Search NASA⌕ Search

SEARCH · Search NASA

Results for “relay orbit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Completion of NASA’s Two-Year Laser Communications Relay Demonstration (LCRD) Experiment Program

The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) completed its two-year experiment program in June 2024. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch. The payload relays data between two optical ground stations located in California and Hawaii and can also exchange data with an RF ground station in New Mexico. The addition of the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station in 2023 enabled data relay demonstrations between a laser terminal in low Earth orbit and either one of the optical ground stations or the RF ground station. The experiment program has included a variety of experiments originating within the LCRD project, NASA, and industry. The experiments have included measurements of the effects of the atmospheric optical channel (turbulence, weather) on the performance and availability of laser communications, adaptive optics characterization, demonstration of optimetrics techniques, and demonstration of Delay/Disruption Tolerant Networking (DTN). Furthermore, various future operational scenarios including robotic and exploration missions and various network service configurations have been emulated. This conference paper provides an overview and highlights of the LCRD experiment program with an emphasis on activities and results since the start of the ILLUMA-T testing in December 2023. A discussion of the expectations for the next phase of the LCRD mission, as well as how LCRD results may be applied to future applications is also included. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

Laser communications↗

Completion of NASA’s Two-Year Laser Communications Relay Demonstration (LCRD) Experiment Program

"The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) completed its two-year experiment program in June 2024. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch. The payload relays data between two optical ground stations located in California and Hawaii and can also exchange data with an RF ground station in New Mexico. The addition of the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station in 2023 enabled data relay demonstrations between a laser terminal in low Earth orbit and either one of the optical ground stations or the RF ground station. The experiment program has included a variety of experiments originating within the LCRD project, NASA, and industry. The experiments have included measurements of the effects of the atmospheric optical channel (turbulence, weather) on the performance and availability of laser communications, adaptive optics characterization, demonstration of optimetrics techniques, and demonstration of Delay/Disruption Tolerant Networking (DTN). Furthermore, various future operational scenarios including robotic and exploration missions and various network service configurations have been emulated. This conference paper provides an overview and highlights of the LCRD experiment program with an emphasis on activities and results since the start of the ILLUMA-T testing in December 2023. A discussion of the expectations for the next phase of the LCRD mission, as well as how LCRD results may be applied to future applications is also included. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL). "

Lasercom↗

A new method for satellite orbit determination using an operational worldwide transponder network

The method utilizes computer programs developed for the forthcoming ATS-F/NIMBUS-F tracking and data relay experiment where the basic tracking measurements are multiple path round-trip propagation times and rates. This method of orbit computation has recently been successfully evaluated by tracking a geostationary satellite (ATS-3) using an existing VHF (150 MHz) network of automatic transponders. A master station sequentially interrogates each transponder via the ATS-3. The master site is located at Schenectady, N. Y. and four automatic transponders were located at Shannon, Reykajavik, Buenos Aires, and Seattle respectively. Data at hourly intervals were collected during a 24 hour period on April 18-19, 1973. After correcting this data for known systematic errors it was provided as input to an orbit determination program where all satellite motions during signal propagation are rigorously accounted for. The resulting estimated ATS-3 orbit yielded observational residuals on the order of 100 meters. By using more than one satellite the present scheme is further capable of accurately locating several stationary or mobile terminals as part of the overall orbital solution.

Lynn, J. J.↗

Mars Reconnaissance Orbiter maneuver plan for Mars 2020 entry, descent, and landing support and beyond

The Mars Reconnaissance Orbiter (MRO) spacecraft continues to perform valuable science observations at Mars, provide telecommunication relay for surface assets, and characterize landing sites for future missions. MRO provided primary relay support for the InSight Mission during Entry, Descent, and Landing (EDL) on November26, 2018. This paper discusses the current maneuver plan to support Mars 2020 EDL and maintain MRO’s orbit for science operations through 2028.

Menon, Premkumar R.↗

50,000 Laps Around Mars: Navigating the Mars Reconnaissance Orbiter Through the Extended Missions (January 2009 - March 2017)

Orbiting Mars since March 2006, the Mars Reconnaissance Orbiter (MRO) spacecraft continues to perform valuable science observations, provide telecommunication relay for surface assets, and characterize landing sites for future missions. Previous papers reported on the navigation of MRO from interplanetary cruise through the end of the Primary Science Phase (PSP) in December 2008 and on maneuvers performed through November 2016. This paper highlights the navigation of MRO from January 2009 through its 50,000th orbit around Mars on March 27, 2017, an eight-year period covering the Extended Science Phase, the first three extended missions, and a portion of the fourth extended mission which began on October 1, 2016. Since the beginning of the PSP in November 2006, MRO’s navigation performance has continued to exceed expectations. Over that period of time, the mission has returned over 300 terabytes of data.

Schulze, William↗

Demonstration of GaN HEMT MMIC High-Power Amplifier for Lunar Proximity Communications

In this paper, we demonstrate a high efficiency, Ka-band (23.15 to 23.55 GHz) GaN HEMT MMIC based single-ended high power amplifier (HPA). The measured Pout, Gain, PAE, RMS EVM for Offset-QPSK, 8PSK, 16APSK, and 32APSK waveforms, 3rd-order IMD products, noise figure, and phase noise are presented. The results indicate that the saturated output power (P sat ) and the small signal Gain are on the order of 38.8 dBm (7.6 W) and 29.3 dB, respectively. The PAE at Psat is 20.0%. At the 1-dB compression point, the RMS EVM and the out-of-band spectral regrowth are less than 6% and –26 dBc respectively, for all four waveforms. Additionally, the spectrum is in compliance with the NTIA mask requirements for all four waveforms. The output 3rd-order intercept point (OIP3) is on the order of 42 dBm. The noise figure is less than 9.5 dB. The SSB phase noise spectral density is compliant with the envelope defined by the MIL-STD-188-164C. The HPA can enable proximity forward links between the orbiting Gateway/relay satellites and the lunar surface elements and cross links between relay satellites.

Ka-band↗

Mars Reconnaissance Orbiter mission

The Mars Reconnaissance Orbiter will deliver to Mars orbit a payload to conduct remote sensing science observations, characterize sites for future landers, and provide critical telecom/navigation relay capability for follow-on missions.

Mars↗

A simulation for gravity fine structure recovery from high-low GRAVSAT SST data

Covariance error analysis techniques were applied to investigate estimation strategies for the high-low SST mission for accurate local recovery of gravitational fine structure, considering the aliasing effects of unsolved for parameters. Surface density blocks of 5 deg x 5 deg and 2 1/2 deg x 2 1/2 deg resolution were utilized to represent the high order geopotential with the drag-free GRAVSAT configured in a nearly circular polar orbit at 250 km. altitude. GEOPAUSE and geosynchronous satellites were considered as high relay spacecraft. It is demonstrated that knowledge of gravitational fine structure can be significantly improved at 5 deg x 5 deg resolution using SST data from a high-low configuration with reasonably accurate orbits for the low GRAVSAT. The gravity fine structure recoverability of the high-low SST mission is compared with the low-low configuration and shown to be superior.

Estes, R. H.↗

NASA TO LAUNCH RELAY EXPERIMENTAL SATELLITE

Objectives of Project Relay are to test intercontinental microwave communications by low-altitude active repeater satellites, measure energy levels of space radiation in the orbital path and determine the extent of radiation damage to solar cells and electronic components. A second Relay satellite will be launched next year. Information obtained from the Relay experiments will contribute, ultimately, to development of a future operational satellite system for world- wide communication.

COMMUNICATIONS SATELLITE↗

Use of non-geostationary orbits for a Ka-band Personal Access Satellite system

This paper discusses the use of satellites in circular orbits at altitudes high enough for continental U.S. (CONUS) visibility. This enables one satellite to relay signals between geographically separated earth stations within CONUS at any one time and thus bypasses the need for intersatellite links. System performance is examined for three circular satellite orbits at altitudes of 20,182 km, 10,353 km, and 5143 km. Inclination angles between the satellite orbit plane and the equatorial plane of 0, 45, and 90 deg are considered. The number of satellites required to provide continuous CONUS coverage is calculated.

Estabrook, Polly↗

In-flight rescue of stranded TDRS-1 spacecraft

On April 4, 1983, the first Tracking and Data Relay Satellite (TDRS-1), one of six to be built for SPACECOM and NASA, was launched by the Space Shuttle Challenger. During the ascent to geosynchronous orbit, the Inertial Upper Stage (IUS) booster malfunctioned, leaving TDRS stranded in a low, elliptical orbit. This report describes the amazing satellite recovery from a wild tumble and the dramatic three-month rescue effort to move TDRS into synchronous orbit. It took a total burn time of 44 hours from a pair of tiny one-pound thrusters, about 800 pounds of propellant, an adaptable, robust attitude control system and much resourcefulness from ground operators to accomplish this feat. TDRS-1 reached its proper earth orbit on June 29, 1983 and then began its ten-year mission as a data relay satellite.

Schmeichel, H.↗

Networks consolidation program

The Networks Consolidation Program (NCP) goals were defined to include the planning, designing, and implementing of a single network of ground tracking stations. The proposed consolidated network is to make use of facilities that are now included in the Goddard Ground Spaceflight Tracking and Data Network as well as the existing JPL Deep Space Network. These facilities are to be combined and modified to provide a consolidated network capable of supporting the set of planetary and Highly Elliptical Earth Orbiter missions that are planned for the Tracking and Data Relay Satellite System era. The history of activities and events that led to the decision to consolidate the NASA ground tracking and data networks are traced. A summary of the management and planning activities that have taken place at the Jet Propulsion Laboratory, Goddard Space Flight Center, and at the NASA Headquarters Office of Space Tracking and Data Systems, with respect to the NCP, from the time of decision in October 1979 to the present, are discussed.

Yeater, M. L.↗

Project LOCOST: Laser or Chemical Hybrid Orbital Space Transport

A potential mission in the late 1990s is the servicing of spacecraft assets located in GEO. The Geosynchronous Operations Support Center (GeoShack) will be supported by a space transfer vehicle based at the Space Station (SS). The vehicle will transport cargo between the SS and the GeoShack. A proposed unmanned, laser or chemical hybrid orbital space transfer vehicle (LOCOST) can be used to efficiently transfer cargo between the two orbits. A preliminary design shows that an unmanned, laser/chemical hybrid vehicle results in the fuel savings needed while still providing fast trip times. The LOCOST vehicle receives a 12 MW laser beam from one Earth orbiting, solar pumped, iodide Laser Power Station (LPS). Two Energy Relay Units (ERU) provide laser beam support during periods of line-of-sight blockage by the Earth. The baseline mission specifies a 13 day round trip transfer time. The ship's configuration consist of an optical train, one hydrogen laser engine, two chemical engines, a 18 m by 29 m box truss, a mission-flexible payload module, and propellant tanks. Overall vehicle dry mass is 8,000 kg. Outbound cargo mass is 20,000 kg, and inbound cargo mass is 6,000 kg. The baseline mission needs 93,000 kg of propellants to complete the scenario. Fully fueled, outbound mission mass is 121,000 kg. A regeneratively cooled, single plasma, laser engine design producing a maximum of 768 N of thrust is utilized along with two traditional chemical engines. The payload module is designed to hold 40,000 kg of cargo, though the baseline mission specifies less. A proposed design of a laser/chemical hybrid vehicle provides a trip time and propellant efficient means to transport cargo from the SS to a GeoShack. Its unique, hybrid propulsion system provides safety through redundancy, allows baseline missions to be efficiently executed, while still allowing for the possibility of larger cargo transfers.

Dixon, Alan↗

Space Transfer Concepts and Analyses for Exploration Missions. Technical Directive 12: Beamed Power Systems Study

Parametric models were constructed for Earth-based laser powered electric orbit transfer from low Earth orbit to geosynchronous orbit. These models were used to carry out performance, cost/benefit, and sensitivity analyses of laser-powered transfer systems including end-to-end life cycle cost analyses for complete systems. Comparisons with conventional orbit transfer systems were made indicating large potential cost savings for laser-powered transfer. Approximate optimization was done to determine best parameter values for the systems. Orbit transfer flights simulations were conducted to explore effects of parameters not practical to model with a spreadsheet. The simulations considered view factors that determine when power can be transferred from ground stations to an orbit transfer vehicle and conducted sensitivity analyses for numbers of ground stations, Isp including dual-Isp transfers, and plane change profiles. Optimal steering laws were used for simultaneous altitude and plane change. Viewing geometry and low-thrust orbit raising were simultaneously simulated. A very preliminary investigation of relay mirrors was made.

Eder, D.↗

A method for computing instantaneous downtrack error from TDRS Doppler residuals

A simple method has been developed which calculates the instantaneous downtrack error in an orbiting vehicle's state vector from TDRS (Tracking and Data Relay Satellite) Doppler observation residuals. The downtrack error is expressed as a delta-time correction to the timetag of the vehicle's state vector. The method requires only a few easily obtained parameters and is easy to implement. This paper details the derivation of computing a delta-time correction from TDRS Doppler observation residuals and evaluates the method's assumptions and limitations. The results presented show that typically the method computes delta-time corrections that are less than five percent off from the true timetag error for Doppler observation residuals within twenty minutes of closest approach to the TDRS.

Haas, Franklin M., Jr.↗

Relay Communications Support to the ExoMars Schiaparelli Lander

The European Space Agency’s ExoMars Trace Gas Orbiter (TGO) arrived at Mars on October 19, 2016, three days after releasing the Schiaparelli Lander on a ballistic trajectory to Meridiani Planum. During the separation event, and subsequently during Schiaparelli’s Entry, Descent, and Landing (EDL), the NASA-provided Electra UHF payload onboard TGO was used to record signals from the Schiaparelli Lander for post-processing on the ground to recover both tracking of the lander’s carrier signal and reconstruction of the lander’s 8 kb/s telemetry. In addition, ESA’s Mars Express orbiter also recorded the Schiaparelli signal, with ground post-processing providing independent tracking of the lander carrier signal, and the Giant Metrewave Radio Telescope near Pune, India was configured to provide real-time detection of the lander carrier signal. While an anomaly in the latter stages of EDL led to loss of the lander, these critical event data sets, and in particular the telemetry reconstruction enabled by the TGO Electra recording, proved essential in enabling detailed diagnosis of the anomaly. And while the loss of the lander during EDL precluded the planned surface relay operations, the preparations for that activity provide important lessons learned for future Mars relay support scenarios.

Edwards, Charles D., Jr.↗

Flight dynamics facility operational orbit determination support for the ocean topography experiment

The Ocean Topography Experiment (TOPEX/POSEIDON) mission is designed to determine the topography of the Earth's sea surface across a 3 yr period, beginning with launch in June 1992. The Goddard Space Flight Center Dynamics Facility has the capability to operationally receive and process Tracking and Data Relay Satellite System (TDRSS) tracking data. Because these data will be used to support orbit determination (OD) aspects of the TOPEX mission, the Dynamics Facility was designated to perform TOPEX operational OD. The scientific data require stringent OD accuracy in navigating the TOPEX spacecraft. The OD accuracy requirements fall into two categories: (1) on orbit free flight; and (2) maneuver. The maneuver OD accuracy requirements are of two types; premaneuver planning and postmaneuver evaluation. Analysis using the Orbit Determination Error Analysis System (ODEAS) covariance software has shown that, during the first postlaunch mission phase of the TOPEX mission, some postmaneuver evaluation OD accuracy requirements cannot be met. ODEAS results also show that the most difficult requirements to meet are those that determine the change in the components of velocity for postmaneuver evaluation.

Bolvin, D. T.↗