Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Modular Growth NTR Space Transportation System for Future NASA Human Lunar, NEA and Mars Exploration Missions

The nuclear thermal rocket (NTR) is a proven, high thrust propulsion technology that has twice the specific impulse (I(sub sp) approx.900 s) of today's best chemical rockets. During the Rover and NERVA (Nuclear Engine for Rocket Vehicle Applications) programs, twenty rocket reactors were designed, built and ground tested. These tests demonstrated: (1) a wide range of thrust; (2) high temperature carbide-based nuclear fuel; (3) sustained engine operation; (4) accumulated lifetime; and (5) restart capability - everything required for affordable human missions beyond LEO. In NASA's recent Mars Design Reference Architecture (DRA) 5.0 study, the NTR was selected as the preferred propulsion option because of its proven technology, higher performance, lower IMLEO, versatile vehicle design, and growth potential. Furthermore, the NTR requires no large technology scale-ups since the smallest engine tested during the Rover program - the 25 klb(sub f) "Pewee" engine is sufficient for human Mars missions when used in a clustered engine configuration. The "Copernicus" crewed Mars transfer vehicle developed for DRA 5.0 was an expendable design sized for fast-conjunction, long surface stay Mars missions. It therefore has significant propellant capacity allowing a reusable "1-year" round trip human mission to a large, high energy near Earth asteroid (NEA) like Apophis in 2028. Using a "split mission" approach, Copernicus and its two key elements - a common propulsion stage and integrated "saddle truss" and LH2 drop tank assembly - configured as an Earth Return Vehicle / propellant tanker, can also support a short round trip (approx.18 month) / short orbital stay (60 days) Mars reconnaissance mission in the early 2030's before a landing is attempted. The same short stay orbital mission can be performed with an "all-up" vehicle by adding an "in-line" LH2 tank to Copernicus to supply the extra propellant needed for this higher energy, opposition-class mission. To transition to a reusable Mars architecture, Copernicus' saddle truss / drop tank assembly is replaced by an in-line tank and "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. Shorter "1-way" transit time fast-conjunction Mars missions are another possibility using this vehicle configuration but, as with reusability, increased launch mass is required. "Scaled down" versions of Copernicus (sized to a SLS lift capability of approx.70 t - 100 t) can be developed initially allowing reusable lunar cargo delivery and crewed landing missions, easy NEA missions (e.g., 2000 SG344 also in 2028) or an expendable mission to Apophis. Mission scenario descriptions, key vehicle features and operational characteristics are provided along with a brief discussion of NASA's current activities and its "pre-decisional" plans for future NTR development.

Borowski, Stanley K.↗

The Asteroid Redirect Mission (ARM): Exploration of a Former Binary NEA?

The National Aeronautics and Space Administration (NASA) is developing the Asteroid Redirect Mission (ARM) as a capability demonstration for future human exploration, including use of high-power solar electric propulsion, which allows for the efficient movement of large masses through deep space. The ARM will also demonstrate the capability to conduct proximity operations with natural space objects and crewed operations beyond the security of quick Earth return. The Asteroid Redirect Robotic Mission (ARRM), currently in formulation, will visit a large near-Earth asteroid (NEA), collect a multi-ton boulder from its surface, conduct a demonstration of a slow push planetary defense technique, and redirect the multi-ton boulder into a stable orbit around the Moon. Once returned to cislunar space in the mid-2020s, astronauts aboard an Orion spacecraft will dock with the robotic vehicle to explore the boulder and return samples to Earth. The ARM is part of NASA's plan to advance technologies, capabilities, and spaceflight experience needed for a human mission to the Martian system in the 2030s. The ARM and subsequent availability of the asteroidal material in cis-lunar space, provide significant opportunities to advance our knowledge of small bodies in the synergistic areas of science, planetary defense, and in-situ resource utilization (ISRU). The current reference target for the ARM is NEA (341843) 2008 EV5, which may have been the primary body of a former binary system (Busch et al., 2011; Tardivel et al., 2016). The ARRM will perform several close proximity operations to investigate the NEA and map its surface. A detailed investigation of this object may allow a better understanding of binary NEA physical characteristics and the possible outcomes for their evolution. An overview of the ARM robotic and crewed segments, including mission operations, and a discussion of potential opportunities for participation with the ARM will be provided in this presentation.

Abell, P. A.↗

The Skylab Medical Operations Project: Recommendations to Improve Crew Health and Performance for Future Exploration Missions

From May of 1973 to February of 1974, the National Aeronautics and Space Administration conducted a series of three manned missions to the Skylab space station, a voluminous vehicle largely descendant of Apollo hardware, and America s first space station. The crewmembers of these three manned missions spent record breaking durations of time in microgravity (28 days, 59 days and 84 days, respectively) and gave the U.S. space program its first experiences with long-duration space flight. The program overcame a number of obstacles (including a significant crippling of the Skylab vehicle) to conduct a lauded scientific program that encompassed life sciences, astronomy, solar physics, materials sciences and Earth observation. Skylab has more to offer than the results of its scientific efforts. The operations conducted by the Skylab crews and ground personnel represent a rich legacy of operational experience. As we plan for our return to the moon and the subsequent manned exploration of Mars, it is essential to utilize the experiences and insights of those involved in previous programs. Skylab and SMEAT (Skylab Medical Experiments Altitude Test) personnel have unique insight into operations being planned for the Constellation Program, such as umbilical extra-vehicular activity and water landing/recovery of long-duration crewmembers. Skylab was also well known for its habitability and extensive medical suite; topics which deserve further reflection as we prepare for lunar habitation and missions beyond Earth s immediate sphere of influence. The Skylab Medical Operations Summit was held in January 2008. Crewmembers and medical personnel from the Skylab missions and SMEAT were invited to participate in a two day summit with representatives from the Constellation Program medical operations community. The purpose of the summit was to discuss issues pertinent to future Constellation operations. The purpose of this document is to formally present the recommendations of the Skylab and SMEAT participants.

Polk, James D.↗

Opportunities and Strategies for Testing and Infusion of ISRU in the Evolvable Mars Campaign

HE Evolvable Mars Campaign (EMC) is developing the plans and systems needed for a robust, evolutionary strategy to explore cis-lunar space, the Mars sphere of influence (including the moons of Mars), and the surface of Mars. Recently, the emphasis of NASA's plans has changed to focus on the prolonged pioneering of space, rather than focusing on a single crewed mission as the ultimate goal. A sustainable, pioneering vision of space would include in-situ resource utilization (ISRU) in multiple forms and at multiple destinations: atmospheric capture of Mars CO2 and/or volatiles for consumables and propellants, regolith for bulk and refined materials, and in-situ manufacturing at the Moon, Mars, and other bodies. These resources would enable a reduction in the logistical needs from Earth for future missions, thus preparing the way for a sustained presence on Mars. Although the EMC initially relies only on propellant production for the Mars ascent vehicle via ISRU, one of its primary objectives is to prospect at every EMC destination to understand the potential for ISRU; this will permit true pioneering to be enabled after the first crew arrives at Mars. Recent and ongoing analysis has considered the possible prospecting measurements that can be performed at the asteroid returned to cis-lunar space by the Asteroid Robotic Redirect Mission (ARRM), at the lunar surface, at Phobos and Deimos, and on the surface of Mars to identify available resources for future use. These opportunities will be available on missions currently in the Evolvable Mars Campaign construct, and will also facilitate the testing and demonstration of resource acquisition, processing, storage, and useage technologies that can play a role in later missions. This analysis has also led to the identification of several objectives that should be targeted during the missions building up to and including the initial crewed missions. These objectives are mapped to strategies for incorporating ISRU to support resource cycle closure and reduce mass requirements from Earth. This analysis has yielded engineering constraints, based on ISRU, that impact the evaluation of landing sites for missions to the surface of Mars. The terrain of a particular site must be sufficiently flat to permit ISRU systems, as well as ancillary systems such as power and propellant storage tanks, to be landed, moved into position, set up, and operated. Water must be accessible in a form that can be acquired via ISRU, in quantities that align with demands. The chosen method of acquiring and processing water should align with the available resources at a particular site, and that site must have sufficient quantities to meet the requirements (based on crew consumables and propellant demands). Lower altitude landing sites are preferred, as the increase in density can facilitate carbon dioxide acquisition from the atmosphere. Another preference is for sites with a greater ability to move regolith for civil engineering purposes; for example, this would be conducive to both bulk regolith uses (such as the manufacture of berms), and processed regolith uses (such as microwave sintering).

Evolvable Mars Campaign↗

Summary of Propulsion System Needs in Support of Project Constellation

In January 2004, the President of the United States established the Vision for Space Exploration (VSE) to return man to the moon and ultimately to extend manned space travel to Mars. This paper will summarize the manned space flight liquid propulsion system needs in support of Project Constellation over the next 10 years. It will include all engine needs to return man to the moon. An overview of engines currently under contract, those baselined but not yet under contract, and those engine needs that hav.e yet to be initiated. Project Constellation includes the components as shown Figure 1. Liquid propulsion systems supporting the manned portion of these elements include the following: the Crew Exploration Vehicle named Orion (crew module reaction control system (CMRCS), service module Orion Main Engine (OME), service module auxiliary RCS, and service module reaction control system (SMRCS)), the Crew Launch Vehicle named Ares 1 (J2X upper stage, first stage roll control system, second stage reaction control system, and the Ares I-X roll control system), the Heavy Lift Launch Vehicle named Ares V (RS68B first stage booster, J-2X upper stage, roll control systems, and the Earth Departure Stage (EDS) (powered by the same Ares V Upper Stage J-2X), and the Lunar Lander named Altair with both descent and ascent stages (lunar orbit insertion and descent main engine, ascent main engine, and attitude control systems for both stages). In addition, there may be additional engine needs for early demonstrators, but those will not be speculated on as part of this paper. Also, other portions of the VSE architecture, including the planned Orion abort demonstrations and the Lunar Precursor Robotic Program, are not addressed here as they either use solid motors or are focused on unmanned precursor missions.

Sumrall, Phil↗

NASA Space Launch System Operations Outlook

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion Multi- Purpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the lifecycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reach-back support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-of-the-art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than sequentially, saving both time and money. These themes are accomplished under the context of a new cross-program integration model that emphasizes peer-to-peer accountability and collaboration towards a common, shared goal. Utilizing the lessons learned through 50 years of human space flight experience, SLS is assigning the right number of people from appropriate backgrounds, providing them the right tools, and exercising the right processes for the job. The result will be a powerful, versatile, and capable heavy-lift, human-rated asset for the future human and scientific exploration of space.

Hefner, William Keith↗

Performance Risk Model Validation with Operationally Relevant Tasks

Human Research Program aims to develop methods to support astronauts’ health and productivity during spaceflight. The Crew Health and Performance Probabilistic Risk Assessment (CHP-PRA) team uses powerful computational methods to predict mission risk in both domains: medical and performance. Here, we show how CHP-PRA uses the Performance Risk Model (PRisM) to quantify the performance risk and show an application of the model on operationally relevant tasks. There are various metrics adopted across performance researchers that PRisM can accommodate. For data analysis, interpretation, and integration, we use a method of unifying data from multiple sources by converting each to a single metric. We consult subject matter experts prior to integrating the converted data into PRisM. The method we use is inspired by the Cooper-Harper rating scale [1]. Using this unified metric, we can easily combine data from various tests and lab groups. We explain our conversion method in detail and show how it pertains to the process of testing and validation of PRisM on operational tasks. We conducted an initial validation in collaboration with the Behavioral Health and Performance (BHP) lab. We test PRisM using data on their operationally relevant task ROBoT-r, a track-and-capture task for grappling incoming resupply vehicles [2]. Several other labs at NASA Johnson Space Center worked together to design 7 Functional Task Tests (FTTs) in pursuit of simulating the tasks required after landing on a planetary surface and after return to Earth [3]. Here we use the results from both ROBoT-r and the 7 FTTs and compare their experiment data to PRisM’s computational output to demonstrate how PRisM can support operations by predicting crew performance on future missions.

performance modeling↗

Factors in International Space Station Integration Feasibility Assessments

The International Space Station, ISS, is a growing vehicle. The ISS configuration changes internally and externally with each ISS flight. Each flight adds resources and capabilities such as docking/berthing ports, power, stowage volume, heat rejection, and data processing capability. The configuration, capabilities and performance characteristics of the vehicle will be in flux until assembly complete. At the same time the knowledge about what is required to support humans involved in long duration space flight is also being greatly expanded. In addition to the changes occurring on-orbit, the situation on the ground is also very dynamic. Proposals for new ISS elements, proposed deletions of elements, changes to the ISS requirements, and changes to the planned configuration are always under evaluation. Furthermore, budgetary issues have driven the need to explore alternative options for the ISS . This environment has made the role of the technical integrator in the ISS program unique in that the baseline against which proposals are evaluated is always changing. The nature of the International Space Station Program adds another dimension to the integrators task. ISS program activities are spread across several centers: KSC, MSFC, GRC, DFRC, ARC and JSc. There are six International Partners/participants each with their own unique organizations. The prime contractor is in Texas, California and Alabama. And, the Space Shuttle Program as the launch vehicle provider is another major interface. In spite of the fluidity of the technical baseline, projections and organizational complexity, in the course of evaluating proposals and producing feasibility assessments there are factors, which frequently emerge as significant. These factors tend to be the limiting conditions when they come into play. The finite resources, which tend to limit the options for ISS are: upmass, life support and crew rescue capability, crew time, utilities, exercise equipment, and docking/berthing ports. Upmass requirements need to be developed for each option proposed. Short term and long term impacts to upmass are the result of the implementation and long term operations. The upmass requirements need to be met by the existing launch vehicles and any change in flight rate will be a significant cost driver. In addition, when any item is brought to the ISS careful consideration must be given to the on-board stowage and crew time available to unpack, transfer, stow and use these items. If stowage is not available then something must be returned, use of non-standard stowage negotiated or the item in question stays on the ground. Additional crew time requirements will impact available utilization time or crew off-duty time. When the human element is affected, such as, by increasing the number of crew members or changing the duration of the crew stay (longer or shorter) there is an additional set of factors that come into play. The main considerations are: rescue capability, exercise requirements and availability of equipment, resupply, and life support capability.

Watson, Patricia M.↗

Planning for Crew Exercise for Future Deep Space Mission Scenarios

Providing the necessary exercise capability to protect crew health for deep space missions will bring new sets of engineering and research challenges. Exercise has been found to be a necessary mitigation for maintaining crew health on‐orbit and preparing the crew for return to earth's gravity. Health and exercise data from Apollo, Space Lab, Shuttle, and International Space Station missions have provided insight into crew deconditioning and the types of activities that can minimize the impacts of microgravity on the physiological systems. The hardware systems required to implement exercise can be challenging to incorporate into spaceflight vehicles. Exercise system design requires encompassing the hardware required to provide mission specific anthropometrical movement ranges, desired loads, and frequencies of desired movements as well as the supporting control and monitoring systems, crew and vehicle interfaces, and vibration isolation and stabilization subsystems. The number of crew and operational constraints also contribute to defining the what exercise systems will be needed. All of these features require flight vehicle mass and volume integrated with multiple vehicle systems. The International Space Station exercise hardware requires over 1,800 kg of equipment and over 24 m3 of volume for hardware and crew operational space. Improvements towards providing equivalent or better capabilities with a smaller vehicle impact will facilitate future deep space missions. Deep space missions will require more understanding of the physiological responses to microgravity, understanding appropriate mitigations, designing the exercise systems to provide needed mitigations, and integrating effectively into vehicle design with a focus to support planned mission scenarios. Recognizing and addressing the constraints and challenges can facilitate improved vehicle design and exercise system incorporation.

Moore, Cherice↗

Altair Lunar Lander Development Status: Enabling Human Lunar Exploration

As a critical part of the NASA Constellation Program lunar transportation architecture, the Altair lunar lander will return humans to the moon and enable a sustained program of lunar exploration. The Altair is to deliver up to four crew to the surface of the moon and return them to low lunar orbit at the completion of their mission. Altair will also be used to deliver large cargo elements to the lunar surface, enabling the buildup of an outpost. The Altair Project initialized its design using a minimum functionality approach that identified critical functionality required to meet a minimum set of Altair requirements. The Altair team then performed several analysis cycles using risk-informed design to selectively add back components and functionality to increase the vehicles safety and reliability. The analysis cycle results were captured in a reference Altair design. This design was reviewed at the Constellation Lunar Capabilities Concept Review, a Mission Concept Review, where key driving requirements were confirmed and the Altair Project was given authorization to begin Phase A project formulation. A key objective of Phase A is to revisit the Altair vehicle configuration, to better optimize it to complete its broad range of crew and cargo delivery missions. Industry was invited to partner with NASA early in the design to provide their insights regarding Altair configuration and key engineering challenges. A blended NASA-industry team will continue to refine the lander configuration and mature the vehicle design over the next few years. This paper will update the international community on the status of the Altair Project as it addresses the challenges of project formulation, including optimizing a vehicle configuration based on the work of the NASA Altair Project team, industry inputs and the plans going forward in designing the Altair lunar lander.

Laurini, Kathleen C.↗

The Spacecraft Water Impurity Monitor, a Framework for the Next Generation Complete Water Analysis System for Crewed Vehicles Beyond the ISS

The Spacecraft Water Impurity Monitor (SWIM) is a joint collaboration to develop an instrument platform that will perform in-flight measurements and deliver a more complete picture of water quality to decision makers. Eventually, missions to the moon, Mars, and beyond will be equipped with analytical capabilities equaling those found in terrestrial labs. Based on what we know about current and future spacecraft environments, SWIM will seek to provide enhanced analytical capability that enables NASA to confidently send astronauts on distant missions without the possibility of returned water samples. This paper discusses the challenges presented by exploration requirements and the research and development progress toward the goal of a total water analysis system. For organic analysis, one of the analysis technologies that the SWIM team have been developing is a liquid-injection gas chromatograph mass spectrometer system; these systems are the workhorses of analytical chemistry laboratories world-wide. For inorganic analysis, the team is exploring a number of technologies ranging from traditional liquid chromatography technologies (e.g. ion chromatography, capillary electrophoresis) to flight-heritage technology such as ion-specific electrodes.

water monitoring↗

Altair Lunar Lander Development Status: Enabling Lunar Exploration

As a critical part of the NASA Constellation Program lunar transportation architecture, the Altair lunar lander will return humans to the moon and enable a sustained program of lunar exploration. The Altair is to deliver up to four crew to the surface of the moon and return them to low lunar orbit at the completion of their mission. Altair will also be used to deliver large cargo elements to the lunar surface, enabling the buildup of an outpost. The Altair Project initialized its design using a "minimum functionality" approach that identified critical functionality required to meet a minimum set of Altair requirements. The Altair team then performed several analysis cycles using risk-informed design to selectively add back components and functionality to increase the vehicle's safety and reliability. The analysis cycle results were captured in a reference Altair design. This design was reviewed at the Constellation Lunar Capabilities Concept Review, a Mission Concept Review, where key driving requirements were confirmed and the Altair Project was given authorization to began Phase A project formulation. A key objective of Phase A is to revisit the Altair vehicle configuration, to better optimize it to complete its broad range of crew and cargo delivery missions. Industry was invited to partner with NASA early in the design to provide their insights regarding Altair configuration and key engineering challenges. NASA intends to continue to seek industry involvement in project formulation activities. This paper will update the international coimmunity on the status of the Altair Project as it addresses the challenges of project formulation, including optinuzing a vehicle configuration based on the work of the NASA Altair Project team, industry inputs and the plans going forward in designing the Altair lunar lander.

Laurini, Kathleen C.↗

Mars transfer vehicle studies

Earth-to-Mars distances vary from 60 to 400 million kilometers over a 14-year cycle. This complicates Mars mission design as a function of calendar time. Stay times at Mars are also strongly driven by opportunities for a return flight path which are within the limits of delta-V associated with practical space vehicles. The biggest difference between Mars and lunar transfer missions is mission time, which grows from a few days for the moon, to as much as a few hundred days for Mars missions. As a result, modules for similarly sized crews must be much larger for Mars missions that for transfer to lunar orbit. Technology challenges for one Mars mission scenario analyzed by Boeing include aerobrakes, propulsion, and life support systems. Mission performance is very sensitive to aerobrake weight fraction and, as a result, there is an incentive to use high performance materials such as advanced composites and thermal protection systems. Lander aerobrake would be used twice (for both planetary capture and descent to the Mars surface), and it would need to survive temperatures up to 3500 degrees.

Woodcock, Gordon↗

NASA Space Launch System Operations Outlook

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion Multi-Purpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the life-cycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reachback support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-ofthe- art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than sequentially, saving both time and money. These themes are accomplished under the context of a new cross-program integration model that emphasizes peer-to-peer accountability and collaboration towards a common, shared goal. Utilizing the lessons learned through 50 years of human space flight experience, SLS is assigning the right number of people from appropriate backgrounds, providing them the right tools, and exercising the right processes for the job. The result will be a powerful, versatile, and capable heavy-lift, human-rated asset for the future human and scientific exploration of space.

Hefner, William Keith↗

Dormancy Should Be Avoided for Mars and Deep Space Recycling Life Support

Mars is the crucial goal of human exploration beyond the Earth-moon system. The Mars round trip transit vehicle has been expected to use a regenerative Life Support System (LSS) similar to the one on the International Space Station (ISS). It often assumed that the Mars transit LSS will be operated on the outward trip to Mars, placed in dormancy while the full crew explores the surface, and then restored to operation for the return trip to Earth. The major difference between Mars missions and operations in the Earth-moon system is the need for much higher reliability for Mars missions, since rapid resupply of parts and materials or a quick crew return to Earth are not possible. Mars systems must achieve intrinsic high reliability by design, test, failure analysis, and redesign and then increase operational robustness by providing spare parts and redundant systems. Further requiring the LSS to be capable of dormancy and restoration to operation greatly increases the difficulty of design, test, and verification. The process of implementing dormancy and then restoring operation would add significant risk to the mission. Dormancy should be avoided for Mars and can be avoided several ways. First and most obvious, some crew can remain continually on board. If no crew can remain onboard, dormancy can still be avoided if an unused spare LSS is activated for the return trip, rather than restarting the used out bound system. Systems similar to the ISS LSS would have a significant probability of failure on a Mars trip and therefore would require two or three spares. Another full spare LSS could be provided as the return trip system, rather than refurbishing a used LSS.

dormancy↗

NASA’s Space Launch System Successfully Launches Artemis I Mission and Hardware Progress Continues for Next Artemis Missions

NASA’s Artemis I mission will be the first flight of the agency’s Space Launch System (SLS) rocket. It will launch an uncrewed Orion spacecraft to the Moon, where it will enter a highly elliptical retrograde orbit. In 2022, final tests, checkouts, and preparations were on schedule to be completed, including the vital wet dress rehearsal (WDR) at Kennedy Space Center’s (KSC) Launch Complex 39B. Following successful completion of WDR, which is expected in summer 2022, the Artemis I launch vehicle will be returned to the Vehicle Assembly Building (VAB) at KSC where it will be prepared for launch. Important data were collected during launch and will be shared as applicable. While the Artemis I hardware and mission took center stage in 2022, significant progress was made on hardware and software for future Artemis missions, including for the first crewed launch and the following SLS Block 1B and Block 2 variants of the rocket.

John Honeycutt↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗