Search NASA⌕ Search

SEARCH · Search NASA

Results for “Design and Prototype”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

A 300 kA Pulsed Power Supply for LBNF

The Long Baseline Neutrino Facility (LBNF) will produce the world’s most intense neutrino beam. While the magnetic horns are expected to be replaced, the LBNF horn power supply is expected to last the lifetime of the project, 30 years. Three series connected magnetic horns will require a 300kA, 800µs pulses at a rate of 1.4 pps to focus the beam. Prototyping proved the component choices and designs. Test results for a single cell and the full 32 cell system will be presented.

Jensen, C. C. [Fermilab] (ORCID:0000000212854906)↗

Short Circuit Detection and Voltage Sense for High Voltage Ionization Tube Power Supplies

Fermilab's PIP-II upgrade requires new rack-mounted power supplies for Beam Loss Monitor (BLM) ionization tubes compatible with the microTCA 4.1 standard, supporting high-side current measurement for short circuit detection, voltage sense telemetry, and low-side current measurement for beam loss readout. This work presents the design and preliminary schematic of such a supply. A resistive current sensing approach was chosen over inductive, optical, and Hall-effect alternatives for its independence from cable length and component availability. A 500 mΩ inline shunt steps the 2 kV common mode voltage down to roughly 70 V, producing a ~27 μV pulse during a short, which is amplified 500x, compared against a 14-bit DAC threshold, and latched to drive a fault line. Voltage sense steps the 2 kV output down at a 1V/1000V ratio, buffers it with a low bias current amplifier, and digitizes it via a 24-bit ADC over SPI. Onboard power is regulated from 12 V down to isolated 5 V and 3.3 V rails, with capacitive isolation on FPGA communication lines. Lumped parameter models were developed for the ionization tube (0.327 nF, 20 to 200 GΩ dynamic resistance) and the RG-58 coaxial cable to support the design. Component selection is complete and a preliminary schematic has been drawn in Altium Designer, forming the foundation for future prototyping and validation.

Yu, Kellen [Cornell U.]↗

The Readout Electronics of the Mu2e Electromagnetic Calorimeter

The Mu2e electromagnetic calorimeter has been designed to measure ~100 MeV electrons with energy resolution σE/E <10%, time resolution σt < 500ps and position resolution σx < 1cm. The detector is composed of 1348 un-doped CsI crystals coupled to two large area Silicon Photomultipliers (SiPMs). Each SiPM is connected to a Front End Electronics (FEE) chip which hosts the shaping amplifier and the high voltage linear regulator. A group of 20 FEE is controlled by one Mezzanine Board (MB) which transmits the amplified signals to one Digitizer ReAdout Controller board (DiRAC). The DiRAC samples the waveforms at 200 MHz with 12-bit ADCs, packs the data according to the Mu2e custom format and transmits them to the event builder through an optical transceiver. To limit the number of pass-through connectors and the length of the cables, the readout and digitization electronics is located inside the detector cryostat and close to the interaction target. The boards will have to sustain a neutron fluence of about 5x10 10 n/cm 2 @ 1 MeVeq (Si)/y and a Total Ionizing Dose of about 12 krad, while working into a 1T magnetic field and a vacuum of 10 (-4) Torr. This harsh operational environment has made the electronics design challenging and required an extended campaign of tests to select and qualify the employed electronic components. In this paper we report on the board architecture and design, on the qualification of the prototypes, as well as on the results of the first vertical slice test of the Mu2e calorimeter.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A tunable dielectric resonator for axion searches at 11 GHz

In the context of axion search with haloscopes, tunable cavity resonators with high quality factor and high effective volume at frequencies above about 8 GHz are central for probing the axion-photon coupling with the required sensitivity to reach the QCD axion models. Higher order modes in dielectrically-loaded cavities allow for higher effective volumes and larger quality factors compared to basic cylindrical cavities, but a proper cavity frequency tuning mechanism to probe broad axion mass ranges is yet not available. In this work, we report about the design and construction of a tunable prototype of a single-shell dielectric resonator with its axion-sensitive pseudo-TM$_{030}$ high-order mode at about 11 GHz frequency. A clamshell tuning method previously tested for empty cylindrical resonators has been perfected for this geometry through simulations and in situ tests conducted at cryogenic temperature. Tuning is accomplished in a range of about 2 $\%$ the central frequency, without significantly impacting the quality factor of about 175000. The experimental results presented in this work demonstrate the tunability of this type of resonator, definitely confirming its applicability to high frequency axion searches.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Engineering of LUPIN: A Test-Bed Radiofrequency Ion Source for Enhanced Neutral Beam Injection on DIII-D

The Large, Uniform Plasma for Ionizing Neutrals (LUPIN) is an RF inductively coupled plasma (ICP) chamber for demonstrating plasma performance of an RF ICP positive ion source upgrade for the DIII-D Neutral Beam Injection (NBI) system. LUPIN will be used to investigate ion source physics, including neutral gas dynamics, plasma density uniformity, interactions with Faraday shields, and power coupling to novel RF antenna designs. LUPIN has an RF generator capable of delivering 20 kW of power at 2 MHz, which is coupled into a cylindrical quartz vessel measuring 20 cm in length and 10 cm in radius. This configuration matches the power density requirements for a full-scale ion source. Target hydrogen and deuterium plasma densities exceeding 10 18 m -3 would relate to extracted ion current densities of 2100 A/m 2 for 10 s. Vacuum conductance and gas flow calculations predict a maximum achievable neutral gas flow rate of 1675 Pa·L/s at 5 Pa of He, which mimics the gas flow of the DIII-D NBI system. Designs have been developed for an internal Faraday shield to mitigate heat flux and ion sputtering on the dielectric vessel. Thermomechanical finite element simulations demonstrated the Faraday shield design to be capable of withstanding anticipated heat loads from worst-case operation scenarios. Results of upcoming experimental investigations on LUPIN will guide the design of a full-scale prototype for DIII-D integration.

Faraday shield↗

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

Giant momentum-dependent spin splitting in centrosymmetric low-$\textit{Z}$ antiferromagnets

The energy vs crystal momentum $\textit{E(k)}$ diagram for a solid (band structure) constitutes the road map for navigating its optical, magnetic, and transport properties. By selecting crystals with specific atom types, composition, and symmetries, one could design a target band structure and thus desired properties. A particularly attractive outcome would be to design energy bands that are split into spin components with a momentum-dependent splitting, as envisioned by Pekar and Rashba, enabling spintronic application. The current paper provides “design principles” for wave-vector dependent spin splitting (SS) of energy bands that parallel the traditional Dresselhaus and Rashba spin-orbit coupling (SOC)–induced splitting, but originates from a fundamentally different source—antiferromagnetism. Here, we identify a few generic antiferromagnetic (AFM) prototypes with distinct SS patterns using magnetic symmetry design principles. These tools allow also the identification of specific AFM compounds with SS belonging to different prototypes. A specific compound—centrosymmetric tetragonal MnF 2 —is used via density functional band-structure calculations to quantitatively illustrate one type of AFM SS. Unlike the traditional SOC-induced effects restricted to noncentrosymmetric crystals, we show that antiferromagnetic-induced spin splitting broadens the playing field to include even centrosymmetric compounds, and gives SS comparable in magnitude to the best known (“giant’” SOC effects, even without traditional SOC, and consequently does not rely on the often-unstable high atomic number elements required for high SOC. We envision that use of the current design principles to identify an optimal antiferromagnet with spin-split energy bands would be beneficial for efficient spin-charge conversion and spin-orbit torque applications without the burden of requiring compounds containing heavy elements.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Cost Effective 6.5% Silicon Steel Laminate for Electric Machines

Iowa State University teamed with United Technologies Research Center and the University of Delaware and demonstrated a high switching frequency non-rare earth permanent magnet motor. A prototype motor with 400 Hz switching frequency, dummy MnBi permanent magnet with 8 MGOe energy density, and 6.5%Si steel as the laminate materials was designed, built, and tested. The performance of the prototype met the expectations showing a higher frequency motor enabled by 6.5%Si steel is a viable approach to meet DOE 2022 cost and performance targets for electric vehicle drive. Adoption of 6.5%Si steel will result in 3% improvement in energy conversion efficiency of the soft magnetic materials. In addition, the ability to use non-rare earth magnet for high power density application effectively mitigate the risk of EV traction motor from the rising rare earth price.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Compliant Intramedullary Stems for Joint Reconstruction

The longevity of current joint replacements is limited by aseptic loosening, which is the primary cause of non-infectious failure for hip, knee, and ankle arthroplasty. Aseptic loosening is typically caused either by osteolysis from particulate wear, or by high shear stresses at the bone-implant interface from over-constraint. Our objective was to demonstrate feasibility of a compliant intramedullary stem that eliminates over-constraint without generating particulate wear. The compliant stem is built around a compliant mechanism that permits rotation about a single axis. We first established several models to understand the relationship between mechanism geometry and implant performance under a given angular displacement and compressive load. We then used a neural network to identify a design space of geometries that would support an expected 100-year fatigue life inside the body. We additively manufactured one representative mechanism for each of three anatomic locations, and evaluated these prototypes on a KR-210 robot. The neural network predicts maximum stress and torsional stiffness with 2.69% and 4.08% error respectively, relative to finite element analysis data. We identified feasible design spaces for all three of the anatomic locations. Simulated peak stresses for the three stem prototypes were below the fatigue limit. Benchtop performance of all three prototypes was within design specifications. Our results demonstrate the feasibility of designing patient- and joint-specific compliant stems that address the root causes of aseptic loosening. Guided by these results, we expect the use of compliant intramedullary stems in joint reconstruction technology to increase implant lifetime.

60 APPLIED LIFE SCIENCES↗

Response of a CMS HGCAL silicon-pad electromagnetic calorimeter prototype to 20–300 GeV positrons

The Compact Muon Solenoid collaboration is designing a new high-granularity endcap calorimeter, HGCAL, to be installed later this decade. As part of this development work, a prototype system was built, with an electromagnetic section consisting of 14 double-sided structures, providing 28 sampling layers. Each sampling layer has an hexagonal module, where a multipad large-area silicon sensor is glued between an electronics circuit board and a metal baseplate. The sensor pads of approximately 1.1 cm$^{2}$ are wire-bonded to the circuit board and are readout by custom integrated circuits. The prototype was extensively tested with beams at CERN's Super Proton Synchrotron in 2018. Based on the data collected with beams of positrons, with energies ranging from 20 to 300 GeV, measurements of the energy resolution and linearity, the position and angular resolutions, and the shower shapes are presented and compared to a detailed Geant4 simulation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Heating performance of a vapor compression heat pump cascaded with a thermoelectric heat pump

Air source heat pumps (ASHPs) are widely utilized for heating and cooling in residential buildings; however, their effectiveness in heating mode is compromised during extreme weather conditions. Extensive research endeavors have been undertaken to develop, test, and assess a cost-effective vapor compression ASHP suitable for cold climate regions. Further, this study takes an innovative approach by developing component and system prototypes for a cold climate heat pump. This design combines a thermoelectric heat pump (TEHP) with a traditional residential split ASHP to augment heating capacity in low ambient temperature conditions. The component and system prototypes underwent experimental testing in the psychrometric chambers. The experimental findings revealed a 13.6% to 13.7% increase in total heat pump heating capacity, accompanied by a 3.1% to 5.0% decrease in the coefficient of performance (COP) at ambient temperatures of -15°C and -19°C, when compared to the original ASHP. The COP of the TEHP is relatively constant, ranging from 1.63 to 1.76. This prototype offers a solution to address the challenges associated with reduced heat pump capacity at low ambient temperatures. The experimental results indicated that the lower the ambient temperature, thermoelectric heat pump auxiliary heating can increase the heating efficiency 60% in comparison to electric resistance.

42 ENGINEERING↗

Integral and Separate Effects Test Facilities To Support Water Cooled Small Modular Reactors: A Review

This study reviews previous experimental facilities and test programs relevant to water-cooled reactor system design and analysis to meet regulatory compliances. This study aims to find the best solution for designing the required experiments, obtaining necessary test data, and verifying the developed computer code/models to support the new reactor design and development while minimizing cost and time while leveraging experiences from previous facilities to minimize. Nuclear reactor licensing requires supportive design, analysis, and experimental results to ensure the safety of the full-scale prototype reactor in regular operation, as well as during postulated accident scenarios. These reactor design analyses are generally performed using system codes and other associated simulation tools that require assessment, verification and validation using an appropriate experimental dataset. Experimental facilities used for reactor system safety analysis and system code assessments are categorized into integral effects test (IET) and separate effects test (SET) facilities. Further, these IET and SET experiments and studies use geometrically scaled systems to reproduce the prototype system behavior at a reasonable cost, albeit with some scaling-related distortions. The design challenge of these model facilities is to identify and minimize scaling distortions while reproducing the most important operational phenomena in steady-state operation and in postulated accident scenarios. Lessons learned from previous experimental facilities, models, and correlations can support the development of new multipurpose, scaled, hybrid, integrated, and modular experimental facilities for advanced light water-cooled small modular reactors (SMRs). Successful operation of these facilities can significantly reduce upfront reactor development and demonstration costs and time to deployment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design, Fabrication and On-Sun Performance Evaluation of SiC Receiver Feature Specimens for CST Applications Using Additively Manufactured SiC Materials

Increasing operating temperatures of solar receivers is paramount to the efficiency of concentrated solar thermal (CST) and solar power (CSP) systems. Successful development of CST systems to generate heat for industrial applications requires significant increase in temperature capability and techno-economically viability of the receiver systems. Supported by an award from the Solar Technology Office (SETO), US Department of Energy (DOE), GE Aerospace Research in collaboration with Heliogen Holdings Inc and Sandia National Lab, is engaged in the development of ultra-High Operating Temperature SiC-matrix Solar Thermal Air Receiver (HOTSSTAR) enabled by additive manufacturing. The program objective is to demonstrate SiC receiver with air exit temperatures up to 1100 oC and high thermal efficiencies. We report design, fabrication and on-sun test results of SiC components of a prototype 50kW (thermal) HOTSSTAR module. The receiver module architecture is based on a radial airflow design and consists of a series of radial SiC receiver sectors organized around a SiC center absorber. The SiC components are fabricated using binder-jet printed SiC followed by melt-infiltration reaction bonding process. To enhance the reliability and to minimize the risk of cracking damage of SiC test articles in thermal gradient and thermal shock environment of the application, the components were laminated with GE’s MI SiC-SiC CMC. Following extensive design and lab test analyses, selected SiC component designs are tested at Heliogen Lancaster Solar field under highly concentrated solar fluxes around 2000 suns to assess the thermal performance characteristics under realistic field conditions. We report on the test results and compare the thermal performances of different HOTSSTAR SiC absorbers. Finally, we discuss fabrication and initial assembly of a 50kW prototype test module in preparation of on-sun field tests to assess the performance of our final design.

CST, CSP, high temperature, air receiver, SiC, add↗

Development of MKIDs for Measurement of the Cosmic Microwave Background with the South Pole Telescope

We present details of the design, simulation, and initial test results of prototype detectors for the fourth-generation receiver of the South Pole Telescope (SPT). Optimized for the detection of key secondary anisotropies of the cosmic microwave background (CMB), SPT-3G+ will measure the temperature and polarization of the mm/sub-mm sky at 220, 285, and 345 GHz, beyond the peak of the CMB blackbody spectrum. The SPT-3G+ focal plane will be populated with microwave kinetic inductance detectors (MKIDs), allowing for significantly increased detector density with reduced cryogenic complexity. We present simulation-backed designs for single-color dual-polarization MKID pixels at each SPT-3G+ observation frequency. We further describe design choices made to promote resonator quality and uniformity, enabling us to maximize the available readout bandwidth. We also discuss aspects of the fabrication process that enable rapid production of these devices and present an initial dark characterization of a series of prototype devices.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Final Technical Report: Innovative Magnetron Power Sources for Superconducting RF (SRF) Accelerators

In this project, MUONS is designing and building custom magnetrons at Richardson Electronics (RELL) to test the predictions of the models and make improvements to the designs to match the needs of NP SRF accelerators and their life-cycle costs. To increase lifetime, the filament temperature is controlled by a feedback circuit that includes a model of back streaming of electrons. The gain of the magnetron is optimized by the design of an input port. A permanent magnet design with trim coil for amplitude adjustment reduces energy consumption. Moving the construction of the magnetron from prototype to manufacturing includes the utilization of RELL processes and designs. To the extent that outgassing of materials influences the lifetime of the magnetron, methods for minimizing outgassing was explored. Further experimentation of the potential of sub-critical voltage operation continues to be explored. The commercialization goal of the project will be naturally achieved as RELL already has world-wide marketing, sales, and support to exploit the assembly-line capabilities generated by this project to enable magnetron technologies for NP accelerators.

43 PARTICLE ACCELERATORS↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Standardization and First Lessons Learned of the Prototype HB650 Cryomodule for PIP-II at Fermilab

The prototype High Beta 650 MHz cryomodule (pHB650 CM) has been designed by an integrated design team, consisting of Fermilab (USA), CEA (France), STFC UKRI (UK), and RRCAT (India). The manufacturing and assembly of this prototype cryomodule is being done at Fermilab, whereas the production cryomodules will be manufactured and assembled by STFC-UKRI. As the first PIP-II cryomodule for which standardization was applied, the design, manufacturing and assembly of this cryomodule led to significant lessons being learnt and experiences gathered. These were incorporated into the design of the pre-production Single Spoke Resonator Type 2 cryomodule (ppSSR2 CM) and the pre-production Low Beta 650 MHz cryomodule (ppLB650 CM). This paper presents the pHB650 CM lessons learned and experiences gathered from the design to the lower coldmass assembly and how this cryomodule has a positive impact on all the next Proton Improvement Plan-II (PIP-II) cryomodules due to the standardization set up among SSR and 650 cryomodules.

43 PARTICLE ACCELERATORS↗