Search NASA⌕ Search

SEARCH · Search NASA

Results for “transportation planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Regarding Pilot Usage of Display Technologies for Improving Awareness of Aircraft System States

ed systems and the procedures for ng in complexity. This interacting trend places a larger burden on pilots to manage increasing amounts of information and to understand system interactions. The result is an increase in the likelihood of loss of airplane state awareness (ASA). One way to gain more insight into this issue is through experimentation using objective measures of visual behavior. This study summarizes an analysis of oculometer data obtained during a high-fidelity flight simulation study that included a variety of complex pilot-system interactions that occur in current flight decks, as well as several planned for the next generation air transportation system. The study was comprised of various scenarios designed to induce low and high energy aircraft states coupled with other emulated causal factors in recent accidents. Three different display technologies were evaluated in this recent pilot-in-the-loop study conducted at NASA Langley Research Center. These technologies include a stall recovery guidance algorithm and display concept, an enhanced airspeed control indication of when the automation is no longer actively controlling airspeed, and enhanced synoptic diagrams with corresponding simplified electronic interactive checklists. Multiple data analyses were performed to understand how the 26 participating airline pilots were observing ASA-related information provided during different stag specific events within these stages.

Daniels, Taumi S.↗

Modular High Temperature Gas-Cooled Reactor: Licensing Part III

Recent Licensing Experience- Advanced and Micro- Reactors Recent Designs Additional Designs Licensing Challenges for advanced reactors Functional Containment Emergency Planning Zones Autonomous and Remote Operation Transportation Manufacturing Licenses NRC License vs. DOE Authorization Siting and Environmental Impact

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Spent Nuclear Fuel Receipt Rate Analysis within an Integrated Waste Manage-ment System Architecture that Includes Consolidated Interim Storage

A key parameter in analyzing the performance of an integrated waste management system (IWMS) architecture for the disposition of spent nuclear fuel (SNF) is the SNF receipt rate from reactor and other custodian sites. The introduction of one or more federal consolidated interim storage facilities (CISFs) into the IWMS architecture can enable the receipt rate profile as a function of time to be accelerated relative to system architectures without a CISF. The question then arises as to what an optimal SNF receipt rate profile for an IWMS architecture might be in view of practical constraints and desired system performance attributes and associated metrics. This paper describes a sensitivity study on SNF receipt rates and the associated results for a selected set of IWMS scenarios aimed an in-forming near-term planning for interim storage capabilities and transportation assets. Two different strategies are compared, one that fills an initial CISF quickly and then idles the transportation system while a disposal system is prepared, and a second strategy that aims to provide a more continuous use of transportation assets and receipt capabilities at the IWMS while the disposal system is readied for SNF receipt. Cost considerations and other factors such as impact on timing of clearing reactor sites of SNF, efficient use of capital assets, and other metrics, including those which may be important to a CISF host community, are examined. Based on the analysis, an initial approach is presented targeting a continuous receipt strategy while having the flexibility to step up receipt capabilities to a reasonable degree when needed and beneficial within overall system constraints.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Wind Shear radar program future plans

The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.

Robertson, Roy E.↗

The current programs of the U.S. National Aeronautics and Space Administration

This paper discusses the U.S. civil space programs carried out by the U.S. National Aeronautics and Space Administration (NASA). The current status of NASA's major program elements, including current funding, for space transportation systems, space science, and space applications are described. In discussing each area, the current status of NASA's major international cooperative projects is briefly described in terms of the respective responsibilities of the partners and the anticipated launch date and operational period of each mission. Also described are NASA's plans for future missions using the Space Transportation System (STS), with emphasis on possible development of an earth-orbiting manned space station.

Pedersen, K. S.↗

A Mars/phobos Transportation System

A transportation system will be necessary to support construction and operation of bases on Phobos and Mars beginning in the year 2020 or later. An approach to defining a network of vehicles and the types of vehicles which may be used in the system are presented. The network will provide a convenient, integrated means for transporting robotically constructed bases to Phobos and Mars. All the technology needed for the current plan is expected to be available for use at the projected date of cargo departure from the Earth system. The modular design of the transportation system provides easily implemented contingency plans, so that difficulties with any one vehicle will have a minimal effect on the progress of the total mission. The transportation network proposed consists of orbital vehicles and atmospheric entry vehicles. Initially, only orbital vehicles will participate in the robotic construction phase of the Phobos base. The Interplanetary Transfer Vehicle (ITV) will carry the base and construction equipment to Phobos where the Orbital Maneuvering Vehicles (OMV's) will participate in the initial construction of the base. When the Mars base is ready to be sent, one or more ITV's will be used to transport the atmospheric entry vehicles from Earth. These atmospheric vehicles are the One Way Landers (OWL's) and the Ascent/Descent Vehicles (ADV's). They will be used to carry the base components and/or construction equipment. The OMV's and the Orbital Transfer Vehicles (OTV's) will assist in carrying the atmospheric entry vehicles to low Martian orbit where the OWL's or ADV's will descent to the planet surface. The ADV's were proposed to accommodate expansion of the system. Additionally, a smaller version of the ADV class is capable of transporting personnel between Mars and Phobos.

Source record↗

The Hubble Space Telescope Scientific Instruments

The paper describes the status of the five Scientific Instruments (SI's) to be flown on the Hubble Space Telescope (HST) which is planned to be launched by the Space Transportation System in the last half of 1986. Concentration is on the testing experience for each of the instruments both at the instrument level and in conjunction with the other instruments and subsystems of the HST. Since the Acceptance/Flight Qualification Program of the HST is currently underway a description of the test and verification plans to be accomplished prior to shipment to the Kennedy Space Center (KSC) and pre-launch tests plans prior to launch are provided. The paper concludes with a brief description of anticipated orbital performance.

Moore, J. V.↗

Vehicle and Mobility Technologies 2024 Annual Impact Report

Research and development at the National Renewable Energy Laboratory supports the U.S. Department of Energy's Vehicle Technologies Office in advancing efficient and sustainable transportation technologies that will improve energy efficiency, fuel economy, and mobility energy productivity, and will enable America to achieve a resilient, secure, clean, and affordable transportation future.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

A new era of space transportation - Future programs

The Space Transportation System - Space Shuttle, Spacelab and Upper Stages - is described from the point of view of systems and operations. Future plans concerning the permanent occupancy of space are examined with emphasis on the Space Construction Base, Advanced Transportation Systems and Space Industrialization plans.

Yardley, J. F.↗

The Human Mars Mission: Transportation Assessment

If funding is available, and for NASA planning purposes, the Human Mars Mission (HMM) is baselined to take place during the 2011 and 2013/2014 Mars opportunities. Two cargo flights will leave for Mars during the first opportunity, one to Mars orbit and the second to the surface, in preparation for the crew during the following opportunity. Each trans-Mars injection (TMI) stack will consist of a cargo/payload portion (currently coming in at between 65 and 78 mt) and a nuclear thermal propulsion (NTP) stage (currently coming in at between 69 and 77 mt loaded with propellant) for performing the departure ΔVs to get on to the appropriate Mars trajectories. Three 66,700 N thrust NTP engines comprise the TMI stage for each stack and perform a ΔV ranging from 3580 to 3890 m/s as required by the trajectory (with gravity losses and various performance margins added to this for the total TMI ΔV performed). This paper will discuss the current application of this NTP stage to a Human Mars mission, and project what implications a nuclear trans-Earth injection (TEI) stage as well as a bi-modal NTP stage could mean to a human visit to Mars.

Mars missions↗

Vadose Zone Transport of Tritium and Nitrate under Ponded Water Conditions

Vadose zone transport of tritium and nitrate can be important considerations at radioactive waste sites, landfills, or areas with industrial impacts. These contaminants are of particular concern because they typically have a relatively higher mobility in the subsurface compared to other compounds. Here, we describe a semiarid site with tritium and nitrate contamination involving a manmade ponded water source above a thick unsaturated zone at Los Alamos National Laboratory in New Mexico, USA. This study demonstrates the value of vadose zone flow and transport modeling for the development of field investigation plans (i.e., identifying optimal borehole locations and depths for contaminant characterization), and how a combination of modeling with isotope and geochemical measurements can provide insight into how tritium and nitrate transport in the vadose zone in semiarid environments. Modeling results suggest that at this location, tritium transport is well predicted by classical multiphase theory. Our work expands the demonstrated usefulness of a standard tritium conceptual model to sites with ponded surface conditions and agrees with previous results where a standard model was able to explain the evolution of a tritium plume at an arid waste disposal site. In addition, depth-based analyses of δ 18 O and δ 2 H of pore waters helped confirm the extent of pond infiltration into the vadose zone, and the δ 15 N of nitrate showed that the contaminant release history of the site was different than originally assumed.

58 GEOSCIENCES↗

Some early perspectives on ground requirements of liquid hydrogen air transports

The paper examines the problem of liquid-hydrogen (LH2) subsonic long-range air transport from the perspectives of airplane manufacturers, the airline operator, the air terminal authority and the LH2 supplier. Emphasis is placed on identifying common problems and interfaces that are likely to occur in preparing for commercial airline operations of LH2 subsonic air transport in the 1990-1995 period. General considerations are discussed relative to sources and cost of gaseous hydrogen, hydrogen liquefaction, and LH2 availability. The fact that hydrogen sustains combustion at altitudes substantially higher than hydrocarbon fuels suggests that air transport can be designed to operate at higher enroute air traffic flight levels. This can be an advantage if only to relieve traffic congestion on heavily traveled routes. Pertinent interfaces in planning for the use of LH2 in air transportation are identified, including productivity and profitability, passenger-fuel compatibility, and lightning and electrical discharges.

Korycinski, P. F.↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: • 25-41-03, EMAD Facility (Building 3900) • 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV) • 25-33-05, Building 3901, Engine Transport System Maintenance Building (Train Shed) This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the conceptual site model, such as an unanticipated release, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report (CR) will be prepared and submitted to NDEP for review and approval. The schedule for completion of the CR will be established in consultation with NDEP.

54 ENVIRONMENTAL SCIENCES↗

Transportation and General Traffic Management, Change 2

This Handbook sets forth those transportation and general traffic management responsibilities, guidelines, and procedures governing the use of commercial and Government transportation for NASA. Transportation is an integral function of the logistic process, involving all activities incident to the movement of persons and things. The fundamental and continuous objectives of transportation are to control and diminish the time-distance of lines of communication by the most suitable means. The function of transportation is accomplished through, and encompasses all, the planning, direction, supervision, and execution of the technical, operational, and administrative tasks required to procure or furnish efficient and economical conveyance of cargo and personnel by all modes of commercial and Government transportation. This Handbook is applicable to NASA Headquarters and Field Installations.

Source record↗

The flight planning - flight management connection

Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.

Sorensen, J. A.↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares I-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

McArthur, J. Craig↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

Analyzing School Bus Electrification in Richmond, Virginia

School buses are an essential component of the transportation infrastructure, serving as a lifeline for students across the globe. However, the widespread use of diesel school buses has raised concerns about the health impact on millions of students exposed to harmful emissions daily. Recognizing this issue, school districts worldwide are urgently seeking cleaner energy alternatives. Electric school buses emerge as an environmentally friendly and sustainable option, fostering a healthier environment for both students and communities. However, school bus electrification faces the challenges of high upfront cost, cumbersome charging management, and constraints from power grids. To help school bus operators address those challenges, this study presents a data-driven analysis for school bus electrification. This study considered a real-world school bus system in Richmond, VA, and developed a mathematical programming model to analyze the system design, charging strategies, and charging load profiles for the electrification scenario. The study evaluated different charging strategies based on model outcomes, aiming to optimize efficiency and effectiveness. Ultimately, this research generated electric school bus charging demand profiles under various scenarios, shedding light on the feasibility and implications of transitioning to electric-powered school buses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗