Search NASA⌕ Search

SEARCH · Search NASA

Results for “trajectory planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Voyager 2 Neptune navigation results

The Voyager 2 spacecraft encounter with the planet Neptune on Aug. 25, 1989 presented a difficult but interesting challenge for navigation. Final plans and strategies are compared with the actual performance obtained during the encounter in three areas. First, the orbit determination experience during encounter is reviewed, and the expected accuracy compared with the history of encounter period orbit estimates. Second, the trajectory correction maneuver history is outlined to show how the planned strategy was carried out to achieve desired science zones while assuring spacecraft safety. Third, the late update strategy is outlined and it is shown how this custom designed, complex procedure was used to support the near encounter science observations.

Gray, D. L.↗

A Generalized-Compliant-Motion Primitive

Computer program bridges gap between planning and execution of compliant robotic motions developed and installed in control system of telerobot. Called "generalized-compliant-motion primitive," one of several task-execution-primitive computer programs, which receives commands from higher-level task-planning programs and executes commands by generating required trajectories and applying appropriate control laws. Program comprises four parts corresponding to nominal motion, compliant motion, ending motion, and monitoring. Written in C language.

Backes, Paul G.↗

Minuteman 2 launched small satellite

The goal of LEOSat Industries' Spring 1994 project was to design a small satellite that has a strong technology demonstration or scientific justification and incorporates a high level of student involvement. The satellite is to be launched into low earth orbit by the converted Minuteman 2 satellite launcher designed by Minotaur Designs, Inc. in 1993. The launch vehicle shroud was modified to a height of 90 inches, a diameter of 48 inches at the bottom and 35 inches at the top for a total volume of 85 cubic feet. The maximum allowable mass of the payload is about 1100 lb., depending on the launch site, orbit altitude, and inclination. The satellite designed by LEOSat Industries is TerraSat, a remote-sensing satellite that will provide information for use in space-based earth studies. It will consist of infrared and ultraviolet/visible sensors similar to the SDI-developed sensors being tested on Clementine. The sensors will be mounted on the Defense Systems, Inc. Standard Satellite-1 spacecraft bus. LEOSat has planned for two satellites orbiting the Earth with trajectories similar to that of LANDSAT 5. The semi-major axis is 7080 kilometers, the eccentricity is 0, and the inclination is 98.2 degrees. The estimated mass of TerraSat is 145 kilograms and the estimated volume is 1.8 cubic meters. The estimated cost of TerraSat is $13.7 million. The projected length of time from assembly of the sensors to launch of the spacecraft is 13 months.

Chan, Sunny↗

Analysis of ETMS Data Quality for Traffic Flow Management Decisions

The data needed for air traffic flow management decision support tools is provided by the Enhanced Traffic Management System (ETMS). This includes both the tools that are in current use and the ones being developed for future deployment. Since the quality of decision support provided by all these tools will be influenced by the quality of the input ETMS data, an assessment of ETMS data quality is needed. Motivated by this desire, ETMS data quality is examined in this paper in terms of the unavailability of flight plans, deviation from the filed flight plans, departure delays, altitude errors and track data drops. Although many of these data quality issues are not new, little is known about their extent. A goal of this paper is to document the magnitude of data quality issues supported by numerical analysis of ETMS data. Guided by this goal, ETMS data for a 24-hour period were processed to determine the number of aircraft with missing flight plan messages at any given instant of time. Results are presented for aircraft above 18,000 feet altitude and also at all altitudes. Since deviation from filed flight plan is also a major cause of trajectory-modeling errors, statistics of deviations are presented. Errors in proposed departure times and ETMS-generated vertical profiles are also shown. A method for conditioning the vertical profiles for improving demand prediction accuracy is described. Graphs of actual sector counts obtained using these vertical profiles are compared with those obtained using the Host data for sectors in the Fort Worth Center to demonstrate the benefit of preprocessing. Finally, results are presented to quantify the extent of data drops. A method for propagating track positions during ETMS data drops is also described.

Chatterji, Gano B.↗

The Cassini-Huygens Mission Overview

The Cassini-Huygens Program is an international science mission to the Saturnian system. Three space agencies and seventeen nations contributed to building the Cassini spacecraft and Huygens probe. The Cassini orbiter is managed and operated by NASA's Jet Propulsion Laboratory. The Huygens probe was built and operated by the European Space Agency. The mission design for Cassini-Huygens calls for a four-year orbital survey of Saturn, its rings, magnetosphere, and satellites, and the descent into Titan's atmosphere of the Huygens probe. The Cassini orbiter tour consists of 76 orbits around Saturn with 45 close Titan flybys and 8 targeted icy satellite flybys. The Cassini orbiter spacecraft carries twelve scientific instruments that are performing a wide range of observations on a multitude of designated targets. The Huygens probe carried six additional instruments that provided in-situ sampling of the atmosphere and surface of Titan. The multi-national nature of this mission poses significant challenges in the area of flight operations. This paper will provide an overview of the mission, spacecraft, organization and flight operations environment used for the Cassini-Huygens Mission. It will address the operational complexities of the spacecraft and the science instruments and the approach used by Cassini-Huygens to address these issues.

mission operations↗

Estimation of Separation Buffers for Wind-Prediction Error in an Airborne Separation Assistance System

Wind prediction errors are known to affect the performance of automated air traffic management tools that rely on aircraft trajectory predictions. In particular, automated separation assurance tools, planned as part of the NextGen concept of operations, must be designed to account and compensate for the impact of wind prediction errors and other system uncertainties. In this paper we describe a high fidelity batch simulation study designed to estimate the separation distance required to compensate for the effects of wind-prediction errors throughout increasing traffic density on an airborne separation assistance system. These experimental runs are part of the Safety Performance of Airborne Separation experiment suite that examines the safety implications of prediction errors and system uncertainties on airborne separation assurance systems. In this experiment, wind-prediction errors were varied between zero and forty knots while traffic density was increased several times current traffic levels. In order to accurately measure the full unmitigated impact of wind-prediction errors, no uncertainty buffers were added to the separation minima. The goal of the study was to measure the impact of wind-prediction errors in order to estimate the additional separation buffers necessary to preserve separation and to provide a baseline for future analyses. Buffer estimations from this study will be used and verified in upcoming safety evaluation experiments under similar simulation conditions. Results suggest that the strategic airborne separation functions exercised in this experiment can sustain wind prediction errors up to 40kts at current day air traffic density with no additional separation distance buffer and at eight times the current day with no more than a 60% increase in separation distance buffer.

Consiglio, Maria C.↗

Nuclear Electric Propulsion (NEP) Developments for Human Mars Missions

Nuclear Electric Propulsion (NEP) has the potential to enable human missions to Mars and other ambitious missions throughout the solar system. This paper will discuss ongoing NEP research and development efforts and challenges to developing NEP systems for these missions. The baseline NEP vehicle design is comprised of multiple subsystems operating in concert. The major subsystems include a nuclear reactor, a dynamic power conversion system to generate electrical power, heat rejection/radiators, a power management and distribution system to deliver power to the electric propulsion (EP) system and to the crewed transit habitat, and the EP system. An additional chemical propulsion system is also included to execute higher-thrust maneuvers in the Earth and Martian gravity wells. Specific issues that will be addressed include mission trajectory design and optimization, concurrent subsystem technology advancement plans and maturation efforts, and systems-level modeling of the entire vehicle to permit the fast exploration of trade-offs that can occur with changes in operating conditions or through the use of different technologies.

Kurt A Polzin↗

Earth return maneuver strategies for Genesis and Stardust

As part of NASA's Discovery Program, Genesis and Stardust will be the first missions since the Apollo Program to return samples collected in deep space. To constrain costs of recovery, entry requirements must be much tighter than those imposed on Apollo. Spacecraft designs were also greatly simplified to limit costs, giving rise to a variety of operational limitations and constraints. In light of these considerations, approach to Earth presents a challenge in terms of both mission planning and navigation. This paper discusses strategies for trajectory correction during the Earth return phases of both missions.

Williams, Kenneth E.↗

Fast model-based scenario optimization in NSTX-U enabled by analytic gradient computation

Model-based optimization offers a systematic approach to advanced scenario planning. In this case, the feedforward-control inputs (actuator trajectories) that are needed to attain and sustain a desired scenario are obtained by solving a nonlinear constrained optimization problem. This class of problems generally minimize a cost function that measures the difference between desired and actual plasma states. Several numerical optimization algorithms, such as sequential quadratic programming, require repeated calculation of the cost function gradients with respect to the input trajectories. Calculating these gradients numerically can be computationally intensive, increasing the time needed to solve the feedforward-control optimization problem. Here, this work introduces a method to analytically calculate these cost function gradients from the current profile evolution model. This can significantly reduce the computational time and allow for fast feedforward-control optimization, which would eventually enable optimal scenario planning between discharges. The performance of the feedforward optimizer with analytical gradients is compared to a traditional optimization algorithm based on numerical gradients for different NSTX-U scenarios. The plasma dynamics in the optimization algorithm are simulated using the Control Oriented Transport SIMulator (COTSIM). Results of the work show that analytical gradients consistently reduce the computation time while achieving trajectories that are comparable to those obtained by traditional optimization algorithms based on numerical gradients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Optimising response to an introduction of African swine fever in wild pigs

African swine fever virus (ASFv) is a virulent pathogen that threatens domestic swine industries globally and persists in wild boar populations in some countries. Persistence in wild boar can challenge elimination and prevent disease-free status, making it necessary to address wild swine in proactive response plans. In the United States, invasive wild pigs are abundant and found across a wide range of ecological conditions that could drive different epidemiological dynamics among populations. Information on the size of the control areas required to rapidly eliminate the ASFv in wild pigs and how this area should change with management constraints and local ecology is needed to optimize response planning. We developed a spatially explicit disease transmission model contrasting wild pig movement and contact ecology in two ecosystems in Southeastern United States. We simulated ASFv spread and determined the optimal response area (reported as the radius of a circle) for eliminating ASFv rapidly over a range of detection times (when ASFv was detected relative to the true date of introduction), culling capacities (proportion of wild pigs in the culling zone removed weekly) and wild pig densities. Large radii for response areas (14 km) were needed under most conditions but could be shortened with early detection (≤ 8 weeks) and high culling capacities (≥ 15% weekly). Under most conditions, the ASFv was eliminated in less than 22 weeks using optimal control radii, although ecological conditions with high rates of wild pig movement required higher culling capacities (≥ 10% weekly) for elimination within 1 year. The results highlight the importance of adjusting response plans based on local ecology and show that wild pig movement is a better predictor of the optimal response area than the number of ASFv cases early in the outbreak trajectory. Furthermore, our framework provides a tool for determining optimal control plans in different areas, guiding expectations of response impacts, and planning resources needed for rapid elimination.

59 BASIC BIOLOGICAL SCIENCES↗

Uncertainty Optimization Applied to the Monte Carlo Analysis of Planetary Entry Trajectories

Recently, strong evidence of liquid water under the surface of Mars and a meteorite that might contain ancient microbes have renewed interest in Mars exploration. With this renewed interest, NASA plans to send spacecraft to Mars approx. every 26 months. These future spacecraft will return higher-resolution images, make precision landings, engage in longer-ranging surface maneuvers, and even return Martian soil and rock samples to Earth. Future robotic missions and any human missions to Mars will require precise entries to ensure safe landings near science objective and pre-employed assets. Potential sources of water and other interesting geographic features are often located near hazards, such as within craters or along canyon walls. In order for more accurate landings to be made, spacecraft entering the Martian atmosphere need to use lift to actively control the entry. This active guidance results in much smaller landing footprints. Planning for these missions will depend heavily on Monte Carlo analysis. Monte Carlo trajectory simulations have been used with a high degree of success in recent planetary exploration missions. These analyses ascertain the impact of off-nominal conditions during a flight and account for uncertainty. Uncertainties generally stem from limitations in manufacturing tolerances, measurement capabilities, analysis accuracies, and environmental unknowns. Thousands of off-nominal trajectories are simulated by randomly dispersing uncertainty variables and collecting statistics on forecast variables. The dependability of Monte Carlo forecasts, however, is limited by the accuracy and completeness of the assumed uncertainties. This is because Monte Carlo analysis is a forward driven problem; beginning with the input uncertainties and proceeding to the forecasts outputs. It lacks a mechanism to affect or alter the uncertainties based on the forecast results. If the results are unacceptable, the current practice is to use an iterative, trial-and-error approach to reconcile discrepancies. Therefore, an improvement to the Monte Carlo analysis is needed that will allow the problem to be worked in reverse. In this way, the largest allowable dispersions that achieve the required mission objectives can be determined quantitatively.

Olds, John↗

Overview and Software Architecture of the Copernicus Trajectory Design and Optimization System

The Copernicus Trajectory Design and Optimization System represents an innovative and comprehensive approach to on-orbit mission design, trajectory analysis and optimization. Copernicus integrates state of the art algorithms in optimization, interactive visualization, spacecraft state propagation, and data input-output interfaces, allowing the analyst to design spacecraft missions to all possible Solar System destinations. All of these features are incorporated within a single architecture that can be used interactively via a comprehensive GUI interface, or passively via external interfaces that execute batch processes. This paper describes the Copernicus software architecture together with the challenges associated with its implementation. Additionally, future development and planned new capabilities are discussed. Key words: Copernicus, Spacecraft Trajectory Optimization Software.

Williams, Jacob↗

Trajectory Orientation: A Technology-Enabled Concept Requiring a Shift in Controller Roles and Responsibilities

The development of a decision support tool (DST) for the en-route domain with accurate conflict prediction time horizons of 20 minutes has introduced an interesting problem. A 20 minute time horizon for conflict prediction often results in the predicted conflict occurring one or more sectors downstream from the sector controller who "owns" (i-e., is responsible for the safe separation of aircraft) one or both of the aircraft in the conflict pair. Based on current roles and responsibilities of today's en route controllers, the upstream controller would not resolve this conflict. In most cases, the downstream controller would wait until the conflicting aircraft entered higher sector before resolving the conflict. This results in a delay of several minutes from the time when the conflict was initially predicted. This delay is inefficient from both a controller workload and user's cost of operations perspective. Trajectory orientation, a new concept for facilitating an efficient, conflict-free flight path across several sectors while conforming to metering or miles-in-trail spacing, is proposed as an alternative to today's sector-oriented method. This concept necessitates a fundamental shift in thinking about inter-sector coordination. Instead of operating independently, with the main focus on protecting their internal airspace, controllers would work cooperatively, depending on each other for well-planned, conflict-free flow of aircraft. To support the trajectory orientation concept, a long time horizon (15 to 20 minutes) for conflict prediction and resolution would most likely be a primary requirement. In addition, new tools, such as controller-pilot data link will be identified to determine their necessity and applicability for trajectory orientation. Finally, with significant controller participation from selected Air Route Traffic Control Centers, potential shifts in R-side/D-side roles and responsibilities as well as the creation of a new controller position for multi-sector planning will be examined to determine the most viable solutions.

Leiden, Ken↗

The Cassini Grand Finale Mission: Planning for a New Mission Environment

The Cassini F-Ring & Proximal Orbits (FRPO) is a new and unique mission; to ensure the highest priority science gets implemented, the POST (Proximal Orbit Science Team) was created to pre-allocate the time around periapse for all 22 proximal orbits. The F-ring orbits, and proximal time outside of POST, were handled similar to Cassini’s Solstice Mission using the Pre-Integrated Event (PIE) process. The new and unique properties of the spacecraft’s trajectory required much forethought to be flown safely while still planning for the most and best science return possible. Some ring-plane crossings (RPX) will be protected against dust impacts by turning the high gain antenna (HGA) to the dust RAM direction (HGA2RAM). If on the first proximal RPX higher than expected dust readings are seen then the Project Office may choose to require more (all) subsequent RPX to be HGA2RAM, implemented via a real-time command overlay for uplinked sequences. The pointing uncertainties will be larger than usual after the final targeted flyby; some of the process changes to address this include adding extra orbit trim maneuvers (OTMs) (fuel permitting) to resync to the reference trajectory and reduce pointing uncertainties; and movable blocks of commands to be used for some periapses where atmospheric drag may cause large timing shifts Changes made for FRPO to address perceptions that these sequences will be hard to implement include requiring early pointing designs (during integration) for certain types of observations, requiring teams to check early on that they can turn to and from their observation attitude, and that their attitude is safe, and adjusting the Implementation process to give more time for science observation designers. This paper will discuss these process changes and lessons learned so far.

Ray, Trina↗

An interactive tool for design and support of lunar, gravity assist, and libration point trajectories

The 'Swingby' interactive tool for design, analysis, and support of maneuver planning for missions that involve transfers to the moon, the lunar orbits, multiple-gravity assists, and the libration-point orbits, runs on a PC and uses pull-down and pop-up menus to allow users to change physical constants and select perturbations for inclusion. Swingby can also target by ascertain parameters, or allow the computer to generate goals on the basis of mission requirements. Rapid mission analyses, operational maneuvers, and contingency plans are thereby obtainable.

Carrico, J.↗

Trajectory-Oriented Approach to Managing Traffic Complexity: Trajectory Flexibility Metrics and Algorithms and Preliminary Complexity Impact Assessment

This document describes exploratory research on a distributed, trajectory oriented approach for traffic complexity management. The approach is to manage traffic complexity based on preserving trajectory flexibility and minimizing constraints. In particular, the document presents metrics for trajectory flexibility; a method for estimating these metrics based on discrete time and degree of freedom assumptions; a planning algorithm using these metrics to preserve flexibility; and preliminary experiments testing the impact of preserving trajectory flexibility on traffic complexity. The document also describes an early demonstration capability of the trajectory flexibility preservation function in the NASA Autonomous Operations Planner (AOP) platform.

Idris, Husni↗

A Sampling Based Approach to Spacecraft Autonomous Maneuvering with Safety Specifications

This paper presents a methods for safe spacecraft autonomous maneuvering that leverages robotic motion-planning techniques to spacecraft control. Specifically the scenario we consider is an in-plan rendezvous of a chaser spacecraft in proximity to a target spacecraft at the origin of the Clohessy Wiltshire Hill frame. The trajectory for the chaser spacecraft is generated in a receding horizon fashion by executing a sampling based robotic motion planning algorithm name Fast Marching Trees (FMT) which efficiently grows a tree of trajectories over a set of probabillistically drawn samples in the state space. To enforce safety the tree is only grown over actively safe samples for which there exists a one-burn collision avoidance maneuver that circularizes the spacecraft orbit along a collision-free coasting arc and that can be executed under potential thrusters failures. The overall approach establishes a provably correct framework for the systematic encoding of safety specifications into the spacecraft trajectory generations process and appears amenable to real time implementation on orbit. Simulation results are presented for a two-fault tolerant spacecraft during autonomous approach to a single client in Low Earth Orbit.

Spacecraft↗

OSIRIS-REx Screening Experience & Lessons Learned

On September 24, 2023, the NASA OSIRIS-REx spacecraft returned a sample of asteroid Bennu, approaching on a hyperbolic impact trajectory relative to Earth. At approximately 108,000 km altitude and four hours prior to hitting the top of the atmosphere, the Sample Return Capsule (SRC) separated from the spacecraft bus, targeting the Utah Test and Training Range. Twenty minutes later, the bus performed a large divert maneuver to fly by at a perigee altitude of ~780 km. Given the immense scientific value of the sample, substantial efforts were undertaken by NASA CARA and the OSIRIS-REx mission to ensure safe passage of the objects from GEO through LEO. This presentation provides an overview of collision avoidance maneuver (CAM) options, results of screenings, coordination with DoD for contingency observations, and lessons learned for screening future Earth flyby and entry trajectories. Two particular challenges included screening two objects using a much larger than normal 250 km spherical monitor volume and decision planning for a single CAM while the SRC was still attached that would alter both trajectories. The larger, non-standard screening volume resulted in custom procedures that CARA personnel had to run manually for each screening, and the initial long propagation times while the objects were more than a week out required significant computing resources. With a single CAM opportunity at 13 hours out, the decision to execute a maneuver had to consider the risk to both objects, where one could imagine a situation where the maneuver would clear a high-risk conjunction for one object and introduce one for the other – begging the question of relative risk posture between the SRC and bus. These among other unique aspects of Earth flyby and entry missions led to novel planning and implementation procedures to support future missions of this type.

Dolan E. Highsmith↗