Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Methodology to design a municipal solid waste pre-collection system. A case study

Highlights: • MSW recovery starts at homes; therefore it is important to facilitate it to people. • Additionally, to optimize MSW collection a previous pre-collection must be planned. • A methodology to organize pre-collection considering several factors is presented. • The methodology has been verified applying it to a Spanish middle town. - Abstract: The municipal solid waste (MSW) management is an important task that local governments as well as private companies must take into account to protect human health, the environment and to preserve natural resources. To design an adequate MSW management plan the first step consists in defining the waste generation and composition patterns of the town. As these patterns depend on several socio-economic factors it is advisable to organize them previously. Moreover, the waste generation and composition patterns may vary around the town and over the time. Generally, the data are not homogeneous around the city as the number of inhabitants is not constant nor it is the economic activity. Therefore, if all the information is showed in thematic maps, the final waste management decisions can be made more efficiently. The main aim of this paper is to present a structured methodology that allows local authorities or private companies who deal with MSW to design its own MSW management plan depending on the available data. According to these data, this paper proposes two ways of action: a direct way when detailed data are available and an indirect way when there is a lack of data and it is necessary to take into account bibliographic data. In any case, the amount of information needed is considerable. This paper combines the planning methodology with the Geographic Information Systems to present the final results in thematic maps that make easier to interpret them. The proposed methodology is a previous useful tool to organize the MSW collection routes including the selective collection. To verify the methodology it has been successfully applied to a Spanish town.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Designing an Optimal LSST Deep Drilling Program for Cosmology with Type Ia Supernovae

The Vera C. Rubin Observatory's Legacy Survey of Space and Time (LSST) is forecast to collect a large sample of Type Ia supernovae (SNe Ia) expected to be instrumental in unveiling the nature of dark energy. The feat, however, requires accurately measuring the two components of the Hubble diagram, distance modulus and redshift. Distance is estimated from SN Ia parameters extracted from light-curve fits, where the average quality of light curves is primarily driven by survey parameters. An optimal observing strategy is thus critical for measuring cosmological parameters with high accuracy. We present in this paper a three-stage analysis to assess the impact of the deep drilling (DD) strategy parameters on three critical aspects of the survey: redshift completeness, the number of well-measured SNe Ia, and cosmological measurements. We demonstrate that the current DD survey plans (internal LSST simulations) are characterized by a low completeness (z ~ 0.55–0.65), and irregular and low cadences (several days), which dramatically decrease the size of the well-measured SN Ia sample. We propose a method providing the number of visits required to reach higher redshifts. We use the results to design a set of optimized DD surveys for SN Ia cosmology taking full advantage of spectroscopic resources for host galaxy redshift measurements. The most accurate cosmological measurements are achieved with deep rolling surveys characterized by a high cadence (1 day), a rolling strategy (at least two seasons of observation per field), and ultradeep (z ≳ 0.8) and deep (z ≳ 0.6) fields. A deterministic scheduler including a gap recovery mechanism is critical to achieving a high-quality DD survey.

79 ASTRONOMY AND ASTROPHYSICS↗

Flat H Frangible Joint Evolution

Space vehicle staging and separation events require pyrotechnic devices. They are single-use mechanisms that cannot be tested, nor can failure-tolerant performance be demonstrated in actual flight articles prior to flight use. This necessitates the implementation of a robust design and test approach coupled with a fully redundant, failure-tolerant explosive mechanism to ensure that the system functions even in the event of a single failure. Historically, NASA has followed the single failure-tolerant (SFT) design philosophy for all human-rated spacecraft, including the Space Shuttle Program. Following the end of this program, aerospace companies proposed building the next generation human-rated vehicles with off-the-shelf, non-redundant, zero-failure-tolerant (ZFT) separation systems. Currently, spacecraft and launch vehicle providers for both the Orion and Commercial Crew Programs (CCPs) plan to deviate from the heritage safety approach and NASA's SFT human rating requirements. Both programs' partners have base-lined ZFT frangible joints for vehicle staging and fairing separation. These joints are commercially available from pyrotechnic vendors. Non-human-rated missions have flown them numerous times. The joints are relatively easy to integrate structurally within the spacecraft. In addition, the separation event is debris free, and the resultant pyro shock is lower than that of other design solutions. It is, however, a serious deficiency to lack failure tolerance. When used for critical applications on human-rated vehicles, a single failure could potentially lead to loss of crew (LOC) or loss of mission (LOM)). The Engineering and Safety & Mission Assurance directorates within the NASA Johnson Space Center took action to address this safety issue by initiating a project to develop a fully redundant, SFT frangible joint design, known as the Flat H. Critical to the ability to retrofit on launch vehicles being developed, the SFT mechanisms must fit within the same three-dimensional envelope as current designs as well as meet structural loads requirements. There is increased mass associated with the redundant design, and the goal is to minimize the weight impact as much as possible. These requirements presented significant challenges, both technically and financially; these challenges will be explored in this paper. Perhaps greater than the technical issues confronted during this design process, were the financial considerations. These were a significant part of the story of this design and development plan. Insufficient financial and labor resources were formidable barriers to completing this project. Nevertheless, JSC personnel successfully conducted several test series at JSC with very useful results. The many lessons learned drove design improvements, performance efficiency, and increased functional reliability. This paper examines the significant technical and financial challenges that these requirements posed to the project team. It discusses the evolution of the SFT frangible joint design, including optimization, testing, and successful partnering of the Johnson Space Center (JSC) engineering and JSC safety organizations, to enhance the flight safety margin for America's next generation of human-rated space vehicles.

Diegelman, Thomas E.↗

Computationally Efficient Motion Planning Algorithms for Agile Autonomous Vehicles in Cluttered Environments

Fast, real-time motion planning of an agile, autonomous vehicle in a cluttered environment, with many geometrically-fixed obstacles, is a very complex problem, especially because of the vehicle dynamics constraints and resource constrained computational capabilities onboard the vehicle. In this paper, we present computationally-efficient versions of our novel motion planning algorithm called the Spherical Expansion and Sequential Convex Programming (SE–SCP) algorithm. The SE–SCP algorithm first uses a spherical-expansion-based randomized sampling algorithm to explore the workspace. Oncea path is found from the start position to the goal position, the algorithm computes a locally optimal trajectory, within its homotopy class for a desired cost function, by solving a sequence of convex optimization problems. Thus, the SE–SCP algorithm is anytime locally optimal and the trajectory is globally optimal if the number of samples tends to infinity. In this paper, we further enhance the computational efficiency of the SE–SCP algorithm using uni-directional and bi-directional rewiring techniques. We also present a detailed proof of the local optimality characteristics of the new SE–SCP algorithms for aspecial case of vehicle dynamics. Simulation examples involving quadrotor and spacecraft help demonstrate the effectiveness of our new algorithms.

Bandyopadhyay, Saptarshi↗

Energy-Efficient and Resilient Infrastructure: Simulation, Validation, and Installation

Advanced, high-performance computing at the National Renewable Energy Laboratory (NREL) has enabled access to vast data resources with cutting-edge software techniques to understand, design, plan for, and maintain energy-efficient and resilient infrastructure. We have focused on cities and airports, but the technology we have developed will easily translate to seaports, inland ports, military installations, or other complex and large-scale energy-intensive systems. We can digitally simulate and explore current and future scenarios to make datadriven decisions for optimizing advanced energy systems, transportation and building operations, infrastructure planning and expansion, and battery storage to guide short- and long-term investments, electrification strategies, and integration of new technologies.

Athena↗

A Model Predictive Control to Improve Grid Resilience

The following article details a model predictive control (MPC) to improve grid resilience when faced with variable generation resources. This topic is of significant interest to utility power systems where distributed intermittent energy sources will increase significantly and be relied on for electric grid ancillary services. Previous work on MPCs has focused on narrowly targeted control applications such as improving electric vehicle (EV) charging infrastructure or reducing the cost of integrating Energy Storage Systems (ESSs) into the grid. In contrast, this article develops a comprehensive treatment of the construction of an MPC tailored to electric grids and then applies it integration of intermittent energy resources. To accomplish this, the following article includes a description of a reduced order model (ROM) of an electric power grid based on a circuit model, an optimization formulation that describes the MPC, a collocation method for solving linear time-dependent differential algebraic equations (DAEs) that result from the ROM, and an overall strategy for iteratively refining the behavior of the MPC. Next, the algorithm is validated using two separate numerical experiments. First, the algorithm is compared to an existing MPC code and the results are verified by a numerically precise simulation. It is shown that this algorithm produces a control comparable to existing algorithms and the behavior of the control carefully respects the bounds specified. Second, the MPC is applied to a small nine bus system that contains a mix of turbine-spinning-machine-based and intermittent generation in order to demonstrate the algorithm’s utility for resource planning and control of intermittent resources. This study demonstrates how the MPC can be tuned to change the behavior of the control, which can then assist with the integration of intermittent resources into the grid. The emphasis throughout the paper is to provide systematic treatment of the topic and produce a novel nonlinear control compatible design framework applicable to electric grids and the control of variable resources. This differs from the more targeted application-based focus in most presentations.

microgrid↗

Volume Change from Solidification Correlation for Hanford Tank Waste.

The U.S. Department of Energy (DOE), Hanford Field Office’s primary mission is to safely and effectively treat Hanford’s tank waste and deliver environmental remediation. Mixed radioactive waste is stored in the underground tanks at the Hanford Site. It was recently estimated that retrieval of the waste in the 200 West Area underground tanks in the SY, S, SX, and U Tank Farms will result in about 41 million gallons of mixed low-level waste (MLLW) (RPP-RPT-65147, Rev. 1). The current plan is to retrieve at least 22 S, SX, and U Farm tanks and pretreat1 to produce pretreated tank waste (PTW) which will be further treated (including solidification /immobilization) for Resource Conservation and Recovery Act (RCRA) Land Disposal Restriction (LDR) organics and inorganics before being transferred to an offsite out-of-state facility for disposal (RPP-PLAN-66135, Rev. 2). In addition, solidified PTW from the 200 East Area may also be transferred to an offsite out-of-state facility for disposal to ensure availability of critical Double-Shell Tank space, meet retrieval obligations, and optimize 200 East Area operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Direct Feed Low Activity Waste Program Throughput Optimization Through Modeling - 18587

The Direct Feed Low Activity Waste (DFLAW) program at Hanford allows for the early treatment of tank wastes years earlier than previously planned. Operational Research (OR) modeling is being used to provide invaluable insight into how complex and integrated processes will operate. The DFLAW OR models are used to help optimize the design and operation of the integrated system. The DFLAW OR models include the processes and real-life complexities involved in the day-to-day operation of the systems and equipment, and can predict key performance characteristics including throughput, mission timescale, equipment and labor utilization, lag storage and capacity requirements. The DFLAW OR models also have the in-built capability to simulate random events such as equipment failures. Adding random variability to models introduces a real-life element to model results. For example, OR modeling breakdown analysis of equipment failure and restoration times may inform specific improvements to a design and plant operation, including areas where the provision of spare (duty/standby) equipment would prove beneficial; the optimum number and capacity of lag storage tanks (for waste intermediate storage, reagents, etc.); operational issues, including scheduling constraints, labor resource constraints, effect of shift schedules (e.g. days only, extended shifts, 24/7),, maintenance strategies, including planned maintenance, equipment upgrades, on-hand spare part stockholding, etc. At Hanford, standalone OR models to date, have been used to help identify key operational issues and improve the design and operation of individual systems within the Tank Farms, Low Activity Waste Pretreatment System (LAWPS), Low Activity Waste (LAW) Vitrification and Effluent Management Facility (EMF) and Integrated Disposal Facility (IDF), logistics and infrastructure, 222-S laboratory [References 1 and 2] including: - Identification of critical spares including transfer pumps; - Underpin size and number of lag storage tanks to maintain continuous LAW feed to the LAW melters; - Underpin sample turnaround times at the 222-S Laboratory (e.g. feed prequalification and evaporator campaign samples) and determine how targets can be achieved without impacting waste feed delivery to LAWPS and the LAW Vitrification Facility; - Determine operational strategy required at IDF including shift schedules and sizes and the number of ILAW transporters that can support DFLAW throughput; - Identification of lag storage management strategies for glass formers, reagents, other consumables due to delivery distance and delays due to bad weather; and - Truck delivery badging needs to support 24/7 operation and management of shift in/out times required to reduce congestion. An Integrated DFLAW OR model has been developed and combines the standalone OR models such that integrated throughput and availability can be assessed from a program perspective. The Integrated OR model will provide a more detailed understanding of the interactions between Tank Farms, LAWPS, LAW VIT and IDF such that key bottleneck areas can be identified and ensure improvements are focused. Examples of future improvements that may be considered include identification of critical spare parts, required on-site maintenance capabilities, shift scheduling, and craft and labor availability. The methods, results and insights derived by DFLAW OR modeling efforts are expected to provide useful applications to other projects that involve combinations of mechanical handling, chemical processing, waste treatment/packaging or environmental remediation operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Earth resources data analysis program, phase 3

Tasks were performed in two areas: (1) systems analysis and (2) algorithmic development. The major effort in the systems analysis task was the development of a recommended approach to the monitoring of resource utilization data for the Large Area Crop Inventory Experiment (LACIE). Other efforts included participation in various studies concerning the LACIE Project Plan, the utility of the GE Image 100, and the specifications for a special purpose processor to be used in the LACIE. In the second task, the major effort was the development of improved algorithms for estimating proportions of unclassified remotely sensed data. Also, work was performed on optimal feature extraction and optimal feature extraction for proportion estimation.

Source record↗

Exploration Medical Capability IMPACT Medical Database – Medical Item Database (MedID) Content Development Methods

The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project encompasses a suite of computational tools that are used to inform systematic trade study evaluations and research prioritizations regarding the optimization of spaceflight medical systems, including the provision of risk assessment metrics, for a given design reference mission (DRM). The IMPACT Medical Database (IMPACT-MD) is the component that virtually houses the clinical and engineering data for medical conditions, capabilities, and resources used to support these analyses. In addition, IMPACT-MD also provides data to the associated SysML model to support the Level 2, Level 3, and Level 4 requirements development needed for IMPACT. IMPACT-MD contains an internal Evidence Library (EL) sub-component that hosts the clinical evidence, treatment and outcome metric data, and incidence data for each medical condition identified for exploration-class missions. Furthermore, a separate Medical Item Database (MedID) sub-component hosts the engineering data and physical attributes (e.g., mass, volume, power, etc.) associated with each medical resource item identified to address the requisite medical conditions. The IMPACT project is conducted under the Exploration Medical Capability (ExMC) element of the Human Research Program (HRP) within NASA's Space Operations Mission Directorate (SOMD). The reader is referred to the documents in Appendix A for a more complete overview of the IMPACT tool suite and functionality as well as further detail on any associated aspects of the project. The primary purpose of this document is to describe the methods utilized in the collection and verification of engineering data content during the project development phase for the MedID sub-component of the IMPACT-MD project. Engineering content data (both existing and new/future) will be stored in IMPACT-MD for use by the IMPACT project. This document will detail the content development and data credibility for the engineering data housed within the MedID subcomponent of IMPACT-MD, which is used to inform the IMPACT 1.0 project deliverables.

Exploration Medical Capability↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

Integrated distribution system and urban district planning with high renewable penetrations

Recent efforts to reduce energy consumption and greenhouse gas emissions have resulted in the development of sustainable, smart districts with highly energy efficient buildings, renewable distributed energy resources (DERs), and support for alternative modes of transportation. However, there is typically little if any coordination between the district developers and the local utility. Most attention is paid to the district's annual net load and generation without considering their instantaneous imbalance or the connecting network's state. This presents an opportunity to learn lessons from the design of distribution feeders for districts characterized by low loads and high penetrations of DERs that can be applied to the distribution grid at large. The aim of this overview is to summarize current practices in sustainable district planning as well as advances in modeling and design tools for incorporating the power distribution system into the district planning process. Recent developments in the modeling and optimization of district power systems, including their coordination with multi-energy systems and the impact of high penetration levels of renewable energy, are introduced. Sustainable districts in England and Japan are reviewed as case studies to illustrate the extent to which distribution system planning has been considered in practice. Finally, newly developed building-to-grid modeling tools that can facilitate coordinated district and power system design with utility involvement are introduced, along with suggestions for future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

State Strategies for Valuing Distributed Energy Resources in Cost-Effective Locations

The deployment of Distributed Energy Resources (DERs), small-scale electricity generation sources or controllable loads connected to the distribution system or a facility served by the distribution system, can have wide-ranging and positive impacts for the electricity grid. Interconnecting a DER in a high-value location on the grid can unlock benefits beyond those that accrue to the off-taker or asset owner. When DERs are deployed optimally, not only can the individual consumer benefit, but the local utility, the electricity system, and other ratepayers can benefit as well. By engaging in locational DER planning, states can help protect their communities and ratepayers and can help ensure the reliability and resilience of the electricity system. This report explores states' role in better integrating locational value into DER siting and development. It first outlines some of the benefits that can be achieved through the deployment of DERs in high-value locations. It then looks at state policy and regulatory roles and the tools states can use to influence the location of DER development. The report next examines the challenges of locational DER planning, with a particular focus on the challenges that states face in influencing the location of DER development. It highlights three case studies from states that engaged in locational DER planning through the Multistate Initiative to Develop Solar in Locations that Provide Benefits to the Grid and then presents several lessons learned from these efforts. The final section of this report summarizes some recent publications related to locational value of DERs in the form of an abbreviated literature review.

14 SOLAR ENERGY↗

NSUF CoMET Project, Implementation Plan FY2019

The Combined Materials and Experiment Toolkit (CoMET) is an NSUF information management resource designed to give users access to the information and tools necessary for designing meaningful experiments and writing clear, structured proposals. NSUF has a milestone to deploy an experiment design expert system to the NSUF website to support applications for the FY2020 CINR, due on August 30, 2019. To meet this milestone, the CoMET project work for FY2019 focuses on three main objectives: 1.) Integrate the three NSUF web applications by linking data fields in one application with the data found in the others. The NSUF web applications are: The Rapid Turnaround Experiment (RTE) Proposal Solicitation system, the Nuclear Fuels and Materials Library (NFML) and the Nuclear Energy Infrastructure Database (NEID) and the researcher and technical staff account and profile management systems. 2.) Build an Experiment Design Wizard (expert system) that will guide users through the process of writing a statement of work for a CINR or RTE experiment. 3.) Build an Irradiation Effects Calculator to help a PI choose the best neutron irradiation facility for their needs, estimate the time needed to achieve their goals, and estimate the resulting radioactivity of their samples, post-irradiation. These objectives are designed to support the mission of the NSUF and optimize the experiment design portion of the proposal processes. The new researcher database will make finding collaborators easier. The wizard will provide the PI with early NSUF expertise so that their proposed experiments, at the “Letter of Intent” and “Pre-Application” stages are better designed to work within the available NSUF facilities. Utilization of these tools should reduce the proportion of proposals that are judged to be infeasible or “not ready” for NSUF access. It should also improve the efficiency of the NSUF technical leads since the PI will be starting with a better statement of work for the project. The tools will also provide resources for NSUF staff to more efficiently screen and score incoming proposals. This implementation plan will layout the work breakdown structure, activities, resources required, and plan for completion of the activities for CoMET in FY2019.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Scheduling with genetic algorithms

In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

Fennel, Theron R.↗

Integrated Intermodal Passenger Transportation System

Modern transportation consists of many unique modes of travel. Each of these modes and their respective industries has evolved independently over time, forming a largely incoherent and inefficient overall transportation system. Travelers today are forced to spend unnecessary time and efforts planning a trip through varying modes of travel each with their own scheduling, pricing, and services; causing many travelers to simply rely on their relatively inefficient and expensive personal automobile. This paper presents a demonstration program system to not only collect and format many different sources of trip planning information, but also combine these independent modes of travel in order to form optimal routes and itineraries of travel. The results of this system show a mean decrease in inter-city travel time of 10 percent and a 25 percent reduction in carbon dioxide emissions over personal automobiles. Additionally, a 55 percent reduction in carbon dioxide emissions is observed for intra-city travel. A conclusion is that current resources are available, if somewhat hidden, to drastically improve point to point transportation in terms of time spent traveling, the cost of travel, and the ecological impact of a trip. Finally, future concepts are considered which could dramatically improve the interoperability and efficiency of the transportation infrastructure.

Klock, Ryan↗

Quantifying the Value of Technology and Policy Innovation in Water Resource Portfolios

Abstract Recent water infrastructure planning models demonstrate that explicitly accounting for hydrological changes in long‐term water planning reduces costs and increases system robustness. However, current models do not consider the effects of other changes occurring in the system over long time horizons, namely technology and policy innovation. By leveraging state‐of‐the‐art dynamic control techniques, we propose a suite of tools that explicitly relate hydrologic change, technology innovation, and policy interventions to system‐level water costs. We design robust and cost‐optimal strategies for water supply expansion under hydrological variability and hundreds of plausible innovation states, for example, treatment cost and diversification improvements, deployment times, and demand reduction campaigns. Our approach circumvents the need to pre‐assign probabilities to innovation scenarios and, instead, directly calculates the effects of technology, policy, and hydrology variations on system cost and planning strategies to identify avenues of impactful innovation. These tools can support technology development hubs, urban, state, and federal water planners in anticipating cost implications of technology and policy innovation at the local level, and prioritizing high‐impact innovation goals based on quantitative targets. Results for the case study of Santa Barbara, California identify high‐value innovation attributes for the city as well as combinations of innovation attributes across technologies and policies, and quantify their potential utility cost reductions.

13 HYDRO ENERGY↗

Optimizing equity in energy policy interventions: A quantitative decision-support framework for energy justice

This paper presents a quantitative framework to support policy decision-making around equitable energy interventions. By combining sociodemographic and techno-economic models in the energy space, we propose a linear programming model to calculate the optimal portfolio of energy investments that explicitly minimizes the energy burden of a given population of energy insecure households. The model is formulated as a multi-objective optimization suitable to support the decisions on weatherization and deployment of distributed energy resources. We illustrate our methodology with a case study involving a population of 14,043 energy insecure households in Wayne County, Detroit, United States.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗