Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

STS-114: Discovery L-2 Countdown Status Briefing

George Diller of NASA Public Affairs hosted this briefing. Pete Nickolenko, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Pete reports his team has completed the avionics system check ups, servicing of the cryogenic tanks will take about seven hours that day, and will perform engine system checks and pad close outs come evening. Pete also summarized other standard close out activities: check ups of the Orbiter and ground communications network, rotary service, structure retraction, and external tank load (ETL). Pete reported that the mission will be 12 days with two weather contingency days, and end of mission landing scheduled at Kennedy Space Center (KSC) at approximately 11:00 in the morning, Eastern time on July 25th. Scott briefly reported that all hardware is on board Discovery, closed out, and ready to fly. Cathy reported that hurricane Dennis moved to the North and looking forward to launch. She mentioned of a new hurricane looming and will be named Emily, spotted some crosswinds which will migrate to the west, there is 30% probability weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast, and with 24 hours and 48 hours turn around plan. Launch constraints, weather, crosswinds, cloud cover, ground imagery system, launch countdown, launch crews, mission management simulations, launch team simulations were topics covered with the News Media.

Source record↗

Investigating Low-Altitude Constellations of Ad-Hoc Lunar PNT System for Distributed Spacecraft Autonomy

In this study, we examine a low-altitude Lunar Position, Navigation, and Timing (LPNT) constellations and the localization performance of Centralized Extended Kalman Filter (CEKF) and Decentralized Extended Kalman Filter (DEKF) algorithms. The primary investigation involves a 100-node swarm operating at a 100 km altitude, in contrast to previous studies that examined a 21-node asset in a frozen-orbit at 5,500 km. The autonomous operation of large-scale swarm is based on two-way Inter-Satellite Link (ISL) measurements, which involve pseudoranges and relative velocities among swarm nodes. We perform a numerical assessment of the two filtering approaches, utilizing ‘fully sampled’ measurements from all available assets as well as ‘two ISL’ measurements where each spacecraft is restricted to only two antennas. This research includes an analysis of CEKF under 2-ISL constraints and evaluates the performance of DEKF in a 100-node swarm, which has not been explored in previous studies. In addition, we examine the impact of increasing the sampling frequency for DEKF, showing that the update cycle can be shortened from a 10-minute interval. A novel approach for ‘2-ISL limited’ DEKF will also be introduced, using a matching formulation that exhaustively enumerates all potential matches. This study provides valuable insights into large-scale distributed swarm operations, considering various filter configurations, sampling frequencies, matching strategies, and scalability of CEKF and DEKF for low-altitude LPNT applications. The Lunar PNT technology plays a key role in providing reliable and robust navigation services on the Moon's surface and the South pole, where the primary Lunar missions are planned. To support upcoming Lunar missions, including small satellites from NASA's Commercial Lunar Payload Services program, the Lunar PNT system must be adaptable to smaller platforms like CubeSats. Driven by the growing involvement of public and private exploration partnerships, the traditional low Earth orbit missions are shifting to beyond geosynchronous orbit [1]. These upcoming missions aim to foster a sustainable and innovative exploration program, in collaboration with commercial and international partners, to facilitate human expansion throughout the solar system and return new knowledge and opportunities to Earth [2]. As part of this trend, there are increasing efforts to utilize science missions in Lunar orbit to develop a non-dedicated and ad-hoc PNT network system. Two traditional approaches, the Deep Space Network (DSN) and the weak signal Global Positioning System (GPS), are established deep-space navigation technologies for missions beyond the geosynchronous orbit. Beginning in 1958, the DSN was developed to communicate with the Explorer 1 spacecraft based on the use of radiometric tracking in spacecraft navigation [3]. The DSN is capable of providing nearly unfettered coverage to spacecraft beyond low-Earth orbit (LEO), however, increased space mission volume has created concerns about future expectations of DSN usage for spacecraft navigation [4]. For cislunar mission applications, the position accuracy using DSN achieves 100 m (3σ) with at least three geometrically diverse ground stations when using radiometric tracking alone [5]. The DSN's dependence on Earth-based ground stations restricts its operational capabilities to periods of Earth visibility. This limitation, coupled with its poor localization performance, renders the DSN unsuitable for future lunar missions that demand continuous tracking and precise positioning. To satisfy the increasing requirements of DSN in Lunar applications, spacecrafts are also required to improve their onboard antenna power and efficiency of the transmission. However, there is an important aggregate cost trade between adding capabilities to every spacecraft and adding to a capacity on the ground that serves multiple spacecraft [6]. A weak GPS system can provide PNT service while the user spacecraft is bound to the Moon, leveraging a single, steerable high gain antenna with the relatively narrow beam which includes all the sources in its field of view [7]. However, the higher the altitude the receiver is above the GPS constellations, the poorer and the weaker are the relative geometry and the received signal powers, respectively, leading to a significant navigation accuracy reduction [8]. The transmitted power becomes weaker with increasing distance from the Earth as well as signals tracked from one of the side lobes of the GPS antenna pattern. As a results, the number of visible satellites and relative geometric condition of the GPS satellites at very high altitude drops dramatically and reduces the navigation solution accuracy. Therefore, the weak GPS system is also not an ideal way to provide PNT service to upcoming Lunar missions when considering its limited geometric condition and the recued navigation accuracy. Another navigation approach on the Moon is being developed, similar to the Global Navigation Satellite System (GNSS) on Earth, aiming to offer navigation service with continuous 24/7 coverage across the entire Lunar surface. For example, lunar communications relay and navigation systems (LCRNS) by NASA and Lunar navigation satellite systems (LNSS) by JAXA are designed to serve as dedicated Position, Navigation, and Timing (PNT) systems for the Moon. However, designing a dedicated LNSS and PNT service involves additional challenges, which are unique to the lunar environment, including limited payload capacity for the CubeSat platform, i.e., the size, weight, and power (SWaP) of the onboard clock, limited lunar ground monitoring stations, and limited financial investment as compared to the legacy Earth-GPS [9]. NASA’s focus on utilizing CubeSat platforms on the Moon leads to an alternative Lunar navigation platform that leverages the existing Lunar science and exploration assets. The small satellites used in Lunar missions can be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions [10]. As upcoming Lunar missions will often operate at low-altitude about 30 km to 100 km for scientific observations and mapping purposes, the low-altitude orbital constellations could be employed to create an ad-hoc Lunar PNT system. However, several issues must be addressed, such as the instability of these orbits, which often require maintenance or are only suitable for short-duration missions, operating for fewer than 90 days. Additionally, at an altitude of 100 km, the satellites have a limited period during which they are above the horizon and capable of providing PNT service to users. The implementation of a non-dedicated, ad-hoc Lunar navigation constellation facilitates on-demand PNT services. A preliminary study of ad-hoc Lunar PNT system was conducted using 21 spacecraft in 5,5000 km altitude frozen orbits to test its feasibility and a basic performance of orbital asset localization among ad-hoc Lunar constellations in small satellites format [10]. These swarm assets are designed for autonomous localization with minimal Earth interaction, reducing dependency on bandwidth and ground resources. The design in [10] demonstrated the feasibility of a decentralized PNT approach, specifically employing a DEKF approach for state estimation, which helps minimize onboard operating costs. The DEKF method distributes computation across individual satellites, which lightens the computational load while maintaining accuracy in orbit ephemeris and clock offsets, similar to centralized systems [11]. In a follow-on study [12], each spacecraft was limited to 2 communications antennae, forcing the selection of measurements and scheduling spacecraft activities to perform the measurements. A matching algorithm is implemented to select the best measurements and schedule position estimation updates. The decentralized localization performance is also investigated with increasing levels of network degradation for swarm assets considering the impact of intermittent and permanent communication failure, to demonstrate the robustness and fidelity of the decentralized Lunar PNT service [13]. This study confirmed that the ad-hoc PNT constellations in frozen orbit are highly robust and resilient to communication failures. However, unlike frozen orbit swarm assets, the low-altitude satellites have a limited ground view at an altitude of 100 km, where the ad-hoc Lunar constellation consists of 98 low-altitude satellites, evenly distributed across seven circular polar orbital planes, alongside two satellites in a frozen orbit at an altitude of 5,500 km (Figure 1). Therefore, the number of satellites visible to ground users is significantly limited in low-altitude orbit constellations. As each visibility of a spacecraft remains intact for only a few ticks before it moves out of the field of view, the ground user encounters challenges in maintaining continuous navigation service, resulting in sparse availability and provision of Lunar PNT system. Consequently, service availability is primarily restricted to the Lunar South Pole region (Figure 2). Given these limitations and concerns, the localization performance of low-altitude swarm assets will be assessed in this study. We focus on the investigation of the localization performance of low-altitude swarm assets and ground users near the Lunar South Pole. The overall flow of the Lunar PNT simulation incorporates the DEKF approach of asset localization and the weighted least-squares approach in user localization (Figure 3). The autonomous Lunar PNT simulation is primarily implemented in MATLAB, where the DEKF based on the matching scheduler is implemented with Google’s OR-tools as a model builder and Gurobi optimization tool as a backend solver. The General Mission Analysis Tool (GMAT) is utilized to generate ephemeris data for swarm assets, and accounts for satellite orbital details, mass, and perturbations like solar radiation pressure and drag coefficients. Each ephemeris dataset is produced in the Moon International Celestial Reference Frame (ICRF) inertial coordinate system. For state estimation, the distributed swarm assets rely on two-way Inter-Satellite Link (ISL) measurements, which involve tracking pseudoranges and relative velocities between visible satellites and anchor nodes during each observation. Numerical evaluations of the decentralized localization process are conducted to demonstrate the feasibility of the low-altitude PNT system in providing reliable navigation services. The main approach involves using DEKF and CEKF to localize 100 satellites in low-altitude constellations, where the CEKF is implemented to serve as a baseline for comparing the performance of distributed algorithms. In both cases, we evaluate ‘fully sampled’ measurements from all available assets, and ‘two ISL’ measurements when spacecraft are constrained to have only two antennas. We test four estimation techniques: CEKF fully sampled, CEKF two ISL, DEKF fully sampled, and DEKF two ISL filters. As the DEKF update cycle is comprised of network setup, communication, and computations, a global broadcast network and 2-way ISL network setup will take from 4 to 6 minutes as maximum [12]. In this simulation, the DEKF update cycle is set to 10 minutes, including a 4-minute latency for obtaining and computing the actual measurement updates. We experiment an increased update cycle to demonstrate the feasibility and evaluate the impact on localization performance using various tuning values for measurement noise covariances (Figures 4 and 5). By comparing centralized and decentralized approaches using a matching algorithm, we analyze the influence of cross-correlation factors in the covariance matrix, assuming 100% reliability of all assets and measurements. The increased frequency and the adjustments of tuning parameters reveal distinct error patterns between the two scenarios. The localization accuracy of the swarm assets and ground users is assessed by taking the median error across 100 assets and one ground user (84.9°S, 137.5°E) over 7-day simulation period (Table 1). Since the user localization accuracy is significantly affected by the performance of the swarm assets, it is crucial to maintain high localization accuracy within the swarm. This study will continue to explore decentralized filtering for autonomous LPNT operations, with further investigation of an 'iterative' matching approach which enumerates every valid matching pair, planned for the following month.

Yeji Kim↗

Optimizing workplace charging facility deployment and smart charging strategies

This study introduces a workplace charging (WPC) optimization model that maximizes the total satisfied electric miles of employees’ plug-in electric vehicles, subject to a given annual budget. The model optimizes both planning decisions of charger number and power levels and operation decisions of charging spot assignment and charging schedule for the given temporal distribution of charging demands and varied electricity prices. Results of experiments based on national average travel data indicate that the actual WPC strategy varies by budget level. Through optimization, the strategy could reduce impacts of the varied electricity price by shifting charging schedules to periods when electricity prices are low. Also, the model is expanded to study the trade-off between providing WPC and addressing consequence of degraded charging service by including the per-mile shadow cost of unsatisfied charging demand. Finally, we observe that their relative competitiveness mainly depends on the actual shadow cost of WPC.

33 ADVANCED PROPULSION SYSTEMS↗

A step in time: Changes in standard-frequency and time-signal broadcasts, 1 January 1972

An improved coordinated universal time (UTC) system has been adopted by the International Radio Consultative Committee. It was implemented internationally by the standard-frequency and time-broadcast stations on 1 Jan. 1972. The new UTC system eliminates the frequency offset of 300 parts in 10 to the 10th power between the old UTC and atomic time, thus making the broadcast time interval (the UTC second) constant and defined by the resonant frequency of cesium atoms. The new time scale is kept in synchronism with the rotation of the Earth within plus or minus 0.7 s by step-time adjustments of exactly 1 s, when needed. A time code has been added to the disseminated time signals to permit universal time to be obtained from the broadcasts to the nearest 0.1 s for users requiring such precision. The texts of the International Radio Consultative Committee recommendation and report to implement the new UTC system are given. The coding formats used by various standard time broadcast services to transmit the difference between the universal time (UT1) and the UTC are also given. For users' convenience, worldwide primary VLF and HF transmissions stations, frequencies, and schedules of time emissions are also included. Actual time-step adjustments made by various stations on 1 Jan. 1972, are provided for future reference.

Chi, A. R.↗

Coal gasification systems engineering and analysis. Appendix H: Work breakdown structure

A work breakdown structure (WBS) is presented which encompasses the multiple facets (hardware, software, services, and other tasks) of the coal gasification program. The WBS is shown to provide the basis for the following: management and control; cost estimating; budgeting and reporting; scheduling activities; organizational structuring; specification tree generation; weight allocation and control; procurement and contracting activities; and serves as a tool for program evaluation.

Source record↗

STS-103 Crew Interviews: John Grunsfeld

Live footage of a preflight interview with Mission Specialist John M. Grunsfeld is seen. The interview addresses many different questions including why Grunsfeld became an astronaut, and the events that led to his interest. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, and a brief touch on Grunsfeld's responsibility during any of the four space walks scheduled for this mission.

Source record↗

STS-103 Crew Interviews: Mike Foale

Live footage of a preflight interview with Mission Specialist C. Michael Foale is seen. The interview addresses many different questions including why Foale became an astronaut, what were the events that led to his interest. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, and a brief touch on Foale's responsibility during any of the four space walks scheduled for this mission.

Source record↗

New Millennium Program: Servicing Earth and Space Sciences

NASA has exciting plans for space science and Earth observations during the next decade. A broad range of advanced spacecraft and measurement technologies will be needed to support these plans within the existing budget and schedule constraints.

New Millennium Program Earth Space↗

Emergency Preparedness for Catastrophic Events at Small and Medium Sized Airports: Lacking or Not?

The implementation of security methods and processes in general has had a decisive impact on the aviation industry. However, efforts to effectively coordinate varied aspects of security protocols between agencies and general aviation components have not been adequately addressed. Whether or not overall security issues, especially with regard to planning for catastrophic terrorist events, have been neglected at the nation's smaller airports is the main topic of this paper. For perspective, the term general aviation is generally accepted to include all flying except for military and scheduled airline operations. Genera aviation makes up more than 1 percent of the U.S. Gross Domestic Product and supports almost 1.3 mission high-skilled jobs in professional services and manufacturing and hence is an important component of the aviation industry (AOPA, n.d.). In both conceptual and practical terms, this paper argues for the proactive management of security planning and repeated security awareness training from both an individual and an organizational perspective within the general aviation venue. The results of a research project incorporating survey data from general aviation and small commercial airport managers as well as Transportation Security Administration (TSA) employees are reported. Survey findings suggest that miscommunication does take place on different organizational levels and that between TSA employees and airport management interaction can be contentious and cooperation diminished. The importance of organizational training for decreasing conflict and increasing security and preparedness is discussed as a primary implication.

Sweet, Kathleen M.↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Impact of Hydrological Data on Power System Operational Studies: Preprint

Hydropower is expected to play an important role in maintaining grid reliability and flexibility as the share of of variable renewable energy increases. While the current hydropower operational models have been studied and used widely, they haven't been updated for decades to meet new performance standards. For example, current steady state and dynamic models often neglect hydrological conditions, which may lead to unrealistic expectations when relying on hydropower for energy and ancillary services. To study this impact, a multi-timescale hydrological model was created by leveraging the National Renewable Energy Laboratory-developed Multi-timescale Integrated Dynamics and Scheduling (MIDAS) tool. Using MIDAS, we compare the impact of considering hydrological conditions in a day-ahead unit commitment (DAUC) schedule on the reduced 240-bus Western Interconnect (WI) test system under winter and summer case studies. We show that neglecting current hydrological conditions of hydropower plants in power system models can lead to an overestimation of hydropower capabilities, which could lead to power balancing issues. For example, power system DAUC simulation results of our reduced test system show that in the case where hydrological conditions are not considered in the model, an approximate 31% overestimation of hydropower capabilities occurs in the summer case and approximately 60% occurs in the winter case compared to what is available. Additionally, results show an underestimation of WI day-ahead power system generation costs by approximately $54M - $80M in the weekly summer scenario and $116M - $126M in the weekly winter scenario. This analysis helps to underscore the importance of considering hydrological data in power system operational studies.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Coping with Irregular Operations: Implications for a Free Flight Environment

Irregular operations involve disruption of scheduled airline operations. They ate of concern to the carriers because they cost money, require personnel effort, and may harm customer good will. Irregular operations may result from aircraft system malfunctions that take planes out of service or result in cancellations, Might system problems or passenger medical emergencies that require diversions, local airport problems that may close down a runway, or weather systems that restrict flow into airports or regions. At the heart of responding to irregular operations is distributed decision making by members of airline operations centers, pilots, and the air traffic control system. Six U.S. carriers participated in a study in which we observed strategies used by operations center personnel to handle various classes of irregular operations. We focused on situations that are most disruptive to regular operations and are most difficult to cope with. We also sought to identify classes of events that would be most affected by changes in the air traffic management system. How a carrier deals with disruptions to its schedule reflects its philosophy and primary goals, as well as its resources. Size and type of operations (short or long-haul) determine which problems have priority. Each airline has different technological support tools to aid in flight planning and replanning, and some carriers have established contingency procedures for coping with various situations. We also examined differences in extent and type of interaction between ABC personnel and various elements of the air traffic system as they managed various problems: who interacts with AM what situations prompt interaction, how often these occur, and the outcomes and Perceived benefits. Use of the expanded NRP program was also studied, along with its advantages to the individual companies. We also examined the implications of the proposed change to a free flight environment on airline strategies for coping with irregular operations.

Orasanu, Judith↗

Coordinated Control Strategy of a Battery Energy Storage System to Support a Wind Power Plant Providing Multi-Timescale Frequency Ancillary Services

With increasing penetrations of wind generation on electric grids, wind power plants (WPPs) are encouraged to provide frequency ancillary services (FAS); however, it is a challenge to ensure that variable wind generation can reliably provide these ancillary services. This paper proposes using a battery energy storage system (BESS) to ensure the WPPs' commitment to FAS. This method also focuses on reducing the BESS's size and extending its lifetime. In this paper, a state-machine-based coordinated control strategy is developed to utilize a BESS to support the obliged FAS of a WPP (including both primary and secondary frequency control). This method takes into account the operational constraints of the WPP (e.g., real-time reserve) and the BESS (e.g., state of charge [SOC], charge and discharge rate) to provide reliable FAS. Meanwhile, an adaptive SOC-feedback control is designed to maintain SOC at the optimal value as much as possible and thus reduce the size and extend the lifetime of the BESS. In conclusion, the effectiveness of the control strategy is validated with an innovative, multi-area, interconnected power system simulation platform that can mimic realistic power systems operation and control by simulating real-time economic dispatch, regulating reserve scheduling, multi-area automatic generation control, and generators' dynamic response.

25 ENERGY STORAGE↗

VAS operational procedures and results at the Kansas City Satellite Field Services Station

An operational assessment of VAS data by using a Man-computer Interactive Data Access System (McIDAS) terminal linked by a 9600 band telephone line is discussed. Seven hours of VAS data were processed and edited daily. Data was scheduled 16 hours a day, 7 days a week; however, during this time period there were very few days with 16 hours of data to evalute. The McIDAS terminal, which has 10 display frames and 5 graphics, provide access to the sounding data processed. These data are processed using two procedures. The dwell sounding data are generated by using all 12 spectral channels with a spin budget of 39. To provide coverage for most of the United States, soundings are made starting at 18 minutes after the hour from approximately 49 deg N to 36 deg N and at 48 minutes after the hour from 36 deg N to 26 deg N. The dwell imaging mode uses 11 channels but the spin budge is 17. With the reduced spin budget, retrievals can be made at 18 or 48 minutes after the hour for approximately 44 deg N to 27 deg N. With these constraints a schedule, of data sets was proposed to use the schedule and how the data set could be used are shown.

Heckman, B.↗

From Cell to System: Accelerated hpc Simulations of BESS Aging under Frequency Regulation and Arbitrage use cases

Lithium-ion battery energy storage systems (BESS) packs have emerged as a leading solution for grid-scale energy storage, enhancing resiliency and balancing load fluctuations. Yet, experimental characterization of large-format LIB packs-particularly to assess performance and degradation over hundreds of cycles - demands substantial hardware investment and multi-year testing campaigns. In this work, we couple a hierarchical, physics-based modeling framework agnostic to electrode chemistries with high-performance computing to accelerate systems level evaluation by upto two orders of magnitude. Building on the open-source liionpack platform, we implement cell, module, and pack-scale electrochemical models enriched with mechanistic aging mechanisms and deploy them on an HPC cluster to simulate 150−200kWh systems over 500 - 1,000 cycles with in days. We subject these virtual B ESS to both constant-current cycling and realistic grid service profiles spanning frequency regulation, ramp-rate support, and energy arbitrage-and quantify the resulting degradation patterns. Our results reveal that localized cell aging can induce substantial nonuniformity at module and pack levels, with service-specific cycling protocols driving distinct aging modes. This rapid, multiscale modeling approach provides a powerful design-space exploration tool for optimizing electrical architecture, control strategies, and operational schedules to prolong pack lifetime and lower total cost of ownership.

Ayalasomayajula, Surya [ORNL] (ORCID:0009000860788↗

Los Alamos Canyon Bridge Upgrades Project

Reinvestment in the Los Alamos Canyon Bridge (LACB) deck, superstructure, and substructure, ensures continued access between Los Alamos National Laboratory (LANL) and the Los Alamos County (LAC) town site; as well as maintains emergency response qualifications to/from the Los Alamos Medical Center (LAMC). The operability of the LACB is critical to the institution and with the evolving oversight from the Federal Highway Administration (FHWA), Department of Energy (DOE) Headquarters, and National Nuclear Security Administration (NNSA); it is imperative safety of the infrastructure is sustained. The Los Alamos Canyon Bridge is 60 plus years old (typical bridge design life of 50 years), a fracture critical structure (no girder redundancies), has an average daily traffic in excess of 13,000 vehicles/day (primary route for LAC commuters), is deteriorating (decreasing code ratings, per inspection), was last rehabilitated in 1992, and maintains access for fire evacuations (Cerro Grande, Las Conchas). Reinvestment in the bridge is expected to extend the service life of the LACB, reduce average maintenance costs by $0.5 M to $2.8M, per year, and provide compliance with current code requirements. Pros, cons, and proposed funding schedule are provided.

42 ENGINEERING↗

The Capability Portfolio Analysis Tool (CPAT): A Mixed Integer Linear Programming Formulation for Fleet Modernization Analysis (Version 2.0.2).

In order to effectively plan the management and modernization of their large and diverse fleets of vehicles, Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) commis- sioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thor- ough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation. This paper, which is an update to the original CPAT formulation document published in 2015 (SAND2015-3487), covers the formulation of important new CPAT features.

97 MATHEMATICS AND COMPUTING↗

Advanced Communications Technology Satellite (ACTS)

The benefits that will be offered by the NASA-sponsored communication spacecraft ACTS which is scheduled for launch in 1992 are described together with examples of demonstrations on proposed data, video, and voice applications supported by the advanced ACTS technologies. Compared to existing satellite service, the ACTS will provide lower cost, better service, greater convenience, and improved service reliability of telecommunications to customers around the world. In addition, the pioneering ACTS technology will provide many capabilities qualitatively different from those of current satellite systems, such as on-demand assignment, frequency reuse, and the flexible targeting of spot beams directly to the very-small-aperture terminals at customer premises.

Olmstead, Dean A.↗