant Loading Operations

The utility of Prognostics and Health Management (PHM) software capability applied to Autonomous Operations (AO) remains an active research area within aerospace applications. The ability to gain insight into which assets and subsystems are functioning properly, along with the derivation of confident predictions concerning future ability, reliability, and availability, are important enablers for making sound mission planning decisions. When coupled with software that fully supports mission planning and execution, an integrated solution can be developed that leverages state assessment and estimation for the purposes of delivering autonomous operations. The authors have been applying this integrated, model-based approach to the autonomous loading of cryogenic spacecraft propellants at Kennedy Space Center.

Walker, Mark↗