Tools, Feasibility, and Cost of Monitoring Plan (SECARB Phase III 9.1.1a, b, c, d, e, f, g)
This report completes several Phase III milestone reporting obligations in Subtask 9.1.1 and Budget Period 3 general reporting requirements, specifically Phase III milestone 9.1.1. g "Subsurface Monitoring Plan" with subparts a-g, Assessment of Feasibility, Cost & Likely Success of Cross-Well EM, crosswell acoustic, CASSM, VSP, borehole logging, repeat seismic, geochemical monitoring, and related methods and backup and archival methods. This report builds on work done for Phase II and in the first year of Phase III and reflects the integration of results of a teamwide planning meeting held in Austin at the Bureau of Economic Geology (BEG) April 8–9, 2008, and a planning and review meeting held September 23, 2008. This report provides the consensus plan for site-specific characterization and monitoring that were used to guide engineering design. The team expected that further plan modifications would be required during the engineering design, cost evaluation, and timeline adjustment that will occur prior to drilling and installation. This report was then updated to include additional adjustments needed as site characterization data were gathered during fieldwork in the summer of 2009 and as the design was finalized.