Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Risk-Based Dynamic Contingency Analysis Applied to Puerto Rico Electric Infrastructure

The U.S. Department of Energy’s (DOE) Office of Electricity and Office of Energy Efficiency & Renewable Energy have funded DOE National Laboratories to perform modeling, analysis, and high-level design of resilience-enhancement options for the power grid of the Commonwealth of Puerto Rico. The Pacific Northwest National Laboratory (PNNL) is one of the national laboratories contributing to the DOE effort. Under this funding, PNNL completed Phase I of their analysis in 2018, which identified high-priority transmission enhancements derived from detailed dynamic cascading analysis of severe contingencies, including a hurricane scenario example. This report describes additional analysis completed under Phase II, which was performed over 2019. The PNNL team applied decades of experience making complex power systems more resilient, reliable, secure, flexible, affordable and sustainable, with partners in government and industry. In this report, PNNL presents the Phase II analysis, in which a risk-based dynamic contingency analysis approach to evaluate impact of several hurricane scenarios was developed. This approach was used to identify high-priority enhancements and test resilience mitigation actions, including the evaluation of high-solar scenarios developed as a result of the 2019 Puerto Rico Integrated Resource Plan (IRP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space Station battery system design and development

The Space Station Electric Power System will rely on nickel-hydrogen batteries in its photovoltaic power subsystem for energy storage to support eclipse and contingency operations. These 81-Ah batteries will be designed for a 5-year life capability and are configured as orbital replaceable units (ORUs), permitting replacement of worn-out batteries over the anticipated 30-year Station life. This paper describes the baseline design and the development plans for the battery assemblies, the battery ORUs and the battery system. Key elements reviewed are the cells, mechanical and thermal design of the assembly, the ORU approach and interfaces, and the electrical design of the battery system. The anticipated operational approach is discussed, covering expected performance as well as the processor-controlled charge management and discharge load allocation techniques. Development plans cover verification of materials, cells, assemblies and ORUs, as well as system-level test and analyses.

Haas, R. J.↗

NASA's Orbital Space Plane Risk Reduction Strategy

This paper documents the transformation of NASA s Space Launch Initiative (SLI) Second Generation Reusable Launch Vehicle Program under the revised Integrated Space Transportation Plan, announced November 2002. Outlining the technology development approach followed by the original SLI, this paper gives insight into the current risk-reduction strategy that will enable confident development of the Nation s first orbital space plane (OSP). The OSP will perform an astronaut and contingency cargo transportation function, with an early crew rescue capability, thus enabling increased crew size and enhanced science operations aboard the International Space Station. The OSP design chosen for full-scale development will take advantage of the latest innovations American industry has to offer. The OSP Program identifies critical technologies that must be advanced to field a safe, reliable, affordable space transportation system for U.S. access to the Station and low-Earth orbit. OSP flight demonstrators will test crew safety features, validate autonomous operations, and mature thermal protection systems. Additional enabling technologies may be identified during the OSP design process as part of an overall risk-management strategy. The OSP Program uses a comprehensive and evolutionary systems acquisition approach, while applying appropriate lessons learned.

Dumbacher, Dan↗

NASA's UAS Integration into the NAS: A Report on the Human Systems Integration Phase 1 Simulation Activities

In 2011 the National Aeronautics and Space Administration (NASA) began a five-year Project to address the technical barriers related to routine access of Unmanned Aerial Systems (UAS) in the National Airspace System (NAS). Planned in two phases, the goal of the first phase was to lay the foundations for the Project by identifying those barriers and key issues to be addressed to achieve integration. Phase 1 activities were completed two years into the five-year Project. The purpose of this paper is to review activities within the Human Systems Integration (HSI) subproject in Phase 1 toward its two objectives: 1) develop GCS guidelines for routine UAS access to the NAS, and 2) develop a prototype display suite within an existing Ground Control Station (GCS). The first objective directly addresses a critical barrier for UAS integration into the NAS - a lack of GCS design standards or requirements. First, the paper describes the initial development of a prototype GCS display suite and supporting simulation software capabilities. Then, three simulation experiments utilizing this simulation architecture are summarized. The first experiment sought to determine a baseline performance of UAS pilots operating in civil airspace under current instrument flight rules for manned aircraft. The second experiment examined the effect of currently employed UAS contingency procedures on Air Traffic Control (ATC) participants. The third experiment compared three GCS command and control interfaces on UAS pilot response times in compliance with ATC clearances. The authors discuss how the results of these and future simulation and flight-testing activities contribute to the development of GCS guidelines to support the safe integration of UAS into the NAS. Finally, the planned activities for Phase 2, including an integrated human-in-the-loop simulation and two flight tests are briefly described.

National Airspace System↗

ISS Microgravity Research Payload Training Methodology

The NASA Microgravity Research Discipline has multiple categories of science payloads that are being planned and currently under development to operate on various ISS on-orbit increments. The current program includes six subdisciplines; Materials Science, Fluids Physics, Combustion Science, Fundamental Physics, Cellular Biology and Macromolecular Biotechnology. All of these experiment payloads will require the astronaut various degrees of crew interaction and science observation. With the current programs planning to build various facility class science racks, the crew will need to be trained on basic core operations as well as science background. In addition, many disciplines will use the Express Rack and the Microgravity Science Glovebox (MSG) to utilize the accommodations provided by these facilities for smaller and less complex type hardware. The Microgravity disciplines will be responsible to have a training program designed to maximize the experiment and hardware throughput as well as being prepared for various contingencies both with anomalies as well as unexpected experiment observations. The crewmembers will need various levels of training from simple tasks as power on and activate to extensive training on hardware mode change out to observing the cell growth of various types of tissue cultures. Sample replacement will be required for furnaces and combustion type modules. The Fundamental Physics program will need crew EVA support to provide module change out of experiment. Training will take place various research centers and hardware development locations. It is expected that onboard training through various methods and video/digital technology as well as limited telecommunication interaction. Since hardware will be designed to operate from a few weeks to multiple research increments, flexibility must be planned in the training approach and procedure skills to optimize the output as well as the equipment maintainability. Early increment lessons learned will be addressed.

Schlagheck, Ronald↗

OSIRIS-REx, Returning the Asteroid Sample

This paper addresses the technical aspects of the sample return system for the upcoming Origins, Spectral Interpretation, Resource Identification, and Security-Regolith Explorer (OSIRIS-REx) asteroid sample return mission. The overall mission design and current implementation are presented as an overview to establish a context for the technical description of the reentry and landing segment of the mission.The prime objective of the OSIRIS-REx mission is to sample a primitive, carbonaceous asteroid and to return that sample to Earth in pristine condition for detailed laboratory analysis. Targeting the near-Earth asteroid Bennu, the mission launches in September 2016 with an Earth reentry date of September 24, 2023.OSIRIS-REx will thoroughly characterize asteroid Bennu providing knowledge of the nature of near-Earth asteroids that is fundamental to understanding planet formation and the origin of life. The return to Earth of pristine samples with known geologic context will enable precise analyses that cannot be duplicated by spacecraft-based instruments, revolutionizing our understanding of the early Solar System. Bennu is both the most accessible carbonaceous asteroid and one of the most potentially Earth-hazardous asteroids known. Study of Bennu addresses multiple NASA objectives to understand the origin of the Solar System and the origin of life and will provide a greater understanding of both the hazards and resources in near-Earth space, serving as a precursor to future human missions to asteroids.This paper focuses on the technical aspects of the Sample Return Capsule (SRC) design and concept of operations, including trajectory design and reentry retrieval. Highlights of the mission are included below.The OSIRIS-REx spacecraft provides the essential functions for an asteroid characterization and sample return mission: attitude control propulsion power thermal control telecommunications command and data handling structural support to ensure successful rendezvous with Bennu characterization of Bennus properties delivery of the sampler to the surface, and return of the spacecraft to the vicinity of the Earth sample collection, performed by the Touch-and-Go Sample Acquisition Mechanism (TAGSAM), to acquire a regolith sample from the surface Earth re-entry and SRC recovery. Following sample collection, OSIRIS-REx drifts away from Bennu until the Asteroid Departure Maneuver is commanded on March 4, 2021, sending OSIRIS-REx on a ballistic return cruise to Earth. No additional large deterministic maneuvers are required to return the SRC to Earth. During the cruise, tracking and trajectory correction maneuvers (TCMs) are performed as necessary to precisely target the entry corridor. As OSIRIS-REx approaches Earth, the reentry plans are reviewed starting about a year before arrival, and preparations begin. The spacecraft is targeted away from the Earth until 7 days before entry. The final two trajectory correction maneuvers bring the spacecraft on target toward the Utah Test and Training Range (UTTR), with sufficient time for contingency resolution. The SRC releases 4 hours prior to atmospheric entry interface and, using the Stardust capsule heritage design, employs a traditional drogue and main parachute descent system for a soft touchdown.

reentry↗

A two-phase investment model for optimal allocation of phasor measurement units considering transmission switching

Ensuring the reliability of an electrical power system requires a wide-area monitoring and full observability of the state variables. Phasor measurement units (PMUs) collect in real time synchronized phasors of voltages and currents which are used for the observability of the power grid. Due to the considerable cost of installing PMUs, it is not possible to equip all buses with PMUs. In this paper, we propose an integer linear programming model to determine the optimal PMU placement plan in two investment phases. In the first phase, PMUs are installed to achieve full observability of the power grid whereas additional PMUs are installed in the second phase to guarantee the N - 1 observability of the power grid. The proposed model also accounts for transmission switching and single contingencies such as failure of a PMU or a transmission line. Results are provided on several IEEE test systems which show that our proposed approach is a promising enhancement to the methods available for the optimal placement of PMUs.

Phasor measurement unit↗

Matching and fairness in threat-based mobile sensor coverage

Mobile sensors can be used to effect complete coverage of a surveillance area for a given threat over time, thereby reducing the number of sensors necessary. The surveillance area may have a given threat profile as determined by the kind of threat, and accompanying meteorological, environmental, and human factors. In planning the movement of sensors, areas that are deemed higher threat should receive proportionately higher coverage. We propose a coverage algorithm for mobile sensors to achieve a coverage that will match - over the long term and as quantified by an RMSE metric - a given threat profile. Moreover, the algorithm has the following desirable properties: (1) stochastic, so that it is robust to contingencies and makes it hard for an adversary to anticipate the sensor's movement, (2) efficient, and (3) practical, by avoiding movement over inaccessible areas. Further to matching, we argue that a fairness measure of performance over the shorter time scale is also important. We show that the RMSE and fairness are, in general, antagonistic, and argue for the need of a combined measure of performance, which we call efficacy. We show how a pause time parameter of the coverage algorithm can be used to control the trade-off between the RMSE and fairness, and present an efficient offline algorithm to determine the optimal pause time maximizing the efficacy. Finally, we discuss the effects of multiple sensors, under both independent and coordinated operation. Extensive simulation results - under realistic coverage scenarios - are presented for performance evaluation.

99 GENERAL AND MISCELLANEOUS↗

Autonomous Rovers for Mars Exploration

Rovers will play a critical role in the exploration of Mars. Near-term mission plans call for long traverses over unknown terrain, robust navigation and instrument placement, and reliable operations for extended periods of time. Longer-term missions may visit multiple science sites in a single day and perform opportunistic science data collection, as well as complex scouting, construction, and maintenance tasks in preparation for an eventual human presence. The Pathfinder mission demonstrated the potential for robotic Mars exploration but at the same time indicated the need for more rover autonomy. The highly ground-intensive control with infrequent communication and high latency limited the effectiveness of the Sojourner rover. When failures occurred, Sojourner often sat idle for extended periods of time, awaiting further commands from earth. In future missions, the tasks will be more complex and extended; hence there will be even more situations where things do not go exactly as planned. Significant advances in rover autonomy are needed to cope with increasing task complexity and greater execution uncertainty. Towards this end, we have designed an on-board executive architecture that incorporates robust operation, resource utilization, and failure recovery. In addition, we have designed ground tools to produce and refine contingent schedules that take advantage of the on-board architecture's flexible execution characteristics. Together, the on-board executive and the ground tools constitute an integrated rover autonomy architecture. This work draws from our experience with the Deep Space One autonomy experiment, with enhancements to ensure robust operation in the face of the unpredictable, complex environment that the rover will encounter on Mars. The rover autonomy architecture is currently being developed and deployed on the Marsokhod rover platform at NASA Ames Research Center. The capabilities of the rover autonomy architecture to support autonomous operations will be demonstrated concretely in upcoming field tests.

Anderson, Corin↗

Moon to Mars (M2M) Habitation Considerations: A Snap Shot As of January 2022

The following NASA Technical Memorandum (TM) is intended to provide a snapshot in time of NASA’s current considerations (ground rules and assumptions, functional allocations, logistics) for habitation systems for the lunar surface (non-roving) and Mars transits. As NASA continues to refine the reference designs to meet the needs of an evolving architecture, it is expected that this information will also be updated as a result. Where appropriate, relevant publicly released documents will be referenced to provide further detail. NASA’s human lunar exploration plan under the Artemis program calls for achieving the goal of sending the first woman and first person of color to the surface of the Moon in the mid- 2020s and working toward sustainable exploration by the end of the decade. Working with both commercial and international partners, NASA will establish a permanent human presence on the Moon to uncover new scientific discoveries and lay the foundation for private companies to build a lunar economy. Longer duration missions on the lunar surface and in lunar orbit will also serve as a test bed for technologies to support future Mars exploration campaigns. The agency will use what we learn on the Moon to prepare for humanity's next giant leap – sending astronauts to Mars. NASA intends to establish a sustained lunar presence with the development of the Artemis Base Camp to prove technologies and capabilities that will one day enable humans to live and work on Mars, beginning with core elements including the Lunar Terrain Vehicle (LTV), the Pressurized Rover (PR), the lunar Surface Habitat (SH), power systems, and in-situ resource utilization (ISRU) systems. For in space operations and eventual transport of humans to Mars, NASA will utilize a Mars Transit Habitat (TH). Following deployment, the TH will complete a series of longer duration missions and shakedown testing while docked at Gateway, leveraging Gateway’s habitation redundancy for safety measures. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. They will be the first operational readiness tests of our long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Both the SH and TH are major architectural elements of NASA’s Moon to Mars (M2M) approach, each with very different concepts of operation. The SH is intended for use on the lunar surface as a home for astronauts, surface operations base, science facility, hub for communications, extravehicular activity (EVA) equipment repair site, waste processing facility, and supply hub. It serves as an enabler for a sustained surface presence and preparation for partial gravity operations during Mars missions. The SH will be designed to be self-sufficient for operations on the lunar surface. The SH will independently provide several functions, including its own power generation, energy storage capability, sleep quarters, hygiene areas, work areas, and dining areas. It will be capable of communicating with surface assets, orbital assets, and directly with Earth ground stations. It is planned to operate with two crew in the habitat for ~28- day stays with crew swap-outs in which the PR crew of two trades places with the habitat crew. During the swap-out, the habitat will nominally support four crew for a short period of time. For contingency scenarios, the habitat must also be capable of supporting four crew for up to 7 days. The TH will be designed to be capable of up to ~1,200-day Mars missions with the ability to carry all food and supplies needed to support a crew of four for this duration. An assumed Mars mission profile for the TH is to carry crew and supplies for ~850-day roundtrips between Earth and Mars orbit that allows 30-day stays on the Martian surface. To test the systems for this long journey, the TH will be used to extend the duration of missions at Gateway, enabling the orbiting outpost to be used as a Mars analog. These analog missions will be accomplished by attaching the TH to Gateway and conducting lunar surface operations from the TH. The TH may also need to perform free-flying shakedown missions to test out all systems prior to leaving for Mars. The habitat provides many critical functions including: a contingency airlock, crew quarters, galley, hygiene areas, safe haven capability, and science equipment. It can receive docked items from either axial end or on a radial port.

Habitat↗

Data Requirements for Application of Risk-Based Dynamic Contingency Analysis to Evaluate Hurricane Impact to Electrical Infrastructure in Puerto Rico

This paper presents a risk-based dynamic contingency analysis framework that was used to evaluate the hurricane impact to electrical infrastructure in Puerto Rico. PNNL developed a scalable risk-based framework for identifying high-voltage transmission resilience improvements by classifying and prioritizing high-risk power grid contingencies (system failures) under hurricane impact. The risk-based framework is founded on grid outage definitions with their associated probabilities of occurrence from hurricane events, in combination with an impact assessment derived from detailed dynamic cascading failure analysis. This paper focuses on a discussion around data requirements for transmission resilience planning for hurricane events, derived from the development of the risk-based framework and its application to Puerto Rico. This paper launches an important first step in encouraging the engineering community and power system industry to move towards establishing resilience planning as a routine practice. Since actual results for Puerto Rico contain sensitive information, sample simulation results will be used to illustrate the data requirements and risk-based dynamic cascading framework on the Puerto Rico power grid, as well as demonstrate the potential for such a simulation framework. The paper includes a discussion on the lessons learned, importance and need for improved datasets that are not usually considered in traditional power system planning. The paper will also elaborate on how the scalable simulation framework and datasets might be expanded to larger footprints and leveraged for modelling other types of natural disasters.

DCAT, Puerto Rico, hurricane, Power System Stabili↗

Statistical and Probabilistic Extensions to Ground Operations' Discrete Event Simulation Modeling

NASA's human exploration initiatives will invest in technologies, public/private partnerships, and infrastructure, paving the way for the expansion of human civilization into the solar system and beyond. As it is has been for the past half century, the Kennedy Space Center will be the embarkation point for humankind's journey into the cosmos. Functioning as a next generation space launch complex, Kennedy's launch pads, integration facilities, processing areas, launch and recovery ranges will bustle with the activities of the world's space transportation providers. In developing this complex, KSC teams work through the potential operational scenarios: conducting trade studies, planning and budgeting for expensive and limited resources, and simulating alternative operational schemes. Numerous tools, among them discrete event simulation (DES), were matured during the Constellation Program to conduct such analyses with the purpose of optimizing the launch complex for maximum efficiency, safety, and flexibility while minimizing life cycle costs. Discrete event simulation is a computer-based modeling technique for complex and dynamic systems where the state of the system changes at discrete points in time and whose inputs may include random variables. DES is used to assess timelines and throughput, and to support operability studies and contingency analyses. It is applicable to any space launch campaign and informs decision-makers of the effects of varying numbers of expensive resources and the impact of off nominal scenarios on measures of performance. In order to develop representative DES models, methods were adopted, exploited, or created to extend traditional uses of DES. The Delphi method was adopted and utilized for task duration estimation. DES software was exploited for probabilistic event variation. A roll-up process was used, which was developed to reuse models and model elements in other less - detailed models. The DES team continues to innovate and expand DES capabilities to address KSC's planning needs.

Trocine, Linda↗

Simulation and Postmortem Analysis of Angeles Forest Disturbance Event

Multiple unexpected solar photovoltaic (PV) plant responses in the California region following contingencies in recent years warrant postmortem analysis leveraging digital fault recorder (DFR) data for a better understanding of such events and preventing similar events in the future. Most utilities in US, in general, possess transient stability (TS) phasor-domain models of the power grid. Since traditional phasor-based transient stability planning models cannot perform such analysis, this paper presents an approach to extract a region of such models and convert it to Electromagnetic transient (EMT) models. The approach is based on the determination of the minimum impedance-weighted spanning tree between the fault location and affected PV plants in a Western Electricity Coordinating Council (WECC) planning model followed by conversion of this region into an EMT model. The accuracy of the proposed approach is validated against DFR records obtained from the 2018 Angeles Forest disturbance event.

Samanta, Sayan↗

Removal of Institutional Controls at CERCLA Site ANL-01 Ditches A, B and C at the Materials and Fuels Complex

ANL-01 is a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site within Operable Unit (OU) 9-04 at the Materials and Fuels Complex (MFC). The ANL-01 site includes the Industrial Waste Pond and its associated ditches. Ditches A, B and C within ANL-01 were remediated in accordance with the Final Record of Decision for Argonne National Laboratory - West (DOE-CH 1998a). Due to the success of the selected and contingent remedies for the ditches and the determination that they are protective of human health and the environment, institutional controls (ICs) are no longer required and Idaho National Laboratory (INL) recommends termination of the ICs. In addition, the documentation requirements of the INL Site-wide Institutional Controls, and Operations and Maintenance Plan for CERCLA Response Actions (DOE-ID 2017) have been met to allow termination to occur.

54 ENVIRONMENTAL SCIENCES↗

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection: Preprint

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Grid Strength Analysis Tool (GSAT) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the GSAT software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Safety concerns for first entry operations of orbiting spacecraft

The Space Station Freedom crew will face operational problems unique to the spacecraft environment due to the absence of convection currents and the confined atmosphere within the habitable modules. Airborne contaminants from the materials offgassing or contingency incidents like thermodegradation may accumulate until they reach hazardous concentrations. Flow modeling and experiences from previous space flight missions confirm that caution must be exercised during first-entry operations. A review of the first-entry procedures performed during the Skylab Program will be presented to highlight the necessity for carefully planned operations. Many of the environmental conditions that can be expected on the Space Station are analogous to those which exist in confined storage or work spaces in the industrial setting. Experience with closed-loop environmental operations (e.g., atmospheric control of submarines) have also demonstrated that the buildup of trace contaminant gases could result in conditions that lead to mission termination or loss of crew. Consequently, some first-entry issues for the Station can be addressed by comparing them to familiar techniques developed on Earth. The instruments of the Environmental Health System (EHS) will provide the necessary monitoring capability to protect crew health and safety during the planned first-entry procedures of the MTC phase of the SSF Program. The authors of this paper will describe those procedures and will cite an example of the consequences when proper first-entry procedures are not followed.

Wilson, Steven H.↗

Solar-B X-ray Telescope (XRT) Concept Study Report

The X-ray observations from the Yohkoh SXT provided the greatest step forward in our understanding of the solar corona in nearly two decades. Expanding on the accomplishments of Yohkoh, we believe that the scientific objectives of the Solar-B mission are achieved with a significantly improved X-ray telescope (XRT) similar to the SXT. The Solar-B XRT will have twice the spatial resolution and a broader temperature response, while building on the knowledge gained from the successful Yohkoh mission. We present the scientific justification for this view, discuss the instrumental requirements that flow from the scientific objectives, and describe the instrumentation to meet these requirements. We then provide a detailed discussion of the design activities carried out during Phase A, noting the conclusions that were reached in terms of their implications for the detailed design activities which are now commencing. Details of the instrument that have changed as a result of the Phase A studied are specifically noted, and areas of concern going into Phase B are highlighted. XRT is a grazing-incidence (GI) modified Wolter I X-ray telescope, of 35cm inner diameter and 2.7m focal length. The 2048x2048 back-illuminated CCD (now an ISAS responsibility) has 13.5 micron pixels, corresponding to 1.0 arcsec and giving full Sun field of view. This will be the highest resolution GI X-ray telescope ever flown for Solar coronal studies, and it has been designed specifically to observe both the high and low temperature coronal plasma. A small optical telescope provides visible light images for co-alignment with the Solar-B optical and EUV instruments. The XRT science team is working in close cooperation with our Japanese colleagues in the design and construction of this instrument. All of the expertise and resources of the High Energy and Solar/Stellar Divisions of the Center for Astrophysics are being made available to this program, and our team will carry its full share of responsibility for mission operations, data reduction and education and public outreach. All aspects of the XRT design were reviewed during Phase A. The study focussed particularly on those aspects that have the greatest affect on instrument performance and extended lifetime, on the image quality error budget, and on the camera (mechanical and electrical) interface and the instrument mounting interfaces. The present instrument design differs in some details from that originally proposed. Selection of the XRT for Phase A study was contingent upon the removal of the camera and its associated electronics, and the acceptance of a stringent cost cap. The removal of the electronics left the XRT without control electronics for the instrument mechanisms. A mechanism controller was therefore added. The removal of the camera resulted in major complications to the integration and test plan. After many discussions, it was decided that the system would be less expensive, and the risk of unacceptable performance lower, if we include a focus mechanism. The remainder of the XRT design baseline matches the proposed configuration. Data requirements for the XRT are driven by the science plans, which are based on the physical processes in the solar outer atmosphere. Discussions to date of the XRT observing plan, both alone and in conjunction with the other Solar-B instruments, shows that the XRT needs 2 Gbits of on-board storage, at least one circulating buffer of 640 Mbits, and twelve 10- minute downlinks per day in order to carry out its required programs.

Golub, Leon↗