Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generating Site”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

A Novel Framework for Optimizing Ramping Capability of Hybrid Energy Storage Systems

Hybrid Energy Storage System has been widely applied in aerospace, electric vehicle, and microgrid applications. The advantages are that they include complimentary technologies with both high power and energy capabilities. HESS have the potential to be useful to the bulk power systems, for example to increase the value of energy produced by variable generation resource through enabling participation in ancillary service markets. Actualizing the benefits of HESSs requires optimizing the combined ramping capability of aggregated HESS resources. To provide quality ancillary service, source of HESSs locating at multiple sites of variable generation resource must be optimally sized and cohesively controlled. Optimizing aggregated resources can be formulated as an optimization problem. Successfully solving this problem not only requires using effective solution methods but also depends on accurately and rapidly setting the necessary parameters in the problem formula. This article proposes a novel framework with double-layer structure to solve the optimization problem of aggregating ramping capability. Program developed on the upper layer focuses on solving the optimization of aggregating ramping capability among multiple HESSs and is compatible with most existing optimization algorithms. Program on lower layer of the framework targets at optimizing the local control of a single HESS based on a thorough analytics of HESS operation strategy presented in this article. Result of local optimization is also provided to upper layer program for updating the parameters in formula of optimization problem. Real time hardware-in-the-loop test is conducted to verify the performance of the optimization framework developed. The work presented is expected to provide guidance for implementing this framework in practical operation.

Luo, Yushen↗

TH-CD-207A-11: Sensitivity Analysis of Action Limits for Real-Time EPID-Based Delivery Verification System Using Artificial Clinical Relevant Error Simulations

Purpose: A real-time patient treatment delivery verification system using EPID (Watchdog) has been developed as an advanced patient safety tool. In a pilot study data was acquired for 119 prostate and head and neck (HN) IMRT patient deliveries to generate body-site specific action limits using statistical process control. The purpose of this study is to determine the sensitivity of Watchdog to detect clinically significant errors during treatment delivery. Methods: Watchdog utilizes a physics-based model to generate a series of predicted transit cine EPID images as a reference data set, and compares these in real-time to measured transit cine-EPID images acquired during treatment using chi comparison (4%, 4mm criteria) after the initial 2s of treatment to allow for dose ramp-up. Four study cases were used; dosimetric (monitor unit) errors in prostate (7 fields) and HN (9 fields) IMRT treatments of (5%, 7%, 10%) and positioning (systematic displacement) errors in the same treatments of (5mm, 7mm, 10mm). These errors were introduced by modifying the patient CT scan and re-calculating the predicted EPID data set. The error embedded predicted EPID data sets were compared to the measured EPID data acquired during patient treatment. The treatment delivery percentage (measured from 2s) where Watchdog detected the error was determined. Results: Watchdog detected all simulated errors for all fields during delivery. The dosimetric errors were detected at average treatment delivery percentage of (4%, 0%, 0%) and (7%, 0%, 0%) for prostate and HN respectively. For patient positional errors, the average treatment delivery percentage was (52%, 43%, 25%) and (39%, 16%, 6%). Conclusion: These results suggest that Watchdog can detect significant dosimetric and positioning errors in prostate and HN IMRT treatments in real-time allowing for treatment interruption. Displacements of the patient require longer to detect however incorrect body site or very large geographic misses will be detected rapidly.

60 APPLIED LIFE SCIENCES↗

Tailoring FeN 4 Sites with Edge Enrichment for Boosted Oxygen Reduction Performance in Proton Exchange Membrane Fuel Cell

Transition metal atoms with corresponding nitrogen-coordination (MNx moieties) are widely proposed as catalytic centers for the oxygen reduction reaction (ORR) in metal-nitrogen-carbon (M-N-C) catalysts. Here, an effective strategy that can tailor Fe-N-C catalysts to simultaneously enrich the number of active sites while boost their intrinsic activity and utilization is reported. This is achieved by edge engineering of FeN 4 sites via a simple ammonium chloride salt-assisted approach, where a high fraction of FeN 4 sites are preferentially generated and hosted in a graphene-like porous scaffold. Theoretical calculations demonstrate that the FeN 4 moieties with adjacent pore defects are likely to be more active than the non-defective configuration. Coupled with the facilitated accessibility of active sites, this prepared catalyst when applied in a practical H 2 -air proton exchange membrane fuel cell delivers a remarkable peak power density of 0.43 W cm -2 , ranking it as one of the most active M-N-C catalysts reported to date. This work presents a new avenue for boosting ORR activity by edge manipulation of FeN 4 sites.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

V5 and V10 Contactor Testing with the Next Generation (CSSX) Solvent for the Savannah River Site Integrated Salt Disposition Process

A solvent extraction system for removal of cesium (Cs) from alkaline solutions was developed utilizing a novel solvent invented at the Oak Ridge National Laboratory (ORNL). This solvent consists of a calix[4]arene-crown-6 extractant dissolved in an inert hydrocarbon matrix. A Modifier is added to the solvent to enhance the extraction power of the calixarene and to prevent the formation of a third phase. An additional additive, called a suppressor, is used to improve stripping performance. The process that deploys this solvent system is known as Caustic Side Solvent Extraction (CSSX). The solvent system has been deployed at the Savannah River Site (SRS) in the Modular CSSX Unit (MCU) since 2008.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterisation of Specimens from a Former Soviet Thorium Processing Facility to Support Site Remediation

The former Prydniprovski Chemical Plant (PChP) is a large ex-soviet nuclear materials processing site of roughly 260 hectares, located in central Ukraine. PcHP was in operation between 1948 and 1991 for the purposes of processing uranium and thorium ore into ore concentrate. During its operational lifetime, tens of millions of tonnes of radioactive waste was generated on the site. A consequence of these activities, coupled with the mismanagement of the resulting radioactive materials and by-products, is that approximately 45% of the southern part of the site has become radioactively contaminated. This area comprises some 100-200 buildings and structures, many of which are in a state of disrepair and dereliction. Around 20 of these buildings are heavily radioactively contaminated, with radiation levels from a few μSv/hr to a maximum of 4 mSv/hr reported. The European Commission is currently working with the Ukraine Ministry of Energy and Coal Use and the Nuclear Regulator to improve radiological safety and security at the site. In order for these remediation works to proceed, the site management needs to characterise the radioactive materials that are held there. As part of this activity, the team from the University of Bristol have undertaken a survey of one of the most heavily contaminated buildings, collecting a selection of in situ material samples. A suite of complimentary materials characterisation techniques (e.g. X-ray Fluorescence, Raman Spectroscopy, etc) have been deployed in order to determine the radionuclides and composition of the compounds present. Characterisation of these samples will allow the operators of the chemical plant to go forward with remediation works within the building.

07 ISOTOPE AND RADIATION SOURCES↗

The future of wind energy in California: Future projections with the Variable-Resolution CESM

Shifting wind patterns are an expected consequence of global climate change, with direct implications for wind energy production. However, wind is notoriously difficult to predict, and significant uncertainty remains in our understanding of climate change impacts on existing wind generation capacity. Historical and future wind climatology and associated capacity factors at five wind turbine sites in California are examined. Historical (1980–2000) and mid-century (2030–2050) simulations were produced using the Variable-Resolution Community Earth System Model (VR-CESM) to understand how these wind generation sites are expected to be impacted by climate change. A high-resolution statistically downscaled WRF product provided by DNV GL, reanalysis datasets MERRA-2, CFSR, NARR, and observational data were used for model validation and comparison. These projections suggest that wind power generation capacity throughout the state is expected to increase during the summer, and decrease during fall and winter, based on significant changes at several wind farm sites. Finally, this study improves the characterization of uncertainty around the magnitude and variability in space and time of California's wind resources in the near future, and also enhances our understanding of the physical mechanisms related to the trends in wind resource variability.

17 WIND ENERGY↗

Hydrogen Generator

A unit for producing hydrogen on site is used by a New Jersey Electric Company. The hydrogen is used as a coolant for the station's large generator; on-site production eliminates the need for weekly hydrogen deliveries. High purity hydrogen is generated by water electrolysis. The electrolyte is solid plastic and the control system is electronic. The technology was originally developed for the Gemini spacecraft.

Source record↗

Detailed Balance Analysis of Photovoltaic Windows

Urban areas currently account for 67-76% of global final energy consumption. With urban living expected to increase from roughly half of the world's population to 70% by the middle of this century, energy generation and efficiency in the urban built environment is critical to a sustainable energy future. Though building-integrated photovoltaics (BIPV) have been in development for many decades, the rapid decrease in the cost of PV in the past decade makes BIPV an economically tractable direction for on-site building energy generation in the near future.

14 SOLAR ENERGY↗

Capturing snapshots of APE1 processing DNA damage

DNA apurinic-apyrimidinic (AP) sites are prevalent noncoding threats to genomic stability and are processed by AP endonuclease 1 (APE1). APE1 incises the AP-site phosphodiester backbone, generating a DNA-repair intermediate that is potentially cytotoxic. The molecular events of the incision reaction remain elusive, owing in part to limited structural information. Here we report multiple high-resolution human APE1-DNA structures that divulge new features of the APE1 reaction, including the metal-binding site, the nucleophile and the arginine clamps that mediate product release. We also report APE1-DNA structures with a T-G mismatch 5' to the AP site, representing a clustered lesion occurring in methylated CpG dinucleotides. Moreover, these structures reveal that APE1 molds the T-G mismatch into a unique Watson-Crick-like geometry that distorts the active site, thus reducing incision. Finally, these snapshots provide mechanistic clarity for APE1 while affording a rational framework to manipulate biological responses to DNA damage.

59 BASIC BIOLOGICAL SCIENCES↗

Los Alamos National Laboratory Input for the National TRU Program 5 Year Plan for National Nuclear Security Administration TRU Waste

On July 16, 2018, Los Alamos National Security (LANS) received a Corporate Board Data Call for Los Alamos National Laboratory (LANL) site input to the National TRU Program 5 Year Plan from the Office of the National TRU Program. This report summarizes LANL input for the National Nuclear Security Administration (NNSA) TRU waste and captures the shipping needs to support the LANL mission. Information is included for the current waste inventory and projected generation rates. The site’s location, characteristics, role and mission are described. Additional information for consideration and pictures for inclusion are provided. A separate submittal will be prepared by N3B for LANL legacy TRU waste managed by N3B under contract to EM-LA.

, LANL↗

LYNM PE1 Pre-Experiment A Site Characterization Report

Underground chemical explosive experiments such as LYNM PE1 generate large multiphenomenological datasets, require complex site preparation and build out, and utilize cutting edge models and analysis techniques to analyze and simulate the explosion-induced signals. This wide range of outcomes makes it a necessity to thoroughly characterize the testbed in advance of experiments in a way that complements the wide suite of data being generated. Here, we present a broad overview of the site characterization work and data collection that was conducted before Experiment A, which is the first in a series of three PE1 experiments. This work includes, but is not limited to, geologic mapping, physical sample collection, analysis of material properties, geophysical borehole logging, and in-situ measurements. This information was collected by a large, dedicated team and was used to inform site construction, finalize instrumentation placement, generate Geologic Framework Models, feed pre-experiment predictions, and facilitate post-experiment data analysis

58 GEOSCIENCES↗

Procedure for locating oil and gas wells in the Appalachian Basin

Locating undocumented (or poorly documented) oil and gas wells for environmental assessment is often difficult. Remnant features that confirm the presence of a well (intact casing/wellhead, well bore, etc.) are typically less than a meter in size and often are obscured from direct observation on the ground or from the air (by dense vegetation, for example). To efficiently find such features, it is useful to first systematically compile publicly available digital data at progressively smaller scales prior to embarking on field campaigns. Further, the information presented here describes the procedure developed and used by the U.S. Department of Energy's National Energy Technology Laboratory to locate potential oil and gas well sites for follow-up field verification and characterization. Digital data are first compiled from national and state resources such as well location/production databases, historical topographic maps, historical aerial photographs, and LiDAR data. Although each data set is likely to be incomplete or inaccurate to some extent, combining the data resources using geographic information system technology can generate potential well site targets with a higher degree of confidence, which improves the efficiency of fieldwork activities. This workflow was developed in the Appalachian Basin region, and although certain aspects may be unique, the general process would be applicable to locating undocumented wells in other regions.

54 ENVIRONMENTAL SCIENCES↗

Renewable Energy Requirements for Future Building Codes: Options for Compliance

As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density per unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft 2 of roof area or 0.5 W/ft 2 of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft 2 of roof area. Section 5 of the report provides a basic framework for draft code language recommendations based on the analysis of the alternative compliance levels.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Feasibility Study of Biopower in East Helena, Montana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former American Smelting and Refining Company (Asarco) smelter in East Helena, Montana, was selected for a feasibility study under the initiative. Biomass was chosen as the renewable energy resource based on the wood products industry in the area. Biopower was selected as the technology based on Montana's renewable portfolio standard (RPS) requiring utilities to purchase renewable power.

09 BIOMASS FUELS↗

Feasibility Study of Anaerobic Digestion of Food Waste in St. Bernard, Louisiana - A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to re-use contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former Kaiser Aluminum Landfill in St. Bernard Parish, Louisiana, was selected for a feasibility study under the program. Preliminary work focused on selecting a biomass feedstock. Discussions with area experts, universities, and the project team identified food wastes as the feedstock and anaerobic digestion (AD) as the technology.

09 BIOMASS FUELS↗

Putney Basketville Site Biomass CHP Analysis

The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response Center for Program Analysis developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The Putney, Vermont, Basketville site, formerly the location of a basket-making facility and a paper mill andwoolen mill, was selected for a feasibility study under the program. Biomass was chosen as the renewable energy resource based on abundant woody-biomass resources available in the area. Biomass combined heat and power (CHP) was selected as the technology due to nearby loads, including Putney Paper and Landmark College.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of large, horizontal-axis wind turbines

A program to develop large, horizontal-axis wind turbines is discussed. The program is directed toward developing the technology for safe, reliable, environmentally acceptable large wind turbines that can generate a significant amount of electricity at costs competitive with those of conventional electricity-generating systems. In addition, these large wind turbines must be fully compatible with electric utility operations and interface requirements. Several ongoing projects in large-wind-turbine development are directed toward meeting the technology requirements for utility applications. The machines based on first-generation technology (Mod-OA and Mod-1) successfully completed their planned periods of experimental operation in June, 1982. The second-generation machines (Mod-2) are in operation at selected utility sites. A third-generation machine (Mod-5) is under contract. Erection and initial operation of the Mod-5 in Hawaii should take place in 1986. Each successive generation of technology increased reliability and energy capture while reducing the cost of electricity. These advances are being made by gaining a better understanding of the system-design drivers, improving the analytical design tools, verifying design methods with operating field data, and incorporating new technology and innovative designs. Information is given on the results from the first- and second-generation machines (Mod-OA, - 1, and -2), the status of the Department of Interior, and the status of the third-generation wind turbine (Mod-5).

Baldwin, D. H.↗

Framework for Identifying Key Environmental Concerns in Marine Renewable Energy Projects- Appendices

Marine wave and tidal energy technology could interact with marine resources in ways that are not well understood. As wave and tidal energy conversion projects are planned, tested, and deployed, a wide range of stakeholders will be engaged; these include developers, state and federal regulatory agencies, environmental groups, tribal governments, recreational and commercial fishermen, and local communities. Identifying stakeholders’ environmental concerns in the early stages of the industry’s development will help developers address and minimize potential environmental effects. Identifying important concerns will also assist with streamlining siting and associated permitting processes, which are considered key hurdles by the industry in the U.S. today. In September 2008, RE Vision consulting, LLC was selected by the Department of Energy (DoE) to conduct a scenario-based evaluation of emerging hydrokinetic technologies. The purpose of this evaluation is to identify and characterize environmental impacts that are likely to occur, demonstrate a process for analyzing these impacts, identify the “key” environmental concerns for each scenario, identify areas of uncertainty, and describe studies that could address that uncertainty. This process is intended to provide an objective and transparent tool to assist in decision-making for siting and selection of technology for wave and tidal energy development. RE Vision worked with H. T. Harvey & Associates, to develop a framework for identifying key environmental concerns with marine renewable technology. This report describes the results of this study. This framework was applied to varying wave and tidal power conversion technologies, scales, and locations. The following wave and tidal energy scenarios were considered: 4 wave energy generation technologies 3 tidal energy generation technologies 3 sites: Humboldt coast, California (wave); Makapu’u Point, Oahu, Hawaii (wave); and the Tacoma Narrows, Washington (tidal) 3 project sizes: pilot, small commercial, and large commercial The possible combinations total 24 wave technology scenarios and 9 tidal technology scenarios. We evaluated 3 of the 33 scenarios in detail: 1. A small commercial OPT Power Buoy project off the Humboldt County, California coast 2. A small commercial Pelamis Wave Power P-2 project off Makapu’u Point, Oahu, Hawaii 3. A pilot MCT SeaGen tidal project, sited in the Tacoma Narrows, Washington. This framework document used information available from permitting documents that were written to support actual wave or tidal energy projects, but the results obtained here should not be confused with those of the permitting documents1. The main difference between this framework document and permitting documents of currently proposed pilot projects is that this framework identifies key environmental concerns and describes the next steps in addressing those concerns; permitting documents must identify effects, find or declare thresholds of significance, evaluate the effects against the thresholds, and find mitigation measures that will minimize or avoid the effects so they can be considered less-than-significant. Two methodologies, 1) an environmental effects analysis and 2) Raptools, were developed and tested to identify potential environmental effects associated with wave or tidal energy conversion projects. For the environmental effects analysis, we developed a framework based on standard risk assessment techniques. The framework was applied to the three scenarios listed above. The environmental effects analysis addressed questions such as: What is the temporal and spatial exposure of a species at a site? What are the specific potential project effects on that species? What measures could minimize, mitigate, or eliminate negative effects? Are there potential effects of the project, or species’ response to the effect, that are highly uncertain and warrant additional study? The second methodology, Raptools, is a collaborative approach useful for evaluating multiple characteristics of numerous siting or technology alternatives, and it allows us to graphically compare alternatives. We used Raptools to answer these questions: How do the scenarios compare, in terms of exposure, risks, and effects to the ecological and human environments? Are there sites that seem to present the fewest effects regardless of technology and scale? Which attributes account for many or much of the effects associated with wave or tidal energy development?

Energy↗