Search NASA⌕ Search

SEARCH · Search NASA

Results for “planner”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Fourth Quarter 2022)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2022 (Q4 2022) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with two different 2030 infrastructure requirement scenarios. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the twelfth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory (NREL) publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Universal Utility Data Exchange (UUDEX) – Security and Administration: Cybersecurity of Energy Delivery Systems (CEDS) Research and Development

A critical component of the Universal Utility Data Exchange (UUDEX) approach is the integrated security contained within its processing. This document describes how that security is designed and expected to be implemented by UUDEX Implementations (U-Implementations), including the UUDEX Server (U-Server) and UUDEX Clients (U-Clients). The UUDEX security hierarchy consists of three levels: 1. The UUDEX Instance (U-Instance) itself, which sits at the top of the hierarchy and contains the U-Server, the UUDEX Identity Authority (U-Identity Authority), and the UUDEX Administrator (U-Administrator) functions; 2. A group of one or more UUDEX Participants (U-Participants) that present “organizations” that participate in the U-Instance and contains the UUDEX Administrator Participant (U-U-Administrator Participant) function; 3. A group of one or more UUDEX Endpoints (U-Endpoints) that represent the individual UUDEX Publish Clients (U-Publish Client) responsible for supplying data to the U-Instance that is consumed by UUDEX Subscriber Clients (U-Subscriber Clients). U-Endpoints can be either autonomous devices that publish and subscribe data such as data exchange servers found in supervisory control and data acquisition and energy management systems, or they can be tied to users of applications that, for example, submit DOE OE-417 disturbance reports. U-Participants and U-Endpoints can be organized into UUDEX Groups (U-Groups). Any number of U-Participants or U-Endpoints can be members of a U-Group. A given U-Participant or U-Endpoint can be a member of multiple U-Groups, but a U-Group cannot contain other U-Groups. For example, a U-Group could be created to contain all U-Participant Transmission Operators within the purview of a Reliability Coordinator, and another U-Group could be created to contain all U-Participant Generator Operators within the purview of a Reliability Coordinator. U-Participants that are both Transmission Operators and Generator Operators would be members of both U-Groups. U-Participants, U-Endpoints, and U-Groups are used in the access control structures to provide access to individual UUDEX Subjects (U-Subjects). U-Groups are created by the U-Administrator and are managed by the U-Administrator or the designated U-Group Managers. U-Endpoints can be assigned UUDEX Roles (U-Roles) that can be used to further restrict access. U-Roles are assigned to individual U-Endpoints. For example, a U-Role of “Security Analyst” could be used to restrict which U-Endpoints can publish or subscribe security incident reports and vulnerability notifications, while a U-Role of “Transmission Planner” can be used to restrict which U-Endpoints can publish power system model updates. U-Role definitions are created by the U-Administrator, but the U-Roles are assigned to U-Endpoints by their respective UUDEX Participant Administrators (U-Participant Administrator). Because all information required to make security decisions is either included within the U-Endpoint’s X.509 digital certificate or stored in a datastore on the U-Server, all security decisions are performed and enforced within the U-Server. This reduces the complexity of the U-Client code and minimizes the chance for compromise of the integrity of the UUDEX security features.

97 MATHEMATICS AND COMPUTING↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (First Quarter 2023)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the first calendar quarter of 2023 by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with a 2030 infrastructure requirement scenario. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the thirteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Phase I Summary of Management Activities - Advanced Construction Technology Initiative Project

As the end of the year is approached, it is essential to review the National Reactor Innovation Center (NRIC) management activities undertaken during the Advanced Construction Technology Initiative (ACTI) project. The ACTI project was launched to support a transformation in nuclear energy construction, management, and deployment costs, enabling nuclear energy to make important contributions to the energy systems of the future. This transformation will increase the confidence of investors, energy system planners, policymakers, and ultimately consumers in the capability of nuclear energy to meet future needs; thus, it represents a critical element of advanced nuclear energy system demonstration. Development and/or demonstration project(s) will consider regulatory requirements for commercial nuclear implementation and will incorporate strategies to develop regulator experience and review of the technology. GE Hitachi (GEH), a leading player in the nuclear industry that offers a range of products and services including nuclear reactor design, fuel supply, and decommissioning solutions, submitted a proposal for the ACTI project. GEH was awarded the contract for the first phase of the project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessing and mapping extreme wave height along the Gulf of Mexico coast

The effect of extreme waves on the coastal community includes inundation, loss of habitats, increasing shoreline erosion, and increasing risks to coastal infrastructures (e.g., ports, breakwaters, oil and gas platforms), important for supporting coastal resilience. The coastal communities along the US Gulf of Mexico are very low-lying, which makes the region particularly vulnerable to impacts of extreme waves generated by storm events. We propose assessing and mapping the risks from extreme waves for the Gulf of Mexico coast to support coastal resiliency planning. The risks will be assessed by computing n-year recurring wave height (e.g., 1, 5, 50, 100-year) using 32-year wave hindcast data and various extreme value analysis techniques including Peak- Over-Threshold and Annual Maxima method. The characteristics of the extreme waves, e.g., relations between the mean and extreme wave climates, directions associated with extreme waves, will be investigated. Hazard maps associated with extreme wave heights at different return periods will be generated to help planners identify potential risks and envision places that are less susceptible to future storm damage.

54 ENVIRONMENTAL SCIENCES↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Second Quarter 2023

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the second calendar quarter of 2023 by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with a 2030 infrastructure requirement scenario. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the fourteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Energy Storage in Local Zoning Ordinances

Increasing policy support and declining prices for battery energy storage systems (BESS) are driving rapid growth in the installation of these systems in the United States and around the world. Because a BESS is modular in nature and has limited infrastructure requirements, it can be built in close proximity to existing uses, which creates the potential for conflict. As the use of BESS grows, local planning and zoning staff are increasingly being asked to determine where the systems can be built and how their impacts on surrounding uses can be mitigated. While a large-scale BESS offers significant electric grid and societal benefits, it can also pose safety, visual, auditory, and environmental impacts on the community in which it is located. While these are material impacts, current safety codes for energy storage systems and land use frameworks provide planners with the necessary tools and processes to mitigate those impacts and ensure that their communities safely receive the benefits of energy storage systems. This report provides an overview of BESS from a land use perspective and describes their implications for zoning and project permitting. It concludes with an analysis of current energy storage zoning standards adopted by local jurisdictions in the U.S. Its intent is to objectively inform land use decisions for energy storage projects by equipping planning officials with relevant information about these technologies and knowledge of what questions to ask during review processes, so that energy storage projects can move forward in ways that will benefit electric systems while not unduly affecting host communities.

25 ENERGY STORAGE↗

Assessing the Resource Adequacy and Community Impacts of an Evolving Grid: Considerations for State Regulators

As U.S. power systems continue to decarbonize, state regulators must be able to broadly assess the cost and reliability implications of proposed fossil retirements and the corresponding resources that are coming online to replace them. Specifically, regulators must evaluate whether proposed infrastructure investments are sufficient to ensure the long-term reliability of the system, while also protecting rate payers by ensuring that such investments are necessary and not excessive. Broadly speaking, this objective is typically framed in terms of maintaining long-term resource adequacy at the lowest cost, while also ensuring that other social and/or environmental objectives are satisfied. System planners currently have a host of sophisticated analytical tools at their disposal to evaluate the cost-benefit trade-offs of different approaches to ensuring resource adequacy. However, most of these tools and associated metrics were designed with traditional power systems in mind. Over the past decade, it has become increasingly clear that the metrics and models that have reliably assessed resource adequacy in systems dominated by large thermal and hydropower resources will be insufficient for systems with significant contributions from emerging technologies such as wind, solar and storage. Therefore, in recent years many new metrics and modeling approaches have been developed, and are increasingly being implemented, to meet the needs of the clean energy transition.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Value of Sharing and Consolidating Critical Community, Electricity, and Natural Hazard Information

The California Public Utilities Commission (CPUC) sought support for the development of database schema specifications for a bi-directional data portal that would foster cross-jurisdictional collaboration necessary to improve resilient energy infrastructure planning processes. This technical assistance activity involved Berkeley Lab researchers reviewing 34 local/tribal government hazard mitigation plans to assess (1) the natural hazards that communities are most concerned about; (2) the variety of–and terminology used to describe–critical community infrastructure; and (3) the availability of GIS information that could be incorporated into CPUC-mandated "Microgrid Planning Portals". In addition, we develop a common, but generic data taxonomy showing what fields to collect to encourage consolidating and sharing of this information in the future. Finally, we partnered with the Bishop Paiute tribal government to demonstrate the value of combining electricity infrastructure, natural hazard layers, and critical community infrastructure into a series of maps. The project demonstrated that a single system containing both electric utility and community infrastructure data—as well as information about natural hazards—will help the state of California, the IOUs, first responders, and long-term planners better prepare for—and thus lower their exposure to these ongoing and emerging hazards. The project also identified a number of challenges that will need to be overcome before it is possible to stand up a single system to display this information.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This guide was developed to improve decision-making in the electricity planning process by strengthening dialogue between electricity system planners and stakeholders throughout the process. This document was created for anyone who is first getting exposed to scenario results from power system planning models, or for those who are beginning to interact with power system modelers. It does not assume any experience with power system modeling, or familiarity with electricity planning concepts. This guide can be helpful to a wide range of people, including but not limited to state utility commissioners and commission staff, state energy offices, and intervenors in the planning process. It is targeted to those who are evaluating or reviewing model results presented by a utility, which typically span utility-scale generation and storage (and associated transmission) assets. This guide is designed to provide enough background and guidance that stakeholders can formulate and ask questions to evaluate model results through a deeper understanding of the key assumptions, data, and methods that drive decision outcomes. The ultimate purpose of this work is to increase transparency in the electricity planning process by enabling stakeholders to better engage and evaluate model results. A follow-on guide will provide a deeper dive into emerging topics, which are expected to become more prominent in the electricity planning process, but whose methods and approaches are still being refined.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Third Quarter 2023)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the third calendar quarter of 2023 (Q3 2023) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the fifteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Regional Real-Time PV Spinning Reserve Estimator

Curtailed photovoltaic (PV) generation is a zero-marginal-cost spinning reserve that can be used for a number of active power control services. Unlike traditional spinning reserve providers, however, i.e., fossil-fueled generators, which have well-defined operating characteristics, e.g., available headroom or potential high limit (PHL), PV plants have by nature variable and uncertain operating characteristics. To ensure the effective coordination between PV plants and the system operator during an active power control event, accurate knowledge of the PV PHL is essential. It ensures that enough headroom is reserved by the PV plants to deliver the award services in real time and informs feasible dispatch decisions made by the market operator. To tackle this challenge, a novel reference-control grouping-based PV plant reserve estimation method has been proposed by the National Renewable Energy Laboratory under past projects funded by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office. The estimation method separates inverters within a plant into two groups: a control group and a reference group. While the reference group is reserved to operate at its PHL, the control group can be curtailed to provide the grid services. Real-time outputs from the reference inverters are used to estimate the PHL for the whole plant based on the ratio between capacities of the reference group and of the plant. This work further enhances the methodology by (1) improving the model accuracy through machine learning; (2) automating the reference inverter selection through correlation analysis; (3) considering estimation look-ahead windows; and (4) applying to regional spinning reserve estimation. Significant performance improvement has been observed based on real-world data collected by CAISO, Southern Company, and Terabase Energy. Compared with the original scaling method, the newly proposed machine learning-based approach reduces the estimation errors by 30% and 13% at the plant level and region level, respectively. Results obtained from this project are intended to be used by grid operators, market operators, balancing authorities, and PV plant owners and operators to facilitate PV participation in ancillary service markets. Regulators, policymakers, and system planners can also consider the results of this work in their decision-making processes. In addition to the performance improvement on the existing reference-control based grouping method, we also investigated how the variability of PV generation from a single PV inverter can be used to represent the variability of PV generation at the plant level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Guide to Understanding Power System Model Results for Long-Term Resource Plans

This guide is for public utility commission staff, state energy office staff, and other stakeholders who review model results for utility integrated resource plans (IRPs). It builds on the "Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans," and delves into more advanced topics that were not included or not fully covered in the beginner's guide. The topics included here are evolving and may or may not be important to the resource plan you are evaluating. Due to limitations in resources, it's also not possible to give the highest level of detail or attention to every topic within a plan. An important part of planning for an uncertain future involves deciding which topics deserve the most focus and resources. It's all about prioritizing efforts where they will have the most impact or be most beneficial despite uncertainties ahead. As with the beginner's guide, we intend for this guide to help improve decision-making in the electricity planning process by strengthening understanding and dialogue between electricity system planners and relevant stakeholders. The following information is designed to allow you to better engage in the planning process by evaluating results, asking questions, and thinking through what is most important. We allocate significant discussion in the guide to electricity demand evolution, demand-side resources, and resource adequacy. These topics have garnered increasing attention, hence their prominence in this guide. Other topics are also presented, but their incorporation into the planning process might vary based on interest and relevance. The absence of certain topics doesn't diminish their importance; rather, it reflects the reality that in planning, trade-offs necessitate prioritizing certain aspects over others.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

MEP Metric Correlations with Socioeconomic and Built Environment Factors [Slides]

NREL's Mobility Energy Productivity tool, or MEP, quantifies the ability of an area's transportation system to connect individuals to goods, services, employment opportunities, and other activities while accounting for time, cost, and energy. However, the MEP tool itself does not examine correlations between mobility energy productivity and other sociodemographic and built environment variables relevant to the urban and transportation planning space. Examining these correlations could have two possible implications -- first, understanding what factors correlate with mobility energy productivity could help urban planners make equitable decisions in allocating transportation resources. Second, as the MEP has not been calculated for all urban areas in the US and is computationally expensive, if other publicly available variables were predictive enough of MEP then a simple model could be used to predict MEP instead of having to compute it for an area for which it has not been updated. A statistical analysis to investigate both of these questions is presented, with many significant associations found between the MEP and identified variables of interest.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quantum Search Approaches to Sampling-Based Motion Planning

In this paper, we present a novel formulation of traditional sampling-based motion planners as database-oracle structures that can be solved via quantum search algorithms. We consider two complementary scenarios: for simpler sparse environments, we formulate the Quantum Full Path Search Algorithm (q-FPS), which creates a superposition of full random path solutions, manipulates probability amplitudes with Quantum Amplitude Amplification (QAA), and quantum measures a single obstacle free full path solution. For dense unstructured environments, we formulate the Quantum Rapidly Exploring Random Tree algorithm, q-RRT, that creates quantum superpositions of possible parent-child connections, manipulates probability amplitudes with QAA, and quantum measures a single reachable state, which is added to a tree. As performance depends on the number of oracle calls and the probability of measuring good quantum states, we quantify how these errors factor into the probabilistic completeness properties of the algorithm. We then numerically estimate the expected number of database solutions to provide an approximation of the optimal number of oracle calls in the algorithm. We compare the q-RRT algorithm with a classical implementation and verify quadratic run-time speedup in the largest connected component of a 2D dense random lattice. We conclude by evaluating a proposed approach to limit the expected number of database solutions and thus limit the optimal number of oracle calls to a given number.

97 MATHEMATICS AND COMPUTING↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Fourth Quarter 2023

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2023 (Q4 2023) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the sixteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗