Search NASA⌕ Search

SEARCH · Search NASA

Results for “power flow initialization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Cavitation-based hydro-fracturing technique for geothermal reservoir stimulation

A rotary shutter valve 500 is used for geothermal reservoir stimulation. The valve 500 includes a pressure chamber 520 for holding a working fluid (F) under pressure. A rotatable shutter 532 is turned with a powering device 544 to periodically align one or more windows 534 with one or more apertures 526 in a bulkhead 524. When aligned, the pressurized working fluid (F) flows through the bulkhead 524 and enters a pulse cavity 522, where it is discharged from the pulse cavity 522 as pressure waves 200. The pressure wave propagation 200 and eventual collapse of the bubbles 202 can be transmitted to a target rock surface 204 either in the form of a shock wave 206, or by micro jets 208, depending on the bubble-surface distance. Once cavitation at the rock face begins, fractures are initiated in the rock to create a network of micro-fissures for enhanced heat transfer.

15 GEOTHERMAL ENERGY↗

U.S. Fusion D-Li Neutron Irradiation Facility: Fusion Prototypic Neutron Source (FPNS) Technology Study

A primary engineering challenge for the realization of fusion energy involves the development of high-performance structural and plasma-facing materials with dimensional stability and resistance to neutron degradation of mechanical properties. The harsh fusion environment, including high levels of helium production and other transmutation products along with high operating temperatures, poses an extreme challenge for materials. Identifying materials that can withstand these conditions is a high priority for fusion energy research. Critical to resolving this gap in scientific understanding is developing a neutron source facility with the ability to mimic the extreme conditions in a fusion reactor. Working with the Department of Energy (DOE) Office of Fusion Energy Sciences (FES), Oak Ridge National Laboratory (ORNL) and the Virtual Laboratory for Technology (VLT) organized a workshop to discuss the need for a Fusion Prototypic Neutron Source (FPNS). [1] While there are a variety of uses for FPNS neutrons, the main driver of US interest is expanding the scientific understanding of materials degradation in the deuterium-tritium (D-T) fusion environment. FPNS will help build the scientific foundation required to enable design of a next step fusion device. Using specifications from previous projects as a guide, key parameters were agreed upon for a near term, moderate cost US facility that would be complementary to the more extensive plans of the International Fusion Materials Irradiation Facility (IFMIF). Types of facilities that could potentially meet those criteria were identified. A scoping study for three technologies was initiated to answer three critical questions: 1) Can the concept meet the key parameters, 2) What is the estimated cost, and 3) What is the estimated schedule. One approach selected for the scoping study is a D-Li stripping source similar to the design of the IFMIF but at a lower beam power and atomic displacement rate for cost and schedule reasons. The purpose of this report is to document the results of the D-Li stripping source option study, providing answers to the three questions. The approach to generating a fusion prototypic neutron source using a deuteron beam incident on a flowing lithium target has been studied for more than 40 years. As a result of the research and development recently executed primarily in Europe and Japan, the ability of this approach to meet key parameters (damage parameters, irradiation volume) outlined in the US workshop for a near-term, moderate cost fusion prototypic neutron source facility is not in doubt. The main question that must be answered is the cost of such a facility. As a result, a strong focus was placed on understanding alternatives for developing the facility and their relative costs. The project was broken into four components for the cost estimate: the ion source, accelerator, lithium target system, and conventional facilities. The cost of the accelerator is an important cost driver for the D-Li stripping concept. To fully understand the range of the accelerator cost, multiple alternatives were considered including normal conducting and superconducting linacs and the frequency of the radiofrequency quadrupole. Multiple previous design studies dating from 1989 through 2017 were examined (costs were escalated to 2019 dollars) and compared. After analysis, two options were selected for costing, one superconducting and one room temperature. We found similar project costs for the two accelerator options, on the order of $100M including design and project management but excluding contingency. Including everything except the conventional facilities, the estimate for the neutron source facility is estimated to be $220M without contingency. Additional significant costs for the facility are the conventional costs arising from the need to construct buildings for the accelerator and target facilities, bringing electrical power to the site including a new substation, and removing the heat from the facility using heat exchangers. While ORNL would oversee this work, much of the effort would be executed by contractors. Estimates for this effort was based on similar projects that are currently being executed at ORNL or were executed at ORNL in the recent past. The estimate for conventional facilities for the neutron facility is $173M without contingency, bringing the total project cost to $393M without contingency. With a 50% contingency, the estimated cost is $589M. The estimate range was established using guidance from the Association for the Advancement of Cost Engineering (AACE). Specifically, guidance from recommended practice 17R-97 provides insight on the expected accuracy range of estimates based on the degree of project definition and the position of the project in the stage-gate process or maturity timeline. An AACE Class 5 type estimate is appropriate for concept screening. The expected accuracy range includes a low end of -50% to -20% and a high end of +30% to +100% around the estimated cost. For the D-Li stripping neutron source, a -20% to +100% cost range was applied for a recommended cost range of $471M to $1,179M. Less emphasis was placed on determining the project schedule due to the fact that the project costs were large and may eliminate this option from consideration. The development of the accelerator facility may require on the order of five years without contingency. A more realistic schedule with contingency may be seven years. However, this estimate should be scrutinized in a preconceptual design activity if a more realistic estimate is needed. Finally, one lesson learned in this process is that the requirements for a near-term, moderate cost facility drives the alternative selection toward existing facilities and infrastructure. The D-Li stripping neutron source option requires a green field site due to the lack of existing buildings and infrastructure that can be reused for this effort. As a result, the conventional facilities costs are a significant fraction of the total facility cost. Other neutron source options where buildings, electrical power, and cooling infrastructure already exist may be able to meet the requirements for a near term, moderate cost facility.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hydrodynamic characterization of the coastal pioneer array ocean observing system

Ocean observation buoys require relatively small amounts of power, yet traditionally necessitate costly resupply trips for battery replacement. With the offshore location of the buoys and small power requirements, wave energy may be an effective solution for providing consistent and reliable power to support the buoy instrumentation. The US National Science Foundation Ocean Observatories Initiative (OOI) includes arrays of point absorber-like buoy systems used for ocean observation that have been deployed at multiple locations including the Southern Mid-Atlantic Bight. A study is currently underway to design a pitch resonator wave energy converter to supplement existing renewable energy generation for powering observation instrumentation. This paper details field measurements from surface moorings of the OOI Coastal Pioneer Array, which informs the subsequent development of a numerical model for the moored observation system. The model is developed in Wave Energy Converter Simulator (WEC-Sim), which leverages the Simscape multibody solver within the MATLAB/Simulink framework and linear potential flow theory to simulate the hydrodynamic interactions and multibody dynamics in 6 degrees of freedom. Multiple tuning variables are considered to produce a model for the system that matches well with empirical data (about 8% error). In conclusion, the WEC-Sim model will serve as a platform for integrating the pitch resonator wave energy converter concept and deployment preparation (detailed design including power take-off and control systems, response evaluation, etc.).

hydrodynamic modeling↗

Experimental study on the startup of the annular wick type heat pipe using fiber optical temperature measurement technique

This study used optical fiber-distributed temperature sensors to measure the internal and external temperature distributions of a water-cooled heat pipe. The sensor technology used in this study is fiber optical distributed temperature sensing, a distributed sensing technique based on the naturally occurring Rayleigh backscatter in optical fibers. This measurement technique provides maximum spatial resolution for static and semi-static applications. Using this sensor, the temperature distribution of the heat pipe's internal, external, vapor core, and the wick was measured with a spatial resolution of 0.65 mm, a sampling frequency of 40 Hz, and a temperature resolution of 0.1 °C. Through the measured temperature distribution database, the starting phenomenon, the effective length trend, and the limitation onset were observed. From the results, it is found that a high-temperature peak appears at the evaporator if a high initial power (75 W) is imposed on the heat pipe, even after the heat pipe approaches the normal operating status. The peak is not observed in a slower startup (30 W initial power then slowly increased to 75 W). It is also found that the temperature distributions and effective condenser length of the heat pipe highly depend on the cooling conditions. There are variations in the temperature according to the radial direction of the horizontal heat pipe due to gravity. In conclusion, lead and lag of the temperature evolution were observed at the onset of the operating limitations.

42 ENGINEERING↗

ROBUST ONLINE MONITORING FOR CALIBRATION ASSESSMENT OF TRANSMITTERS AND INSTRUMENTATION

Robust online monitoring (OLM) technologies are expected to enable the extension or elimination of periodic sensor calibration intervals in operating and new reactors. Specifically, the next generation of OLM technology is expected to include newly developed advanced algorithms that improve monitoring of sensor/system performance and enable the use of plant data to derive information that currently cannot be measured. These advances in OLM technologies will improve the safety and reliability of current and planned nuclear power systems through improved accuracy and increased reliability of sensors used to monitor key parameters. In this paper, we discuss an overview of research being performed within the Nuclear Energy Enabling Technologies (NEET)/Advanced Sensors and Instrumentation (ASI) program, for the development of OLM algorithms to use sensor outputs and, in combination with other available information, 1) determine whether one or more sensors are out of calibration or failing and 2) replace a failing sensor with reliable, accurate sensor outputs. Algorithm development is focused on the following OLM functions: • Signal validation – fault detection and selection of acceptance criteria • Virtual sensing – signal value prediction and acceptance criteria • Response-time assessment – fault detection and acceptance criteria selection A GP-based uncertainty quantification (UQ) method previously developed for UQ in OLM, was adapted for use in sensor-fault detection and virtual sensing. For signal validation, the various components to the OLM residual (which is computed using an AAKR model) were explicitly defined and modeled using a GP. Evaluation was conducted using flow loop data from multiple sources. Results using experimental data from laboratory-scale flow loops indicate that the approach, while capable of detecting sensor drift, may be incapable of discriminating between sensor drift and model inadequacy. This may be due to a simplification applied in the initial modeling, where the sensor degradation is assumed to be stationary. In the case of virtual sensors, the GP model was used in a predictive mode to estimate the correct sensor reading for sensors that may have failed. Results have indicated the viability of using this approach for virtual sensing. However, the GP model has proven to be computationally expensive, and so alternative algorithms for virtual sensing are being evaluated. Finally, automated approaches to performing noise analysis for extracting sensor response time were developed. Evaluation of this technique using laboratory-scale data indicates that it compares well with manual techniques previously used for noise analysis. Moreover, the automated and manual approaches for noise analysis also compare well with the current “gold standard”, hydraulic ramp testing, for response time monitoring. Ongoing research in this project is focused on further evaluation of the algorithms, optimization for accuracy and computational efficiency, and integration into a suite of tools for robust OLM that are applicable to monitoring sensor calibration state in nuclear power plants.

calibration interval extension↗

2018 Energy Storage Pricing Survey

Since grid energy storage is still a nascent industry, it is often difficult to obtain capital costs for various energy storage technologies. This type of information is required to perform an initial cost-benefit analysis related to a potential energy storage deployment, as well as to compare different energy storage technology options. The goal of this report is to summarize energy storage capital costs that were obtained from industry pricing surveys. The methodology breaks down the cost of an energy storage system into the following categories: the storage module; the balance of system; the power conversion system; the energy management system; and the engineering, procurement, and construction costs. Pricing data is presented for the following technologies: pumped hydro storage; compressed air energy storage; sodium battery storage; zinc battery storage; long duration flywheels; short duration flywheels; vanadium flow batteries; zinc bromide flow batteries; iron flow batteries; nickel batteries; lithium ion energy batteries; lithium ion power batteries; lead acid batteries; and advanced lead carbon batteries.

25 ENERGY STORAGE↗

Validation of NEAMS Tools Using MSRE Data

This report documents the benchmarks developed and performed for the tools and codes developed under the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program utilizing the MSRE experiment data. There are three focus areas explored in this work: fuel evolution, CFD, and system transient analyses. Fuel depletion is important for MSR reactor physics and fuel cycle analysis. Fuel depletion capability is currently being developed in the Griffin reactor physics code. To support this, a benchmark problem is developed using the MSRE data and an existing depletion code with flowing fuel analysis functionality (ADDER) to validate this new capability in Griffin. The ADDER calculation is compared with the TRITON-MSR results as well as the MSRE experimental data. This benchmark can be directly used to verify and validate the Griffin fuel depletion capability in future years. For CFD simulation, the MSRE CAD model is obtained from the Copenhagen Atomics and a mesh is generated for the MSRE inlet plenum. The Nek5000 code will be employed to find the flow distribution in the MSRE inlet plenum based on the mesh generated. For system analysis, a simple benchmark problem for three types of MSR system transients is developed. The SAM and SPECTRA codes are used to solve the simple problem, and the results from the two codes agree well. The SAM code is also employed to obtain the frequency response of the MSRE system at the 5 and 8 MWt power levels. The results agree well with the experiment measurements. These verification and validation efforts gives SAM users more confidence in MSR system transient simulations using SAM. Lastly, the SAM-Griffin Multiphysics coupling work is initiated. A simple one-way coupling of evaluating the precursor drift effect on the MSRE k-eff is demonstrated. This preliminary coupling work serves as the basis for future more complex Multiphysics simulation and modelling.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

ENERGY-DEPENDENT POWER SPECTRAL STATES AND ORIGIN OF APERIODIC VARIABILITY IN BLACK HOLE BINARIES

We found that the black hole candidate MAXI J1659-152 showed distinct power spectra, i.e., power-law noise (PLN) versus band-limited noise (BLN) plus quasi-periodic oscillations (QPOs) below and above about 2 keV, respectively, in observations with Swift and the Rossi X-ray Timing Explorer during the 2010 outburst, indicating a high energy cutoff of the PLN and a low energy cutoff of the BLN and QPOs around 2 keV. The emergence of the PLN and the fading of the BLN and QPOs initially took place below 2 keV when the source entered the hard intermediate state and settled in the soft state three weeks later. The evolution was accompanied by the emergence of the disk spectral component and decreases in the amplitudes of variability in the soft and hard X-ray bands. Our results indicate that the PLN is associated with an optically thick disk in both hard and intermediate states, and the power spectral state is independent of the X-ray energy spectral state in a broadband view. We suggest that in the hard or intermediate state, the BLN and QPOs emerge from the innermost hot flow subjected to Comptonization, while the PLN originates from the optically thick disk farther out. The energy cutoffs of the PLN and the BLN or QPOs then follow the temperature of the seed photons from the inner edge of the optically thick disk, while the high frequency cutoff of the PLN follows the orbital frequency of the inner edge of the optically thick disk as well.

79 ASTRONOMY AND ASTROPHYSICS↗

Small Hydro Reference Model Project (Final Project Report)

Small hydropower has long been developed in the United States, but still thousands of small hydro sites remain untapped. Most of them are technically and environmentally feasible but may not be cost-effective to develop at the current level of technology and carbon and fuel markets. This report aims to identify the cost drivers for small hydro generation through cost analyses, and to improve understanding of the pathways for cost reduction and the strategies for accelerating small hydro development in the United States. Reference to the empirical cost equations in literature, an initial capital cost (ICC) equation for nonpowered dam (NPD) and conduit projects has been preliminarily developed using limited project cost data collected from the Federal Energy Regulatory Commission (FERC) e-library and directly from industrial contacts. The regression analysis shows a correlation between the project ICC and plant capacity and head. The electro-mechanical equipment costs for Francis, axial flow, Kaplan, and propeller turbines are derived from the historical budget prices of a small hydro turbine manufacturer. These cost curves show the turbine-generator cost is also associated with the plant capacity and net head. In addition, the initial cost breakdowns are analyzed based on project cost data from literature and industry. It was found that the turbine-generator and the powerhouse are often the major cost components for low-head projects, whereas water conveyance is likely to be the key cost driver for high-head projects. The ICC variations for different site features, such as new greenfield sites vs. non-powered dams, are also discussed.

Zhang, Qin Fen (Katherine)↗

Independent Confirmatory Survey Summary and Results for the Enrico Fermi Atomic Power Plant, Unit 1, Newport, Michigan (Final Report No. 2)

The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) was a fast breeder reactor design that was cooled by sodium and operated at essentially atmospheric pressure. On May 10, 1963, the Atomic Energy Commission (AEC) granted an operating license, DPR-9, to the Power Reactor Development Company (PRDC), a consortium specifically formed to own and operate a nuclear reactor at the Fermi 1 site. The reactor was designed for a maximum capability of 430 megawatts (MW); however, the maximum reactor power with the first core loading (Core A) was 200 MW. The primary system was filled with sodium in December 1960 and criticality was achieved in August 1963. The reactor was tested at low power during the first couple years of operation. Power ascension testing above 1 MW commenced in December 1965 immediately following the receipt of a high-power operating license. In October 1966 during power ascension, zirconium plates at the bottom of the reactor vessel became loose and blocked sodium coolant flow to some fuel subassemblies. Two subassemblies started to melt and the reactor was manually shut down. No abnormal releases to the environment occurred. Forty-two months later after the cause had been determined, cleanup completed, and the fuel replaced, Fermi 1 was restarted. However, in November 1972, PRDC made the decision to decommission Fermi 1 as the core was approaching its burn-up limit. The fuel and blanket subassemblies were shipped off-site in 1973. Following that, the secondary sodium system was drained and sent off-site. The radioactive primary sodium was stored on-site in storage tanks and 55 gallon (gal) drums until it was shipped off-site in 1984. The initial decommissioning of Fermi 1 was completed in 1975. Effective January 23, 1976, DPR-9 was transferred to the Detroit Edison Company (DTE) as a 'possession only' license (DTE 2010a). This report details the confirmatory activities performed during the second Oak Ridge Institute for Science and Education (ORISE) site visit to Fermi 1 in November 2010. The survey was strategically planned during a Unit 2 (Fermi 2) outage to take advantage of decreased radiation levels that were observed and attributed to Fermi 2 from the operating unit during the first site visit. However, during the second visit there were elevated radiation levels observed and attributed to the partially dismantled Fermi 1 reactor vessel and a waste storage box located on the 3rd floor of the Fermi 1 Turbine Building. Confirmatory surveys (unshielded) performed directly in the line of sight of these areas were affected. The objective of the confirmatory survey was to verify that the final radiological conditions were accurately and adequately described in Final Status Survey (FSS) documentation, relative to the established release criteria. This objective was achieved by performing document reviews, as well as independent measurements and sampling. Specifically, documentation of the planning, implementation, and results of the FSS were evaluated; side-by-side FSS measurement and source comparisons were performed; site areas were evaluated relative to appropriate FSS classification; and areas were assessed for residual, undocumented contamination.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

USING KAPPA FUNCTIONS TO CHARACTERIZE OUTER HELIOSPHERE PROTON DISTRIBUTIONS IN THE PRESENCE OF CHARGE-EXCHANGE

Kappa functions have long been used in the analysis and modeling of suprathermal particles in various space plasmas. In situ observations of the supersonic solar wind show its distribution contains a cold ion core and power-law tail, which is well-represented by a kappa function. In situ plasma observations by Voyager, as well as observations of energetic neutral atom (ENA) spectra by the Interstellar Boundary Explorer (IBEX), showed that the compressed and heated inner heliosheath (IHS) plasma beyond the termination shock can also be represented by a kappa function. IBEX exposes the IHS plasma properties through the detection of ENAs generated by charge-exchange in the IHS. However, charge-exchange modifies the plasma as it flows through the IHS, and makes it difficult to ascertain the parent proton distribution. In this paper we investigate the evolution of proton distributions, initially represented by a kappa function, that experience losses due to charge-exchange in the IHS. In the absence of other processes, it is no longer representable by a single kappa function due to the energy-dependent, charge-exchange process. While one can still fit a kappa function to the evolving proton distribution over limited energy ranges, this yields fitting parameters (pseudo-density, pseudo-temperature, pseudo-kappa index) that depend on the energy range of the fit. We discuss the effects of fitting a kappa function to the IHS proton distribution over limited energy ranges, its dependence on the initial proton distribution properties at the termination shock, and implications for understanding the observations.

79 ASTRONOMY AND ASTROPHYSICS↗

Cooling and instabilities in colliding radiative flows with toroidal magnetic fields

ABSTRACT We report on the results of a simulation-based study of colliding magnetized plasma flows. Our set-up mimics pulsed power laboratory astrophysical experiments but, with an appropriate frame change, is relevant to astrophysical jets with internal velocity variations. We track the evolution of the interaction region where the two flows collide. Cooling via radiative losses is included in the calculation. We systematically vary plasma beta (βm) in the flows, the strength of the cooling (Λ0), and the exponent (α) of temperature dependence of the cooling function. We find that for strong magnetic fields a counter-propagating jet called a ‘spine’ is driven by pressure from shocked toroidal fields. The spines eventually become unstable and break apart. We demonstrate how formation and evolution of the spines depend on initial flow parameters and provide a simple analytical model that captures the basic features of the flow.

79 ASTRONOMY AND ASTROPHYSICS↗

Development of a first-principles hybrid boiler model for oxy-combustion power generation system

The design of an oxy-combustion system for CO 2 capture involves the integration of multiple devices including air separation unit, coal-fired boiler, steam turbine, flue gas cleanup, recycle, and compression units. Thousands of design parameters for the entire system need to be optimized to achieve the lowest cost per kilowatt-hour of electricity generated. An appropriate first-principles based boiler model with short computer execution time but yet reasonable accuracy in both air-fired and oxy-fired configurations is highly desired. To this end, a hybrid boiler model with 1-D resolution for main flow and reaction related calculations and 3-D resolution for radiative heat transfer was developed as a part of the oxy-combustion subtask of the Carbon Capture and Simulation Initiative (CCSI) sponsored by U.S. Department of Energy. Furthermore, the developed model is able to automatically generate a 3-D mesh based on user-specified furnace shape for the calculation of radiative heat transfer using discrete ordinates method.

01 COAL, LIGNITE, AND PEAT↗

The Integrated Basin-Scale Opportunity Assessment Initiative: Pilot Assessment for the Deschutes River Basin

In 2010, the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office provided funding to Pacific Northwest National Laboratory, Oak Ridge National Laboratory (ORNL), and Argonne National Laboratory to develop an approach for assessing a river basin as an integrated system within the context of existing uses and environmental conditions to identify opportunities for sustainable hydropower development and environmental improvements. Called the Integrated Basin-Scale Opportunity Assessment Initiative (BSOA Initiative), the project is one of seven action items of the March 24, 2010 Memorandum of Understanding (MOU) for Sustainable Hydropower. Early efforts of the BSOA Initiative focused on forming a National Steering Committee, identifying potential basins for opportunity assessments, methodologies for stakeholder engagement, existing and needed analytical tools, barriers to the opportunity assessment process, and significant data gaps. One of the key outcomes was identifying a need for better collaborative decision-making tools that can be used by stakeholders. In response to this need, the Basin-Scale Project Team chose a scenario-based modeling approach for assessing hydropower, environmental, and other water-use opportunities. The approach involved the development of a daily hydrologic model for the Upper Deschutes River and Lower Crooked River subbasins to simulate alternative water management scenarios. Two example scenarios were constructed to demonstrate the use of the hydrologic model to explore three management goals in the Deschutes Basin: 1) increasing hydropower assets by adding new generation at existing dams or diversions and in existing irrigation canals or conduits, 2) increasing instream flows to benefit fish and aquatic ecosystems, and 3) maintaining existing water uses (primarily irrigation). Actions to achieve these goals were simulated by incrementally increasing minimum flow requirements during the storage season and reducing water demands during the irrigation season, while simulating hydropower generation at non-powered dams and in irrigation canals. As part of the effort to demonstrate scenario-based modeling, the project team also developed a web-based data-visualization interface for synthesizing modeling results. The interface allows users to view model results in raw form (daily flow) or in the form of value-based metrics that are based on specific information needs expressed by stakeholders (e.g., how often flow exceeds a conservation flow target at a certain location). In addition to the modeling efforts, 29 potential hydropower sites (14 non-powered dams, 15 canal/conduit sites) were evaluated for their technical and economic feasibility using ORNL’s Hydropower Energy and Economic Assessment tool. Results of the feasibility assessment indicated that eight of the sites (four non-powered dams, four canals/conduits) may be feasible and could add approximately 19 megawatts (MW) of hydroelectric capacity in the basin and generate over 78 gigawatt-hours (GWh) of energy per year. The approach presented here is intended to encourage consideration of methods that emphasize exploration of a range of potential management actions that may achieve a better balance among multiple, and often conflicting, management goals. It is important to consider the approach as an iterative and collaborative process focused on moving debates beyond agreement about an exact target that is acceptable to all parties to a discussion of how stakeholders can better understand how achieving their goals interacts with the achievement of goals by other stakeholder groups. By exploring the results of the model in this way, stakeholders are more likely to narrow the bounds of interest so that more in-depth analysis can be completed.

13 HYDRO ENERGY↗

Health, safety, and environmental risks from energy production: A year-long reality check

Large-scale carbon dioxide capture and storage (CCS) offers the benefit of reducing CO{sub 2} emissions and thereby mitigating climate change risk, but it will also bring its own health, safety, and environmental risks. Curtis M. Oldenburg, Editor-in-Chief, considers these risks in the context of the broader picture of energy production. Over the last year, there have been major acute health, safety, and environmental (HSE) consequences related to accidents involving energy production from every major primary energy source. These are, in chronological order: (i) the Upper Big Branch (coal) Mine disaster, (ii) the Gulf of Mexico Macondo (oil) well blowout, (iii) the San Bruno (natural gas) pipeline leak and explosion, and (iv) the Fukushima (nuclear) reactor radioactivity releases. Briefly, the Upper Big Branch Mine disaster occurred in West Virginia on April 5, 2010, when natural methane in the mine ignited, causing the deaths of 29 miners, the worst coal mine disaster in the USA since 1970. Fifteen days later, the Macondo oil well in the Gulf of Mexico suffered a blowout, with a gas explosion and fire on the floating drilling platform that killed 11 people. The oil and gas continued to flow out of the well at the seafloor until July 15, 2010, spilling a total of approximately 5 million barrels of oil into the sea. On September 9, 2010, a 30-inch (76-cm) buried, steel, natural gas pipeline in San Bruno, California, leaked gas and exploded in a residential neighborhood, killing 8 people in their homes and burning a total of 38 homes. Flames were up to 1000 ft (300 m) high, and the initial explosion itself reportedly measured 1.1 on the Richter scale. Finally, on March 11, 2011, a magnitude 9.0 earthquake off the coast of Japan's main island, Honshu, caused a tsunami that crippled the backup power and associated cooling systems for six reactor cores and their spent fuel storage tanks at the Fukushima nuclear power plant. At time of writing, workers trying to bring the crisis under control have been exposed to dangerous levels of radiation, and radioactive water and particulates have been released to the sea and atmosphere. These four disasters, all of which occurred within the past 12 months, were not unprecedented; similar events differing only in detail have happened around the world before, and such events will occur again. Today, developed nations primarily use fossil fuels to create affordable energy for comforts such as lighting, heating and air-conditioning, refrigeration, transportation, education, and entertainment, as well as for powering manufacturing, which creates jobs and a wealth of material goods. In addition to the risks of the existing energy infrastructure that have become obvious through these recent disasters, there is also the ongoing risk of climate change that comes from the vast emissions of greenhouse gases, primarily CO{sub 2}, from the burning of fossil fuels. The implementation of CO{sub 2} capture and storage (CCS) will help mitigate CO{sub 2} emissions from fossil fuel energy, but it also carries with it HSE risks. In my personal interactions with the public and with students, the main concern voiced is whether CO{sub 2} could leak out of the deep reservoirs into which it is injected and rise up out of the ground, smothering people and animals at the ground surface. Another concern expressed is that CO{sub 2} pipelines could fail and cause similar gaseous plumes of CO{sub 2}. The widespread concerns about CO{sub 2} leaking out over the ground surface may be inspired by events that have happened within natural systems in equatorial Africa, in Indonesia, and in Italy. Researchers have been investigating a wide variety of HSE risks of geologic CO{sub 2} storage for some time and have determined that wells are the main potential pathways for significant leakage from the deep subsurface. I discuss the acute HSE risks of CO{sub 2} leakage through wells and from pipelines, and compare the behavior of failures in CO{sub 2} wells and pipelines with oil and gas analogues from which most of our experience derives.

54 ENVIRONMENTAL SCIENCES↗

Accelerating transients with NekRS: GPU overlapping domain implementation and multi-rate timestepping

The simulation of nuclear transients using Computational Fluid Dynamics (CFD) presents significant computational challenges due to the inherent complexity and the wide separation in temporal scales between various flow physical phenomena. These disparities lead to high computational costs, often making the simulation of transients impractical without advanced techniques. Consequently, multiple research initiatives are being pursued by the NEAMS thermal-hydraulic area, some driven by academic institutions and some by national laboratories. Overall, they are exploring novel methods to make transient simulations more feasible and efficient. This report delves into recent advancements within the CFD code NekRS, specifically those achieved in Fiscal Year 2024 under the CONNECT effort, aimed at improving the performance and feasibility of transient simulations. The first major advancement involves the porting of NekRS to Aurora, one of the Department of Energy’s (DOE) most powerful supercomputers. Additionally, the report discusses the implementation of an overlapping domain capability within NekRS. This novel GPU-accelerated capability allows different spatial regions of the domain to be solved independently, enhancing the code’s efficiency, particularly when running large-scale simulations in complex domains. The scalability of this approach is demonstrated, highlighting its potential to transform how transients are approached in CFD simulations. Lastly, the report focuses on how this overlapping domain capability specifically accelerates transient simulations through multi-rate timestepping. By decoupling different regions and facilitating faster computations, this method offers a promising pathway to making nuclear transient simulations more computationally feasible, addressing one of the critical bottlenecks in the field. Together, these advancements represent a significant leap forward in transient simulation technology, bringing closer the possibility of handling highly complex nuclear scenarios with greater efficiency and accuracy.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The Cementitious Barriers Partnership Experimental Programs and Software Advancing DOE’s Waste Disposal/Tank Closure Efforts – 15436

The U.S. Department of Energy Environmental Management (DOE-EM) Office of Tank Waste Management-sponsored Cementitious Barriers Partnership (CBP) is chartered with providing the technical basis for implementing cement-based waste forms and radioactive waste containment structures for long-term disposal. DOE needs in this area include the following to support progress in final treatment and disposal of legacy waste and closure of High-Level Waste (HLW) tanks in the DOE complex: long-term performance predictions, flow sheet development and flow sheet enhancements, and conceptual designs for new disposal facilities. The DOE-EM Cementitious Barriers Partnership is producing software and experimental programs resulting in new methods and data needed for end-users involved with environmental cleanup and waste disposal. Both the modeling tools and the experimental data have already benefited the DOE sites in the areas of performance assessments by increasing confidence backed up with modeling support, leaching methods, and transport properties developed for actual DOE materials. In 2014, the CBP Partnership released the CBP Software Toolbox –“Version 2.0” which provides concrete degradation models for 1) sulfate attack, 2) carbonation, and 3) chloride initiated rebar corrosion, and includes constituent leaching. These models are applicable and can be used by both DOE and the Nuclear Regulatory Commission (NRC) for service life and long-term performance evaluations and predictions of nuclear and radioactive waste containment structures across the DOE complex, including future SRS Saltstone and HLW tank performance assessments and special analyses, Hanford site HLW tank closure projects and other projects in which cementitious barriers are required, the Advanced Simulation Capability for Environmental Management (ASCEM) project which requires source terms from cementitious containment structures as input to their flow simulations, regulatory reviews of DOE performance assessments, and Nuclear Regulatory Commission reviews of commercial nuclear power plant (NPP) structures which are part of the overall US Energy Security program to extend the service life of NPPs. In addition, the CBP experimental programs have had a significant impact on the DOE complex by providing specific data unique to DOE sodium salt wastes at Hanford and SRS which are not readily available in the literature. Two recent experimental programs on cementitious phase characterization and on technetium (Tc) mobility have provided significant conclusions as follows: recent mineralogy characterization discussed in this paper illustrates that sodium salt waste form matrices are somewhat similar to but not the same as those found in blended cement matrices which to date have been used in long-term thermodynamic modeling and contaminant sequestration as a first approximation. Utilizing the CBP generated data in long-term performance predictions provides for a more defensible technical basis in performance evaluations. In addition, recent experimental studies related to technetium mobility indicate that conventional leaching protocols may not be conservative for direct disposal of Tc-containing waste forms in vadose zone environments. These results have the potential to influence the current Hanford supplemental waste treatment flow sheet and disposal conceptual design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System overview and characterization of a high-temperature, high-pressure, entrained-flow, laboratory-scale gasifier

The high-temperature, high-pressure, entrained-flow, laboratory-scale gasifier at the Colorado School of Mines, including the primary systems and the supporting subsystems, is presented. The gasifier is capable of operating at temperatures and pressures up to 1650 °C and 40 bar. The heated section of the reactor column has an inner diameter of 50 mm and is 1 m long. Solid organic feedstock (e.g., coal, biomass, and solid waste) is ground into batches with particle sizes ranging from 25 to 90 μm and is delivered to the reactor at feed rates of 2–20 g/min. The maximum useful power output of the syngas is 10 kW, with a nominal power output of 1.2 kW. The initial characterization and demonstration results of the gasifier system with a coal feedstock are also reported.

09 BIOMASS FUELS↗