Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Commissioning of the pair spectrometer of the GlueX experiment

The main goal of the pair spectrometer of the GlueX experiment at Jefferson Lab is to determine the photon beam flux and to measure beam polarization. Here, we present the design of the pair spectrometer and the performance results during the first commissioning runs of the GlueX experiment.

43 PARTICLE ACCELERATORS↗

Design, construction and commissioning of the Digital Hadron Calorimeter—DHCAL

A novel hadron calorimeter is being developed for future lepton colliding beam detectors. The calorimeter is optimized for the application of Particle Flow Algorithms (PFAs) to the measurement of hadronic jets and features a very finely segmented readout with 1 × 1 cm(2) cells. The active media of the calorimeter are Resistive Plate Chambers (RPCs) with a digital, i.e. one-bit, readout. To first order the energy of incident particles in this calorimeter is reconstructed as being proportional to the number of pads with a signal over a given threshold. A large-scale prototype calorimeter with approximately 500,000 readout channels has been built and underwent extensive testing in the Fermilab and CERN test beams. This paper reports on the design, construction, and commissioning of this prototype calorimeter.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Installation and Commissioning of the GLUEX DIRC

The GlueX experiment takes place in experimental Hall D at Jefferson Lab (JLab). With a linearly polarized photon beam of up to 12 GeV energy, GlueX is a dedicated experiment to search for hybrid mesons via photoproduction reactions. The low-intensity (Phase I) of GlueX was recently completed; the high-intensity (Phase II) started in 2020 including an upgraded particle identification system, known as the DIRC (Detection of Internally Reflected Cherenkov light), utilizing components from the decommissioned BaBar experiment. The identification and separation of the kaon final states will significantly enhance the GlueX physics program, by adding the capability of accessing the strange quark flavor content of conventional (and potentially hybrid) mesons. Here, we report that the installation and commissioning of the DIRC detector has been successfully completed.

47 OTHER INSTRUMENTATION↗

Construction and commissioning of CMS CE prototype silicon modules

As part of its HL-LHC upgrade program, the CMS collaboration is developing a High Granularity Calorimeter (CE) to replace the existing endcap calorimeters. The CE is a sampling calorimeter with unprecedented transverse and longitudinal readout for both electromagnetic (CEE) and hadronic (CE-H) compartments. The calorimeter will be built with ~30,000 hexagonal silicon modules. Prototype modules have been constructed with 6-inch hexagonal silicon sensors with cell areas of 1.1 cm 2 , and the SKIROC2-CMS readout ASIC. Beam tests of different sampling configurations were conducted with the prototype modules at DESY and CERN in 2017 and 2018. This paper describes the construction and commissioning of the CE calorimeter prototype, the silicon modules used in the construction, their basic performance, and the methods used for their calibration.

Calorimeters↗

The design, construction, and commissioning of the KATRIN experiment

The KArlsruhe TRItium Neutrino (KATRIN) experiment, which aims to make a direct and model-independent determination of the absolute neutrino mass scale, is a complex experiment with many components. More than 15 years ago, we published a technical design report (TDR) to describe the hardware design and requirements to achieve our sensitivity goal of 0.2 eV at 90%C.L. on the neutrino mass. Since then there has been considerable progress, culminating in the publication of first neutrino mass results with the entire beamline operating. In this paper, we document the current state of all completed beamline components (as of the first neutrino mass measurement campaign), demonstrate our ability to reliably and stably control them over long times,and present details on their respective commissioning campaigns.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Configuration, Performance, and Commissioning of the ATLAS b-jet Triggers for the 2022 and 2023 LHC data-taking periods

In 2022 and 2023, the Large Hadron Collider produced approximately two billion hadronic interactions each second from bunches of protons that collide at a rate of 40 MHz. The ATLAS trigger system is used to reduce this rate to a few kHz for recording. Selections based on hadronic jets, their energy, and event topology reduce the rate to 𝒪(10) kHz while maintaining high efficiencies for important signatures resulting in b-quarks, but to reach the desired recording rate of hundreds of Hz, additional real-time selections based on the identification of jets containing b-hadrons (b-jets) are employed to achieve low thresholds on the jet transverse momentum at the High-Level Trigger. The configuration, commissioning, and performance of the real-time ATLAS b-jet identification algorithms for the early LHC Run 3 collision data are presented. These recent developments provide substantial gains in signal efficiency for critical signatures; for the Standard Model production of Higgs boson pairs, a 50% improvement in selection efficiency is observed in final states with four b-quarks or two b-quarks and two hadronically decaying τ-leptons.

47 OTHER INSTRUMENTATION↗

Commissioning of an MPGD-based Drift Chamber for Heavy-ion Tracking in FRIB's Sweeper magnet system

A newly developed drift chamber equipped with an innovative hybrid Micro-Pattern Gaseous Detector based readout was commissioned at FRIB. The detector consists of a Multi-layer Thick Gas Electron Multiplier (M-THGEM) mounted over a high-granularity, position-sensitive readout board. Denoted as the Micro-Pattern Drift Chamber (MPDC), the new device is used to provide tracking capability as part of the detectors of the Sweeper magnet system for neutron-invariant-mass spectrometry at the Facility for Rare Isotope Beams (FRIB). The localization of impinging ions in a 30 × 30 cm 2 drift area is derived by processing the charge-avalanche distribution induced on the segmented readout board. The signals induced on the readout pads are processed by a compact, multi-channel Data Acquisition System (DAQ) based on the Scalable Readout System (SRS). To facilitate synchronization with other detector systems of the Sweeper magnet system, the SRS has been configured to accept an external trigger.

Gaseous detectors↗

The Tevatron Wide Band Longitudinal Coupled Bunch Mode Dampers - an Account From Its Commissioning to Its Decommissioining

The Tevatron longitudinal dampers were built in 2002 to stop the proton beam from spontaneously blowing up during high energy physics. The system has been operational since then and has been very successful in keeping the beam stable. In October 2 011, the Tevatron will be shutdown and the dampers decommissioned. The goal of this paper is to document the 9 year experience in the operation of these dampers, account for the design choices made at the time, describe its commissioning, and its performa nce during its working life. Included will be a discussion on the type of instability which required the damper to be built.

43 PARTICLE ACCELERATORS↗

LCLS-II Helium Refrigeration System Commissioning Results

SLAC National Accelerator Laboratory has upgraded to LCLS-II, featuring a 4 GeV superconducting linear accelerator composed of 37 cryomodules and two large helium refrigeration systems with a cooling capacity of 4 kW at 2.0 K. The LCLS-II Helium Refrigeration System (HRS) consists of two compressor stations, each with a power of approximately 4.5 MW, two 4.5 K cold boxes, each with a power of 18 kW equivalent at 4.5 K, and two sets of cold compressors that can each produce a flow of 230 g/s at 31 mbar (2.0K). Performance tests of the HRS were meticulously planned and successfully carried out, with results demonstrating that it exceeded the process requirements for LCLS-II operations. This paper provides a detailed presentation of the LCLS-II HRS performance and the challenges encountered during the commissioning phase.

42 ENGINEERING↗

Commissioning Results of the ESR2 Compressors at JLab

Abstract The future operation of the 4 kW 15 Kelvin MOLLER experiment at Jefferson lab necessitates an increase of cryogenic capacity at the End Station Refrigerator. The current plant is the former 1.5 kW (4.5 K) ESCAR plant that has been operating at Jefferson Lab since 1995. The existing 1.5 kW plant is not able to support the load for MOLLER and will be replaced with a refurbished plant comprised of the cold box and compressors of the 4 kW ASST-A plant from the Superconducting Super Collider in Texas. This paper reports the commissioning results of the warm compressor system. We compare the compressors’ current and past performance, specifically examining their Isothermal and Volumetric efficiency. The results indicate that the refurbished equipment’s efficiency is comparable to its original performance, proving that the reuse and refurbishment of old systems is a worthwhile endeavor.

Perry, C. [Thomas Jefferson National Accelerator F↗

SNS Central Helium Liquefier spare Carbon Bed installation and commissioning

The Spallation Neutron Source (SNS) Central Helium Liquefier (CHL) at Oak Ridge National Laboratory (ORNL) has been without major operations downtime since operations were started back in 2006. This system utilizes a vessel filled with activated carbon as the final major component to remove oil vapor from the compressed helium circuit prior to insertion into the system's cryogenic cold box. The need for a spare carbon bed at SNS due to the variability of carbon media lifetime calculation to adsorption efficiency will be discussed. The fabrication, installation and commissioning of this spare carbon vessel will be presented. The novel plan for connecting the spare carbon vessel piping to the existing infrastructure will be presented.

Degraff, Brian D.↗

EC-Bench: A Benchmark for Enzyme Commission Number Prediction

Enzymes are proteins that catalyze specific biochemical reactions in cells. Enzyme Commission (EC) numbers are used to annotate enzymes in a four-level hierarchy that classifies enzymes based on the specific chemical reactions they catalyze. Accurate EC number prediction is essential for understanding enzyme functions. Despite the availability of numerous methods for predicting EC numbers from protein sequences, there is no unified framework for evaluating and studying such methods systematically. This gap limits the ability of the community to identify the most effective approaches for enzyme annotation. We introduce EC-Bench, a benchmark for EC number prediction, consisting of 1) an initial representative set of existing methods (including homology-based, deep learning, contrastive learning, and language model methods), 2) existing and novel accuracy and efficiency performance metrics, and 3) selected datasets to allow for comprehensive comparative study. EC-Bench is open-source and provides a framework for researchers to not only compare among existing methods objectively under uniform conditions, but also to introduce and effectively evaluate performance of new methods in a comparative framework. To demonstrate the utility of EC-Bench, we perform extensive experimentation to compare the existing EC number prediction methods and establish their advantages and disadvantages in a variety of prediction tasks, namely “exact EC number prediction”, “EC number completion” and (partial or additional) “EC number recommendation”. We find wide variation in the performance of different methods, but also subtle but potentially useful differences in the performance of different methods across tasks and for different parts of the EC hierarchy.

59 BASIC BIOLOGICAL SCIENCES↗

Commissioning and performance of the ATLAS transition radiation tracker with first high energy pp and Pb-Pb collisions at LHC

The ATLAS Transition Radiation Tracker (TRT) is the outermost of the three sub-systems of the ATLAS Inner Detector at the Large Hadron Collider at CERN. It consists of close to 300000 thin-wall drift tubes (straws) providing on average 30 two-dimensional space points with 0.12-0.15 mm resolution for charged particle tracks with |{eta}| < 2 and pt > 0.5 GeV. Along with continuous tracking, it provides particle identification capability through the detection of transition radiation X-ray photons generated by high velocity particles in the many polymer fibers or films that fill the spaces between the straws. Custom-built analog and digital electronics is optimized to operate as luminosity increases to the LHC design. In this article, a review of the commissioning and first operational experience of the TRT detector will be presented. Emphasis will be given to performance studies based on the reconstruction and analysis of LHC collisions. The first studies of the TRT detector response to the extremely high track density conditions during the November 2010 heavy ion LHC running period will be presented. These studies give interesting insight to the expected performance of the TRT in future high luminosity LHC proton-proton runs. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning and Testing the 1970's Era LASS Solenoid Magnet in JLab's Hall D

JLab refurbished and reconfigured the LASS1, 1.85m bore Solenoid and installed it as the principal analysis magnet for nuclear physics in the newly constructed, Hall D at Jefferson Lab. The magnet contains four superconducting coils within an iron yoke. The magnet was built in the early1970's at Stanford Linear Accelerator Center and used a second time at Los Alamos National Laboratory. The coils were extensively refurbished and individually tested by JLab. A new Cryogenic Distribution Box provides cryogens and their control valving, current distribution bus, and instrumentation pass-through. A repurposed CTI 2800 refrigerator system and new transfer line complete the system. We describe the re-configuration, the process and problems of re-commissioning the magnet and the results of testing the completed magnet.

43 PARTICLE ACCELERATORS↗

Commissioning Validation of CLAS-12 Torus Magnet Protection and Cryogenic Safety System

This paper provides an overview of the CLAS12 Torus magnet electromagnetic loss and energy balance in the magnet system and impact on the cryogenics system during an event of a fast dump and quench, as part of the commissioning activities within Hall B for the 12 GeV Accelerator Upgrade project at Jefferson Lab in November 2016. Test carried out validates the design of torus magnet protection and cryogenic safety system. This magnet is unique in that it comprises 6 superconducting coils which are individually conduction-cooled by helium, thereby providing an element of thermal and mechanical decoupling between the coils. Lastly, as such its behavior under a fast dump condition (and even a quench) is markedly different from that of more conventional bath-cooled superconducting magnets.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Commissioning of the Power Supplies and Coils of the SMART Tokamak

The small aspect ratio tokamak (SMART) is a spherical tokamak (ST) that offers unique capabilities for studying the potential of negative triangularity. It has been designed, constructed, and is currently being operated by the Plasma Science Fusion Technology (PSFT) Laboratory at the University of Seville. SMART has a total of 21 coils, organized into seven independent circuits and driven by five modular power supplies (PS). The PS operation relies on switching converter technology based on IGBT and supercapacitors (SCs). The PS delivers predefined current waveforms to the copper coil system consisting of the central solenoid (CS), 12 toroidal field (TF) coils, three series pairs of poloidal field (PF) coils, and two independent PF coils. This study details the commissioning and validation of the PS toroidal and solenoid coils, as well as the assembly of coils in SMART. The maximum rated current and slope were measured, along with the series impedance of the coils, the output current ripple, and the noise levels. The internal parameters of the SCs were measured, and optimized current profiles were proposed to enhance overall performance. A comparison has been made between the theoretical values and the experimental results, providing insight into the performance of the PS and areas for improvement.

Power electronics↗

An Improved Coefficient Calculator for the California Energy Commission 6 Parameter Photovoltaic Module Model

This paper describes an improved algorithm for calculating the six parameters required by the California Energy Commission (CEC) photovoltaic (PV) Calculator module model. Rebate applications in California require results from the CEC PV model, and thus depend on an up-to-date database of module characteristics. Currently, adding new modules to the database requires calculating operational coefficients using a general purpose equation solver - a cumbersome process for the 300+ modules added on average every month. The combination of empirical regressions and heuristic methods presented herein achieve automated convergence for 99.87% of the 5487 modules in the CEC database and greatly enhance the accuracy and efficiency by which new modules can be characterized and approved for use. The added robustness also permits general purpose use of the CEC/6 parameter module model by modelers and system analysts when standard module specifications are known, even if the module does not exist in a preprocessed database.

14 SOLAR ENERGY↗

USING TECHNOLOGY TO SUPPORT PROACTIVE MANAGEMENT OF MATERIALS DEGRADATION FOR THE U.S. NUCLEAR REGULATORY COMMISSION

The majority of the U.S. reactor fleet is applying for license renewal to extend the operating life from the current 40 years to 60 years, and there is now active interest in extending the operating life to beyond 60 years. Many plants are also applying for increases in power rating and both of these changes increases the need for an improved understanding of materials degradation. Many materials degrade over time and much is known about the degradation of materials under normal environmental conditions; however, less is known about the characteristics of materials degradation when the environment is subject to higher than normal radiological conditions over extended periods of time. Significant efforts are being made by industrial, academic and regulatory groups worldwide to identify, classify and mitigate potential problems arising from degradation of components in this context. From a regulatory perspective, the U.S. Nuclear Regulatory Commission (USNRC) is very interested in being able to identify ways to insure their licensees proactively manage the identification of materials degradation and the mitigation of its effects. To date, the USNRC has consolidated “generic” programs for mitigating aging issues in the two volume Generic Aging Lessons Learned (GALL) Report (NUREG-1801) [1][2], and have encouraged applicants for license renewal to use these programs where applicable in their plant when applying for renew of their reactor’s license. The USNRC has also published a comprehensive report entitled Expert Panel Report on Proactive Materials Degradation (NUREG/CR-6923) [3] that inventories the types of degradation mechanisms that could exist in each component of a Light Water Reactor (LWR) and each degradation mechanism is assessed regarding how much is known about mitigating its effects. Since the number of plant designs and materials used varies greatly within the U.S. fleet, there are many variations to implementing aging management programs (AMPs), requiring significant dialogs between the Licensee and the USNRC. These discussions are part of the licensing basis and as such are documented with up to multi-hundred page responses that are loosely coupled through the USNRC Agency-wide Document Access and Management System (ADAMS), which serves as an electronic records repository for the USNRC . These discussions have supported revisions to the GALL, including the revision that is being prepared as this paper is being written. The USNRC has sought the help of the Pacific Northwest National Laboratory to improve the staff’s ability to navigate the significant numbers of documents that are generated in this process and to provide a forum for regulators, licensees and researchers to share knowledge in the efforts to improve the cyclic process for defining, applying, validating and re-defining AMPs. Work to date in this area is publicly accessible and this paper will describe that work and outline a potential path forward. The presenter will also demonstrate the capabilities of the PMMD information tools (http://pmmd.pnl.gov).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗