Search NASA⌕ Search

SEARCH · Search NASA

Results for “Final”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Body-fixed, Three-Axis Reference System Study: Phase II Final Report

This Phase II Body-Fixed, Three-Axis Reference System Study Final Report is the result of a follow-on contract awarded by NASAIMSFC to TRW Systems in April 1966, under Contract No, NASS-20209. of the Phase I1 Study was to refine and supplement the strapdown inertial ’ reference assembly (SIRA), software, airborne computer, and alignment analyses performed during Phase I of the same contract. The purpose Specifically, the Phase I results in many areas were those which could be achieved using simplifying assumptions (linearization) and hand analyses. It was the purpose of the Phase I1 studies to investigate the validity of the Phase I results by means of more sophisticated computer simulations, in which no simplifying assumptions were made, for each of the areas analyzed. The Phase 11 analyses were directed, therefore, at confirming the analytical feasibility asserted by the Phase I results.

Source record↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗