Search NASA⌕ Search

SEARCH · Search NASA

Results for “Challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

IT Challenges for Space Medicine

This viewgraph presentation reviews the various Information Technology challenges for aerospace medicine. The contents include: 1) Space Medicine Activities; 2) Private Medical Information; 3) Lifetime Surveillance of Astronaut Health; 4) Mission Medical Support; 5) Data Repositories for Research; 6) Data Input and Output; 7) Finding Data/Information; 8) Summary of Challenges; and 9) Solutions and questions.

Johnson-Throop, Kathy↗

Challenges and Lessons Learned in the Application of Autonomy to Space Operations

NASA's Space Operations Management Office (SOMO) is working toward a goal of providing an integrated infrastructure of mission and data services for space missions undertaken by NASA enterprises. A significant portion of this effort is focused on reducing the cost of these services. We are interested in the potential of autonomy to reduce operations costs. SOMO services support space missions, but are not part of the mission objectives; therefore the level of acceptable risk is very low. In fact, SOMO could be effective ly prevented from applying autonomy if customers merely perceive it as adding risk to their mission(s). We are interested in this workshop from the standpoint of understanding what can be done to realize the potential cost savings due to autonomy while maintaining acceptable risk and serving the needs of our customers. We would like to present our lessons learned so far in adopting autonomy and automation, which we think will contribute to clarifying the challenges facing the use of such technology. SOMO provides services to a diverse and ambitious set of mission customers. Many of these missions are groundbreaking missions for which communications, data, and other operations requirements sometimes cannot be clearly articulated early in the program. This motivates a need for systems that are robust in the face of unanticipated situations so that customer missions are not unreasonably constrained or impacted by "shortcomings" in SOMO services. One of SOMO's primary goals is to realize a paradigm in which SOMO acts as a service provider to organizations that fly space missions for NASA, other government agencies, and even the commercial sector. These organizations purchase SOMO services "by the pound" as customers. We have to provide systems that are not experiments themselves, but rather stable bases from which to do bold experiments. To this end, SOMO also seeks to work closely with industry to see that robust autonomy technology gets infused into products and services for the space industry and beyond. The potential for application of these technologies spans space-based communications networks (e.g. TDRSS) and ground-based assets including communication and tracking antenna systems, data networks, and control centers. There are several problems that are candidates for the application of autonomy, if it can be made reliable enough, including: antenna control, antenna scheduling, communication link scheduling and operation, navigation, attitude determination, fault detection, isolation, and reconfiguration (for spacecraft or ground assets), and mission-level planning and scheduling. Some attempts have been made to apply autonomy and automation in these areas in the past with varying degrees of success. We will present relevant case histories and the lessons inferred from them. Combining this past experience with anticipated future needs, we can clarify the challenges that must be met in order to realize the benefits of autonomy.

Forrest, David J.↗

Space Shuttle Star Tracker Challenges

The space shuttle fleet of avionics was originally designed in the 1970's. Many of the subsystems have been upgraded and replaced, however some original hardware continues to fly. Not only fly, but has proven to be the best design available to perform its designated task. The shuttle star tracker system is currently flying as a mixture of old and new designs, each with a unique purpose to fill for the mission. Orbiter missions have tackled many varied missions in space over the years. As the orbiters began flying to the International Space Station (ISS), new challenges were discovered and overcome as new trusses and modules were added. For the star tracker subsystem, the growing ISS posed an unusual problem, bright light. With two star trackers on board, the 1970's vintage image dissector tube (IDT) star trackers track the ISS, while the new solid state design is used for dim star tracking. This presentation focuses on the challenges and solutions used to ensure star trackers can complete the shuttle missions successfully. Topics include KSC team and industry partner methods used to correct pressurized case failures and track system performance.

Herrera, Linda M.↗

Engineering Challenges for Active Debris Removal

Recent modeling studies on the instability of the debris population in the low Earth orbit (LEO) region and the collision between Iridium 33 and Cosmos 2251 have underlined the need for active debris removal. A 2009 analysis by the NASA Orbital Debris Program Office shows that, in order to maintain the LEO debris population at a constant level for the next 200 years, an active debris removal of about five objects per year is needed. The targets identified for removal are those with the highest mass and collision probability products in the environment. Many of these objects are spent upper stages with masses ranging from 1 to more than 8 metric tons, residing in several altitude regions and concentrated in about 10 inclination bands. To remove five of those objects on a yearly basis, in a cost-effective manner, represents many challenges in engineering, technology development, and operations. This paper outlines a conceptual end-to-end debris removal operation, including launch, precision tracking, rendezvous, stabilization (of the tumbling targets), capture, and deorbit of the targets; and highlights major challenges associated with the operations. Pros and cons of several proposed removal techniques are also evaluated.

Liou, Jer-Chyi↗

Utilization of Hydrologic Remote Sensing Data in Land Surface Modeling and Data Assimilation: Current Status and Challenges

Recent advances in remote sensing technologies have enabled the monitoring and measurement of the Earth's land surface at an unprecedented scale and frequency. The myriad of these land surface observations must be integrated with the state-of-the-art land surface model forecasts using data assimilation to generate spatially and temporally coherent estimates of environmental conditions. These analyses are of critical importance to real-world applications such as agricultural production, water resources management and flood, drought, weather and climate prediction. This need motivated the development of NASA Land Information System (LIS), which is an expert system encapsulating a suite of modeling, computational and data assimilation tools required to address challenging hydrological problems. LIS integrates the use of several community land surface models, use of ground and satellite based observations, data assimilation and uncertainty estimation techniques and high performance computing and data management tools to enable the assessment and prediction of hydrologic conditions at various spatial and temporal scales of interest. This presentation will focus on describing the results, challenges and lessons learned from the use of remote sensing data for improving land surface modeling, within LIS. More specifically, studies related to the improved estimation of soil moisture, snow and land surface temperature conditions through data assimilation will be discussed. The presentation will also address the characterization of uncertainty in the modeling process through Bayesian remote sensing and computational methods.

Kumar, Sujay V.↗

Dst Index in the 2008 GEM Modeling Challenge - Model Performance for Moderate and Strong Magnetic Storms

The GEM 2008 modeling challenge efforts are expanding beyond comparing in-situ measurements in the magnetosphere and ionosphere to include the computation of indices to be compared. The Dst index measures the largest deviations of the horizontal magnetic field at 4 equatorial magnetometers from the quiet-time background field and is commonly used to track the strength of the magnetic disturbance of the magnetosphere during storms. Models can calculate a proxy Dst index in various ways, including using the Dessler-Parker Sckopke relation and the energy of the ring current and Biot-Savart integration of electric currents in the magnetosphere. The GEM modeling challenge investigates 4 space weather events and we compare models available at CCMC against each other and the observed values of Ost. Models used include SWMF/BATSRUS, OpenGGCM, LFM, GUMICS (3D magnetosphere MHD models), Fok-RC, CRCM, RAM-SCB (kinetic drift models of the ring current), WINDMI (magnetosphere-ionosphere electric circuit model), and predictions based on an impulse response function (IRF) model and analytic coupling functions with inputs of solar wind data. In addition to the analysis of model-observation comparisons we look at the way Dst is computed in global magnetosphere models. The default value of Dst computed by the SWMF model is for Bz the Earth's center. In addition to this, we present results obtained at different locations on the Earth's surface. We choose equatorial locations at local noon, dusk (18:00 hours), midnight and dawn (6:00 hours). The different virtual observatory locations reveal the variation around the earth-centered Dst value resulting from the distribution of electric currents in the magnetosphere during different phases of a storm.

Rastaetter, Lutz↗

Managing Challenges in a Multi Contractor Project

The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

King, Ron↗

Challenges of CPAS Flight Testing

The Crew Exploration Vehicle Parachute Assembly System (CPAS) is being designed to land the Orion Crew Module (CM) at a safe rate of descent at splashdown via a series of Drogue, Pilot, and Main parachutes. Because Orion is considerably larger and heavier than Apollo, many of the flight test techniques developed during the Apollo program must be modified. The Apollo program had a dedicated C-133 aircraft, which was modified to allow a simple airdrop of "boilerplate" flight test vehicles. However, the CPAS program must use either commercial or military assets with minimal modifications to airframes or procedures. Conceptual envelopes from 2-Degree Of Freedom trajectories are presented for several existing and novel architectures. Ideally, the technique would deliver a representative capsule shape to the desired altitude and dynamic pressure at test initiation. However, compromises must be made on the characteristics of trajectories or the fidelity of test articles to production hardware. Most of the tests to date have used traditional pallet and weight tub or missile-shaped test vehicles. New test vehicles are being designed to better incorporate Orion structural components and deploy parachutes in a more representative fashion. The first attempt to test a capsule-shaped vehicle failed due to unexpected events while setting up the test condition through a series of complex procedures. In order to avoid the loss of another expensive test article which will delay the program, simpler deployment methods are being examined and more positive control of the vehicle will be maintained. Existing challenges include interfacing with parent aircraft, separating test vehicles, achieving test conditions, and landing within limited test ranges. All these challenges must be met within cost and schedule limits.

Ray, Eric S.↗

Hyperresolution Global Land Surface Modeling: Meeting a Grand Challenge for Monitoring Earth's Terrestrial Water

Monitoring Earth's terrestrial water conditions is critically important to many hydrological applications such as global food production; assessing water resources sustainability; and flood, drought, and climate change prediction. These needs have motivated the development of pilot monitoring and prediction systems for terrestrial hydrologic and vegetative states, but to date only at the rather coarse spatial resolutions (approx.10-100 km) over continental to global domains. Adequately addressing critical water cycle science questions and applications requires systems that are implemented globally at much higher resolutions, on the order of 1 km, resolutions referred to as hyperresolution in the context of global land surface models. This opinion paper sets forth the needs and benefits for a system that would monitor and predict the Earth's terrestrial water, energy, and biogeochemical cycles. We discuss six major challenges in developing a system: improved representation of surface-subsurface interactions due to fine-scale topography and vegetation; improved representation of land-atmospheric interactions and resulting spatial information on soil moisture and evapotranspiration; inclusion of water quality as part of the biogeochemical cycle; representation of human impacts from water management; utilizing massively parallel computer systems and recent computational advances in solving hyperresolution models that will have up to 10(exp 9) unknowns; and developing the required in situ and remote sensing global data sets. We deem the development of a global hyperresolution model for monitoring the terrestrial water, energy, and biogeochemical cycles a grand challenge to the community, and we call upon the international hydrologic community and the hydrological science support infrastructure to endorse the effort.

Wood, Eric F.↗

2008 GEM Modeling Challenge: Metrics Study of the Dst Index in Physics-Based Magnetosphere and Ring Current Models and in Statistical and Analytic Specifications

In this paper the metrics-based results of the Dst part of the 2008-2009 GEM Metrics Challenge are reported. The Metrics Challenge asked modelers to submit results for 4 geomagnetic storm events and 5 different types of observations that can be modeled by statistical or climatological or physics-based (e.g. MHD) models of the magnetosphere-ionosphere system. We present the results of over 25 model settings that were run at the Community Coordinated Modeling Center (CCMC) and at the institutions of various modelers for these events. To measure the performance of each of the models against the observations we use comparisons of one-hour averaged model data with the Dst index issued by the World Data Center for Geomagnetism, Kyoto, Japan, and direct comparison of one-minute model data with the one-minute Dst index calculated by the United States Geologic Survey (USGS).

Rastaetter, L.↗

Attitude Control and Orbital Dynamics Challenges of Removing the First 3-Axis Stabilized Tracking and Data Relay Satellite from the Geosynchronous ARC

Launched on April 4, 1983 onboard STS 6 (Space Shuttle Challenger), the First Tracking and Data Relay Satellite (TDRS 1) was retired above the Geosynchronous Orbit (GEO) on June 27, 2010 after having provided real-time communications with a variety of low-orbiting spacecraft over a 26-year period. To meet NASA requirements limiting orbital debris 1, a team of experts was assembled to conduct an End-Of-Mission (EOM) procedure to raise the satellite 350 km above the GEO orbit. Following the orbit raising via conventional station change maneuvers, the team was confronted with having to deplete the remaining propellant and passivate all energy storage or generation sources. To accomplish these tasks within the time window, communications (telemetry and control links), electrical power, propulsion, and thermal constraints, a spacecraft originally designed as a three-axis stabilized satellite was turned into a spinner. This paper (a companion paper to Innovative Approach Enabled the Retirement of TDRS 1, paper # 1699, IEEE 2011 Aerospace Conference, March 5-12, 2011 sup 2) focuses on the challenges of maintaining an acceptable spinning dynamics, while repetitively firing thrusters. Also addressed are the effects of thruster firings on the orbit characteristics and how they were mitigated by a careful scheduling of the fuel depletion operations. Periodic thruster firings for spin rate adjustment, nutation damping, and precession of the momentum vector were also required in order to maintain effective communications with the satellite. All operations were thoroughly rehearsed and supported by simulations thus lending a high level of confidence in meeting the NASA EOM goals.

Benet, Charles A.↗

Challenges of In-Flight Calibrations for the Mars Reconnaissance Orbiter Payload

The Mars Reconnaissance Orbiter is the most complex spacecraft that has ever been sent to investigate the Red Planet. A major part of what makes this mission so complex is the suite of instruments that were selected. The instruments on MRO vary from a simple imaging system, not much larger than a pocket knife to the largest camera ever flown to another planet. Not only does the size of the instruments vary, so do the scientific investigations associated with each instrument. In order to ensure that this payload suite would be able to satisfy all of its science objectives, a major effort was put forth by the MRO Project to ensure these instruments were well calibrated prior to the start of the Primary Science Phase. The in-flight calibration plan for MRO proved to be quite challenging, given the often conflicting requirements due to the varying capability of each of the instruments and the desire to constrain the workload on the Mission Operations personnel. The quality of data returned by MRO since the start of the Primary Science Phase is a tribute to the effort that was put forth to characterize the in-flight performance of the instruments. This paper will describe the challenges associated with the planning and implementation of the various calibration events on MRO, and will exhibit some of the results from those calibrations.

Mars Reconnaissance Orbiter (MRO)↗

GEM-CEDAR Challenge: Comparing Ionospheric Models with Poynting Flux from DMSP Observations

As part to the GEM-CEDAR challenge we are extending the model-data comparisons to electrodynamic in-situ measurements in low-Earth orbit. We use DMSP observations of electric and magnetic fields to compute Poynting Flux values along the satellite track in high latitudes including the auroral zones and the polar cap. Models of the ionosphere that include electrodynamic parameters have been run for five events selected for the GEM-CEDAR modeling challenge for which DMSP data are available for comparison. Combined with a magnetic field model we use the modeled electric fields to compute Poynting Flux and Joule Dissipation values from outputs of CTIPe, TIE-GCM, the ionospheric electrodynamics solvers of the SWMF, LFM and OpenGGCM magnetosphere-ionosphere coupled models, and the Weimer electric field model. The online metrics analysis tool at the Community Coordinated Modeling Center (CCMC) has been updated to handle the analysis of separate short segments of available data (high-latitude sections of the satellite orbit) with model outputs to analyze how well auroral patterns are being reproduced by the models. We present initial results from the new analysis tool in terms of model yields (ratio of the difference between maximum and minimum values of model results to the observation), timing/location errors of local maxima in the inbound and outbound auroral crossings as well as cross-correlations for individual passes. We collect the information for many DMSP passes and present an analysis for model performance during quiet and geomagnetically disturbed time periods using half-orbit integrated values as well.

Rastaetter, Lutz↗

Thermal Energy for Lunar In Situ Resource Utilization: Technical Challenges and Technology Opportunities

Oxygen production from lunar raw materials is critical for sustaining a manned lunar base but is very power intensive. Solar concentrators are a well-developed technology for harnessing the Sun s energy to heat regolith to high temperatures (over 1375 K). The high temperature and potential material incompatibilities present numerous technical challenges. This study compares and contrasts different solar concentrator designs that have been developed, such as Cassegrains, offset parabolas, compound parabolic concentrators, and secondary concentrators. Differences between concentrators made from lenses and mirrors, and between rigid and flexible concentrators are also discussed. Possible substrate elements for a rigid mirror concentrator are selected and then compared, using the following (target) criteria: (low) coefficient of thermal expansion, (high) modulus of elasticity, and (low) density. Several potential lunar locations for solar concentrators are compared; environmental and processing-related challenges related to dust and optical surfaces are addressed. This brief technology survey examines various sources of thermal energy that can be utilized for materials processing on the lunar surface. These include heat from nuclear or electric sources and solar concentrators. Options for collecting and transporting thermal energy to processing reactors for each source are examined. Overall system requirements for each thermal source are compared and system limitations, such as maximum achievable temperature are discussed.

Gordon, Pierce E. C.↗

Provenance Challenges for Earth Science Dataset Publication

Modern science is increasingly dependent on computational analysis of very large data sets. Organizing, referencing, publishing those data has become a complex problem. Published research that depends on such data often fails to cite the data in sufficient detail to allow an independent scientist to reproduce the original experiments and analyses. This paper explores some of the challenges related to data identification, equivalence and reproducibility in the domain of data intensive scientific processing. It will use the example of Earth Science satellite data, but the challenges also apply to other domains.

Tilmes, Curt↗

CEDAR Electrodynamics Thermosphere Ionosphere (ETI) Challenge for Systematic Assessment of Ionosphere/Thermosphere Models: NmF2, hmF2, and Vertical Drift Using Ground-Based Observations

Objective quantification of model performance based on metrics helps us evaluate the current state of space physics modeling capability, address differences among various modeling approaches, and track model improvements over time. The Coupling, Energetics, and Dynamics of Atmospheric Regions (CEDAR) Electrodynamics Thermosphere Ionosphere (ETI) Challenge was initiated in 2009 to assess accuracy of various ionosphere/thermosphere models in reproducing ionosphere and thermosphere parameters. A total of nine events and five physical parameters were selected to compare between model outputs and observations. The nine events included two strong and one moderate geomagnetic storm events from GEM Challenge events and three moderate storms and three quiet periods from the first half of the International Polar Year (IPY) campaign, which lasted for 2 years, from March 2007 to March 2009. The five physical parameters selected were NmF2 and hmF2 from ISRs and LEO satellites such as CHAMP and COSMIC, vertical drifts at Jicamarca, and electron and neutral densities along the track of the CHAMP satellite. For this study, four different metrics and up to 10 models were used. In this paper, we focus on preliminary results of the study using ground-based measurements, which include NmF2 and hmF2 from Incoherent Scatter Radars (ISRs), and vertical drifts at Jicamarca. The results show that the model performance strongly depends on the type of metrics used, and thus no model is ranked top for all used metrics. The analysis further indicates that performance of the model also varies with latitude and geomagnetic activity level.

Shim, J. S.↗

Active Debris Removal and the Challenges for Environment Remediation

Recent modeling studies on the instability of the debris population in the low Earth orbit (LEO) region and the collision between Iridium 33 and Cosmos 2251 have underlined the need for active debris removal. A 2009 analysis by the NASA Orbital Debris Program Office shows that, in order to maintain the LEO debris population at a constant level for the next 200 years, an active debris removal of about five objects per year is needed. The targets identified for removal are those with the highest mass and collision probability products in the environment. Many of these objects are spent upper stages with masses ranging from 1 to more than 8 metric tons, residing in several altitude regions and concentrated in about 7 inclination bands. To remove five of those objects on a yearly basis, in a cost-effective manner, represents many challenges in technology development, engineering, and operations. This paper outlines the fundamental rationale for considering active debris removal and addresses the two possible objectives of the operations -- removing large debris to stabilize the environment and removing small debris to reduce the threat to operational spacecraft. Technological and engineering challenges associated with the two different objectives are also discussed.

Liou, J. C.↗

Survey of Applications of Active Control Technology for Gust Alleviation and New Challenges for Lighter-weight Aircraft

This report provides a historical survey and assessment of the state of the art in the modeling and application of active control to aircraft encountering atmospheric disturbances in flight. Particular emphasis is placed on applications of active control technologies that enable weight reduction in aircraft by mitigating the effects of atmospheric disturbances. Based on what has been learned to date, recommendations are made for addressing gust alleviation on as the trend for more structurally efficient aircraft yields both lighter and more flexible aircraft. These lighter more flexible aircraft face two significant challenges reduced separation between rigid body and flexible modes, and increased sensitivity to gust encounters due to increased wing loading and improved lift to drag ratios. The primary audience of this paper is engineering professionals new to the area of gust load alleviation and interested in tackling the multifaceted challenges that lie ahead for lighter-weight aircraft.

Regan, Christopher D.↗