A Semi-supervised Hybrid Machine Learning Framework for the Qualification of Resistance Spot Welds

• Industries requiring high structural integrity, including automotive, aerospace, and construction, place considerable significance on weld quality classification. • The inspection normally involves human expertise through predefined quality metrics that are subjective, error-prone, and time-intensive • The challenge to classification model development is the scarcity of labeled data and imbalanced distributions in the data that are labeled. • This work develops a new hybrid methodology that achieves clustering using KMeans++ together with supervised classification to overcome these challenges. • The ensemble-based classifiers were identified as optimal, with accuracy enhancements of up to 8% using the pseudo-labeled dataset. • The work provides practical insight into feature engineering and machine learning integration in industrial quality assurance applications.

Rogers, Jeremy K. [Savannah River National Laborat↗

Ohio Advanced Energy Manufacturing Center (OAEMC)

The program goal of the Ohio Advanced Energy Manufacturing Center (OAEMC) is to support advanced energy manufacturing and to create responsive manufacturing clusters that will support the production of advanced energy and energy-efficient products to help ensure the nation's energy and environmental security. This goal cuts across a number of existing industry segments critical to the nation's future. Many of the advanced energy businesses are starting to make the transition from technology development to commercial production. Historically, this transition from laboratory prototypes through initial production for early adopters to full production for mass markets has taken several years. Developing and implementing manufacturing technology to enable production at a price point the market will accept is a key step. Since these start-up operations are configured to advance the technology readiness of the core energy technology, they have neither the expertise nor the resources to address manufacturing readiness issues they encounter as the technology advances toward market entry. Given the economic realities of today's business environment, finding ways to accelerate this transition can make the difference between success and failure for a new product or business. The advanced energy industry touches a wide range of industry segments that are not accustomed to working together in complex supply chains to serve large markets such as automotive and construction. During its first three years, the Center has catalyzed the communication between companies and industry groups that serve the wide range of advanced energy markets. The Center has also found areas of common concern, and worked to help companies address these concerns on a segment or industry basis rather than having each company work to solve common problems individually. EWI worked with three industries through public-private partnerships to sew together disparate segments helping to promote overall industry health. To aid the overall advanced energy industry, EWI developed and launched an Ohio chapter of the non-profit Advanced Energy Economy. In this venture, Ohio joins with six other states including Colorado, Connecticut, Illinois, Maine, Massachusetts, New Hampshire, Rhode Island and Vermont to help promote technologies that deliver energy that is affordable, abundant and secure. In a more specific arena, EWI's advanced energy group collaborated with the EWI-run Nuclear Fabrication Consortium to promote the nuclear supply chain. Through this project EWI has helped bring the supply chain up to date for the upcoming period of construction, and assisted them in understanding the demands for the next generation of facilities now being designed. In a more targeted manner, EWI worked with 115 individual advanced energy companies that are attempting to bring new technology to market. First, these interactions helped EWI develop an awareness of issues common to companies in different advanced energy sectors. By identifying and addressing common issues, EWI helps companies bring technology to market sooner and at a lower cost. These visits also helped EWI develop a picture of industry capability. This helped EWI provide companies with contacts that can supply commercial solutions to their new product development challenges. By providing assistance in developing supply chain partnerships, EWI helped companies bring their technology to market faster and at a lower cost than they might have been able to do by themselves. Finally, at the most granular level EWI performed dedicated research and development on new manufacturing processes for advanced energy. During discussions with companies participating in advanced energy markets, several technology issues that cut across market segments were identified. To address some of these issues, three crosscutting technology development projects were initiated and completed with Center support. This included reversible welds for batteries and high temperature heat exchangers. It also included a novel advanced weld trainer that EWI has recently commercialized.

99 GENERAL AND MISCELLANEOUS↗

Developing the Next Generation of Net Zero Professionals through the Race to Zero: Preprint

The U.S. Department of Energy Race to Zero inspires collegiate students to become the next generation of building science professionals through a zero energy ready buildings design challenge. As industry looks to close the gap to more net zero energy construction, Race to Zero teams are tasked with exploring how to apply net zero across climates both nationally and internationally. For the past four annual competition events, teams developed comprehensive, integrated residential designs with industry partners that are market-ready and innovative. While each team addressed home design differently through upgrades to existing production builder plans, new developments to meet community needs, or existing building renovations and retrofits, the competition requires their solutions meet zero energy ready residential standards.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Developing the Next Generation of Net Zero Professionals through the Race to Zero

The U.S. Department of Energy Race to Zero inspires collegiate students to become the next generation of building science professionals through a zero energy ready buildings design challenge. As industry looks to close the gap to more net zero energy construction, Race to Zero teams are tasked with exploring how to apply net zero across climates both nationally and internationally. For the past four annual competition events, teams developed comprehensive, integrated residential designs with industry partners that are market-ready and innovative. While each team addressed home design differently through upgrades to existing production builder plans, new developments to meet community needs, or existing building renovations and retrofits, the competition requires their solutions meet zero energy ready residential standards.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Specific SPS construction studies: Operations and maintenance

Surface as well as in-space operations of the solar power satellite program are addressed. The primary end products of SPS industrial enterprise are shown SPS and its ground receiving antenna every six months; and (3) construction of electric cargo orbital transfer vehicles. The production of photovoltaic cells and solar blankets is also considered.

Miller, K. H.↗

Verified! How Performance-Based Procurement Can Boost New Construction Program Savings and Empower Building Owners

Most utility new construction programs depend on modeled projections and deemed savings based on individual technologies. The industry has established ways to evaluate these programs based on the promise - not the actual performance - of these buildings post- occupancy. Deeper savings from a more integrated design with continuous performance monitoring are left on the table, locking out the higher performance for the lifetime of the building. This paper will demonstrate how performance-based procurement can empower utility incentive offerings to drive deep energy savings and reduce administrative costs. The key is to incentivize a change in the building owner's procurement process and reward actual building energy performance rather than incentivizing specific measures. The paper looks at strategies to transition new construction programs from technology-based verification to actual measurement of performance outcomes. Accelerate Performance, a U.S. Department of Energy (DOE) funded initiative, changes the building procurement approach, which spurs innovation and motivates the design and contracting industry to achieve deep energy savings in new construction - in the case of DOE's National Renewable Energy Laboratory Research Support Facility (NREL) in Golden, CO, 50% without increasing initial costs. Utility programs in three states, Illinois, Minnesota, and Connecticut, are actively piloting the approach with leading-edge owners. The paper will share savings results and lessons learned from the three different utility pilot programs. The paper provides practical guidance for utility program managers about how to apply the Accelerate Performance approach to supplement their current new construction program offerings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data distribution in the NBS Automated Manufacturing Research Facility

The Automated Manufacturing Research Facility (AMRF) at the National Bureau of Standards was constructed as a testbed for research in the automation of small batch maufacturing, in particular for systems producing machined parts in lots of 1000 or less. Potential standard interfaces between existing and future components of small batch of factory floor metrology in an automated environment, delivering proven measurement techniques and standard reference materails industry to are identified. Commercially available product are used to construct the facility to expedite transfer of research results into the private sector.

Mitchell, M. J.↗

A Center for Extraterrestrial Engineering and Construction (CETEC)

A group of knowledgeable scientists and engineers in New Mexico has recognized the need for such a testing capability and has proposed a project to evelop an extraterrestrial surface simulation facility. A group of universities, national laboratories, and private industrial firms is proposing to establish a Center for Extraterrestrial Engineering and Construction (CETEC) and to develop large extraterrestrial surface simulation facilities in which this needed testing can be realistically performed. The CETEC is envisioned to be both a center of knowledge and data regarding engineering, construction, mining, and material process operations on extraterrestrial bodies and a set of extraterrestrial surface simulation facilities. The primary CETEC facility is proposed to be a large domed building made of steel reinforced concrete with more than one acre of test floor area covered with several feet of simulated lunar soil and dust. Various aspects of the project are presented in viewgraph form.

Leigh, Gerald G.↗

Assessing Foundation Insulation Strategies for the 2012 International Energy Conservation Code in Cold Climate New Home Construction

Even though the International Energy Conservation Code 2012 (International Code Council 2012) is a model code now available for adoption by individual states, only two cold-climate states have adopted it as their new home energy code. Understanding the resistance to adoption is important in assisting more states to accept the code and engage in deep energy strategies nationwide. This three-part assessment by the NorthernSTAR Building America Partnership was focused on foundation insulation R-values for cold climates and the design, construction, and performance implications. In Section 1, a literature review and attendance at stakeholder meetings held in Minnesota were used to assess general stakeholder interest and concerns about proposed code changes. Section 2 includes drawings of robust foundation insulation systems that were presented at one Minnesota stakeholder meeting to address critical issues and concerns for adopting best practice strategies. In Section 3, a sampling of builders participated in a telephone interview to gain baseline knowledge on insulation systems used to meet the current energy code and how the same builders intend to meet the new proposed code. In general, most builders expressed interest in being able to deliver greater energy efficiency to their customers. Concerns were voiced, however, about the costs compared to the energy savings, constructability, and durability risk resulting from increased foundation insulation R-values. When solutions for building robust foundation wall systems were presented to stakeholders, they did express interest in learning the details of the strategies. There was, however, continued interest in proof of cost, payback, and hygrothermal performance. Builders who participated in the interview were more confident in being able to meet the new requirements. This might have been a result of these respondents already using more advanced techniques for foundation insulation. This insight gives Building America an opportunity to engage the industry with existing research and practice measures that can address constructability and durability concerns at the proposed code levels. It also indicates that builders are interested in more specific information on cost, energy savings, and overall hygrothermal performance. Filling these voids could yield the supportive data needed to enhance building industry confidence and engage more states in the adoption of 2012 International Energy Conservation Code for new homes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Drop in the Bucket or a Pebble in a Pond: Commercial Building Partners’ Replication of EEMs Across Their Portfolios

This study presents findings from questionnaire and interview data investigating replication efforts of Commercial Building Partnership (CBP) partners that worked directly with the Pacific Northwest National Laboratory (PNNL). PNNL partnered with 12 organizations on new and retrofit construction projects as part of the U.S. Department of Energy (DOE) CBP program. PNNL and other national laboratories collaborate with industry leaders that own large portfolios of buildings to develop high performance projects for new construction and renovation. This project accelerates market adoption of commercially available energy saving technologies into the design process for new and upgraded commercial buildings. The labs provide assistance to the partners’ design teams and make a business case for energy investments. From the owner’s perspective, a sound investment results in energy savings based on corporate objectives and design. Through a feedback questionnaire, along with personal interviews, PNNL gathered qualitative and quantitative information relating to replication efforts by each organization. Data through this process were analyzed to provide insight into two primary research areas: 1) CBP partners’ replication efforts of technologies and approaches used in the CBP project to the rest of the organization’s building portfolio (including replication verification), and, 2) the market potential for technology diffusion into the total U.S. commercial building stock, as a direct result of the CBP entire program.

Commercial Building Partnerships↗

Determination of a Generic Human Error Probability Distribution, Part 2: A Dynamic SPAR-H Example Application

Humans are an integral part of a nuclear power plant (NPP) from its construction, to its everyday maintenance and operation. In the nuclear industry there are many approaches to quantifying component reliability, which is called probability risk assessment (PRA). In PRA there are two considerations given to the quantification, static and dynamic. Static is quantified before or after an operation; and dynamic is time dependent, in that the probability changes as real time data are provided. In PRA, the importance of the components is calculated, but what of the importance of the human component? There are several methods for human reliability analysis (HRA), which include but are not limited to: THERP, ATHEANA, CREAM, SPAR-H, ASEP, and SLIM. Each of these methods aims to provide a more accurate and objective human error probability (HEP) quantification. Of the methods listed above, ASEP, THERP, and SPAR-H are all inextricably linked. The Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) method was generated to better generalize the Technique for Human Error Rate Prediction (THERP) and Accident Sequence Precursor (ASEP). THERP is mapped to specific scenario templates, and ASEP is a simplified screening method, while SPAR-H employs generalizations to describe the spectrum of human behavior while maintaining the same theoretical underpinnings. SPAR-H is a well-known and accepted HRA method that uses performance shaping factors (PSFs) to classify inputs to the human component. PSFs capture a wide variety of input data, including plant status, crew dynamics, task description, and psychological aspects of the human operator. Current efforts have been focused to further generalize SPAR-H in to a dynamic framework. These methods can fit into dynamic NPP simulations such as RAVEN / RELAP-7. In order to do this, a dynamic methodology is applied to model the human as would be applied to the components. This method is applied in part one in the accompanying paper.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Management at the New Conversion Facility of 'TVEL'{sup R} Fuel Company - 13474

The project on the new conversion facility construction is being implemented by Joint Stock Company (JSC) 'Siberian Group of Chemical Enterprises' (SGChE) within TVEL{sup R} Fuel Company. The objective is to construct the up-to-date facility ensuring the industrial and environmental safety with the reduced impact on the community and environment in compliance with the Russian new regulatory framework on radioactive waste (RW) management. The history of the SGChE development, as well as the concepts and approaches to RW management implemented by now are shown. The SGChE future image is outlined, together with its objectives and concept on RW management in compliance with the new act 'On radioactive waste management' adopted in Russia in 2011. Possible areas of cooperation with international companies are discussed in the field of RW management with the purpose of deploying the best Russian and world practices on RW management at the new conversion facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space Flight LiDARs, Navigation & Science Instrument Implementations: Lasers, Optoelectronics, Integrated Photonics, Fiber Optic Subsystems and Components

For the past 25 years, the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center's Photonics Group in the Engineering Directorate has been substantially contributing to the flight design, development, production, testing and integration of many science and navigational instruments. The Moon to Mars initiative will rely heavily upon utilizing commercial technologies for instrumentation with aggressive schedule deadlines. The group has an extensive background in screening, qualifying, development and integration of commercial components for spaceflight applications. By remaining adaptable and employing a rigorous approach to component and instrument development, they have forged and fostered relationships with industry partners. They have been willing to communicate lessons learned in packaging, part construction, materials selection, testing, and other facets of the design and production process critical to implementation for high-reliability systems. As a result, this successful collaboration with industry vendors and component suppliers has enabled a history of mission success from the Moon to Mars (and beyond) while balancing cost, schedule, and risk postures. In cases where no commercial components exist, the group works closely with other teams at Goddard Space Flight Center and other NASA field centers to fabricate and produce flight hardware for science, remote sensing, and navigation applications. Summarized here is the last ten years of instrumentation development lessons learned and data collected from the subsystems down to the optoelectronic component level.

Detectors↗

CONSTRUCTED WETLAND TREATMENT SYSTEMS FOR WATER QUALITY IMPROVEMENT

The Savannah River National Laboratory implemented a constructed wetland treatment system (CWTS) in 2000 to treat industrial discharge and stormwater from the Laboratory area. The industrial discharge volume is 3,030 m{sup 3} per day with elevated toxicity and metals (copper, zinc and mercury). The CWTS was identified as the best treatment option based on performance, capital and continuing cost, and schedule. A key factor for this natural system approach was the long-term binding capacity of heavy metals (especially copper, lead, and zinc) in the organic matter and sediments. The design required that the wetland treat the average daily discharge volume and be able to handle 83,280 m{sup 3} of stormwater runoff in a 24 hour period. The design allowed all water flow within the system to be driven entirely by gravity. The CWTS for A-01 outfall is composed of eight one-acre wetland cells connected in pairs and planted with giant bulrush to provide continuous organic matter input to the system. The retention basin was designed to hold stormwater flow and to allow controlled discharge to the wetland. The system became operational in October of 2000 and is the first wetland treatment system permitted by South Carolina DHEC for removal of metals. Because of the exceptional performance of the A-01 CWTS, the same strategy was used to improve water quality of the H-02 outfall that receives discharge and stormwater from the Tritium Area of SRS. The primary contaminants in this outfall were also copper and zinc. The design for this second system required that the wetland treat the average discharge volume of 415 m{sup 3} per day, and be able to handle 9,690 m{sup 3} of stormwater runoff in a 24 hour period. This allowed the building of a system much smaller than the A-01 CWTS. The system became operational in July 2007. Metal removal has been excellent since water flow through the treatment systems began, and performance improved with the maturation of the vegetation during the first season of growth of each system. Sediment samples after the first and third years of operation indicated that copper was being bound in the sediments very rapidly after entering the treatment system. The design of the system encourages low redox and sulfide production in the sediments. The objective is to stabilize metals, including mercury, as sulfide compounds in the sediments. Costs for maintenance and operation of the systems are minimal, consisting primarily of ensuring that the pipes are not clogged and that water is flowing through the system. The treatment cost per thousand gallons is many times less than conventional wastewater treatment facilities. Life expectancy and function of the biological system is based on the life of the engineering aspects and not the wetland ecology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion Control Measures at Oak Ridge Reservation Landfills Oak Ridge, Tennessee - 19190

URS-CH2M Oak Ridge LLC (UCOR) manages the cleanup of the 2,200-acre East Tennessee Technology Park (ETTP) for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The ETTP was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. In disposing of low-level radioactive and other wastes from demolition activities, the UCOR approach relies on the availability of onsite facilities to streamline disposal, reduce costs and enhance cleanup schedules while confining shipments and related hazards onsite. The sanitary/industrial waste facility, known as the Oak Ridge Reservation Landfill Facility (ORRLF) is a solid waste operation that receives and disposes of sanitary/industrial, construction/demolition and classified, special waste; and spoil materials types of waste generated at the U.S. Department of Energy (DOE) Oak Ridge facilities. ETTP is the primary generator; however, the landfill accepts waste from Y-12 National Security Complex (Y-12), Oak Ridge National Laboratory and other DOE prime contractors in the Oak Ridge area. ORRLF's mission is to receive nonhazardous, non-radioactive, and non-Resource Conservation and Recovery Act of 1976 (RCRA)-regulated solid wastes. Approved operations include receiving, compacting, and covering wastes; leachate management, site drainage; erosion control and prevention, inspections, maintenance and recording keeping. The Oak Ridge Reservation has three separate State of Tennessee-permitted active landfills (Landfill IV, Landfill V, and Landfill VII) that meet different disposal needs -- classified industrial waste, industrial waste that includes office trash and cafeteria waste, and construction and demolition debris,. As with a typical landfill, strategic waste placement and covering involves moving a lot of soil, usually resulting in large areas of exposed land. After increased sediment was noted in streams following heavy rains, a concerted erosion prevention and sediment control effort began in 2017. While not uncommon for landfills, the ORRLF staff knew they could do better in controlling sediment. In response, the ORRLF staff developed an approach of aggressive revegetation, ditch improvements and other erosion controls. Staff developed a list of all the areas that needed the most attention and requested resources. UCOR management arranged funding for needed improvements. The oldest of the three landfills is Industrial Landfill IV, which opened in 1989 and has an expected remaining 60 years of life. Therefore, how the landfills are maintained/managed today directly affects the compliance posture, the capacity, and the infrastructure in the future. A systematic, aggressive and multi-pronged approach was taken to address the major concerns first, then continue with longer-term, and/or lower priority projects. Buy-in was obtained from both craft and supervision, resulting in approaches like 'Ditch of the Month'. In addition, management support at the highest levels has provided resources and recognition that further fuels progress. After working on the site for the past year, what used to be exposed brown hills looks more like a golf course now. Now that the grass is established and other erosion controls are in place, the amount of sediment leaving the site has been reduced, and the appearance of the landfills is improved. Vegetation dissipates the kinetic energy from rain droplets while the root system helps hold the soil in place, and wire-reinforced silt fences and straw wattles have greatly improved erosion control. Improved ditches reduce the runoff velocities allowing sediments to fall out of suspension in the stormwater before they reach the receiving waters, and structures are in place to let finer sediment settle in ponds rather than going downstream. In addition, the project has added more stone to roadways to minimize tracking dirt down the road as an average of 20 to 40 trucks per day enter and leave the site. Ongoing landfill erosion and sediment control must be funded and maintained continually. The lack of attention to either resource will negatively affect the condition of the landfill fairly quickly. Constant compliance commitment is necessary to ensure protection to the environment, the operator/workers and the public. Operations must include sediment control, pond maintenance and clean out, road maintenance and construction, erosion prevention, seeps repair, leachate management, landfill expansion, mowing and grounds upkeep and much more. Knowledgeable/experience staff is also crucial. Knowing how to build lifts, create leachate drainage windows, respond to high rains events, compact waste will impact operations today and future operations into the closure / post closure periods. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Saving Melting and Revert Reduction Technology (Energy SMARRT): Development of CCT Diagrams

One of the most energy intensive industries in the U.S. today is in the melting and casting of steel alloys for use in our advanced technological society. While the majority of steel castings involve low or mild carbon steel for common construction materials, highly-alloyed steels constitute a critical component of many industries due to their excellent properties. However, as the amount of alloying additions increases, the problems associated with casting these materials also increases, resulting in a large waste of energy due to inefficiency and a lack of basic information concerning these often complicated alloy systems. Superaustenitic stainless steels constitute a group of Fe-based alloys that are compositionally balanced to have a purely austenitic matrix and exhibit favorable pitting and crevice corrosion resistant properties and mechanical strength. However, intermetallic precipitates such as sigma (³) and Laves can form during casting or exposure to high-temperature processing, which degrade the corrosion and mechanical properties of the material. Knowledge of the times and temperatures at which these detrimental phases form is imperative if a company is to efficiently produce castings of high quality in the minimum amount of time, using the lowest amount of energy possible, while producing the least amount of material waste. Anecdotal evidence from company representatives revealed that large castings frequently had to be scrapped due to either lower than expected corrosion resistance or extremely low fracture toughness. It was suspected that these poor corrosion and / or mechanical properties were directly related to the type, amount, and location of various intermetallic phases that formed during either the cooling cycle of the castings or subsequent heat treatments. However, no reliable data existed concerning either the time-temperature-transformation (TTT) diagrams or the continuous-cooling-transformation (CCT) diagrams of the super-austenitics. The goal of this study was to accurately characterize the solid-solid phase transformations seen in cast superaustenitic stainless steels. Heat treatments were performed to understand the time and temperature ranges for intermetallic phase formations in alloys CN3MN and CK3McuN. Microstructures were characterized using scanning electron microscopy (SEM), transmission electron microscopy (TEM), and energy and wavelength dispersive spectroscopy (EDS, WDS). In this way TTT and CCT diagrams could be developed for the matrix of samples chosen. As this study consisted of basic research into the development of TTT and CCT diagrams as an aid to the US steel casting industry, there is no formal commercialization plan associated with this task other than presentations and publications via the Steel Founders Society of America to their members. The author is confident that the data contained in this report can be used by steel foundries to refine their casting procedures in such a way as to reduce the amount of waste produced and energy wasted by significantly reducing or eliminating the need for remelting or recasting of material due to unwanted, premature intermetallic formation. This development of high alloy steel CCT diagrams was predicted to result in an average energy savings of 0.05 trillion BTU's/year over a 10 year period (with full funding). With 65% of the proposed funding, current (2011) annual energy saving estimates, based on initial dissemination to the casting industry in 2011and market penetration of 97% by 2020, is 0.14 trillion BTU's/year. The reduction of scrap and improvement in casting yield will also result in a reduction of environmental emissions associated with the melting and pouring of the steel. The average annual estimate of CO2 reduction per year through 2020 is 0.003 Million Metric Tons of Carbon Equivalent (MM TCE)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Overview of the design, construction, and operation of interstate liquid petroleum pipelines.

The U.S. liquid petroleum pipeline industry is large, diverse, and vital to the nation's economy. Comprised of approximately 200,000 miles of pipe in all fifty states, liquid petroleum pipelines carried more than 40 million barrels per day, or 4 trillion barrel-miles, of crude oil and refined products during 2001. That represents about 17% of all freight transported in the United States, yet the cost of doing so amounted to only 2% of the nation's freight bill. Approximately 66% of domestic petroleum transport (by ton-mile) occurs by pipeline, with marine movements accounting for 28% and rail and truck transport making up the balance. In 2004, the movement of crude petroleum by domestic federally regulated pipelines amounted to 599.6 billion tonmiles, while that of petroleum products amounted to 315.9 billion ton-miles (AOPL 2006). As an illustration of the low cost of pipeline transportation, the cost to move a barrel of gasoline from Houston, Texas, to New York Harbor is only 3 cents per gallon, which is a small fraction of the cost of gasoline to consumers. Pipelines may be small or large, up to 48 inches in diameter. Nearly all of the mainline pipe is buried, but other pipeline components such as pump stations are above ground. Some lines are as short as a mile, while others may extend 1,000 miles or more. Some are very simple, connecting a single source to a single destination, while others are very complex, having many sources, destinations, and interconnections. Many pipelines cross one or more state boundaries (interstate), while some are located within a single state (intrastate), and still others operate on the Outer Continental Shelf and may or may not extend into one or more states. U.S. pipelines are located in coastal plains, deserts, Arctic tundra, mountains, and more than a mile beneath the water's surface of the Gulf of Mexico (Rabinow 2004; AOPL 2006). The network of crude oil pipelines in the United States is extensive. There are approximately 55,000 miles of crude oil trunk lines (usually 8 to 24 inches in diameter) in the United States that connect regional markets. The United States also has an estimated 30,000 to 40,000 miles of small gathering lines (usually 2 to 6 inches in diameter) located primarily in Texas, Oklahoma, Louisiana, and Wyoming, with small systems in a number of other oil producing states. These small lines gather the oil from many wells, both onshore and offshore, and connect to larger trunk lines measuring 8 to 24 inches in diameter. There are approximately 95,000 miles of refined products pipelines nationwide. Refined products pipelines are found in almost every state in the United States, with the exception of some New England states. These refined product pipelines vary in size from relatively small, 8- to 12-inch-diameter lines, to up to 42 inches in diameter. The overview of pipeline design, installation, and operation provided in the following sections is only a cursory treatment. Readers interested in more detailed discussions are invited to consult the myriad engineering publications available that provide such details. The two primary publications on which the following discussions are based are: Oil and Gas Pipeline Fundamentals (Kennedy 1993) and the Pipeline Rules of Thumb Handbook (McAllister 2002). Both are recommended references for additional reading for those requiring additional details. Websites maintained by various pipeline operators also can provide much useful information, as well as links to other sources of information. In particular, the website maintained by the U.S. Department of Energy's Energy Information Administration (EIA) (http://www.eia.doe.gov) is recommended. An excellent bibliography on pipeline standards and practices, including special considerations for pipelines in Arctic climates, has been published jointly by librarians for the Alyeska Pipeline Service Company (operators of the Trans-Alaska Pipeline System [TAPS]) and the Geophysical Institute/International Arctic Research Center, both located in Fairbanks (Barboza and Trebelhorn 2001), available electronically at http://www.gi.alaska.edu/services/library/pipeline.html codes. The Association of Oil Pipe Lines (AOPL) and the American Petroleum Institute (API) jointly provide an overview covering the life cycle of design, construction, operations, maintenance, economic regulation, and deactivation of liquid pipelines (AOPL/API 2007).