Search NASA⌕ Search

SEARCH · Search NASA

Results for “OPERATOR PERFORMANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

An Evaluation of Detect and Avoid (DAA) Displays for Unmanned Aircraft Systems: The Effect of Information Level and Display Location on Pilot Performance

A consortium of government, industry and academia is currently working to establish minimum operational performance standards for Detect and Avoid (DAA) and Control and Communications (C2) systems in order to enable broader integration of Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS). One subset of these performance standards will need to address the DAA display requirements that support an acceptable level of pilot performance. From a pilot's perspective, the DAA task is the maintenance of self separation and collision avoidance from other aircraft, utilizing the available information and controls within the Ground Control Station (GCS), including the DAA display. The pilot-in-the-loop DAA task requires the pilot to carry out three major functions: 1) detect a potential threat, 2) determine an appropriate resolution maneuver, and 3) execute that resolution maneuver via the GCS control and navigation interface(s). The purpose of the present study was to examine two main questions with respect to DAA display considerations that could impact pilots' ability to maintain well clear from other aircraft. First, what is the effect of a minimum (or basic) information display compared to an advanced information display on pilot performance? Second, what is the effect of display location on UAS pilot performance? Two levels of information level (basic, advanced) were compared across two levels of display location (standalone, integrated), for a total of four displays. The authors propose an eight-stage pilot-DAA interaction timeline from which several pilot response time metrics can be extracted. These metrics were compared across the four display conditions. The results indicate that the advanced displays had faster overall response times compared to the basic displays, however, there were no significant differences between the standalone and integrated displays. Implications of the findings on understanding pilot performance on the DAA task, the development of DAA display performance standards, as well as the need for future research are discussed.

detect and avoid↗

Review of performance, medical, and operational data on pilot aging issues

An extensive review of the literature and studies relating to performance, medical, operational, and legal data regarding pilot aging issues was performed in order to determine what evidence there is, if any, to support mandatory pilot retirement. Popular misconceptions about aging, including the failure to distinguish between the normal aging process and disease processes that occur more frequently in older individuals, continue to contribute to much of the misunderstanding and controversy that surround this issue. Results: Review of medical data related to the pilot aging issue indicate that recent improvement in medical diagnostics and treatment technology have made it possible to identify to a high degree individuals who are at risk for developing sudden incapacitating illness and for treating those with disqualifying medical conditions. Performance studies revealed that after controlling for the presence of disease states, older pilots are able to perform as well as younger pilots on many performance tasks. Review of accident data showed that older, healthy pilots do not have higher accident rates than younger pilots, and indeeed, evidence suggests that older pilots have an advantage in the cockpit due to higher experience levels. The Man-Machine-Mission-Environment interface of factors can be managed through structured, supervised, and enhanced operations, maintenance, flight reviews, and safety procedures in order to ensure safe and productive operations by reducing the margin of error and by increasing the margin of safety. Conclusions: There is no evidence indicating any specific age as an arbitrary cut-off point for pilots to perform their fight duties. A combination of regular medical screening, performance evaluation, enhanced operational maintenance, and safety procedures can most effectively ensure a safe pilot population than can a mandatory retirement policy based on arbitrary age restrictions.

Stoklosa, J. H.↗

Performing process migration with allreduce operations

Compute nodes perform allreduce operations that swap processes at nodes. A first allreduce operation generates a first result and uses a first process from a first compute node, a second process from a second compute node, and zeros from other compute nodes. The first compute node replaces the first process with the first result. A second allreduce operation generates a second result and uses the first result from the first compute node, the second process from the second compute node, and zeros from others. The second compute node replaces the second process with the second result, which is the first process. A third allreduce operation generates a third result and uses the first result from first compute node, the second result from the second compute node, and zeros from others. The first compute node replaces the first result with the third result, which is the second process.

Archer, Charles Jens↗

Cesium and Rubidium Frequency Standards Status and Performance on the GPS Program

This paper is an update of the on-orbit operational performance of the frequency standards on the last Block 1 Navstar satellite (GPS-10), the complete Block 2 Navstar satellites (GPS-13 to 21) and the Block 2A Navstar (GPS-22 to 40) satellites. Since the status of the GPS constellation is now at full operational capability (FOC), a minimum of twenty-four satellites are in position with all the necessary tests successfully completed. The evolution of frequency standards on board the GPS vehicles will be presented with corresponding results. Various methods and techniques will be presented to show on-orbit life time, down time, state of health telemetry, on-orbit trending and characterization of all the frequency standards. Other topics such as reliability, stability, clock quirks and idiosyncrasies of each vehicle will be covered.

VanMelle, M. J.↗

Intrusion Detection System Alarm Station Operator Interface Improvements

To address Alarm Station operator performance, Portable Intrusion Detection System team gathered information concerning AS operator data needs when assessing alarms. The purpose was to improve the Portable Intrusion Detection System operator interface to ensure that critical information was quickly presented and easily accessible. To gather the data, the team used a Goal Directed Task Analysis approach. The method of analysis was to prepare a set of interview questions, interview selected AS operator experts, conduct the interviews, create a goal/decision/information hierarchy based on information gathered, and then apply the results to the operator interface. In applying the results, the team had to consider not only the Goal Directed Task Analysis -determined information needs of the Alarm Station operator end-user population, but also account for customer requirements and differences in domain. The constraints in implementing all situation awareness recommendations are summarized and initial potential solutions presented.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Preliminary design and simulations of a Shuttle-Attached Manipulator System.

The preliminary design of a Shuttle-Attached Manipulator System is based on two arms that are articulated at shoulder, elbow, and wrist. Details of manipulator design are considered, giving attention to arm reach, velocity, acceleration, torque, joint angular travel limits, control, crew systems and man-machine interface, and telecommunications. The results of man-in-the-loop simulations show the feasibility of grappling a representative space payload from the Shuttle using a long boom manipulator system. The task, however, is sufficiently difficult to require the full concentration of one operator who should be relieved of any other tasks while performing operations with the manipulator system.

Brodie, S. B.↗

Some Recent Developments in Numerical Modelling at ECMWF

A new atmospheric model was introduced into operational forecasting at the European Center for Medium Range Weather Forecasts, on 21 April 1983. The principal differences between this model and the Center's first operational model were in the adiabatic formulation, which, in the new model, includes use of a spectral representation in the horizontal, a more general vertical coordinate, and a modified, more-efficient, time-stepping scheme. In addition, new programming techniques and standards were adopted to facilitate both the model's use as a research tool and its adaptation to make full use of the features of the recently-acquired CRAY X-MP computer. A number of revisions were also made in detailed aspects of the formulation of the parameterization schemes. The operational change to this new model was accompanied by a second important change, namely the use of a higher envelope orography in the lower boundary conditions of the model. Problems in the operational performance of the model and development preparatory to the future operational implementation of a high resolution version of the model on the CRAY X-MP are discussed.

Simmons, A. J.↗

NAS-Wide Fast-Time Simulation Study for Evaluating Performance of UAS Detect-and-Avoid Alerting and Guidance Systems

This presentation contains the analysis results of NAS-wide fast-time simulations with UAS and VFR traffic for a single day for evaluating the performance of Detect-and-Avoid (DAA) alerting and guidance systems. This purpose of this study was to help refine and validate MOPS alerting and guidance requirements. In this study, we generated plots of all performance metrics that are specified by RTCA SC-228 Minimum Operational Performance Standards (MOPS): 1) to evaluate the sensitivity of alerting parameters on the performance metrics of each DAA alert type: Preventive, Corrective, and Warning alerts and 2) to evaluate the effect of sensor uncertainty on DAA alerting and guidance performance.

DAA Alerting Performance↗

System and method for detecting high-energy photons

A system for detecting high-energy photons includes a pixelated image detector exposed to visible light and high-energy photons, and the pixelated image detector generates one or more images from the exposure to the visible light and high-energy photons. The system further includes one or more processors operably connected to the pixelated image detector and configured to perform operations on the one or more images to discriminate between visible light and high-energy photons. A method for detecting high-energy photons includes exposing a pixelated image detector to visible light and high-energy photons and discriminating between the visible light that interacts with the pixelated image detector and the high-energy photons that interact with the pixelated image detector.

Gibbs, Kenneth M.↗

A 20 Year Lifecycle Study for Launch Facilities at the Kennedy Space Center

The lifecycle cost analysis was based on corrosion costs for the Kennedy Space Center's Launch Complexes and Mobile Launch Platforms. The first step in the study involved identifying the relevant assets that would be included. Secondly, the identification and collection of the corrosion control cost data for the selected assets was completed. Corrosion control costs were separated into four categories. The sources of cost included the NASA labor for civil servant personnel directly involved in overseeing and managing corrosion control of the assets, United Space Alliance (USA) contractual requirements for performing planned corrosion control tasks, USA performance of unplanned corrosion control tasks, and Testing and Development. Corrosion control operations performed under USA contractual requirements were the most significant contributors to the total cost of corrosion. The operations include the inspection of the pad, routine maintenance of the pad, medium and large scale blasting and repainting activities, and the repair and replacement of structural metal elements. Cost data was collected from the years between 2001 and 2007. These costs were then extrapolated to future years to calculate the 20 year lifecycle costs.

Kolody, Mark R.↗

IER 268 CED-3b Report

The goal of IER 268 was to collect information from the operation of the Godiva IV super-prompt critical assembly to support multi-physics modeling efforts. There were two types of systems deployed. One was a Photo-Doppler Velocimetry (PDV) system which used the reflection of laser light on the surface of the Godiva IV core. The other consisted of an MHD 240 detector with two other detectors (an MHD-241 and an Eljen EJ-325A) used for reference as the MHD-240 detector was moved. The collection is referred to as the MHD Detector in the narrative log. There were two types of Godiva operations performed to gather data. A series of super-prompt critical bursts were performed and data collected on both systems, tied to a common trigger. Separately, a series of delayed critical operations at various power levels was performed for a combination of MHD detector distances from Godiva and the presence and absence of a shield in the line of sight between Godiva and the MHD detector. This data was collected to determine the contribution of room return during the burst measurements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The effect of monocular target blur on simulated telerobotic manipulation

A simulation involving three types of telerobotic tasks that require information about the spatial position of objects is reported. This is similar to the results of psychophysical experiments examining the effect of blur on stereoacuity. It is suggested that other psychophysical experimental results could be used to predict operator performance for other telerobotic tasks. It is demonstrated that refractive errors in the helmet-mounted stereo display system can affect performance in the three types of telerobotic tasks. The results of two sets of experiments indicate that monocular target blur of two diopters or more degrades stereo display performance to the level of monocular displays. This indicates that moderate levels of visual degradation that affect the operator's stereoacuity may eliminate the performance advantage of stereo displays.

Liu, Andrew↗

Tools to Address Glare and Avian Flux Hazards from Solar Energy Systems

This report describes software tools that can be used to evaluate and mitigate potential glare and avian-flux hazards from photovoltaic and concentrating solar power (CSP) plants. Enhancements to the Solar Glare Hazard Analysis Tool (SGHAT) include new block-space receptor models, integration of PVWatts for energy prediction, and a 3D daily glare visualization feature. Tools and methods to evaluate avian-flux hazards at CSP plants with large heliostat fields are also discussed. Alternative heliostat standby aiming strategies were investigated to reduce the avian-flux hazard and minimize impacts to operational performance. Finally, helicopter flyovers were conducted at the National Solar Thermal Test Facility and at the Ivanpah Solar Electric Generating System to evaluate the alternative heliostat aiming strategies and to provide a basis for model validation. Results showed that the models generally overpredicted the measured results, but they were able to simulate the trends in irradiance values with distance. A heliostat up-aiming strategy is recommended to alleviate both glare and avian-flux hazards, but operational schemes are required to reduce the impact on heliostat slew times and plant performance. Future studies should consider the trade-offs and collective impacts on these three factors of glare, avian-flux hazards, and plant operations and performance.

14 SOLAR ENERGY↗

Solar energy system performance evaluation. Seasonal report for Wormser, Columbia, South Carolina

The Wormser Solar Energy System's operational performance from April 1979 through March 1980 was evaluated. The space heating subsystem met 42 percent of the measured space heating load and the hot water subsystem met 23 percent of the measured hot water demand. Net electrical energy savings were 4.36 million Btu's or 1277 kwh. Fossil energy savings will increase considerably if the uncontrolled solar energy input to the building is considered.

Source record↗

Cesium and rubidium frequency standards status and performance on the GPS program

This paper is an update of the on-orbit operational performance of the frequency standards on the Block I GPS 8 to 11 Navstar satellites, the Block II GPS 13 to 21 Navstar satellites and the Block IIA GPS 22 to 40 Navstar satellites. A brief history of the frequency standards depicting improvements incorporated in the GPS Program with corresponding results will be presented. The frequency standards configurations from the start to the present, including the various Block IIA clock configurations will be discussed. Topics such as clock observations and long term trending analysis which could enhance on-orbit performance analysis will be covered.

Vanmelle, M. J.↗

Transient Liquefaction on the Lunar or Martian Surface Operational Demonstration

The Cryogenic Fluid In-situ Liquefaction for Landers (CryoFILL) activity has been investigating concepts for the liquefaction of cryogenic fluids produced on the surface of the Moon and Mars. Liquefaction testing of oxygen in a scaled lander tank using an integrated, industrial cryocooler system was completed. The testing covered the determination of the nominal performance operation of the system, constant liquefaction performance, and transient liquefaction performance. The goal of the testing was to demonstrate cryogenic liquefaction operational capabilities on the Lunar and Martian surfaces for landers and In Situ Resource Utilization. The testing met all key performance parameter threshold values including liquefaction rate (demonstrated 1.6 kg/hr compared to threshold of 1.1 kg/hr), number of variables as transient (goal of 3: liquefaction flow, environmental temperature, and cryocooler input power – all demonstrated), and number of fill levels (goal of 3: < 5%, 50%, and 90% - all demonstrated). Key testing results from oxygen liquefaction testing will be discussed including sensitivities provided by the analysis team.

Liquefaction↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

The Multi-Attribute Task Battery II (MATB-II) Software for Human Performance and Workload Research: A User's Guide

The Multi-Attribute Task Battery (MAT Battery). is a computer-based task designed to evaluate operator performance and workload, has been redeveloped to operate in Windows XP Service Pack 3, Windows Vista and Windows 7 operating systems.MATB-II includes essentially the same tasks as the original MAT Battery, plus new configuration options including a graphical user interface for controlling modes of operation. MATB-II can be executed either in training or testing mode, as defined by the MATB-II configuration file. The configuration file also allows set up of the default timeouts for the tasks, the flow rates of the pumps and tank levels of the Resource Management (RESMAN) task. MATB-II comes with a default event file that an experimenter can modify and adapt

Santiago-Espada, Yamira↗