Search NASA⌕ Search

SEARCH · Search NASA

Results for “RACKS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

T-1072: Beam test for muon strips

Beam test for muon strips is an experiment to measure the efficiency, time resolution and longitudinal position resolution of scintillator strips for a muon system at future colliders. The muon system at future colliders is envisioned as several layers of position-sensitive detectors embedded in the iron flux-return yoke of the solenoidal magnet. The role of the muon system is primarily the identification of muons and track matching to the central tracker, besides serving as the tail catcher for the hadronic showers that penetrate beyond the hadron calorimetry. Previous tests performed at Fermilab with cosmic muons have shown that scintillators with wavelength-shifting (WLS) fibers and a SiPM readout offer promising performance (NIM A 823, 2016, pp.120-125). The purpose of the present beam tests is to determine the performance parameters with better accuracy. The measurement setup is schematically presented in Fig. 1. The length of the tested strips will vary between 1 m and 2 m. The scintillator strip to be tested will be placed horizontally perpendicular to the beam on a platform in the area behind the beam dump of MT6.2. Two fast scintillators S1 and S2 with vacuum PMT readout will be placed in front and after the tested strip in the beam. The distance between S1 and S2 is 1 m. One fast scintillator strip S3 will be placed in beam immediately in front of the tested strip, perpendicular to the tested strip. A rack with a CAMAC crate and two NIM crates will be used for the data acquisition. The data collection will be performed and monitored from a PC with USB connection to the CAMAC Crate controller.

43 PARTICLE ACCELERATORS↗

Artificial Intelligence for Data Center Operations (AIOps): Cooperative Research and Development (Final Report)

High performance computing data centers will increasingly need to rely on automation to keep pace with exascale growth in compute capability and to manage and optimize the data center environment and facility resources. Artificial intelligence and machine learning approaches provide the means to improve HPC data center operational efficiency, by learning historical trends and training models to operate on real-time data collected from both IT and facilities sources. NREL has developed methods of real-time collection, aggregation and streaming of these data in the ESIF HPC Data Center and has collected a significant dataset of relevant metrics across computer systems, racks, environmental, building and utility sources for research into various predictive analytics problems. HPE's Advanced Technology Group (ATG) is doing comprehensive research into exascale monitoring and management for High Performance Computing (HPC) systems (hereinafter HPE's Data Monitoring/ Management Technology). NREL and HPE will collaborate to add Artificial Intelligence (AI) to NREL's real-time data collection/ aggregation/ streaming system and HPE's Data Monitoring/ Management System, with the goal of improving the operational efficiency of NREL's Energy Systems Integration Facility (ESIF) HPC Data Center through data analytics on both historical and real-time data from IT systems and facilities operations. This collaboration will consist of efforts in Data Management, Data Analytics, and AI/ML Optimization for both manual and autonomous intervention in data center operations. This will be a multi-year, multi-staged effort with a goal towards building capabilities for an Advanced Smart Facility, and demonstration of these techniques in the NREL ESIF HPC Data Center.

97 MATHEMATICS AND COMPUTING↗

Analog Signal Multiplexing System for the IOTA Proton Injector

he Fermilab Accelerator Science and Technology (FAST) Facility at FNAL is a dedicated research and development center focused on advancing particle accelerator technologies for future applications worldwide. Currently, a key objective of FAST Opera-tions is to commission the 2.5 MeV IOTA Proton Injec-tor (IPI) and enable proton injection into the Integrable Optics Test Accelerator (IOTA) storage ring. The low and medium-energy sections of the IPI include four frame-style dipole trims and two multi-function cor-rectors with independently controlled coils, requiring readout of 32 analog channels for current and voltage monitoring in total. To reduce cost and optimize rack space within the PLC-based control system, a 32-to-4 analog signal multiplexing system was designed and implemented. This system enables real-time readback of excitation parameters from all magnetic correctors. This paper presents the design, construction, implementation, and performance of the multiplexing system.

MacLean, Daniel R. [Fermilab] (ORCID:0000000210103↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Conceptual Design of a Water Tank Critical Facility for SPARC

Critical experiments, sometimes referred to zero-power reactors, are crucial tools in developing and validating nuclear physics predictions and thus an indispensable capability to ensure criticality safety during all parts of the nuclear fuel cycle and in reducing uncertainties in reactor physics predictions toward optimizing nuclear energy production. The System Physics Advanced Reactor Facility (SPARC) project was recently initiated to enable large-scale criticality experiments using a horizontal split table machine well suited toward solid core materials systems (fuel, moderator, reflector). The facility selected for this mission was a former pool-type research reactor building and thus also well suited toward a second critical experiment capability able to house full-size light-water reactor (LWR) fuel bundles. A conceptual design study was undertaken to review past water tank critical experiments used for LWR physics experiments and to develop an early engineering design for a new critical assembly tank (CAT). The work described here shows that a relatively simple CAT concept can be constructed and deployed in the SPARC facility to meet the urgent demands for new critical experiments on advanced LWR fuel bundles designs. The SPARC facility layout is conducive to the receipt and upending of LWR fuel bundles using existing containers and equipment from the LWR industry. The facility’s overhead crane can then be used to handle fuel bundles and place them in a vertical storage rack or in the CAT for critical experiments, both of which fit within the building’s “open basement” alongside other equipment planned for SPARC and the horizontal split table. A slightly lower area in the basement can serve as a large drain tank so that fail-safe valves drain the CAT reactor tank for safe shutdown. Neutronic configurations were determined where a 3 × 3 array of fuel bundles can be surrounded by full-length “loose rods” to adjust reactivity so that critical is achieved when the bundles are fully submerged. Viable configurations were determined for both pressurized- and boiling-water-reactor-type fuel bundles. This design concept was used to develop an early planning basis for establishing the CAT capability alongside the otherwise planned SPARC project in order to help streamline the process. Recent presidential executive orders have highlighted the need to achieve power uprates in LWR plants and the CAT capability will be a crucial element of these initiatives. Based on the work described herein, it is recommended that an earnest and timely project begin in order to establish this urgently needed capability.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Novel PV Array System Design to Accelerate Solar Deployment, Reduce LCOE, Reduce Land Use Competition, and Increase Siting Flexibility

The increasing demand for solar energy faces significant barriers, including inefficient construction processes, high project costs limiting LCOE reductions, and diminishing availability of "good" sites with favorable interconnection. Conventional solar installations are often constrained by long construction timelines and the need for flat, large plots. Furthermore, the industry struggles with a shortage of skilled labor. Planted Solar aims to address these challenges by fundamentally transforming solar deployment from a construction project into a streamlined manufacturing process. Our novel approach combines high-density racking, integrated terrain-following design software, and installation automation. Unlike competing solutions that either assist with standard array assembly or offer dense packing without terrain adaptability or automation, Planted's technology uniquely brings together a new array product with in-place automated manufacturing to achieve the lowest possible cost, greater site flexibility, and accelerated deployment.

14 SOLAR ENERGY↗

Lithium-Ion Battery Design for Grid-Scale Energy Storage App

A software that delivers parameters from energy storage system (ESS) to container, rack, module and single cell design, as well as data analysis on arbitrage energy and frequency regulation of ESS in different regions, has been developed. The Lithium-ion Battery Design for Grid-scale Energy Storage App V1.0 has the capability to output the system, module and cell design with the energy, power, capacity, group method, cost of single cell, and single cell test protocol which break down from input energy storage system data in different regions. The default chemistry of the battery is LiFePO4 and graphite. The energy density of the graphite/LiFePO 4 pouch cell ranges from 100 Wh/kg to 200 Wh/Kg in the software. Graphite/LiFePO 4 pouch cell (up to 1Ah in lab) manufacturing line is also built and can be used to evaluate the test protocol, moreover, for electrolyte evaluation in other ESMI seedling projects. The software enables rapid prototyping to accelerate energy storage research, development, and manufacturing.

Liu, Dianying↗

Short Circuit Detection and Voltage Sense for High Voltage Ionization Tube Power Supplies

Fermilab's PIP-II upgrade requires new rack-mounted power supplies for Beam Loss Monitor (BLM) ionization tubes compatible with the microTCA 4.1 standard, supporting high-side current measurement for short circuit detection, voltage sense telemetry, and low-side current measurement for beam loss readout. This work presents the design and preliminary schematic of such a supply. A resistive current sensing approach was chosen over inductive, optical, and Hall-effect alternatives for its independence from cable length and component availability. A 500 mΩ inline shunt steps the 2 kV common mode voltage down to roughly 70 V, producing a ~27 μV pulse during a short, which is amplified 500x, compared against a 14-bit DAC threshold, and latched to drive a fault line. Voltage sense steps the 2 kV output down at a 1V/1000V ratio, buffers it with a low bias current amplifier, and digitizes it via a 24-bit ADC over SPI. Onboard power is regulated from 12 V down to isolated 5 V and 3.3 V rails, with capacitive isolation on FPGA communication lines. Lumped parameter models were developed for the ionization tube (0.327 nF, 20 to 200 GΩ dynamic resistance) and the RG-58 coaxial cable to support the design. Component selection is complete and a preliminary schematic has been drawn in Altium Designer, forming the foundation for future prototyping and validation.

Yu, Kellen [Cornell U.]↗

Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CAS 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Safeguards Verification Method and Instrument to Detect Pin Diversion from Pressurized Water Reactor (PWR) Spent Fuel Assemblies Phase I Study

A novel methodology to detect diversion of spent fuel from Pressurized Water Reactors (PWR) has been developed in order to address a long unsolved safeguards verification problem for international safeguards community such as International Atomic Energy Agency (IAEA) or European Atomic Energy Community (EURATOM). The concept involves inserting tiny neutron and gamma detectors into the guide tubes of a spent fuel assembly and measuring the signals. The guide tubes form a quadrant symmetric pattern in the various PWR fuel product lines and the neutron and gamma signals from these various locations are processed to obtain a unique signature for an undisturbed fuel assembly. Signatures based on the neutron and gamma signals individually or in a combination can be developed. Removal of fuel pins from the assembly will cause the signatures to be visibly perturbed thus enabling the detection of diversion. All of the required signal processing to obtain signatures can be performed on standard laptop computers. Monte Carlo simulation studies and a set of controlled experiments with actual commercial PWR spent fuel assemblies were performed and validated this novel methodology. Based on the simulation studies and benchmarking measurements, the methodology developed promises to be a powerful and practical way to detect partial defects that constitute 10% or more of the total active fuel pins. This far exceeds the detection threshold of 50% missing pins from a spent fuel assembly, a threshold defined by the IAEA Safeguards Criteria. The methodology does not rely on any operator provided data like burnup or cooling time and does not require movement of the fuel assembly from the storage rack in the spent fuel pool. A concept was developed to build a practical field device, Partial Defect Detector (PDET), which will be completely portable and will use standard radiation measuring devices already in use at the IAEA. The use of the device will not require any information provided by the operator or any prior knowledge of the spent fuel assembly. The device can also be operated without any movement of the spent fuel from its storage position. Based on parametric studies conducted via computer simulation, the device should be able to detect diversion of as low as ten percent of the missing or replaced fuel from an assembly regardless of the location of the missing fuel within the assembly, of the cooling time, initial fuel enrichment or burnup levels. Conditions in the spent fuel pool such as clarity of the water or boron content are also not issues for this device. The shape of the base signature is principally dependent on the layout of the guide tubes in the various types of PWR fuel assemblies and perturbations in the form of replaced fuel pins will distort this signature. These features of PDET are all unique and overcome limitation and disadvantages presented by currently used devices such as the Fork detector or the Cerenkov Viewing Device. Thus, this device when developed and tested could fill an important need in the safeguards area for partial defect detection, a technology that the IAEA has been seeking for the past few decades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Slow control and TDAQ systems installation and tests in the Mu2e experiment

The Mu2e experiment at Fermilab will attempt to detect a coherent neutrinoless conversion of a muon into an electron in the field of an aluminum nucleus, with a sensitivity that is 10,000 times greater than existing limits. The Mu2e trigger and data acquisition system (TDAQ) uses the otsdaqframework as its online Data Acquisition System (DAQ) solution. Developed at Fermilab, otsdaq integrates several components, such as an artdaq-based DAQ, an art-based event processing, and an EPICS-based detector control system (DCS), and provides a uniform multi-user interface toits components through a web browser. The data streams from the Mu2e tracker and calorimeter are handled by the artdaq-based DAQ and processed by a one-level software trigger implemented within the art framework. Events accepted by the trigger have their data combined, post-trigger, with the separately read-out data from the Mu2e Cosmic Ray Veto system. The foundation of Mu2e DCS, EPICS, an Experimental Physics and Industrial Control System, is an open-source platform for monitoring, controlling, alarming, and archiving. Over the last three years, a prototype ofthe TDAQ and DCS systems has been built and tested at Fermilab’s Feynman Computing Center.Currently, the production system installation is underway. At the end, this work presents a brief update on the installation of racks and DAQ hardware.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Spectrometer for Sky-Scanning Sun-Tracking Atmospheric Research (4STAR): Instrument Technology

The Spectrometer for Sky-Scanning, Sun-Tracking Atmospheric Research (4STAR) combines airborne sun tracking and sky scanning with diffraction spectroscopy, to improve knowledge of atmospheric constituents and their links to air-pollution/climate. Direct beam hyper-spectral measurement of optical depth improves retrievals of gas constituents and determination of aerosol properties. Sky scanning enhances retrievals of aerosol type and size distribution. 4STAR measurements will tighten the closure between satellite and ground-based measurements. 4STAR incorporates a modular sun-tracking/ sky-scanning optical head with fiber optic signal transmission to rack mounted spectrometers, permitting miniaturization of the external optical head, and future detector evolution. Technical challenges include compact optical collector design, radiometric dynamic range and stability, and broad spectral coverage. Test results establishing the performance of the instrument against the full range of operational requirements are presented, along with calibration, engineering flight test, and scientific field campaign data and results.

atmosphere↗

Comparing Outdoor to Indoor Performance for Bifacial Modules Affected by Polarization-Type Potential-Induced Degradation

Bifacial photovoltaic (PV) modules have the advantage of using light reflected off of the ground to contribute to power production. Predicting the energy gain is challenging and requires complex models to do so accurately. Often, module degradation over time is neglected in models for the sake of simplicity or is underestimated. Comparing outdoor and indoor current–voltage (I–V) performance for bifacial modules is more challenging than for monofacial modules, as there are additional variables to consider such as rear albedo non-uniformity, cell mismatch, and their effects on temperature. This challenge is compounded when heterogeneous degradation modes occur, such as polarization-type potential-induced degradation (PID-p). To examine the effects of PID-p on I–V predictions using an empirical data-driven approach, 16 bifacial PERC modules are installed outdoors on racks with different albedo conditions. A subset is exposed to high-voltage biases of −1500 V or +1500 V. Outdoor data are traced at irradiance ranges of 150–250 W/m 2 , 500–600 W/m 2 , and 900–1000 W/m 2 . These curves are corrected using control module temperature, wire resistivity, and module resistance measured indoors. We examine several methods to transform indoor I–V curves to accurately, and more simply than existing methods, approximate outdoor performance for bifacial modules without and with varying levels of PID-p degradation. This way, bifacial performance modeling can be more accessible and informed by fielded, degraded modules. Distributions of percent errors between indoor and outdoor performance parameters and Mean Absolute Percent Errors (MAPEs) are used to assess method quality. Results including low-irradiance data (150–250 W/m 2 ) are discussed but are filtered for quantifying method quality as these data introduce substantial errors. The method with the most optimal tradeoff between low MAPE and analysis simplicity involves measuring the front side of a module indoors at an irradiance equal to plane-of-array irradiance plus the product of module bifaciality and albedo irradiance. This method gives MAPE values of 1–6.5% for non-degraded and 1.6–5.9% for PID-p degraded module performance.

14 SOLAR ENERGY↗

ARM Airborne Continuous carbon dioxide measurements

The heart of the AOS CO2 Airborne Rack Mounted Analyzer System is the AOS Manifold. The AOS Manifold is a nickel coated aluminum analyzer and gas processor designed around two identical nickel-plated gas cells, one for reference gas and one for sample gas. The sample and reference cells are uniquely designed to provide optimal flushing efficiency. These cells are situated between a black-body radiation source and a photo-diode detection system. The AOS manifold also houses flow meters, pressure sensors and control valves. The exhaust from the analyzer flows into a buffer volume which allows for precise pressure control of the analyzer. The final piece of the analyzer is the demodulator board which is used to convert the DC signal generated by the analyzer into an AC response. The resulting output from the demodulator board is an averaged count of CO2 over a specified hertz cycle reported in volts and a corresponding temperature reading. The system computer is responsible for the input of commands and therefore works to control the unit functions such as flow rate, pressure, and valve control.The remainder of the system consists of compressors, reference gases, air drier, electrical cables, and the necessary connecting plumbing to provide a dry sample air stream and reference air streams to the AOS manifold.

54 ENVIRONMENTAL SCIENCES↗

ARM Airborne Continuous carbon dioxide measurements

The heart of the AOS CO2 Airborne Rack Mounted Analyzer System is the AOS Manifold. The AOS Manifold is a nickel coated aluminum analyzer and gas processor designed around two identical nickel-plated gas cells, one for reference gas and one for sample gas. The sample and reference cells are uniquely designed to provide optimal flushing efficiency. These cells are situated between a black-body radiation source and a photo-diode detection system. The AOS manifold also houses flow meters, pressure sensors and control valves. The exhaust from the analyzer flows into a buffer volume which allows for precise pressure control of the analyzer. The final piece of the analyzer is the demodulator board which is used to convert the DC signal generated by the analyzer into an AC response. The resulting output from the demodulator board is an averaged count of CO2 over a specified hertz cycle reported in volts and a corresponding temperature reading. The system computer is responsible for the input of commands and therefore works to control the unit functions such as flow rate, pressure, and valve control.The remainder of the system consists of compressors, reference gases, air drier, electrical cables, and the necessary connecting plumbing to provide a dry sample air stream and reference air streams to the AOS manifold.

54 ENVIRONMENTAL SCIENCES↗

Electromagnetic Transient Modeling of Data Centers

This report serves as a user manual for the accompanying EMT model library developed by the National Laboratory of the Rockies (NLR) for various equipment in large data centers. The EMT model library enables detailed modeling of large data center loads for conducting grid stability studies. The EMT model library for data centers include detailed models of a 5.5 kW power supply unit (PSU), a 2.5 uninterruptible power supply (UPS), a 260 MW gas turbine-generator, a 500 kW motor load, and a 33 kW IT rack. These components represent all major equipment in data centers that need to be modeled for performing grid stability studies for data centers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NLR HPC Eagle Node Power Data

Power time series captured from all Eagle nodes using iLO (Integrated Lights Out) The Eagle HPC operated at NLR from 2019 through 2024. Eagle was a 2,000-node, 8-petaflop system. This dataset is a comprehensive time series of instantaneous snapshots of power usage at 1 minute intervals from all nodes at the node level. Data provided in compressed Hive dataset/Parquet format. iLO Power Time Series Fields ts: Timestamp dv: Device / Node - Rack and Unit - r103u17 == r(ack)103u(nit)17 vl: Value - Value in watts (instantaneous value at sampling time) day month year

97 MATHEMATICS AND COMPUTING↗

NLR HPC Eagle GPU Node Metrics

Ganglia node metrics and iLO (Integrated Lights Out) power data captured from six representative Eagle GPU nodes The Eagle HPC operated at NLR from 2019 through 2024. Eagle was a 2,000-node, 8-petaflop system. This dataset is a representative sample of metrics for 6 of the GPU nodes. Each GPU node contained 2 CPUs and 2 GPUs. Data provided in compressed CSV format. Ganglia and iLO Power Time Series Fields ts: Timestamp dv: Device / Node - Rack and Unit - r103u17 == r(ack)103u(nit)17 mt: Metric (only present for Ganglia) vl: Value - Value in watts for iLO power (instantaneous value at sampling time) or specified Ganglia metric below Ganglia Metrics Metric name -- Metric description -- Unit cpu_aidle -- Percent of time since boot idle CPU -- Percent cpu_idle -- Percent CPU idle -- Percent cpu_nice -- Percent CPU nice -- Percent cpu_speed -- Speed in MHz of CPU -- MHz cpu_user -- Percent CPU user -- Percent cpu_wio -- The percentage of CPU Wait I/O -- Percent gpu0_bar1_memory -- Used GPU bar1 memory -- MB gpu0_decoder_util -- GPU decoder utilization -- Percent gpu0_ecc_db_error -- Total ECC error counts for the GPU -- Number gpu0_encoder_util -- GPU encoder utilization -- Percent gpu0_fan -- Fan speed -- RPM gpu0_fb_memory -- Used GPU framebuffer memory -- MB gpu0_graphics_clock_report -- Current clock speeds for the device -- MHz gpu0_mem_total -- Memory total -- MB gpu0_mem_util -- Memory utilization -- Percent gpu0_power_usage_report -- Power usage report -- Watts gpu0_temp -- GPU 1 temperature -- Celsius gpu1_bar1_memory -- Used GPU bar1 memory -- MB gpu1_decoder_util -- GPU decoder utilization -- Percent gpu1_ecc_db_error -- Total ECC error counts for the GPU -- Number gpu1_encoder_util -- GPU encoder utilization -- Percent gpu1_fan -- Fan speed -- RPM gpu1_fb_memory -- Used GPU framebuffer memory -- MB gpu1_graphics_clock_report -- Current clock speeds for the GPU -- MHz gpu1_mem_total -- Memory total -- MB gpu1_mem_util -- Memory utilization -- MB gpu1_power_usage_report -- Power usage report -- Watts gpu1_temp -- GPU 1 temperature -- Celsius ipmi_cpu1_temp -- CPU 1 temperature -- Celsius ipmi_cpu2_temp -- CPU 2 temperature -- Celsius ipmi_inlet_ambient_temp -- Temperature measured at intake -- Celsius ipmi_vr_p1_temp -- CPU 1 voltage regulator temperature -- Celsius ipmi_vr_p2_temp -- CPU 2 voltage regulator temperature -- Celsius mem_buffers -- Amount of buffered memory -- Bytes mem_cached -- Amount of cached memory -- Bytes mem_free -- Amount of available memory -- Bytes mem_shared -- Amount of shared memory -- Bytes mem_total -- Amount of available memory -- Bytes