Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launches”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

A Microphone Phased Array for Launch Acoustics Application

A new, portable, phased array of microphones is built at NASA Ames Research Center specifically for the harsh environment encountered in launch pads of rocket vehicles. It uses 70 piezoresistive, dynamic pressure sensors, optimally distributed on a 10.5ft diameter open frame dome structure. The open frame is light yet robust to sustain the high wind load of typical seaside launch pads, and the blast and acoustic loads from the launch. A 200-ft long cable bundle carries the microphone signals to a weather-protected cabinet containing the data systems, and allows for the placement of the array tall structures. The array is equipped with an infra-red camera and a visible wavelength camera for imaging the launch pad. The beamformed noise maps will be superimposed on the video footages collected by the cameras for correct identification of the noise sources. The array is tested with very loud speaker sources to determine the beamforming ability using different schemes, such as the conventional beamforming, orthogonal-functional beamforming, and spectral element methods. A comparative study was conducted to determine the minimum attainable spatial resolution. Data from a validation test in an outdoor setup, where the array was placed on a Telehandler at several different heights and distances from either a single or a pair of speakers, is presented in this paper. The final goal is to use the array during NASA’s Artemis-II launch to determine the distribution of noise sources on the Mobile Launcher.

Acoustics↗

Beyond Gravity Single Launch Payload Accommodations Shock Testing

The Vulcan Centaur launch vehicle is purpose-built to meet all the U.S. government’s National Security Space Launch (NSSL) needs. A shock test for the Centaur V’s payload accommodations (PLA), single launch (SL) configuration was successfully conducted at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, in May 2021. This test was a joint effort between MSFC, Beyond Gravity and United Launch Alliance. The primary purpose of the shock test was to characterize the shock environment induced by the separation event on components attached to the PLA and its interfaces. Additional test requirements included: (1) verifying the payload fairing (PLF) did not contact the flight hardware during the mechanical separation of the PLF horizontal separation system (HSS) and (2) evaluating the performance of the HSS spring packages during jettison. The data acquired during the PLF SL shock test will be used to validate the shock predictions from pre-test analysis of the launch vehicle and the PLF separation analysis. This paper provides an overview of the PLA SL shock test planning and execution as well as the required catch system, instrumentation and results.

separation↗

Beyond Gravity Single Launch Payload Accommodations Shock Testing

The Vulcan Centaur launch vehicle is purpose-built to meet all the U.S. government’s National Security Space Launch (NSSL) needs. A shock test for the Centaur V’s payload accommodations (PLA), single launch (SL) configuration was successfully conducted at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, in May 2021. This test was a joint effort between MSFC, Beyond Gravity and United Launch Alliance. The primary purpose of the shock test was to characterize the shock environment induced by the separation event on components attached to the PLA and its interfaces. Additional test requirements included: (1) verifying the payload fairing (PLF) did not contact the flight hardware during the mechanical separation of the PLF horizontal separation system (HSS) and (2) evaluating the performance of the HSS spring packages during jettison. The data acquired during the PLF SL shock test will be used to validate the shock predictions from pre-test analysis of the launch vehicle and the PLF separation analysis. This paper provides an overview of the PLA SL shock test planning and execution as well as the required catch system, instrumentation and results.

separation↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Space Launch System Base Aerodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022. The integrated test flight was composed of launch and ascent of SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2022. The SLS total thrust of 8,800,000 lbf was powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, the base flow field had highly complex phenomena and regimes. SLS base aerodynamics covers vehicle base pressure and integrated axial force during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This was the first time in-depth base aerodynamics flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

On obtaining lunar mission launch opportunities

A general procedure for predicting launch opportunities for the RAE-B lunar orbiter mission is presented. It is shown that knowledge of the earth-moon distance and lunar phase and declination are sufficient to determine launch periods consistent with present mission constraints and to approximately predict launch, transfer, and arrival parameters such as park orbit coast time, the possiblity of shadows in all phases of the mission, arrival energy, and the amount of sunlit orbit time in the lunar orbit. Constraints on RAE-B include bounds on the spin axis-sun angle in the translunar trajectory, an upper limit on the arrival energy, and a minimum time for sunlight duration in lunar orbits are being considered for the mission. Comparisons are made of relevant parameters for the two cases. The general features of launch, transfer, and arrival parameters are discussed and are shown to be a function of lunar declination, flight time, and launch azimuth.

Swartwood, H., Jr.↗

Advanced small launch vehicle study

A conceptual design study was conducted to determine the most economical (lowest cost/launch) approach for the development of an advanced small launch vehicle (ASLV) for use over the next decade. The ASLV design objective was to place a 340 kg (750 lb) payload into a 556 km (300 n.mi.) circular orbit when launched due east from Wallops Island, Virginia. The investigation encompassed improvements to the current Scout launch vehicle; use of existing military and NASA launch vehicle stages; and new, optionally staged vehicles. Staging analyses included use of liquid, solid, and hybrid propellants. Improvements in guidance, controls, interstages, telemetry, and payload shroud were also considered. It was concluded that the most economical approach is to progressively improve the Scout launch vehicle in three phased steps which are discussed.

Reins, G. E.↗

Launch vehicle system requirements and restraints for the ERTS-A spacecraft

The technical requirements and restraints imposed by the ERTS spacecraft upon the Delta launch vehicle, shroud system, associated launch complex, and range are presented for technical coordination among various agencies involved in the launch vehicle and launch operations. The payload and spacecraft systems are described, and the mission, design, test, and launch base data are outlined.

Corrigan, J. F.↗

Saturn 5 Launch Vehicle Flight Evaluation Report, SA-513, Skylab 1

Saturn V SA-513 (Skylab-1) was launched at 13:30:00 Eastern Daylight Time (EDT) on May 14, 1973, from Kennedy Space Center, Complex 39, Pad A. The vehicle lifted off on a launch azimuth of 90 degrees east of north and rolled to a flight azimuth of 40.88 degrees east of north. The launch vehicle successfully placed the Saturn Work Shop in the planned earth orbit. All launch vehicle objectives were accomplished. No launch vehicle failures or anomalies occurred that seriously affected the mission.

Source record↗

Skylab 2 post-launch report (RCS 76-0000-00048)

The launch vehicle stages for SL-2, the CSM experiments, and their associated support equipment are reported. The performance of KSC systems in support of processing and launch of the SL-2 are described along with major processing events for each launch vehicle stage, the spacecraft, and the general experiments of the SL-2 S/V. The final countdown and hold times are noted and a summary of the launch vehicle is included. The weather conditions at launch time and the range support activities are given.

Source record↗

Apollo Saturn 511 effluent measurements from the Apollo 16 launch operations: An experiment

An experiment was performed in conjunction with the Apollo 16 launch to define operational and instrumentational problems associated with launch-vehicle exhaust effluent monitoring. Ground and airborne sampling were performed for CO, CO2, hydrocarbons, and particulates. Sampling systems included filter pads and photometers for particulates and whole-air grab samples for gases. Launch debris was identified in the particulate samples at ground level(taken immediately after launch) and in the airborne measurements (taken 40 to 50 minutes after launch approximately 40 km downwind of the pad). Operational problems were identified and included the need for higher instrumentation mobility and the need for real-time sampling instrumentation as opposed to collection-type samples such as the whole-air grab sample.

Gregory, G. L.↗

A Saturn launched X-ray astronomy experiment. Volume 1: S-027

The S-027 X-Ray Astronomy Experiment originally proposed in early 1966, was developed to detect X-rays in the 2 keV to 10 keV range. Both a prototype unit and flight unit were constructed with the prototype unit also serving as the engineering model, the qualification test unit, and after refurbishment, as the back-up flight unit. Two Ground Support Equipment consoles were built to verify the experiment operation. A photograph of one experiment package with its Ground Support Equipment is shown. The S-027 experiment was scheduled for launch in 1968/69 and although both units were completed and tested to the extent that either would be ready for the scheduled launch, delays in the space program resulted in a launch date slip of several years. When the 1968/69 launch delay became official, provisions were made for storage of the two experiment packages at SCI Electronics in Huntsville, Alabama until a new launch date could be established.

Source record↗

ATS-F launch planning document

Launch operations of the ATS 6 satellite and the Titan 3 C launch vehicle are analyzed. The subjects discussed are: (1) launch vehicle trajectory, (2) launch vehicle mark events, (3) standard orbital parameter messages, (4) STADAN ground station visibility, (5) launch window, (6) separation attitude, and (7) separation events. The VHF Omni earth coverage antenna is described. Graphs of visibility from various ground stations are developed.

Walsh, R.↗

On the launch vehicle payload interface response

A method has been developed by which an estimate of the launch vehicle/payload interface response is derived from the interface responses obtained from missions with the identical launch vehicle but different payloads. This method requires knowledge of the launch vehicle eigenvalues, interface modal displacements, and the dynamic characteristics of the payloads. No other launch vehicle information is required. The organization responsible for the payload is able to perform loads and responses analysis resulting from a payload change without interfacing with the launch vehicle organization.

Chen, J. C.↗

Solar power satellite system definition study. Part 2, volume 8: SPS launch vehicle ascent and entry sonic overpressure and noise effects

Recoverable launch vehicle concepts for the Solar Power Satellite program were identified. These large launch vehicles are powered by proposed engines in the F-1 thrust level class. A description of the candidate launch vehicles and their operating mode was provided. Predictions of the sonic over pressures during ascent and entry for both types of vehicles, and prediction of launch noise levels in the vicinity of the launch site were included. An overall assessment and criteria for sonic overpressure and noise levels was examined.

Source record↗

Summary of airborne chlorine and hydrogen chloride gas measurements for August 20 and September 5, 1977 Voyager launches at Air Force Eastern Test Range, Florida

Airborne chlorine and hydrogen chloride measurements were made in the tropospheric ground cloud following the Voyager launches of August 20 and September 5, 1977. The maximum observed hydrogen chloride concentration for both launches was about 25 to 30 parts per million (ppm) occurring typically 2 to 6 minutes after launch. By completion of the sampling mission (1-1/2 hours for August, 4-1/2 hours for September), the maximum in-cloud concentration decayed to about 1 to 2 ppm. Maximum observed chlorine concentrations were about 40 to 55 parts per billion (ppb) about 2 to 8 minutes after launch; by about 15 minutes after launch, chlorine concentrations were less than 10 ppb (detection limit). In-cloud chlorine concentrations were well below 1 percent of hydrogen chloride concentrations. The appendix of the report discusses the chlorine instrument and the laboratory evaluation of the detector.

Gregory, G. L.↗

NASA to launch NOAA's GOES-C earth monitoring satellite

NASA's launch of the GOES-C geostationary satellite from Kennedy Space Center, Florida is planned for June 16, 1978. The launch vehicle is a three stage Delta 2914. As its contribution, GOES-C will contribute information from a data sparse area of the world centered in the Indian Ocean. GOES-C will replace GOES-1 and will become GOES-3 once it has successfully orbited at 35,750 kilometers (22,300 miles). NASA's Spaceflight Tracking and Data Network (STDN) will provide support for the mission. Included in the article are: (1) Delta launch vehicle statistics, first, second and third stages; (2) Delta/GOES-C major launch events; (3) Launch operations; (4) Delta/GOES-C personnel.

Source record↗