Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pilots”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Impact of Rheology Models on Horizontal Well Polymer Flooding in a Heavy Oil Reservoir on Alaska North Slope: A Simulation Study

Polymer rheology can have either a positive or a negative effect on polymer flooding performance under varied circumstances. Many researchers have studied the effect of polymer rheology in a vertical well, but no field scale studies have been conducted to investigate whether polymer rheology is beneficial to polymer flooding in heavy oil reservoirs developed by horizontal wells. In this paper, we conducted a numerical simulation study to examine the effect of HPAM polymer rheology on a polymer flooding pilot, which is the first-ever project conducted on a heavy oil reservoir from Alaska North Slope (ANS) developed by horizontal wells. Three rheology types were considered in the study including the apparent viscosity measured during coreflooding of using a HPAM polymer, the bulk viscosity measured with a viscometer, and a Newtonian flow model. The results suggest that using the bulk viscosity in simulation underestimates the conformance control and the water-oil-ratio reduction capability of the HPAM polymer solution. When the apparent viscosity is used, the incremental oil and sweep were largely increased, and the optimal recovery period of polymer flooding was extended greatly, especially for the heterogeneous formations. Therefore, the rheology type of polymer plays a significant role in the incremental oil recovery and injection profile of the horizontal well system given the pilot test conditions. This study has provided practical guidance to field operators for the ongoing polymer flooding pilot on ANS and will also provide valuable information for other polymer projects conducted in similar conditions.

Leng, Jianqiao↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Heat Integration Optimization and Dynamic Modeling Investigation for Advancing the Coal-Direct Chemical Looping Process

The purpose of the project is to address the optimization and startup operation of a modular coal direct chemical looping (CDCL) combustion system integrated with a steam cycle for power generation to reduce the risks involved in further scale-up of the technology. The modular reactor design of the CDCL process provides flexibility in the fabrication of the reactor and in its operating capacity (i.e. turndown ratio) at the cost of a more complex heat exchange network (HEN) design and integration. To address the technology gaps and advance the efficiency and economic feasibility of the CDCL technology, the project will perform a detailed and comprehensive analysis of the integration of a modular CDCL reactor system and a steam cycle system under both static and transient conditions via HEN process performance simulations and system dynamic modeling, respectively. The scope of work consists of 1) Experimental and computational studies of the CDCL combustor reactor 2) Comprehensive static (i.e. steady-state) system HEN design analysis in CDCL 550 MWe commercial unit for power generation and 3) Dynamic modeling of site specific design of 10MWe CDCL large pilot plant. The project team has successfully developed and validated a kinetic model for the oxidation of oxygen carriers in the combustor using the unreacted shrinking core model (UCSM). The model is capable of capturing the oxidation kinetics of fully or partially reduced oxygen carrier particles. A computational fluid dynamics (CFD) model is developed to simulate the hydrodynamics, heat transfer, and chemical reaction occurring in the CDCL combustor. The model is developed in MFIX and ANSYS Fluent. Key aspects of CDCL combustor operation, including heat transfer, oxygen carrier oxidation, and the transport of oxygen carrier particles, are simulated using this CFD model. The HEN for a commercial scale 550 MWe CDCL power plant is simulated and optimized using ASPEN Plus. Practical design considerations are incorporated based on industrial experiences. The performance and cost for the commercial CDCL plant is updated based on these analyses. A dynamic model for the 10 MWe CDCL pilot plant is developed in ProTRAX simulation software. The model is based on the pilot plant design developed in project DE-FE0027654 “10 MWe CDCL Large Pilot Plang – Pre-FEED Study” and the steam cycle data obtained from Dover Light & Power plant. The transient behaviors during pilot plant load variation are simulated using the dynamic model.

01 COAL, LIGNITE, AND PEAT↗

Subtask 2.6 – Optimization of Aerosol Mitigation Technology for Postcombustion CO 2 Capture

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion CO 2 capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery (EOR). The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the aerosols present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and aerosols provide nucleation sites where amine vapors can condense. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, aerosol components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to optimize aerosol mitigation technology for PCCC at a lignite-fired power plant. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on collection of aerosols at a low-rank coal-fired power station. Determine the impact of aerosols on the efficiency and degradation products of amine-based carbon capture systems fired with low-rank fuels. Work was conducted at Minnkota Power Cooperative’s (MPC’s) Milton R. Young (MRY) Station Unit 2 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. To gather initial data for sizing and specifying a WESP for this system, a temporary pilot-scale WESP was rented and installed on-site. Several different conditions were tested to examine the impact of flow rate, voltage, and current on WESP performance. The WESP was effective at removing large particulate (>200 nm) but caused an increase in fine particulate (<75 nm). Fine particulate material at the inlet and outlet of the WESP was collected, analyzed, and showed that crystalline sulfates carried over from the plant’s FGD unit were being converted to fine aerosols and SO 2 was being converted to SO 3 through the WESP. Additionally, the high moisture content of the flue gas stream at this sample location also contributed to an overall increase in aerosol mass under some of the test conditions. Using the results from the rented WESP, the project team installed a smaller-scale WESP upstream of the EERC’s slipstream CO 2 capture system. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then routed through the new WESP before passing to the CO 2 absorber columns. Fluor’s amine-based solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Aerosols and sulfur species were measured at multiple locations throughout the pilot-scale system. The inlet FGD and DCC removed much of the particulate matter and gaseous sulfur upstream of the WESP. With this configuration, the WESP achieved >95% particulate capture. The new WESP did not show any of the increases in SO 3 or other aerosol species that had been consistently observed with the larger-scale WESP installed immediately downstream of the plant’s full-scale FGD unit. Particulate samples captured and analyzed from the WESP inlet did not show any presence of crystalline sulfate materials, indicating that the pilot-scale FGD and DCC were efficient at reducing carryover from the plant’s full-scale FGD unit. A set of parametric tests were conducted on the new WESP to assess the impacts of flow rate, voltage, number of online WESP fields, and gas-phase sulfur content on aerosol and sulfur transformations. The results showed that the WESP performed similarly well at all sets of conditions. Sulfur and particulate matter exiting the WESP were further reduced through the absorber column as the amine-based solvent captured some of the residual contaminants. Solvent analysis showed that these species were slowly concentrating in the solvent over the duration of the test. When the WESP was taken offline and the sulfur slip through the FGD allowed to rise, the sulfate content in the solvent rose sharply, showing that the extra FGD and WESP were effective at reducing sulfate and cation uptake. This would be expected to extend amine-based solvent life by slowing the formation of heat-stable salts and other degradation products. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission and MPC.

01 COAL, LIGNITE, AND PEAT↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends with Washed and Unwashed Legacy Coals and Other Waste Fuels to Generate White Hydrogen

The objective of this effort, primarily funded by the United States Department of Energy (DOE), and led by the Electric Power Research Institute, Inc. (EPRI), with support by Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), has been to qualify coal, biomass, and plastic waste blends based on performance testing of selected fuel pellet compositions in a pilot-scale updraft moving-bed (UDMB) gasifier. The testing provided relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are the focus. The gasifier used for testing is HMI’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips (biomass). However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The three feedstocks were densified and pelletized by California Pellet Mill (CPM) to meet the feedstock size required by Sotacarbo’s 30mm ID UDMB gasifier, under contract to HMI. The technical tasks and results from this two-year research project included: (1) Feed Procurement and Preparation: Nine different tri-fuel pellets were prepared from varying compositions of fresh mined PRB coal, corn stover biomass, and car fluff waste plastics. Tri-fuel pellets were produced by CPM and shipped to Sotacarbo’s test facility in Carbonia, Sardinia, Italy. (2) Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different UDMB gasification tests to be performed in Sotacarbo’s 12-inch ID pilot scale gasifier, the process monitoring instrumentation used, and the extractive samples recovered for analysis of the total gasification process mass and energy balance. (3) Gasifier Testing: Nine different gasification runs were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstock compositions generated from varying mixtures of PRB coal, biomass, and plastic wastes. The testing generated performance data on gasification reaction efficiency and performance, yielding relevant data for models used to scale up the gasifier design. This task also included work to refurbish and reassemble the pilot gasifier at Sotacarbo and perform a baseline 100% PRB coal run. (4) Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results are reported in the project’s final report, published in March 2024. The results show that all tri-fuel pellets gasified well and maintained structural integrity throughout the gasification process. The syngas generated can be shifted to hydrogen by using commercial syngas shifting technologies. (5) High Fidelity computational fluid dynamics (CFD) Simulation: The National Energy Technology Laboratory (NETL) team performed CFD simulations of the UDMB gasifier for two of the tri-fuel pellets gasified in Sotacarbo’s pilot scale gasifier. The kinetic mechanisms for the pyrolysis of each constituent, PRB coal, corn stover biomass, and waste plastics are based on thermogravimetric analysis performed by Sotacarbo. The gasification model was validated by comparing the predicted syngas composition at the exit of the gasifier with the measured syngas composition. In addition, the reactor’s measured internal temperature profile agreed well with the predicted internal reactor temperature profile. These results validate that the model can be used to predict the performance of the updraft moving bed gasifier for different feedstocks and operating conditions. This paper summarizes the results of the completed work in which the pelletizing procedure was validated to ensure the viability of the tri-fuel pellets for the gasification runs performed at Sotacarbo’s 30 mm UDMB gasifier. The gasification performance data from this series of nine runs will enable modeling of a full-scale HMI industrial scale gasifier supporting both combined heat and power, and Hydrogen production from coal (both fresh mined and legacy) combined with various biomass and waste plastics. Additionally, plans and progress on a follow-up project, being executed by the same project team, will be presented. In this project, a total of twenty (20) different feedstocks are being prepared from varying compositions of biomass (both woody biomass and corn stover) with a mixture of legacy coal waste, plastic waste, and refuse-derived fuel (RDF). The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design to 50 megawatt electric (MWe) (equivalent hydrogen production). Tests will also be performed on a bench-scale fluidized-bed gasifier for comparison purposes. The results of this testing will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends.

08 HYDROGEN↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transforming Aeration Energy in Water Resource Recovery Facilities (WRRFs) through Suboxic Nitrogen Removal (Final Report)

The objective of this project was to advance two key technological components—aeration control strategies and process design methodologies—to support the development and broader adoption of suboxic biological nitrogen removal (SBNR). The project focused on achieving the following three goals: • Enhance Model Predictive Control (MPC) Technology: Advance the DO/Nmaster MPC platform from its initial 2018 pilot deployment at the Chico Water Resource Recovery Facility in California to full-scale integration. This included partnering with a blower technology commercialization partner and incorporating machine learning (ML) capabilities to enable nationwide deployment. • Bridge Knowledge Gaps in SBNR Process Design: Address fundamental gaps in SBNR process understanding through controlled pilot-scale testing at a dedicated pilot facility. These efforts supported the development of robust kinetic models to inform reliable SBNR control, operational strategies, and design frameworks. • Demonstrate Full-Scale Implementation of Low DO/SBNR with ML: Transition low dissolved oxygen (DO)/SBNR coupled with ML from pilot-scale trials to full-scale demonstration in flow-through biological nutrient removal (BNR) systems, with the goal of enabling scalable, nationwide adoption in activated sludge treatment processes. The project included demonstration of SBNR at the pilot scale as performed by Hampton Roads Sanitation District (HRSD) and at the full-scale as performed by the Los Angeles County Sanitation Districts' (LACSD) Pomona Water Reclamation Plant (POWRP).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sorbent Based Post-Combustion CO 2 Slipstream Testing

TDA Research, Inc. has developed a low-cost sorbent (alkalized alumina) based technology for post-combustion CO 2 capture. The sorbent runs in an isothermal process for adsorption and regeneration. Neither temperature swing nor pressure swing is needed. TDA designed a system which operated 10 fixed beds to simulate a moving bed process. The flow pattern was optimized to minimize the steam usage for regeneration. An excellent sorbent (Batch 1) was also developed with collaboration with our partner. The sorbent degraded after long term operation. We developed a reprocessing procedure, which can be conducted in situ, to restore the sorbent capture capacity as the fresh sorbent after running for about 1250 hours. The reprocessing extended the sorbent longevity significantly. TDA designed a pilot unit (40’ x 32’ x 11.5’), processing flue gas equivalent to 0.5 MW of power generation. It had 10 beds and each bed could hold 1.75 m 3 of sorbent. We worked with Springs Fabrication, Inc. to complete the construction of the pilot unit. It was then shipped and installed at NCCC. The pilot unit was kept running in 24-hour mode when the flue gas and steam were available. It could run automatically without operator on site. Parametric and long-term (2 months) tests were carried out successfully. The results showed that TDA’s process can achieve 90% capture and 95% CO 2 purity for both coal and NG flue gases. For coal flue gas, the system reached performance target when processing up to 0.62 MW flue gas, 24% higher than the design capacity. Thus, capital cost could be saved on the reactors and sorbent. The strip air flow was designed to be 0.25 of that of the flue gas. The test data showed the strip/flue ratio can be reduced to as little as 0.18, which saves the power consumption for the strip air blower. The pressure drop was found to be lower than what the empirical equation calculated. The sorbent still had 91.7% of original capacity after 3-month test. With the data from the pilot test, we updated the TEA. For a 550-MW e supercritical coal fired power plant with CO 2 capture, the capture cost for TDA’s process is $34.9/tonne CO 2 captured, which meets DOE’s goal of $40/tonne and is 17.1% less than the DOE baseline Case 12. Therefore, TDA’s process has a good potential for commercialization.

01 COAL, LIGNITE, AND PEAT↗

Architectural development of an ST fusion device

A recent U.S. National Academy study recommended the development of a next step Sustained High Power Density (SHPD) facility within the U.S. as an intermediate step in designing and building a Pilot Plant device. Several papers have been written describing the physics, design and engineering scoping analysis performed in developing this machine design. This paper places emphasis on the continued evolution of the architectural development of past activities to meet the requirements of an ST fusion pilot plant and power plant. The current effort centers on meeting basic physics and component requirements in a machine design that improves the chance of achieving fission level availability (95%) within an arrangement that promotes design simplicity, offsite construction with on-site modular assembly. As a prelude to both the SHPD and Pilot Plant, a scoping design of a 500MWe Spherical Tokamak Advanced Reactor (STAR) has been defined to investigate design options and physics scenarios that can successfully meet physics performance, engineering requirements and economic conditions of an ST power plant. Following a successful physics/engineering assessment, the STAR Power Plant design will be downsized to meet the specifications established in the design of a near term ST Pilot Plant

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Ride Pingo to Transit

In this project, we developed an on-demand microtransit first- and last-mile service. To integrate the service with fixed-route transit, we developed a feature called Transit Connect that prioritized riders’ on-time arrival at the transit station over other service requirements. We first prototyped service and related algorithms in a simulated environment, and then piloted the service in the city of Kent, Washington. Our algorithm incorporates request-specific hard drop-off deadlines to ensure timely arrivals for transit transfers. In the pilot, these constraints were obtained from GTFS Realtime data to accurately determine the schedule of the transit and the location of the stations. This approach introduced the ability to accept or decline new requests based on the timing of transit connections for these new requests and connection status of onboarding customers. The pilot (called “Ride Pingo to Transit”) deployed a fleet of three 14-person vans, ran from September 2021 to March 2023, and served a total of 21,329 trips. Transit Connect was offered for drop-offs at both Kent Station and the Kent Valley hub. In total, 2,844 such trips were completed. This dataset was collected from our pilot, which includes the following: - Requests: List of all trip requests, including those that were actually served and those not materialized. - Fleet: Daily vehicle service logs. - Service details: Daily vehicle stop logs (boarding and alighting). - Trip types: First mile, last mile, or point-to-point. ![pingo to transit](pingo-to-transit.jpg)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Robust Carbon Dioxide Plume Imaging Using Joint Tomographic Inversion of Seismic Onset Time and Distributed Pressure and Temperature Measurements (Final Report)

We develop and demonstrate rapid and cost-effective methodologies for spatiotemporal tracking of CO2 plumes during geologic sequestration using joint inversion of seismic data and distributed pressure and temperature measurements. Key elements of our methodology are: (a) a computationally efficient approach to pressure and temperature propagation, (b) analysis of time lapse seismic data using a novel ‘seismic onset time’ approach to detect fluid front propagation, and (c) data assimilation and uncertainty assessment via joint inversion of pressure, temperature and time lapse seismic data, and (d) validating the numerical tomographic inversion using a CO2 injection demonstration projects, specifically data collected from the from the Petra Nova Parish Holdings CCUS project in the West Ranch Field, Texas and the Chester-16 reef CO2 injection site in Northern Michigan which is part of the DOE Midwestern Carbon Sequestration Project. The research team is led by Texas A&M University and includes Battelle as a subcontractor with support from Shell, Anadarko, Chevron and JX Nippon. A carbon dioxide (CO2) water-alternating-gas (WAG) pilot was conducted to gain insights into tertiary oil recovery potential via CO2 flood in the West Ranch Field as part of the Petra Nova project, the world’s largest post-combustion CO2 capture and utilization initiative. With a fluvial formation geology and large contrasts in permeability, this is a challenging and novel application of CO2 enhanced oil recovery (EOR). We build a predictive dynamic model of the subsurface that incorporates the multiphase and compositional data acquired during the pilot operation. The calibrated model is used for the carbon dioxide plume imaging. The study began with an initialization of the pilot sector model extracted from a calibrated full-field model. The pilot model calibration follows a two-step hierarchical workflow. First, we performed a large-scale update of the permeability distribution by integrating available bottomhole pressure and multiphase production data. In the second step, local permeability field is fine-tuned using a streamline-based method to match CO2 breakthrough times at the producers. The predictive capability of the calibrated model was verified through two blind validation tests: (1) the model showed good agreement with saturation logs acquired at two observation wells; and (2) the model reproduced the CO2 recovery as a fraction of the injected CO2. The use of seismic onset times has shown great promise for integrating near-continuous seismic surveys for updating geologic models. In this study, we analyze the impact of seismic survey frequency on the onset time approach aiming to extend the application of onset time to infrequent seismic surveys. In addition, we quantitatively examine the nonlinearity of the onset time method and compare it to the commonly used amplitude inversion method. We carry out a sensitivity analysis of seismic survey frequency based on the complete seismic survey data (over 175 surveys) of steam injection in a heavy oil reservoir (Peace River Unit) in Canada. Our results show that an adequate onset time map can be obtained from the infrequent seismic surveys by interpolation between seismic surveys as long as there is no change in the dominant underlying physics between the successive surveys. The study also shows that nonlinearity of the onset time method can be -smaller than that of the amplitude inversion method by several orders of magnitude. Application to the Brugge benchmark case shows that the onset time method obtains comparable permeability update as the traditional seismic amplitude inversion method with faster computation and improved convergence characteristics. We extend the streamline-based data integration approach to incorporate distributed temperature sensor (DTS) data using the concept of thermal tracer travel time. Then, a hierarchical workflow composed of evolutionary and streamline methods is employed to jointly history match the DTS and pressure data. Finally, CO2 saturation and streamline maps are used to visualize the CO2 plume movement during the sequestration process. The hierarchical workflow is applied to a carbon sequestration project in a carbonate reef reservoir within the Northern Niagaran Pinnacle Reef Trend in Michigan, USA. The monitoring data set consists of distributed temperature sensing (DTS) data acquired at the injection well and a monitoring well, flowing bottom-hole pressure data at the injection well, and time-lapse pressure measurements at several locations along the monitoring well. The history matching results indicate that the CO2 movement is mostly restricted to the intended zones of injection which is consistent with an independent warm-back analysis of the temperature data. In addition to employing simulation models and inverse methods for CO2 plume imaging, we also initialized a data-driven technology for detecting inter-well connectivity based on production and pressure data. Our machine-learning framework is built on the statistical recurrent unit (SRU) model and interprets well-based injection/production data into inter-well connectivity without relying on a geologic model. We test it on synthetic and field-scale CO2 EOR projects utilizing the water-alternating-gas (WAG) process. The validation of the proposed data-driven inter-well connectivity assessment is performed using synthetic data from simulation models where inter-well connectivity can be easily measured using the streamline-based flux allocation. The SRU model is shown to offer excellent prediction performance on the synthetic case. Despite significant measurement noise and frequent well shut-ins imposed in the field-scale case, the SRU model offers good prediction accuracy, the overall relative error of the phase production rates at most producers ranges from 10% to 30%. It is shown that the dominant connections identified by the data-driven method and streamline method are in close agreement. Texas A&M University, the lead organization in the project, was primarily responsible for the development of tomographic approaches for CO2 plume mapping in conjunction with distributed pressure, temperature and seismic onset time data. Battelle, as a subcontractor, was primarily responsible for the development of analytical and empirical methods for analyzing transient injection rate and pressure data from point/line sources such as injection and monitoring wells. An additional area of emphasis for Battelle was the use of machine learning for such tasks as inferring reservoir connectivity information from injection-production data, and identifying variable importance for machine learning-based proxy models developed from full-physics simulations. The two organizations also collaborated on the application of the tomographic inversion methodology for a field data set.

02 PETROLEUM↗

High Yield, Economical and Environmentally Benign Production of Rare Earth Elements from Coal Ash [Abstract]

Fly ash stored in landfills and ponds across the United States is an attractive, abundant domestic resource for the cost-effective recovery of rare earth elements (REE) and other critical minerals (CM). Physical Sciences Inc. (PSI) and its team members, Winner Water Services (WWS) and University of Kentucky/Center for Applied Energy Research (UK/CAER) successfully executed a multiphase program that developed and demonstrated pilot plant operations for cost-effective and environmentally-friendly production of rare earth element oxide (REO) concentrates, and the critical minerals scandium and aluminum (in the forms of salts or oxide products). We constructed and operated a sub-scale (0.5 kg/day) micropilot facility to demonstrate the key physical and chemical processing operations, predict yields, and troubleshoot process bottlenecks. The project team then designed, constructed and operated two decoupled pilot plant operations: (1) an operational pilot plant for physical separation processes with a capacity of 0.4 metric tons per day (tpd) where we optimized processes to produce selected ash fractions as the feedstock for chemical processing as well as valuable byproducts such as cement substitute, cenospheres, magnetic ash and secondary fuel carbon, and (2) an operational pilot plant for chemical processing with a capacity of 0.5 tpd that developed optimized processes for the production of: (a) REO concentrates, (b) critical minerals recovery (Sc, Al), and (c) beneficiated ash as valuable byproduct suitable for cement applications.

01 COAL, LIGNITE, AND PEAT↗

Tailoring Cementitious Materials Towards Value-Added Use of Large CO 2 Volumes

Hydraulic cements with alternative chemistries were developed for large-volume and value-added use of carbon dioxide. The hydraulic cements were processed using the energy-efficient mechanochemical technique at room temperature and atmospheric pressure. Carbon dioxide was captured directly from combustion emissions during processing. For this purpose, mechanochemical processing of hydraulic cements was accomplished under a flow of combustion emissions prior to the release of emissions to the atmosphere. The process removed a significant fraction of carbon dioxide from combustion emissions. The hydraulic cements captured carbon dioxide at about 10% of their weight. Two hydraulic cement chemistries were developed, and their mechanochemical processing was successfully scaled-up. The characteristic feature of one chemistry was its relatively low (near-neutral) pH where the integration of carbon dioxide yielded clear value. The second cement chemistry was based on alkali activation of industrial wastes. This chemistry could make value-added use of carbon dioxide, but it had to be refined to control the pH drop caused by CO 2 integration. These two cements render binding effects upon hydration by forming a combination of stable carbonates and aluminosilicates or phosphates. Efforts to develop cement chemistries based solely on carbonates were not successful. The mechanochemical process was found to integrate carbon dioxide into the alternative cement chemistries in the form of disordered and metastable carbonates. During hydration reactions, the disordered/metastable carbonates are either transformed into stable carbonate phases with desired binding efforts, or carbonates get integrated into the primary inorganic binders (hydrates). When compared with mechanochemical processing in pure carbon dioxide, mechanochemical processing in combustion emissions produced hydraulic cements with improved engineering properties. The mechanochemical process was scaled-up, and its variables as well as the raw materials formulations were optimized for implementation at pilot scale. Scale-up was found to enhance the carbon capture potential and the engineering qualities of the resulting hydraulic cements. This was because scale-up raises the intensity of mechanical energy input to raw materials. Certain mechanochemical phenomena cannot be induced, irrespective of the cumulative mechanical energy input, unless the intensity of impact is raised above a minimum level that cannot be achieved in laboratory-scale implementation of the process. Due to this effect, the duration of the mechanochemical process as well as its energy demand could be reduced significantly (by an order of magnitude) upon transition from laboratory to pilot scale, with the hydraulic cements produced at pilot scale offering engineering properties that were superior to those realized in laboratory-scale mechanochemical processing. The hydraulic cements produced at pilot scale via mechanochemical processing under a flow of combustion emissions were thoroughly characterized. They were found to meet standard requirements for ‘General Use’ hydraulic cements. They were compatible with the industrial-scale concrete production and construction practices that are used with the currently prevalent hydraulic cements. The new hydraulic cements with integrated carbon dioxide were found to offer distinct advantages over the currently prevalent Portland cement in terms of net carbon footprint and energy content. The combined raw materials and energy costs of the new hydraulic cements are competitive, and major cost savings can be realized because of the simplified production process that significantly lowers the capital investment in cement production plants. Mechanochemical processing of the new hydraulic cements under a flow of combustion emissions can be implemented using some existing components of cement manufacturing plants; this facilitates adoption of the technology by the cement industry.

36 MATERIALS SCIENCE↗

Modeling of Reactor Design and Optimization for Scale-Up of the Catalyxx Process for Ethanol Conversion to Higher Alcohol Biofuels

This report summarizes the results of a collaborative efforts between Oak Ridge National Laboratory (ORNL) and Catalyxx Inc. to investigate scale-up of Catalyxx’s Ethanol upgrading to higher alcohols process. The study was funded by the U.S. Department of Energy (DOE) Bioenergy Technologies Office (BETO) under CRADA (Cooperative Research and Development Agreement) No: NFE-20-08396. The project is part of the Direct Funding Opportunity (DFO) for Computational Science to Enable Bioenergy program which utilized computational toolsets developed by the Consortium for Computational Physics and Chemistry, a multi-laboratory consortium in BETO. The report here summarizes a packed-bed reactor modeling effort spanning the range from lab to industrial scale (from 4 gram to 5-ton catalyst beds), and examining reactor design, process optimization strategies, and suggested design and operating conditions for Catalyxx’s ethanol upgrading plants. The results in this report have been shared in monthly steering meetings and presentations are available in the shared data house owned by Catalyxx. The modeling effort helped to define optimum operation conditions for maximum alcohol selectivity and yield: i.e., temperature control scenarios ranging from adiabatic to isothermal, feed rate, pressure, and inlet H 2 /Ethanol ratio. The modeling results were verified at lab-(4 gram) and pre-pilot (4 kg) scales and has been used to evaluate a 5-ton packed-bed reactor and identify operating conditions to maximize the butanol yield. Special focus was given to understanding mass-transfer effects in the pre-pilot and pilot-scale reactors, over the domain of flow rate, pressure, feed composition, pellet size, shape, porosity, bed voidage, and reactor dimensions (i.e., length/diameter). Modeling was also used to evaluate innovative reactor design concepts such as water removal to improve alcohol selectivity and yield, and a reactor with an additional side inlet to facilitate quenching. These concepts were thoroughly explored, and potential benefits were disclosed. The results in this report are summarized and described qualitatively to protect the IP rights of Catalyxx. The details have been shared with the Catalyxx team in the regular steering meetings. At the end of the project, Catalyxx Inc. announced a successful demonstration of pilot scale operation in Seville, Spain.

02 PETROLEUM↗

LLNS Request for Variance From 10 CFR 851 for Construction of LLNL Emergency Operations Center

Lawrence Livermore National Security, LLC (LLNS) is submitting the following variance application requesting the use of the State of California’s Occupational Safety and Health Administration (Cal/OSHA) Regulations in lieu of Title 10 Code of Federal Regulations Part 851 (10 CFR 851, the Rule), Worker Safety and Health Program, Subpart B (Program Requirements), Subpart C (Specific Program Requirements), and Appendix A (Worker Safety and Health Functional Areas), solely with respect to the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Center (EOC) facility. The request is in support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach for the projects in the pilot. This pilot is to test and demonstrate innovation leading to a reduced cost of construction for building commercial type structures at Department of Energy (DOE)/NNSA facilities. The variance proposes to permit local/regional construction businesses contracted to Management & Operation contractor operated facilities to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the DOE Complex. This will permit compliance to standards that are as safe and healthful as those in 10 CFR 851 without confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum.

99 GENERAL AND MISCELLANEOUS↗