Search NASA⌕ Search

SEARCH · Search NASA

Results for “power generation dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Decarbonization of the Electric Power Sector and Implications for Low-Cost Hydrogen Production from Water Electrolysis

Increasing development of wind and solar generation in the power sector can create economic opportunities for the deployment of water electrolyzers that produce hydrogen. Temporal variation in the marginal cost of energy in future decarbonized grids can make it favorable for electrolyzers to dispatchably ramp hydrogen production up and down in response to low- and high-cost times. Using this strategy, low-cost hydrogen production is enabled by electrolyzers that are low-capital cost and tolerant to frequent on/off cycling. Ramping down hydrogen production to a designated turndown ratio can avoid performance degradation caused by on/off cycling by not shutting the electrolyzer completely off. This comes with a slight cost penalty which can be minimized if the turndown ratio is low (i.e., the system ramps down hydrogen production to close to zero). These results suggest that electrolyzers integrated into future power systems are likely to benefit from the ability to ramp operation up and down quickly and operate in a standby mode. This analysis forms a basis for comparative tradeoffs between electrolyzer capital cost, operating strategy, and system durability and demonstrates the importance of considering all three factors in technoeconomic analysis.

capital cost↗

Stochastic multi-period optimal dispatch of energy storage in unbalanced distribution feeders

This report presents a convex, multi-period, AC-feasible Optimal Power Flow (OPF) framework that robustly dispatches flexible demand-side resources in unbalanced distribution feeders against uncertainty in very-short timescale solar Photo-Voltaic (PV) forecasts. This is valuable for power systems with significant behind-the-meter solar PV generation as their operation is affected by uncertainty from forecasts of demand and solar PV generation. The aim of this work is then to ensure the feasibility and reliability of distribution system operation under high solar PV penetration. We develop and present a novel, robust OPF formulation that accounts for both the nonlinear power flow constraints and the uncertainty in forecasts. This is achieved by linearizing an optimal trajectory and using first-order methods to systematically tighten voltage bounds. Case studies on a realistic distribution feeder shows the effectiveness of a receding-horizon implementation.

25 ENERGY STORAGE↗

Flexible operation of batteries in power system scheduling with renewable energy

The fast growing expansion of renewable energy increases the complexities in balancing generation and demand in the power system. The energy-shifting and fast-ramping capability of energy storage has led to increasing interests in batteries to facilitate the integration of renewable resources. In this paper, we present a two-step framework to evaluate the potential value of energy storage in power systems with renewable generation. First, we formulate a stochastic unit commitment approach with wind power forecast uncertainty and energy storage. Second, the solution from the stochastic unit commitment is used to derive a flexible schedule for energy storage in economic dispatch where the look-ahead horizon is limited. Here, analysis is conducted on the IEEE 24-bus system to demonstrate the benefits of battery storage in systems with renewable resources and the effectiveness of the proposed battery operation strategy.

25 ENERGY STORAGE↗

Decomposing Loosely Coupled Mixed-Integer Programs for Optimal Microgrid Design

Microgrids are frequently employed in remote regions, in part because access to a larger electric grid is impossible, difficult, or compromises reliability and independence. Although small microgrids often employ spot generation, in which a diesel generator is attached directly to a load, microgrids that combine these individual loads and augment generators with photovoltaic cells and batteries as a distributed energy system are emerging as a safer, less costly alternative. In this work, we present a model that seeks the minimum-cost microgrid design and ideal dispatched power to support a small remote site for one year with hourly fidelity under a detailed battery model; this mixed-integer nonlinear program (MINLP) is intractable with commercial solvers but loosely coupled with respect to time. A mixed-integer linear program (MIP) approximates the model, and a partitioning scheme linearizes the bilinear terms. We introduce a novel policy for loosely coupled MIPs in which the system reverts to equivalent conditions at regular time intervals; this separates the problem into subproblems that we solve in parallel. We obtain solutions within 5% of optimality in at most six minutes across 14 MIP instances from the literature and solutions within 5% of optimality to the MINLP instances within 20 minutes.

97 MATHEMATICS AND COMPUTING↗

Revised financial analysis of experimental releases conducted at Glen Canyon Dam during water years 1997 through 2005.

Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. This paper examines the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes operations comply with the ROD operating criteria and experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases in some water years resulted in financial benefits to Western whileothers resulted in financial costs. During the study period, the total financial costs of all experimental releases were more than $23 million.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Financial analysis of experimental releases conducted at Glen Canyon Dam during water years 1997 through 2005.

Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. This paper examines the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes operations comply with the ROD operating criteria and experimental releases that actually took place during the study period, and (2) a ''without experiments'' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases in some water years resulted in financial benefits to Western while others resulted in financial costs. During the study period, the total financial costs of all experimental releases were $11.9 million.

13 HYDRO ENERGY↗

Preliminary Findings of the South Africa Power System Capacity Expansion and Operational Modelling Study: Preprint

Wind and solar power contract prices have recently become cheaper than many conventional new-build alternatives in South Africa and trends suggest a continued increase in the share of variable renewable energy (vRE) on South Africa's power system with coal technology seeing the greatest reduction in capacity, see 'Figure 6: Percentage share by Installed Capacity (MW)' in [1]. Hence it is essential to perform a state-of-the-art grid integration study examining the effects of these high penetrations of vRE on South Africa's power system. Under the 21st Century Power Partnership (21CPP), funded by the U.S. Department of Energy, the National Renewable Energy Laboratory (NREL) has significantly augmented existing models of the South African power system to investigate future vRE scenarios. NREL, in collaboration with Eskom's Planning Department, further developed, tested and ran a combined capacity expansion and operational model of the South African power system including spatially disaggregated detail and geographical representation of system resources. New software to visualize and interpret modelling outputs has been developed, and scenario analysis of stepwise vRE build targets reveals new insight into associated planning and operational impacts and costs. The model, built using PLEXOS, is split into two components, firstly a capacity expansion model and secondly a unit commitment and economic dispatch model. The capacity expansion model optimizes new generation decisions to achieve the lowest cost, with a full understanding of capital cost and an approximated understanding of operational costs. The operational model has a greater set of detailed operational constraints and is run at daily resolutions. Both are run from 2017 through 2050. This investigation suggests that running both models in tandem may be the most effective means to plan the least cost South African power system as build plans seen to be more expensive than optimal by the capacity expansion model can produce greater operational cost savings seen only in the operational model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES) v0.1.0

The DISPATCHES software will enable the design and optimization of Integrated Energy Systems (IES). The platform will support hybridizing existing generation facilities (such as nuclear and coal plants) as well as greenfield hybrid designs that incorporate advanced technologies (such as Advanced Modular Reactors and Coal FIRST), and it will enable the consideration of multiple technology options with different time constants. The design of the IES will be optimized for operation within the bulk power system via energy market signals (day ahead, real-time, and ancillary services) obtained from a production cost model. The goal of DISPATCHES is to identify flexible, dynamic designs that are responsive to grid market signals resulting in highly efficient, cost effective tightly coupled hybrid energy systems that can act as a "black box" to the grid to provide increased flexibility and resiliency.

Gunter, Daniel↗

Networked Microgrids for Self-healing Power Systems

This paper proposes a transformative architecture for the normal operation and self-healing of networked microgrids (MGs). MGs can support and interchange electricity with each other in the proposed infrastructure. The networked MGs are connected by a physical common bus and a designed two-layer cyber communication network. The lower layer is within each MG where the energy management system (EMS) schedules the MG operation; the upper layer links a number of EMSs for global optimization and communication. In the normal operation mode, the objective is to schedule dispatchable distributed generators (DGs), energy storage systems (ESs) and controllable loads to minimize the operation costs and maximize the supply adequacy of each MG. When a generation deficiency or fault happens in a MG, the model switches to the self-healing mode and the local generation capacities of other MGs can be used to support the on-emergency portion of the system. A consensus algorithm is used to distribute portions of the desired power support to each individual MG in a decentralized way. The allocated portion corresponds to each MG’s local power exchange target which is used by its EMS to perform the optimal schedule. The resultant aggregated power output of networked MGs will be used to provide the requested power support. Test cases demonstrate the effectiveness of the proposed methodology.

Consensus Algorithm↗

Real-Time Dispatch With Secondary Frequency Regulation: A Pathway to Consider Intra-Interval Fluctuations

Real-time dispatch balances the power demand with minimized operating costs. For the current dispatch model, the demand is assumed to be constant within a time interval, while the intra-interval power balance is left to frequency regulation. Based on practical experience and simulations, this behavior may lead to insufficient frequency regulation and uneconomic regulation costs considering the increase in intra-interval fluctuations caused by renewables. Here, a real-time dispatch method with secondary frequency regulation behaviors is proposed. Without changing the interval of the real-time dispatch command, the system regulation mileage and intra-interval generation adjustment are explicitly formulated in a mixed-integer optimization model. To reduce the computational burden, an efficient two-stage calculation method is proposed. With practical utility data, this article finds that the proposed method can effectively improve the system frequency performance with the subminute net load forecasting curve obtained by an off-the-shelf forecasting approach. Time-domain simulations in IEEE and practical utility systems validate the effectiveness of the proposed method in terms of the frequency performance and total operating costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financial Analysis of the 2018 Glen Canyon Dam Bug Flow Experiment

This report examines the financial implications of the macroinvertebrate production flows (MPF) experiment conducted at the Glen Canyon Dam (GCD) from May 1, through August 31, 2018. It is the first report examining the financial implications of a MPF experiment since the 2016 Record of Decision (ROD) was adopted in December 2016 (Reclamation 2016). The 2016 ROD implemented the Long-Term Experimental and Management Plan (LTEMP) regime. Experimental releases may have either a positive or a negative impact on the financial value of energy production. For these experimental releases, financial costs of approximately $165,000 were incurred because this experiment maintained flat releases on the weekends and holidays. This study identifies the main factors that contribute to MPF costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating GCD operations under two scenarios: (1) a Baseline scenario that mimics MPF operations during the period of the experiment when it complies with the 2016 ROD operating criteria, and (2) a counterfactual Without Experiments scenario that is identical to the baseline except it assumes that the MPF experiment did not occur. The Generation and Transmission Maximization Superlite (GTMax SL) model was the main simulation tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. GCD is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power sale prices in the modeling process. In addition to estimating the financial impact of MPFs, the team used the GTMax SL model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the experimental releases, and WAPA operating practices.

13 HYDRO ENERGY↗

REopt Lite User Manual

REopt Lite evaluates the economic viability of grid-connected solar photovoltaics, wind, combined heat and power, and electric and thermal storage at commercial and small industrial sites. It allows building owners to identify the system sizes and dispatch strategies that minimize the site’s life cycle cost of energy. REopt Lite also estimates the amount of time on-site generation and storage can sustain the site's critical load during a grid outage and allows the user the choice of optimizing for energy resilience. It is primarily used to inform project development decisions and to support research on the factors that drive project feasibility for market development and policy analysis. It is available through a web interface, application programing interface, and open-source code. This user manual provides an overview of the model, including its capabilities and typical applications; inputs and outputs; economic calculations; technology descriptions; and model parameters, variables, and equations. The model is highly flexible and is continually evolving to meet the needs of each analysis. Therefore, this report is not an exhaustive description of all capabilities, but rather a summary of the core components of the model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comprehensive Solutions for Integration of Solar Resources into Grid Operations

The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of such a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.

14 SOLAR ENERGY↗

Eastern Renewable Generation Integration Study

The Eastern Interconnection (EI) is one of the largest power systems in the world, and its size and complexity have historically made it difficult to study in high levels of detail in a modeling environment. In order to understand how this system might be impacted by high penetrations (30% of total annual generation) of wind and solar photovoltaic (PV) during steady state operations, the National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy (DOE) conducted the Eastern Renewable Generation Integration Study (ERGIS). This study investigates certain aspects of the reliability and economic efficiency problem faced by power system operators and planners. Specifically, the study models the ability to meet electricity demand at a 5-minute time interval by scheduling resources for known ramping events, while maintaining adequate reserves to meet random variation in supply and demand, and contingency events. To measure the ability to meet these requirements, a unit commitment and economic dispatch (UC&ED) model is employed to simulate power system operations. The economic costs of managing this system are presented using production costs, a traditional UC&ED metric that does not include any consideration of long-term fixed costs. ERGIS simulated one year of power system operations to understand regional and sub-hourly impacts of wind and PV by developing a comprehensive UC&ED model of the EI. In the analysis, it is shown that, under the study assumptions, generation from approximately 400 GW of combined wind and PV capacity can be balanced on the transmission system at a 5-minute level. In order to address the significant computational burdens associated with a model of this detail we apply novel computing techniques to dramatically reduce simulation solve time while simultaneously increasing the resolution and fidelity of the analysis. Our results also indicate that high penetrations of wind and PV (collectively variable generation (VG)), significantly impact the operation of traditional generating resources and cause these resources to be used less frequently and operate across a broader output range because wind and PV have lower operating costs and variable output levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The role of hydrogen as long-duration energy storage and as an international energy carrier for electricity sector decarbonization

With countries and economies around the globe increasingly relying on non-dispatchable variable renewable energy (VRE), the need for effective energy storage and international carriers of low-carbon energy has intensified. This study delves into hydrogen's prospective, multifaceted contribution to decarbonizing the electricity sector, with emphasis on its utilization as a scalable technology for long-duration energy storage and as an international energy carrier. Using Japan as a case study, based on its ambitious national hydrogen strategy and plans to import liquefied hydrogen as a low-carbon fuel source, we employ advanced models encompassing capacity expansion and hourly dispatch. We explore diverse policy scenarios to unravel the timing, quantity, and operational intricacies of hydrogen deployment within a power system. Our findings highlight the essential role of hydrogen in providing a reliable power supply by balancing mismatches in VRE generation and load over several weeks and months and reducing the costs of achieving a zero-emission power system. The study recommends prioritizing domestically produced hydrogen, leveraging renewables for cost reduction, and strategically employing imported hydrogen as a risk hedge against potential spikes in battery storage and renewable energy costs. Furthermore, the strategic incorporation of hydrogen mitigates system costs and enhances energy self-sufficiency, informing policy design and investment strategies aligned with the dynamic global energy landscape.

08 HYDROGEN↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - NLR Historical Solar PV

The U.S. Department of Energy and National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis from variable sources, hydrogen compression and storage, and hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) research platform. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence data centers and other variable loads. This dataset entry describes the behavior of a 1.25-MW proton exchange membrane MC250 electrolyzer system, manufactured by Nel Hydrogen , [1] when fed historical data generated by the 430-kW, fixed-axis solar photovoltaic (PV) array located at NLR’s Flatirons Campus. (While the electrolyzer balance of plant supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack.) Solar PV power output data for the 2020 calendar year were categorized on a daily basis by total energy generation and standard deviation. Each day was then ranked by these metrics, and the 25th, 50th, and 100th percentiles were selected. The 75th percentile day did not exhibit sufficient variability to make for a valuable experiment. A similar process was used for the related historical wind dataset . [2] The historical days in 2020 that represented these percentiles are Dec. 19, March 29, and May 4, respectively. The entire solar day’s power profile was then fed through the MC250 electrolyzer. Due to its length, the 100th percentile day experiment was split into two parts, and the final 3 hours of the solar day were not captured. These final 3 hours contained no spikes or dips of interest and simply represented a slow decay of input solar power. Also, a single timestamp (13:13:47 on Jan. 14, 2026) was lost in the hydrogen system supervisory control and data acquisition. Finally, during the 25th percentile experiment (solar day Dec. 19, 2020) data recording was lost from 11:00:13 to 11:14:45. The roughly 15 minutes of the solar profile were rerun at the end of the experiment and spliced into this time slot during post-processing. The electrolysis system controls hydrogen production by varying direct current applied to the stack, from a maximum of 3,000 A to a minimum safe operation of 300 A, or 10%. Because the current–voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The historical solar profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. For more details on the statistical analysis process, see the slide deck “Public Reference Data for Megawatt-Scale Hydrogen Electrolysis: NLR Historical Solar PV Analysis and Profile Generation” accessible with this data entry. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single solar PV electrolysis experiment and is formatted as: {technology}_{percentile}_{scaling factor} For instance, “solarPV-430kW_25_2x.zip” reports the experiment using the 25th percentile solar data from the historical 2020 solar PV dataset, scaled to 200%. Scaling factors were applied to the generated solar PV power output files to more closely match the 1.25-MW capacity of the electrolyzer. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production, electrolysis power consumption, and solar power input. A PDF file detailing the historical solar data statistical analysis used to generate the solar profile. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30-minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all experiments combined into one dataset labeled "combined_solarPV_experiments.csv". [1] nelhydrogen.com/product/mc-series-electrolyser . [2] data.nlr.gov/submissions/316 .

08 HYDROGEN↗

Capacity Expansion Modeling for Storage Technologies

The Resource Planning Model (RPM) is a capacity expansion model designed for regional power systems and high levels of renewable generation. Recent extensions capture value-stacking for storage technologies, including batteries and concentrating solar power with storage. After estimating per-unit capacity value and curtailment reduction potential, RPM co-optimizes investment decisions and reduced-form dispatch, accounting for planning reserves; energy value, including arbitrage and curtailment reduction; and three types of operating reserves. Multiple technology cost scenarios are analyzed to determine level of deployment in the Western Interconnection under various conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗