Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

NASA Aerospace Flight Battery Systems Program Update

The objectives of NASA's Aerospace Flight Battery Systems Program is to: develop, maintain and provide tools for the validation and assessment of aerospace battery technologies; accelerate the readiness of technology advances and provide infusion paths for emerging technologies; provide NASA projects with the required database and validation guidelines for technology selection of hardware and processes relating to aerospace batteries; disseminate validation and assessment tools, quality assurance, reliability, and availability information to the NASA and aerospace battery communities; and ensure that safe, reliable batteries are available for NASA's future missions.

Manzo, Michelle↗

Study Of Radiation Effects Electronics at Atmospheric Altitudes

A test bed for the in situ evaluation of electronic devices for high altitude aircraft was developed. A prototype of the test bed, suitable for operation on a research aircraft, was built and readied for ground tests. The principle investigator established a working relationship with the Project APEX team at Dryden with the intent of flying the test bed "piggyback" on an Project APEX balloon in 1998. Contact was also established with NASA contractors charged with operating the ER-2 aircraft now at Dryden.

Wilkins, Richard↗

No-Oven, No-Autoclave Composite Processing

Very large composite structures, such as those used in NASA's Space Launch System, push the boundaries imposed by current autoclaves. New technology is needed to maintain composite performance and free manufacturing engineers from the restraints of curing equipment size limitations. Recent efforts on a Phase II project by Cornerstone Research Group, Inc. (CRG), have advanced the technology and manufacturing readiness levels of a unique two-part epoxy resin system. Designed for room-temperature infusion of a dry carbon preform, the system includes a no-heat-added cure that delivers 350 F composite performance in a matter of hours. This no-oven, no-autoclave (NONA) composite processing eliminates part-size constraints imposed by infrastructure and lowers costs by increasing throughput and reducing capital-specific, process-flow bottlenecks. As a result of the Phase II activity, NONA materials and processes were used to make high-temperature composite tooling suitable for further production of carbon-epoxy laminates and honeycomb/ sandwich-structure composites with an aluminum core. The technology platform involves tooling design, resin infusion processing, composite part design, and resin chemistry. The various technology elements are combined to achieve a fully cured part. The individual elements are not unusual, but they are combined in such a way that enables proper management of the heat generated by the epoxy resin during cure. The result is a self-cured carbon/ epoxy composite part that is mechanically and chemically stable at temperatures up to 350 F. As a result of the successful SBIR effort, CRG has launched NONA Composites as a spinoff subsidiary. The company sells resin to end users, fabricates finished goods for customers, and sells composite tooling made with NONA materials and processes to composite manufacturers.

Rauscher, Michael D.↗

Nanotechnology

Present an overview of the Nanotechnology Project at NASA's Game Changing Technology Industry Day. Mature and demonstrate flight readiness of CNT reinforced composites for future NASA mission applicationsSounding rocket test in a multiexperiment payloadIntegrate into cold gas thruster system as propellant storageThe technology would provide the means for reduced COPV mass and improved damage tolerance and flight qualify CNT reinforced composites. PROBLEM/NEED BEING ADDRESSED:Reduce weight and enhance the performance and damage tolerance of aerospace structuresGAME-CHANGING SOLUTION:Improve mechanical properties of CNTs to eventually replace CFRP –lighter and strongerFirst flight-testing of a CNT reinforced composite structural component as part of an operational flight systemUNIQUENESS:CNT manufacturing methods developedFlight qualify CNT reinforced composites

Nanotechnology↗

Uncrewed Aerial Systems for Emergency Medical First Response: A Market Research Report

This report presents the findings from market research conducted for NASA’s Aerial Aid Convergent Aeronautics Solutions (CAS) exploration project, which aims to assess the current state of the market and technological readiness for Uncrewed Aerial Systems (UAS) for medical emergency first response. The research reveals a robust and rapidly growing market for UAS, with a notable emerging sector for Drones as First Responders (DFR). Despite this growth, DFR applications are currently limited by regulatory, technical, and other challenges, which restrict their use primarily to manned remote video surveillance, and therefore are primarily employed by police units. To our knowledge, there is no evidence of UAS being utilized by medical first responders for scene assessment. Limited evidence exists for closely related applications; however, these are mostly confined to pilot programs for the delivery of medical supplies or equipment. Although there has been discussion around fully autonomous DFR applications for medical purposes such as UAS ambulances or patient transport drones, these applications are generally not yet operational in practice. The technology for full autonomy, especially in guidance and control, has seen significant advancements, and recent Federal Aviation Administration (FAA)regulations are likely to accelerate adoption. Computer vision algorithms for fully autonomous medical emergency response scene surveillance are primed for advancement and deployment. A notable gap likely exists between advancements in computer vision research and what is being integrated in the commercial DFR sector. This gap is primarily due to challenges such as quality assurance for autonomous systems, the availability of application-specific training datasets for computer vision algorithms, regulatory constraints, and public perception and privacy concerns.

Joshua M Fody↗

The High-Repetition-Rate Advanced Petawatt Laser System

The High-Repetition-Rate Advanced Petawatt Laser System (HAPLS), being developed at Lawrence Livermore National Laboratory (LLNL), recently completed a significant milestone: demonstration of continuous operation of an all diode-pumped, high-energy femtosecond petawatt laser system. The system is now ready for delivery and integration at the European Extreme Light Infrastructure Beamlines facility project (ELI Beamlines) in the Czech Republic.

42 ENGINEERING↗

Project Selection for NASA's R&D Programs

The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

Jones, Harry↗

Technology readiness levels and technology status for selected long term/high payoff technologies on the RLV program

The development of a new space transportation system in a climate of constant budget cuts and staff reductions can be and is a difficult task. It is no secret that NASA's current launching system consumes a very large portion of NASA funding and requires a large army of people to operate & maintain the system. The new Reusable Launch Vehicle (RLV) project and it's programs are faced with a monumental task of making the cost of access to space dramatically lower and more efficient than NASA's current system. With pressures from congressional budget cutters and also increased competition and loss of market share from international agencies RLV's first priority is to develop a 'low-cost, reliable transportation to earth orbit.' One of the RLV's major focus in achieving low-cost, reliable transportation to earth orbit is to rely on the maturing of advanced technologies. The technologies for the RLV are numerous and varied. Trying to assess their current status, within the RLV development program is paramount. There are several ways to assess these technologies. One way is through the use of Technology Readiness Levels (TRL's). This project focused on establishing current (summer 95) 'worst case' TRL's for six selected technologies that are under consideration for use within the RLV program. The six technologies evaluated were Concurrent Engineering, Embedded Sensor Technology, Rapid Prototyping, Friction Stir Welding, Thermal Spray Coatings, and VPPA Welding.

Rosmait, Russell L.↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Advanced Near Net Shape Technology

The objective of the Advanced Near Net Shape Technology (ANNST) project is to radically improve near net shape manufacturing methods from the current Technology/ Manufacturing Readiness Levels (TRL/MRL 3-4) to the point where they are viable candidates (TRL/ MRL-6) for shortening the time and cost for insertion of new aluminum alloys and revolutionary manufacturing methods into the development/improvement of space structures. Conventional cyrotank manufacturing processes require fabrication of multiple pieces welded together to form a complete tank. A variety of near net shape manufacturing processes has demonstrated excellent potential for enabling single-piece construction of components such as domes, barrels, and ring frames. Utilization of such processes can dramatically reduce the extent of welding and joining needed to construct cryogenic tanks and other aerospace structures. The specific focus of this project is to successfully mature the integrally stiffened cylinder (ISC) process in which a single-piece cylinder with integral stiffeners is formed in one spin/flow forming process. Structural launch vehicle components, like cryogenic fuel tanks (e.g., space shuttle external tank), are currently fabricated via multipiece assembly of parts produced through subtractive manufacturing techniques. Stiffened structural panels are heavily machined from thick plate, which results in excessive scrap rates. Multipiece construction requires welds to assemble the structure, which increases the risk for defects and catastrophic failures.

Vickers, John↗

Technology and Tool Development to Support Safety and Mission Assurance

The Assurance Case approach is being adopted in a number of safety-mission-critical application domains in the U.S., e.g., medical devices, defense aviation, automotive systems, and, lately, civil aviation. This paradigm refocuses traditional, process-based approaches to assurance on demonstrating explicitly stated assurance goals, emphasizing the use of structured rationale, and concrete product-based evidence as the means for providing justified confidence that systems and software are fit for purpose in safely achieving mission objectives. NASA has also been embracing assurance cases through the concepts of Risk Informed Safety Cases (RISCs), as documented in the NASA System Safety Handbook, and Objective Hierarchies (OHs) as put forth by the Agency's Office of Safety and Mission Assurance (OSMA). This talk will give an overview of the work being performed by the SGT team located at NASA Ames Research Center, in developing technologies and tools to engineer and apply assurance cases in customer projects pertaining to aviation safety. We elaborate how our Assurance Case Automation Toolset (AdvoCATE) has not only extended the state-of-the-art in assurance case research, but also demonstrated its practical utility. We have successfully developed safety assurance cases for a number of Unmanned Aircraft Systems (UAS) operations, which underwent, and passed, scrutiny both by the aviation regulator, i.e., the FAA, as well as the applicable NASA boards for airworthiness and flight safety, flight readiness, and mission readiness. We discuss our efforts in expanding AdvoCATE capabilities to support RISCs and OHs under a project recently funded by OSMA under its Software Assurance Research Program. Finally, we speculate on the applicability of our innovations beyond aviation safety to such endeavors as robotic, and human spaceflight.

Mission Assuranc↗

FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integrated in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.

54 ENVIRONMENTAL SCIENCES↗

How NASA decided Webb was ready: Inside the risk assessment

Every do-it-yourselfer knows how hard it can be to declare a project complete. Will another turn of the bolt or brushstroke make things better or worse? That was roughly the choice NASA faced a year before the Dec. 25 launch of the James Webb Space Telescope. Would more testing close more technical risks in the nearly $10 billion project or create new ones? In the end, NASA decided against more testing. NASA’s Jesse Leitner and Tupper Hyde describe the assessment they performed.

JWST↗

SIM Lite Astrometric Observatory Progress Report

The SIM Lite Astrometric Observatory (aka SIM Lite), a micro-arcsecond astrometry space mission, has been developed in response to NASA's indefinite deferral of the SIM PlanetQuest mission. The SIM Lite mission, while significantly more affordable than the SIM PlanetQuest mission concept, still addresses the full breadth of SIM science envisioned by two previous National Research Council (NRC) Astrophysics Decadal Surveys at the most stringent 'Goal' level of astrometric measurement performance envisioned in those surveys. Over the past two years, the project has completed the conceptual design of the SIM Lite mission using only the completed SIM technology; published a 250 page book describing the science and mission design (available at the SIM website: http://sim.jpl.nasa.gov); been subject to an independent cost and technical readiness assessment by the Aerospace Corporation; and submitted a number of information responses to the NRC Astro2010 Decadal Survey. The project also conducted an exoplanet-finding capability double blind study that clearly demonstrated the ability of the mission to survey 60 to 100 nearby sun-like dwarf stars for terrestrial, habitable zone planets in complex planetary systems. Additionally, the project has continued Engineering Risk Reduction activities by building brassboard (form, fit and function to flight) version of key instrument elements and subjecting them to flight qualification environmental and performance testing. This paper summarizes the progress over the last two years and the current state of the SIM Lite project.

exoplanet↗

LWS/SET Technology Experiment Carrier

This paper examines the approach taken to building a low-cost, modular spacecraft bus that can be used to support a variety of technology experiments in different space environments. It describes the techniques used and design drivers considered to ensure experiment independence from as yet selected host spacecraft. It describes the technology experiment carriers that will support NASA's Living With a Star Space Environment Testbed space missions. NASA has initiated the Living With a Star (LWS) Program to develop a better scientific understanding to address the aspects of the connected Sun-Earth system that affect life and society. A principal goal of the program is to bridge the gap between science, engineering, and user application communities. The Space Environment Testbed (SET) Project is one element of LWS. The Project will enable future science, operational, and commercial objectives in space and atmospheric environments by improving engineering approaches to the accommodation and/or mitigation of the effects of solar variability on technological systems. The SET Project is highly budget constrained and must seek to take advantage of as yet undetermined partnering opportunities for access to space. SET will conduct technology validation experiments hosted on available flight opportunities. The SET Testbeds will be developed in a manner that minimizes the requirements for accommodation, and will be flown as flight opportunities become available. To access the widest range of flight opportunities, two key development requirements are to maintain flexibility with respect to accommodation constraints and to have the capability to respond quickly to flight opportunities. Experiments, already developed to the technology readiness level of needing flight validation in the variable Sun-Earth environment, will be selected on the basis of the need for the subject technology, readiness for flight, need for flight resources and particular orbit. Experiments will be accumulated by the Project and manifested for specific flight opportunities as they become available. The SET Carrier is designed to present a standard set of interfaces to SET technology experiments and to be modular and flexible enough to interface to a variety of possible host spacecraft. The Carrier will have core components and mission unique components. Once the core carrier elements have been developed, only the mission unique components need to be defined and developed for any particular mission. This approach will minimize the mission specific cost and development schedule for a given flight opportunity. The standard set of interfaces provided by SET to experiments allows them to be developed independent of the particulars of a host spacecraft. The Carrier will provide the power, communication, and the necessary monitoring features to operate experiments. The Carrier will also provide all of the mechanical assemblies and harnesses required to adapt experiments to a particular host. Experiments may be hosted locally with the Carrier or remotely on the host spacecraft. The Carrier design will allow a single Carrier to support a variable number of experiments and will include features that support the ability to incrementally add experiments without disturbing the core architecture.

Sherman, Barry↗

Getting Electric Vehicle Ready in Indian Country

As electric vehicles (EV) become more common, Tribes can guide how charging infrastructure is planned, approved, and built on Tribal lands. Tribes can prepare for future infrastructure projects by updating codes, zoning, parking rules, and permitting process, as well as improving electrical infrastructure and broadband access.

33 ADVANCED PROPULSION SYSTEMS↗