Job Superscheduler Architecture and Performance in Computational Grid Environments

Computational grids hold great promise in utilizing geographically separated heterogeneous resources to solve large-scale complex scientific problems. However, a number of major technical hurdles, including distributed resource management and effective job scheduling, stand in the way of realizing these gains. In this paper, we propose a novel grid superscheduler architecture and three distributed job migration algorithms. We also model the critical interaction between the superscheduler and autonomous local schedulers. Extensive performance comparisons with ideal, central, and local schemes using real workloads from leading computational centers are conducted in a simulation environment. Additionally, synthetic workloads are used to perform a detailed sensitivity analysis of our superscheduler. Several key metrics demonstrate that substantial performance gains can be achieved via smart superscheduling in distributed computational grids.

Shan, Hongzhang↗

New Direction of NASA Exploration Life Support

NASA's activities in life support Research and Technology Development (R&TD) have changed in both focus and scope following implementation of recommendations from the Exploration System Architecture Study (ESAS). The limited resources available and the compressed schedule to conduct life support R&TD have required that future efforts address the needs of the Crew Exploration Vehicle (CEV), the Lunar Surface Access Module (LSAM) and Lunar Outpost (LO). Advanced Life Support (ALS) efforts related to long duration planetary bases have been deferred or canceled. This paper describes the scope of the new Exploration Life Support (ELS) project; how it differs from ALS, and how it supports critical needs for the CEV, LSAM and LO. In addition, this paper provides rationale for changes in the scope and focus of technical content within ongoing life support R&TD activities.

Chambliss, Joe↗

Engineering a Multimission Approach to Navigation Ground Data System Operations

The Mission Design and Navigation (MDNAV) Section at the Jet Propulsion Laboratory (JPL) supports many deep space and earth orbiting missions from formulation to end of mission operations. The requirements of these missions are met with a multimission approach to MDNAV ground data system (GDS) infrastructure capable of being shared and allocated in a seamless and consistent manner across missions. The MDNAV computing infrastructure consists of compute clusters, network attached storage, mission support area facilities, and desktop hardware. The multimission architecture allows these assets, and even personnel, to be leveraged effectively across the project lifecycle and across multiple missions simultaneously. It provides a more robust and capable infrastructure to each mission than might be possible if each constructed its own. It also enables a consistent interface and environment within which teams can conduct all mission analysis and navigation functions including: trajectory design; ephemeris generation; orbit determination; maneuver design; and entry, descent, and landing analysis. The savings of these efficiencies more than offset the costs of increased complexity and other challenges that had to be addressed: configuration management, scheduling conflicts, and competition for resources. This paper examines the benefits of the multimission MDNAV ground data system infrastructure, focusing on the hardware and software architecture. The result is an efficient, robust, scalable MDNAV ground data system capable of supporting more than a dozen active missions at once.

Mission Design and Navigation (MDNAV)↗

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! Specifically, the standard practice for doing so is the Large Area Pulsed Solar Simulation (LAPSS). A LAPSS test can characterize a photovoltaic system's efficiency via its response to rapidly applied impulses of simulated sunlight. However, a Class D program on a constrained budget and schedule may not have the resources to ship an entire satellite for a LAPSS test alone. Such was the case with the Lunar Atmospheric and Dust Environment Explorer (LADEE) program, which was also averse to the risk of hardware damage during shipment. When the Electrical Power System (EPS) team was denied a spacecraft-level LAPSS test, the lack of an end-to-end power generation test elevated to a project-level technical risk. The team pulled together very limited resources to not only eliminate the risk, but build a process to monitor the health of the system through mission operations. We discuss a process for performing a low-cost, end-to-end test of the LADEE photovoltaic system. The approach combines system-level functional test, panel-level performance results, and periodic inspection (and repair) up until launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of data. The process starts in manufacturing at the subcontractor. The panel manufacturer provides functional test and LAPSS data on each individual panel. We apply an initial assumption that the per-panel performance is sufficient to meet the power generation requirements. The manufacturer's data is also carried as the performance allocation for each panel during EPS system modeling and initial mission operations. During integration and test, a high-power, professional theater lamp system provides simulated sunlight to each panel on the spacecraft, thereby permitting a true end-to-end system test. A passing test results in a step response to nearly full-rated current at the appropriate solar array switch in the power system. A metal-halide bulb, infrared imagers, and onboard spacecraft measurements are utilized to minimize risk of thermal damage during test. Data is provided to support test results for both passing and marginal panels. Prior to encapsulation in the launch vehicle, each panel is inspected for damage by the panel manufacturer. Cracked cells or other damage is amended on-site. Because the photovoltaic test system is inexpensive and portable, each repaired panel can be re-verified immediately. Post-launch, the photovoltaic system is again characterized for per-panel deviations from the manufacturer's performance test. This proved especially tricky as the LADEE spacecraft performs only one current measurement on the entire array. The algorithm for Matlab tools to assess panel performance based on spacecraft attitude is discussed. While not as precise and comprehensive as LAPSS, the LADEE approach leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a spacecraft level performance test versus the programmatic risk of shipping the spacecraft to another facility. The resources required are a fraction of that for a LAPSS test, and is easy to repeat. Further, the test equipment can be handed down to future projects without building an on-site facility.

photovoltaic↗

How the Lean Management System is Working on a Closure Project - 13242

Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

Happell, Nadine↗

Intelligent perturbation algorithms to space scheduling optimization

The limited availability and high cost of crew time and scarce resources make optimization of space operations critical. Advances in computer technology coupled with new iterative search techniques permit the near optimization of complex scheduling problems that were previously considered computationally intractable. Described here is a class of search techniques called Intelligent Perturbation Algorithms. Several scheduling systems which use these algorithms to optimize the scheduling of space crew, payload, and resource operations are also discussed.

Kurtzman, Clifford R.↗

ATD-2 Field Evaluation of Pre-Departure Trajectory Option Set Reroutes in North Texas Metroplex

The NASA Airspace Technology Demonstration-2 Phase 3 capabilities extend Integrated Arrival, Departure and Surface scheduling to a Metroplex environment where multiple airports are interacting and sharing resources along the terminal boundary. The Phase 3 coordinated scheduling provides pre-departure reroute recommendations to flight operators which reduce delay caused by terminal restrictions. This paper reports results of the Phase 3 Stormy 2021 Field Evaluation conducted between November 2020 and September 2021 in the North Texas Metroplex. During the field evaluation NASA partnered with the FAA, American Airlines, Southwest Airlines, and Envoy Airlines to evaluate Phase 3 capabilities in an operational environment. The benefits results are provided as delay savings metrics measured in time and converted to fuel and emissions savings using detailed fuel flow models provided by flight operators.

ATD-2 Field Evaluation, Trajectory Option Set, Pre↗

ATD-2 Field Evaluation of Pre-Departure Trajectory Option Set Reroutes in North Texas Metroplex

The NASA Airspace Technology Demonstration-2 Phase 3 capabilities extend Integrated Arrival, Departure and Surface scheduling to a Metroplex environment where multiple airports are interacting and sharing resources along the terminal boundary. The Phase 3 coordinated scheduling provides pre-departure reroute recommendations to flight operators which reduce delay caused by terminal restrictions. This paper reports results of the Phase 3 Stormy 2021 Field Evaluation conducted between November 2020 and September 2021 in the North Texas Metroplex. During the field evaluation NASA partnered with the FAA, American Airlines, Southwest Airlines, and Envoy Airlines to evaluate Phase 3 capabilities in an operational environment. The benefits results are provided as delay savings metrics measured in time and converted to fuel and emissions savings using detailed fuel flow models provided by flight operators.

ATD-2↗

Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

Drummond, Mark↗

Controlling Distributed Planning

A system of software implements an extended version of an approach, denoted shared activity coordination (SHAC), to the interleaving of planning and the exchange of plan information among organizations devoted to different missions that normally communicate infrequently except that they need to collaborate on joint activities and/or the use of shared resources. SHAC enables the planning and scheduling systems of the organizations to coordinate by resolving conflicts while optimizing local planning solutions. The present software provides a framework for modeling and executing communication protocols for SHAC. Shared activities are represented in each interacting planning system to establish consensus on joint activities or to inform the other systems of consumption of a common resource or a change in a shared state. The representations of shared activities are extended to include information on (1) the role(s) of each participant, (2) permissions (defined as specifications of which participant controls what aspects of shared activities and scheduling thereof), and (3) constraints on the parameters of shared activities. Also defined in the software are protocols for changing roles, permissions, and constraints during the course of coordination and execution.

Clement, Bradley↗

Assessment of grid-friendly collective optimization framework for distributed energy resources

Distributed energy resources have the potential to provide services to facilities and buildings at lower cost and environmental impact in comparison to traditional electric-gridonly services. The reduced cost could result from a combination of higher system efficiency and exploitation of electricity tariff structures. Traditionally, electricity tariffs are designed to encourage the use of ‘off peak’ power and discourage the use of ‘onpeak’ power, although recent developments in renewable energy resources and distributed generation systems (such as their increasing levels of penetration and their increased controllability) are resulting in pressures to adopt tariffs of increasing complexity. Independently of the tariff structure, more or less sophisticated methods exist that allow distributed energy resources to take advantage of such tariffs, ranging from simple pre-planned schedules to Software-as-a-Service schedule optimization tools. However, as the penetration of distributed energy resources increases, there is an increasing chance of a ‘tragedy of the commons’ mechanism taking place, where taking advantage of tariffs for local benefit can ultimately result in degradation of service and higher energy costs for all. In this work, we use a scheduling optimization tool, in combination with a power distribution system simulator, to investigate techniques that could mitigate the deleterious effect of ‘selfish’ optimization, so that the high-penetration use of distributed energy resources to reduce operating costs remains advantageous while the quality of service and overall energy cost to the community is not affected.

Pensini, Alessandro↗

Minions Version 1.0

Establishes the input/output dependencies between individual application tasks, schedules and executes them on available computing resources in order of their dependencies. Uses statistical modeling algorithms to summarize the properties of the tasks to present to users a compact view of the surrent state of the overall application tasks and the effectiveness of various runtime optimizations on such tasks to improve utility of scheduling. Finally, uses statistical models to predict availability of computing resources

Bronevetsky, G.↗

Load Balancing for Multiphysics. In: AIAA 2013-2856,

Coupled Multi-Physics simulations, such as hybrid CFD-MD simulations, represent an increasingly important class of scientific applications. Often the physical problems of interest demand the use of high-end computers, such as TeraGrid resources, which are often accessible only via batch-queues. Batch-queue systems are not developed to natively support the coordinated scheduling of jobs – which in turn is required to support the concurrent execution required by coupled multi-physics simulations. In this paper we develop and demonstrate a novel approach to overcome the lack of native support for coordinated job submission requirement associated with coupled runs. We establish the performance advantages arising from our solution, which is a generalization of the Pilot-Job concept – which in of itself is not new, but is being applied to coupled simulations for the first time. Our solution not only overcomes the initial co-scheduling problem, but also provides a dynamic resource allocation mechanism. Support for such dynamic resources is critical for a load balancing mechanism, which we develop and demonstrate to be effective at reducing the total time-to-solution of the problem. We establish that the performance advantage of using Big Jobs is invariant with the size of the machine as well as the size of the physical model under investigation. The Pilot-Job abstraction is developed using SAGA, which provides an infrastructure agnostic implementation, and which can seamlessly execute and utilize distributed resources.

Lohner, Rainald↗

Space Shuttle Main Engine component assembly, assignment, and scheduling expert system

The SSME's Component Assembly and Life Management Expert System (CALMES) assists the engine assembly and scheduling process, ensuring that these activities utilize available resources with the greatest possible efficiency. On the basis of parts inventories and a proposed flight schedule, CALMES (1) determined how components may be optimally assembled from the parts inventory, (2) assigns components to flights, (3) schedules component testing, and (4) schedules component assembly. A graph-theoretical optimal matching algorithm, based on a modified simplex method, is applied to the major functions required by the SSME component assembly and scheduling processes.

Dietz, W. E.↗

Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Schedule Analysis Software Saves Time for Project Planners

Since the early 2000s, a resource management team at Marshall Space Flight Center has developed and improved the Schedule Test and Assessment Tool, a software add-on capable of analyzing, summarizing, and finding logic gaps in project schedules. Companies like Lanham, Maryland-based Vantage Systems Inc. use the tool to manage NASA projects, but it has also been released for free to more than 200 US companies, agencies, and other entities.

Source record↗

Methodologies for building robust schedules

COMPASS is the name of a Computer Aided Scheduling System designed and built for NASA. COMPASS can be used to develop schedule of activities based upon the temporal relationships of the activities and their resource requirements. COMPASS uses this information, and guided by the user, develops precise start and stop times for the activities. In actual practice however, it is impossible to know with complete certainty what the actual durations of the scheduled activities will really be. The best that one can hope for is knowledge of the probability distribution for the durations. This paper investigates methodologies for using a scheduling tool like COMPASS that is based upon definite values for the resource requirements, while building schedules that remain valid in the face of the schedule execution perturbations. Representations for the schedules developed by these methodologies are presented, along with a discussion of the algorithm that could be used by a computer onboard a spacecraft to efficiently monitor and execute these schedules.

Dean, John H.↗