Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Wolak: You can't be serious, Mr. Falk

The author believes that suppliers and demanders in all markets, not just those in electricity markets, take all available unilateral actions to maximize their profits, which is equivalent to maximizing all available unilateral market power. He takes up a number of points of disagreement with Falk. These lead into an important point about the market efficiency and system reliability properties of the combined capacity payment mechanism and short-term energy market model versus a model that relies on fixed-price long-term contracts for energy with a short-term energy market as the primary means for providing sufficient revenues to generation unit owners. Neither capacity markets nor energy markets are perfectly competitive; therefore it is an empirical question as to whether the combination of imperfectly competitive capacity and short-term energy markets will come closer to achieving these goals than imperfectly competitive markets for fixed-price long-term energy contracts and short-term wholesale energy. Further complicating this choice is the fact that in both cases these market mechanisms will be subject to imperfect regulatory oversight plagued by, among other things, asymmetric information between market participants and the regulator.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Calif. ISO gears up for growing renewables portfolio

Operating the grid is going to become more of a challenge as wind and solar generation -- the biggest two contributors with the most hourly and daily variations -- grow over time. Forecasting exactly how much capacity will be available a mere one hour ahead still remains difficult. More renewable generation is not good business for conventional peaking and load-following thermal generation, mostly burning natural gas. Their revenues, depending on the specific scenario considered, may drop by 20 to 40 percent. Something has to be done to sustain these critical players even as their output is not required as much as in the past.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Economic Impacts of High Wind Penetration Scenarios in the United States

The U.S. electric sector is experiencing rapid increases in renewable generation with an expectation of continued growth. We examine the impacts of increased wind electricity on the U.S. economy using a hybrid model that links a detailed electric sector model (the National Renewable Energy Laboratory's Regional Energy Deployment System [ReEDS]) with a computable general equilibrium model of the U.S. economy (the Massachusetts Institute of Technology's U.S. Regional Energy Policy [USREP] model). Increasing wind capacity displaces fossil fuels for electricity generation, which depresses fossil fuel prices and reduces economy-wide CO 2 emissions. Competitive wind deployment in the reference scenario achieves these outcomes with lower electricity prices than a scenario with wind capacity fixed at 2016 levels. Lower fossil fuel and electricity prices benefit low-income households, but the dominant economic impacts are driven by increased electric sector investment and capital returns, which primarily benefit those with higher incomes. Overall, cost-competitive wind provides benefits to the U.S. economy that are initially low but rise beyond 2030 to achieve cumulative welfare and GDP improvements of $110 and $111 billion through 2050. Prescribing additional wind deployment (meeting 35% of demand by 2050) increases post-2030 electricity prices but not more so than keeping wind capacity fixed at 2016 levels. The negative effect of higher prices on welfare, however, is outweighed by higher returns from the additional wind investment. While these changes favor higher income classes, we find economy-wide benefits through 2040. These benefits diminish by 2050, but the cumulative additional gains through 2050, beyond the reference case, are $192 billion in welfare and $150 billion in GDP.

17 WIND ENERGY↗

Nuclear Power's Future Role in a Decarbonized U.S. Electricity System

This study explores the potential future role of nuclear energy in a decarbonized U.S. electricity system through a multi-model comparison approach. We employ four state-of-the-art CEMs with native and harmonized input assumptions, layered with different policy and technology trajectories. Comparing outputs across models, technology assumptions, and policy scenarios informs model understanding, interpretation, and development decisions. Under current policies, models differ in their projections for nuclear retirements, but nuclear power plants consistently run with high capacity factors and new builds only occur in scenarios with very low nuclear costs. String power sector carbon policies drive models to align in keeping existing nuclear capacity and employing nuclear plant flexibility, but they may not be enough to bring new nuclear capacity online in the absence of significant cost declines. Therefore, significant economic deployment of new nuclear capacity requires both a stringent electric sector CO2 policy and very low cost assumptions for new nuclear. While these scenarios should not be interpreted as predictions, they are informative for understanding differing model assessments of the relative competitiveness of nuclear energy under a range of policy and technology conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Program helps pick site for renewable energy generation

Monthly economic diversity column for Tri-City Herald - excerpt pasted below: Sunshine and wind are two things we know well in the Tri-Cities area and beyond. My own backyard is a perpetual vortex of breezy fun, for example, to the point that it almost seems silly not to harness it for something useful. But I recently learned that when we're talking about building renewable energy generation capacity, it's not quite as simple as 'If you build it, they will come.' In fact, according to renewable energy expert and Pacific Northwest National Laboratory researcher John DeSteese, there are several criteria that make a piece of property suitable for this kind of development. DeSteese and his team recently completed an assessment regarding the use of specific land for renewable power generation through PNNL's Technology Assistance Program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

CTOP↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

integrated demand management↗

Emerging Trends in Power System Planning Models

This presentation highlights NREL's power system modeling capabilities, both existing and the future direction of improvements. Specific enhancements to the ReEDS (Regional Energy Deployment System) model and a new electricity market design testbed called EMIS (Electricity Markets and Investment Suite) were described. This content was part of a broader discussion to help inform the National Academies of Sciences, Engineering, and Medicine Committee on the Future of Electric Power in the U.S. on existing power system models and improvements needed in these models to capture the increasing complexity and interconnectedness of the power system.

capacity expansion modeling↗

Nodal Capacity Expansion Modeling with ReEDS: A Case Study of the RTS-GMLC Test System

Test systems play an important role in power systems analysis and are used extensively for a wide range of purposes like reliability analysis, production cost modeling, studying the impacts of load shifting, and many more. These test systems have continued to evolve over the years to keep pace with changing system compositions due to technology and policy changes. In this work, we apply the Regional Energy Deployment System (ReEDS) model, a large-scale capacity expansion model (CEM), on the nodal RTS-GMLC system to perform capacity expansion of the bus-level test system. This work both demonstrates that a large-scale CEM can successfully be applied to nodal systems, and that the CEM can allow a test system to be evolved to meet desired criteria. The process allowed the coupling of CEM data not available in the test system (such as capital costs) with test system data to provide plausible system evolutions in line with scenario specifications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Economic Development Benefits from Wind Energy in Nebraska: A Report for the Nebraska Energy Office (Revised)

This report focuses on the economic development impacts estimated from building and operating 7,800 MW of new wind power in Nebraska. This level of development is on the scale envisioned in the Department of Energy (DOE) report 20% Wind Energy by 2030. A practical first step to building 7,800 of wind is completing 1,000 MW. We also include the estimated economic impacts to Nebraska from building 1,000 MW of wind power. Our primary analysis indicates that the development and construction of approximately 7,800 MW of wind energy in Nebraska by 2030 will support 20,600 to 36,500 annual full-time equivalents (AFTE). In addition, operating the full 7,800 MW of wind energy could support roughly 2,000 to 4,000 full-time workers throughout the operating life of the wind facilities (LFTE). Nebraska's economy is estimated to see an average annual boost in economic activity ranging from $140 million to $260 million solely from construction and development related activities between 2011 and 2030. An additional boost of $250 - $442 million annually is estimated from operating 7,800 MW of wind capacity.

17 WIND ENERGY↗

Case Study: BESS Capacity Building for Malawi

To strengthen Malawi's national electricity grid and to enhance reliability, the government of Malawi and the Electricity Supply Corporation of Malawi are partnering with the Global Alliance for People and Planet to develop a 20-megawatt/30-megawatt-hour battery energy storage system at Kanengo, Malawi, expected to come online in 2026. In parallel, the Global Energy Alliance for People and Planet and the National Laboratory of the Rockies implemented a comprehensive technical capacity-building program to equip the Electricity Supply Corporation of Malawi, the Malawi Energy Regulatory Authority, and the Malawi University of Business and Applied Sciences with the expertise needed to plan, regulate, and operate advanced storage systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Robust broadcast-communication control of electric vehicle charging

The anticipated increase in the number of plug-in electric vehicles (EV) will put additional strain on electrical distribution circuits. Many control schemes have been proposed to control EV charging. Here, we develop control algorithms based on randomized EV charging start times and simple one-way broadcast communication allowing for a time delay between communication events. Using arguments from queuing theory and statistical analysis, we seek to maximize the utilization of excess distribution circuit capacity while keeping the probability of a circuit overload negligible.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling Power Plant Siting Opportunities and Constraints in the Eastern Interconnection

The electrical transmission grid is a critical part of the U.S. national infrastructure, and its modernization is a U.S. Department of Energy (DOE) priority. We describe the Energy Zones Mapping Tool (EZMT), a unique, powerful, and public web-based system with multi-criteria decision analysis (MCDA) models for more than 20 power plant technologies and many other capabilities. Through a case study on natural gas combined cycle (NGCC) power plants in the Eastern Interconnection (EI), we provide an example of incorporating an EZMT MCDA model into a larger planning context, with projections of interconnection-level capacity expansion, thermoelectric power plant retirements, and water availability. Our results provide insights on candidate NGCC site distributions and the criteria influencing them. The case study provides both an efficient methodology for performing similar analyses and hundreds of candidate NGCC power plant sites that can be studied in more detail as potential project sites.

20 FOSSIL-FUELED POWER PLANTS↗

How Today's Hydropower Impacts Tomorrow's Grid: Counterfactual Scenarios Showing Grid Impacts if Hydropower Goes Away

Amidst ongoing discussions about hydropower removals, retirements, and reduced availability due to drought and other environmental considerations, it is important to understand the long-term effects of reduced hydropower resources on the U.S. electric grid. This analysis uses the Regional Energy Deployment System (ReEDS™) grid planning model to compare several representative scenarios of retiring hydropower and pumped storage hydropower (PSH) capacity over time and explore the overall implications on the U.S. grid from present day through 2050. Reduced hydropower capacity and generation is replaced by a mix of both fossil and non-fossil resources, including natural gas, wind, solar, and battery technologies. Additional natural gas usage leads to an increase in cumulative national electric sector carbon dioxide and criteria pollutant operating emissions of less than 1% in many scenarios but up to 4-5.3% in some cases. Total electric sector costs also increase by <1% in many scenarios but up to 3.6% in the most extreme scenarios where nearly all the hydropower and PSH fleet retires, equating to $\$$340 billion in undiscounted costs. National results indicate that absent additional interventions, retiring hydropower and PSH capacity could increase electric sector emissions and direct capital and operating costs. However, more focused analysis is required to evaluate specific asset-level, local, and regional implications, and a broader scope is necessary to weigh these electric sector impacts alongside economic, ecological, water management, and other cross-sectoral effects that could be either negative or positive.

14 SOLAR ENERGY↗

Economic Evaluation of a Coupled Nuclear Power Plant and Hydrogen Production Facility: A Case Study

This study optimized the design sizes and operation of a power-to-hydrogen-to-power integrated energy system to allow a baseload power plant to operate flexibly in the energy market. In collaboration with a utility industry partner, the system, consisting of an electrolyzer, compressors, storage tank, and fuel cell, was optimized under conditions specific to the proposed project at the site of a nuclear power plant. The Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES) maximized net present value by optimizing sizing of components and dispatch decisions. Revenues included sale of electricity, capacity payments typical of the New York Independent System Operator, and the section 45V hydrogen production tax credit of the Inflation Reduction Act of 2022 (the tax credit was assumed to be available to legacy plants in the absence of clear guidance at present). Under default assumptions which excluded many capital expenditures, the base case optimized solution had a net present value of $\$$1.4 million over a 30 year lifetime, with a 0.365 MW fuel cell operating nearly continuously and 85% of revenues supplied by the hydrogen production tax credit (which was counted as a revenue regardless of profit, thus assuming credit monetization or offset of taxes within the larger firm was possible in all years). Beyond the base case, a sensitivity study elucidated drivers of the economics as capacity payment rate and hydrogen production tax credit rate vary. Additional sensitivity studies also extended results to variation of other, previously fixed parameters, including the fuel cell capital cost, and to imposition of further constraints. Optimization was also repeated for the default assumptions but recognizing tax credits upon use of hydrogen rather than upon its production, producing no change in the optimal solution. Most notably, capacity payments above $\$$15/kW-month drove optimal fuel cells multiple times larger than those with the default estimated capacity payment of $\$$2.5/kW-month (approaching 11 vs. 0.365 MW), and these larger fuel cells operated rarely (capacity factors of ~0.03). Furthermore, when the hydrogen production tax credit was provided for only 10 years, under the specific assumptions of this study (e.g., neither site preparation costs nor electrolyzer capital cost counted), the optimal solution avoided economic loss by ceasing system operation after the 10th year. Viewed broadly, this study demonstrated the capabilities of DISPATCHES, which can be user-adapted to serve other industrial case studies.

08 HYDROGEN↗

An Estimate of the Cost of Electricity from Light Water Reactors and Fossil Plants with Carbon Capture and Sequestration

As envisioned in this report, LIFE technology lends itself to large, centralized, baseload (or 'always on') electrical generation. Should LIFE plants be built, they will have to compete in the electricity market with other generation technologies. We consider the economics of technologies with similar operating characteristics: significant economies of scale, limited capacity for turndown, zero dependence on intermittent resources and ability to meet environmental constraints. The five generation technologies examined here are: (1) Light Water Reactors (LWR); (2) Coal; (3) Coal with Carbon Capture and Sequestration (CCS); (4) Natural Gas; and (5) Natural Gas with Carbon Capture and Sequestration. We use MIT's cost estimation methodology (Du and Parsons, 2009) to determine the cost of electricity at which each of these technologies is viable.

20 FOSSIL-FUELED POWER PLANTS↗

Distribution Network Capacity Market Design: Marginal Distribution Capacity Pricing Mechanism for Efficient Investment and Cost Allocation

As electricity markets begin to shift from reliance on large, centralized power plants and towards distributed energy resources (DERs), there is a growing acknowledgement that more efficient planning, operations, and oversight is needed in the distribution system. This paper addresses one step in that direction by proposing an auction mechanism that uses a detailed distribution system planning model that allocates permits to end-used customers who request capacity to install new devices at their location and network upgrade contracts to utilities or 3rd-party companies who offer to upgrade system components. The resulting plan maximizes market surplus, that is, maximizes the total benefit to consumers minus the cost of network upgrades. We apply a marginal pricing scheme to the auction’s results such that the cost of each permits or contracts is differentiated by time and location, based on the Lagrangian multipliers of binding network constraints. These prices are shown to be no greater than the bid price of any awarded contract and no less than the offered cost of any awarded upgrade contract. Furthermore, the nonlinearity of power flows in the planning model result in an additional surplus that would be collected by the entity that hosts the auction, which could then be refunded to market participants or used to cover overhead costs of running the market. We provide four example auction results in a simple three-node distribution feeder to demonstrate the properties of the design. Results suggest that larger or more realistic case studies could be a promising next step.

24 POWER TRANSMISSION AND DISTRIBUTION↗