Search NASA⌕ Search

SEARCH · Search NASA

Results for “synchronization operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Rotor instability due to loose rotating part

Loosening of a rotating part from its fixed position on the shaft or a part of the stator which comes loose and begins to turn with the rotor very frequently represents machinery malfunction. The loose part becomes involved in rotative motion mostly due to dry or fluid friction, and thus its motion is very erratic. The loose part can also move axially along the shaft. Detachment of the rotating part causes changes in the rotor balance state. Most often this results in higher unbalance. During steady-state operation the effect of a loose rotating part can manifest itself through heat vibration. It can be diagnosed by observing periodic changes of amplitude and phase of the synchronous response. During start-up (or shutdown) a loose rotating part carrying some amount of unbalance may manifest its dynamic action in the form of subsynchronous vibrations, very similar to those of other instabilities. The objective of this demonstration is to observe the effect of a loose rotating part (fixed, however, in the axial direction) under both steady-state (rotor constant speed) and transient (rotor start-up or shutdown) operation. The dynamic response depends very much on the amount of damping in the system: lubrication of the loose part/shaft surfaces and addition/elimination of aerodynamic drag blades, mounted on the loose disk, significantly change the rotor response.

Muszynska, A.↗

Motion Parameters Determination of the SC and Phobos in the Project Phobos-Grunt

The SC "Phobos-Grunt" flight is planned to 2009 in Russia with the purpose to deliver to the Earth the soil samples of the Mars satellite Phobos. The mission will pass under the following scheme [1-4]: the SC flight from the Earth to the Mars, the SC transit on the Mars satellite orbit, the motion round the Mars on the observation orbit and on the quasi-synchronous one [5], landing on Phobos, taking of a ground and start in the direction to the Earth. The implementation of complicated dynamical operations in the Phobos vicinity is foreseen by the project. The SC will be in a disturbance sphere of gravitational fields from the Sun, the Mars and the Phobos. The SC orbit determination is carried out on a totality of trajectory measurements executed from ground tracking stations and measurements of autonomous systems onboard space vehicle relatively the Phobos. As ground measurements the radio engineering measurements of range and range rate are used. There are possible as onboard optical observations of the Phobos by a television system and ranges from the SC up to the Phobos surface by laser locator. As soon as the Phobos orbit accuracy is insufficient for a solution of a problem of landing its orbit determination will be carried out together with determination of the SC orbit. Therefore the algorithms for joint improving of initial conditions of the SC and the Phobos are necessary to determine parameters of the SC relative the Phobos motion within a single dynamical motion model. After putting on the martial satellite orbit, on the Phobos observation orbit, on the quasi-synchronous orbit in the Phobos vicinity the equipment guidance and the following process of the SC orbit determination relatively Phobos requires a priori knowledge of the Phobos orbit parameters with sufficiently high precision. These parameters should be obtained beforehand using both all modern observations and historical ones.

Akim, E. L.↗

NASA Operational Simulator for Small Satellites: Tools for Software Based Validation and Verification of Small Satellites

The NASA Operational Simulator for Small Satellites (NOS3) is a suite of tools to aid in areas such as software development, integration test (IT), mission operations training, verification and validation (VV), and software systems check-out. NOS3 provides a software development environment, a multi-target build system, an operator interface-ground station, dynamics and environment simulations, and software-based hardware models. NOS3 enables the development of flight software (FSW) early in the project life cycle, when access to hardware is typically not available. For small satellites there are extensive lead times on many of the commercial-off-the-shelf (COTS) components as well as limited funding for engineering test units (ETU). Considering the difficulty of providing a hardware test-bed to each developer tester, hardware models are modeled based upon characteristic data or manufacturers data sheets for each individual component. The fidelity of each hardware models is such that FSW executes unaware that physical hardware is not present. This allows binaries to be compiled for both the simulation environment, and the flight computer, without changing the FSW source code. For hardware models that provide data dependent on the environment, such as a GPS receiver or magnetometer, an open-source tool from NASA GSFC (42 Spacecraft Simulation) is used to provide the necessary data. The underlying infrastructure used to transfer messages between FSW and the hardware models can also be used to monitor, intercept, and inject messages, which has proven to be beneficial for VV of larger missions such as James Webb Space Telescope (JWST). As hardware is procured, drivers can be added to the environment to enable hardware-in-the-loop (HWIL) testing. When strict time synchronization is not vital, any number of combinations of hardware components and software-based models can be tested. The open-source operator interface used in NOS3 is COSMOS from Ball Aerospace. For testing, plug-ins are implemented in COSMOS to control the NOS3 simulations, while the command and telemetry tools available in COSMOS are used to communicate with FSW. NOS3 is actively being used for FSW development and component testing of the Simulation-to-Flight 1 (STF-1) CubeSat. As NOS3 matures, hardware models have been added for common CubeSat components such as Novatel GPS receivers, ClydeSpace electrical power systems and batteries, ISISpace antenna systems, etc. In the future, NASA IVV plans to distribute NOS3 to other CubeSat developers and release the suite to the open-source community.

Verification↗

Block 1, phase 1 very long baseline interferometry implementation

The Block 1, phase 1 VBLI System, implemented in the Deep Space Network and currently undergoing system testing, is discussed. The system can be characterized as the modification of existing equipment and the addition of new software in the 64 m subnet and the addition of new hardware and software in the Network Operations and Control Center. It is to be operational to support Voyager project navigation requirements and is to provide, on a weekly basis, the information related to station clock synchronization, UT1, and polar motion.

Wilcher, J. H.↗

Thermal analysis of the IUE - Seven years later

The International Ultraviolet Explorer (IUE) is a large astronomical observatory which was launched on January 26, 1978. The observatory was placed into a three-axis stabilized, eccentric synchronous orbit with an inclination of about 29 degrees. It was designed for a three year lifetime, but is currently still operational. This paper will briefly review the thermal design which consists of multilayer insulation, ammonia-filled grooved heat pipes, bimetallic actuated louvers, and assorted commandable heaters. It will then discuss the seven years of thermal data and compare the results with prelaunch predictions. Finally an attempt will be made to explain the unexpected and continuing rise in temperature of the hydrazine auxiliary propulsion system which has increased over twenty degrees centigrade since launch.

Skladany, J. T.↗

A performance evaluation of the software-implemented fault-tolerance computer

The results of a performance evaluation of the Software-Implemented Fault-Tolerance (SIFT) computer system conducted in the NASA Avionics Integration Research Laboratory are presented. The essential system functions are described and compared to both earlier design proposals and subsequent design improvements. Using SIFT's specimen task load, the executive tasks, such as reconfiguration, clock synchronization, and interactive consistency, are found to consume significant computing resources. Together with other system overhead (e.g., voting and scheduling), the operating system overhead is in excess of 60 percent. The authors propose specific design changes that reduce this overhead burden significantly.

Palumbo, D. L.↗

Electro-mechanical vibratory system

The problem of predicting the phase angle of two self-synchronized rotors starting from rest is presented. It is shown that with insufficient power the rotors may not reach the final operating speed of the motors and stay locked at one of the lower natural frequencies of the vibrating system, thus producing large amplitude and failure of the equipment.

Paz, Mario↗

System Decommutes And Displays Telemetry Data

TDPlus computer program software system for decommutation of pulse-code-modulation (PCM) telemetry signals. Provides synchronization, conversion into engineering units, and display of serial bit streams. Transforms IBM PC-compatible computer into PCM-telemetry-decommutation system. Synchronizes telemetric signals data and enables conversion back into such meaningful forms as voltage, current, pressure, and the like. Also controls operation of digital-to-analog converters to ship data to paper strip charts or to parallel digital ports for offloading to other computers. Software used to process actual data only when telemetry-data-processing computer modified in accordance with specifications contained in "TDPlus TM Data Processor" (GSC-13291). Written in Turbo C and 8088 Assembly language.

Massey, D. E.↗

ECLIPS at LMD: Preliminary results of phase 2

The LMD (Laboratoire de Meteorologie Dynamique) ground-based backscatter lidar station (48 degrees 4 N, 02 degrees 0 E) near Paris was operated daily during the phase 2 of the Experimental Closed Lidar Pilot Study (ECLIPS) from May 22 to June 19, 1991 simultaneously with a radiometric equipment recording the downward short wavelength (SW) and long wavelength (LW) fluxes. A day-by-day summary of the field measurement as a function of universal time (UT) is given. Considering a 5 days week, there are only two days of missing data (05/31 and 06/06) in our record. The nearby meteorological station (10 km away) provides rawindsounding at 00UT and 12UT. During two days, the French airborne lidar LEANDRE was flown over the ground-based station. The airborne equipment looked down while the ground based equipment looked up. The two lidars were operated at 532 nm, and the on-board radiometers were identical to the ones on the ground. The measurements were synchronized with Advanced Very High Resolution Radiometer (AVHIRR) overpasses as required. We also indicate the Meteosat data corresponding to the period of measurements. Two examples of simultaneous ground-based lidar, pygeometer and pyranometer data are displayed.

Valentin, R.↗

A decision support tool for synchronizing technology advances with strategic mission objectives

Successful accomplishment of the objectives of many long-range future missions in areas such as space systems, land-use planning, and natural resource management requires significant technology developments. This paper describes the development of a decision-support data-derived tool called MisTec for helping strategic planners to determine technology development alternatives and to synchronize the technology development schedules with the performance schedules of future long-term missions. Special attention is given to the operations, concept, design, and functional capabilities of the MisTec. The MisTec was initially designed for manned Mars mission, but can be adapted to support other high-technology long-range strategic planning situations, making it possible for a mission analyst, planner, or manager to describe a mission scenario, determine the technology alternatives for making the mission achievable, and to plan the R&D activity necessary to achieve the required technology advances.

Hornstein, Rhoda S.↗

The Space Technology 5 Power System Design

The Space Technology 5 (ST5) mission is a NASA New Millennium Program (NMP) project that was developed to validate new technologies for future missions and to demonstrate the feasibility of building and launching multiple, miniature spacecraft that can operate as science probes, collecting research quality measurements. The three satellites in the ST5 constellation will be launched into a sun synchronous LEO (Low Earth Orbit) in early 2006. ST5 fits in the 25 kilogram and 24 Watt class of miniature but fully capable spacecraft. The power system design features the use of new technology components and a low voltage power bus. In order to hold the mass and volume low and to qualify new technologies for future use in space, high efficiency triple junction solar cells and a lithium ion battery were baselined into the design. The Power System Electronics (PSE) was designed for a high radiation environment and uses hybrid microcircuits for power switching and over current protection. The ST5 power system architecture and technologies will be presented.

Stewart, Karen D.↗

Pulsed hall thruster system

A pulsed Hall thruster system includes a Hall thruster having an electron source, a magnetic circuit, and a discharge chamber; a power processing unit for firing the Hall thruster to generate a discharge; a propellant storage and delivery system for providing propellant to the discharge chamber and a control unit for defining a pulse duration .tau.<0.1d.sup.3.rho./m, where d is the characteristic size of the thruster, .rho. is the propellant density at standard conditions, and m is the propellant mass flow rate for operating either the power processing unit to provide to the Hall thruster a power pulse of a pre-selected duration, .tau., or operating the propellant storage and delivery system to provide a propellant flow pulse of duration, .tau., or providing both as pulses, synchronized to arrive coincidentally at the discharge chamber to enable the Hall thruster to produce a discreet output impulse.

Hruby, Vladimir J.↗

Maintaining Aura's Orbit Requirements While Performing Orbit Maintenance Maneuvers Containing an Orbit Normal Delta-V Component

The Earth Observing System (EOS) Afternoon Constellation consists of five member missions (GCOM-W1, Aqua, CALIPSO, CloudSat, and Aura), each of which maintain a frozen, sun-synchronous orbit with a 16-day repeating ground track that follows the Worldwide Reference System-2 (WRS-2). Under nominal science operations for Aura, the propulsion system is oriented such that the resultant thrust vector is aligned 13.493 degrees away from the velocity vector along the yaw axis. When performing orbit maintenance maneuvers, the spacecraft performs a yaw slew to align the thrust vector in the appropriate direction. A new Drag Make Up (DMU) maneuver operations scheme has been implemented for Aura alleviating the need for the 13.493 degree yaw slew. The focus of this investigation is to assess the impact that no-slew DMU maneuver operations will have on Aura's Mean Local Time (MLT) which drives the required along track separation between Aura and the constellation members, as well as Aura's frozen orbit properties, eccentricity and argument of perigee. Seven maneuver strategies were analyzed to determine the best operational approach. A mirror pole strategy, with maneuvers alternating at the North and South poles, was implemented operationally to minimize impact to the MLT. Additional analysis determined that the mirror pole strategy could be further modified to include frozen orbit maneuvers and thus maintain both MLT and the frozen orbit properties under noslew operations.

Aqua↗

Test Methodology Development for Experimental Structural Assessment of ASC Planar Spring Material for Long-Term Durability

A vibration-based testing methodology has been developed that will assess fatigue behavior of the metallic material of construction for the Advanced Stirling Convertor displacer (planar) spring component. To minimize the testing duration, the test setup is designed for base-excitation of a multiplespecimen arrangement, driven in a high-frequency resonant mode; this allows completion of fatigue testing in an accelerated period. A high performance electro-dynamic exciter (shaker) is used to generate harmonic oscillation of cantilever beam specimens, which are clasped on the shaker armature with specially-designed clamp fixtures. The shaker operates in closed-loop control with dynamic specimen response feedback provided by a scanning laser vibrometer. A test coordinator function synchronizes the shaker controller and the laser vibrometer to complete the closed-loop scheme. The test coordinator also monitors structural health of the test specimens throughout the test period, recognizing any change in specimen dynamic behavior. As this may be due to fatigue crack initiation, the test coordinator terminates test progression and then acquires test data in an orderly manner. Design of the specimen and fixture geometry was completed by finite element analysis such that peak stress does not occur at the clamping fixture attachment points. Experimental stress evaluation was conducted to verify the specimen stress predictions. A successful application of the experimental methodology was demonstrated by validation tests with carbon steel specimens subjected to fully-reversed bending stress; high-cycle fatigue failures were induced in such specimens using higher-than-prototypical stresses

fatigue testing machines↗

Mars orbits with daily repeating ground traces

This paper derives orbits at Mars with ground traces that repeat at the same times every solar day (sol). A relay orbiter in such an orbit would pass over in-situ probes at the same times every sol, ensuring consistent coverage and simplifying mission design and operations. 42 orbits in five dasses are characterized: 14 circular equatorial prograde orbits 14 circular equatorial retrograde orbits 11 circular sun synchronous orbits 2 eccentric equatorial orbits 1 eccentric critically inclined orbit The paper reports on the performance of a relay orbiter in some of the orbits.

Turner, Andrew↗

Remote Science Work Support, Context, and Approach on NASA's VIPER Mission

Returning humans to the Moon, sending humans for the first time to Mars will necessarily include an accompaniment of robotic vehicles. A mission work system will be needed that supports remote teams of humans and robots in cooperation (synchronous and asynchronous) with earthbound systems, engineering and science teams. All of these elements have individual development contexts and manners of operation; at the same time, all are in varying degrees conjoined during mission development stages and operations. As such, the assembly of elements (people, activities, disciplinary knowledge, and machines) that constitute a mission work system can be developed independently and cooperatively. Current missions and those in development, in keeping with NASA’s history of employing prior mission knowledge, will shape how and by which organizational schemas, or elements of, future missions will draw from, or wholly rely. NASA’s Volatiles Investigating Polar Exploration Rover mission, VIPER, presents an opportunity for a unique operational schema within the history of space exploration and remotely conducted science research.

science operations↗

Thermal and orbital analysis of Earth monitoring Sun-synchronous space experiments

The fundamentals of an Earth monitoring Sun-synchronous orbit are presented. A Sun-synchronous Orbit Analysis Program (SOAP) was developed to calculate orbital parameters for an entire year. The output from this program provides the required input data for the TRASYS thermal radiation computer code, which in turn computes the infrared, solar and Earth albedo heat fluxes incident on a space experiment. Direct incident heat fluxes can be used as input to a generalized thermal analyzer program to size radiators and predict instrument operating temperatures. The SOAP computer code and its application to the thermal analysis methodology presented, should prove useful to the thermal engineer during the design phases of Earth monitoring Sun-synchronous space experiments.

Killough, Brian D.↗

The cesium bombardment engine north-south stationkeeping experiment on ATS-6

Two one-millipound-thrust cesium-bombardment ion thrusters have been developed and integrated on the ATS-F spacecraft for the purpose of demonstrating compatible north-south stationkeeping of a synchronous communication satellite. In addition to the two flight units, an identical system is undergoing extended testing on the ground to demonstrate operating lifetime. On July 17, 1974, approximately 50 days after launch, preliminary operation of one of the thrusters was begun. Completely successful operation was achieved on the first run. In addition to verifying operation, the principal accomplishments were the demonstration of a total absence of interference with the complete array of spacecraft-to-ground communication links and the verification of the predicted spacecraft operating potential of approximately -10 volts. Subsequent attempts to operate the same thruster have not been successful and an investigation of possible explanations is underway.

Hunter, R. E.↗