Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Recommended Methods for Monitoring Skeletal Health in Astronauts to Distinguish Specific Effects of Prolonged Spaceflight

NASA uses areal bone mineral density (aBMD) by dual-energy X-ray absorptiometry (DXA) to monitor skeletal health in astronauts after typical 180-day spaceflights. The osteoporosis field and NASA, however, recognize the insufficiency of DXA aBMD as a sole surrogate for fracture risk. This is an even greater concern for NASA as it attempts to expand fracture risk assessment in astronauts, given the complicated nature of spaceflight-induced bone changes and the fact that multiple 1-year missions are planned. In the past decade, emerging analyses for additional surrogates have been tested in clinical trials; the potential use of these technologies to monitor the biomechanical integrity of the astronaut skeleton will be presented. OVERVIEW: An advisory panel of osteoporosis policy-makers provided NASA with an evidence-based assessment of astronaut biomedical and research data. The panel concluded that spaceflight and terrestrial bone loss have significant differences and certain factors may predispose astronauts to premature fractures. Based on these concerns, a proposed surveillance program is presented which a) uses Quantitative Computed Tomography (QCT) scans of the hip to monitor the recovery of spaceflight-induced deficits in trabecular BMD by 2 years after return, b) develops Finite Element Models [FEM] of QCT data to evaluate spaceflight effect on calculated hip bone strength and c) generates Trabecular Bone Score [TBS] from serial DXA scans of the lumbar spine to evaluate the effect of age, spaceflight and countermeasures on this novel index of bone microarchitecture. SIGNIFICANCE: DXA aBMD is a widely-applied, evidence-based predictor for fractures but not applicable as a fracture surrogate for premenopausal females and males <50 years. Its inability to detect structural parameters is a limitation for assessing changes in bone integrity with and without countermeasures. Collective use of aBMD, TBS, QCT, and FEM analysis for astronaut surveillance could accommodate NASA's aggressive schedule for risk definition and inform a NASA-developed model which assesses the probability of overloading bones during mechanically-loaded mission tasks and possibly for physical activities after return to Earth.

Vasadi, Lukas J.↗

UAS-NAS Flight Test Series 3: Test Environment Report

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration in the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability (SSI), Human Systems Integration (HSI), and Communications (Comm), and Certification to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Detect and Avoid (DAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project is conducting a series of human-in-the-loop (HITL) and flight test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity, and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS. The integrated events started with two initial flight test used to develop and test early integrations and components of the test environment. Test subjects and a relevant test environment were brought in for the integrated HITL (or IHITL) conducted in 2014. The IHITL collected data to evaluate the effectiveness of DAA Well Clear (DWC) algorithms and the acceptability of UAS concepts integrated into the NAS. The first integrated flight test (and the subject of this report) followed the IHITL by replacing the simulation components with live aircraft. The project finishes the integrated events with a final flight test to be conducted in 2016 that provides the researchers with an opportunity to collect DWC and Collision Avoidance (CA) interoperability data during flight encounters.

flight test↗

The Relationship between Workload, Performance and Fatigue in a Short-Haul Airline

Short-haul flights are associated with irregular work schedules and increased workload, due to frequent takeoffs and landings. We examined the relationship between pilot workload, performance and subjective fatigue during normal short-haul operations. Ninety airline pilots (8 female), mean age 33 (±8 years) completed a NASA-Task Load Index (NASA-TLX), a Psychomotor Vigilance Task (PVT; a reaction time test sensitive to sleep loss) and a Samn-Perelli (SP) fatigue scale, over a period of 20 duty days at top-of-descent on 2762 short-haul flights. The duty days included either 2 or 4 flights per day starting at different times as scheduled during normal operations. Workload was measured using the six NASA-TLX scales: mental demand, physical demand, temporal demand, effort, performance and frustration. Lapses (reaction times [RT] > 500ms) were calculated for the PVT. Spearman correlations were calculated to identify relationships between the NASA-TLX, PVT lapses, and SP. The six scales of NASA-TLX were positively correlated with the PVT lapses (p < 0.01) showing an increase in workload when lapses increased. There was a positive correlation between subjective fatigue as measured by the SP fatigue scale and each of the six scales of NASA-TLX (p < 0.001) suggesting that pilots reported higher workload when perceived levels of fatigue were higher. Of the six workload scales, mental demand and performance were rated the highest (mental: M = 40.99, SD = 20.32; performance: M = 41.61, SD = 20.71) and effort was rated the lowest (M = 15.59, SD = 8.98). Preliminary analyses suggest that high workload is associated with poorer PVT performance and increased self-reported fatigue in this population of short-haul pilots. Future studies should explore how other workload factors (i.e. flight hours, time of day) influence self-reported and objective fatigue measures.

TLX↗

Measurement of Charged Particle Interactions in Spacecraft and Planetary Habitat Shielding Materials

The Microgravity Materials Program, through its 98-HEDS-04 Research Announcement, has called for research to support 'enhanced human radiation protection through the development of light weight soft goods with high radiation protection characteristics.' Given the nature of the particle flux from the Galactic Cosmic Radiation (GCR), and the many constraints on the depth and type of shielding in spacecraft and planetary habitats, it is clear that the health risks these particles present to astronauts in deep space cannot be entirely eliminated. It is the objective of this project to develop a highly accurate model of GCR transport so that NASA can develop and validate the properties of protective shielding materials with the best available information. The validity of the GCR transport model depends in large part on having accurate and precise input data in the form of the charge-changing and fragment production cross sections for the heavy ions of greatest biological significance. The accuracy of the transport model can be evaluated and enhanced by employing the following a three-step strategy: (1) New cross section data will be made available to the NASA-Langley scientists responsible for the transport codes, and will be used as inputs to the codes; (2) The codes will be used to predict additional cross sections and/or details of the radiation field behind realistic shielding arrangements, where the materials and configurations may be quite complex. Mock-ups of the shielding configurations suitable for use in accelerator experiments will obtained by the NASA-Langley co-investigators; and (3) The transport model predictions will be tested in accelerator-based experiments. The time scale for one pass through these steps is well-suited to a four-year schedule. Over a longer term, these steps may be repeated, leading to still further refinements of the transport code, new predictions, and an additional round of measurements, until the desired predictive accuracy is achieved. The focus of this work is primarily on the first of these steps, the determination of fragmentation cross sections, which will be the main task in years one and two. The detailed strategy for carrying out the remainder of the program is more difficult to specify, as it depends on unpredictable factors such as the extent to which the transport model must be modified, schedules for accelerator time, target fabrication, etc.

Zeitlin, C.↗

A performance evaluation of the software-implemented fault-tolerance computer

The results of a performance evaluation of the Software-Implemented Fault-Tolerance (SIFT) computer system conducted in the NASA Avionics Integration Research Laboratory are presented. The essential system functions are described and compared to both earlier design proposals and subsequent design improvements. Using SIFT's specimen task load, the executive tasks, such as reconfiguration, clock synchronization, and interactive consistency, are found to consume significant computing resources. Together with other system overhead (e.g., voting and scheduling), the operating system overhead is in excess of 60 percent. The authors propose specific design changes that reduce this overhead burden significantly.

Palumbo, D. L.↗

Automated Sequence Processor: Something Old, Something New

High productivity required for operations teams to meet schedules Risk must be minimized. Scripting used to automate processes. Scripts perform essential operations functions. Automated Sequence Processor (ASP) was a grass-roots task built to automate the command uplink process System engineering task for ASP revitalization organized. ASP is a set of approximately 200 scripts written in Perl, C Shell, AWK and other scripting languages.. ASP processes/checks/packages non-interactive commands automatically.. Non-interactive commands are guaranteed to be safe and have been checked by hardware or software simulators.. ASP checks that commands are non-interactive.. ASP processes the commands through a command. simulator and then packages them if there are no errors.. ASP must be active 24 hours/day, 7 days/week..

Automated↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Artemis IV

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D Hilmers↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Late Artemis Missions

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D. Hilmers↗

Part-Task Simulation of Synthetic and Enhanced Vision Concepts for Lunar Landing

During Apollo, the constraints placed by the design of the Lunar Module (LM) window for crew visibility and landing trajectory were a major problem. Lunar landing trajectories were tailored to provide crew visibility using nearly 70 degrees look-down angle from the canted LM windows. Apollo landings were scheduled only at specific times and locations to provide optimal sunlight on the landing site. The complications of trajectory design and crew visibility are still a problem today. Practical vehicle designs for lunar lander missions using optimal or near-optimal fuel trajectories render the natural vision of the crew from windows inadequate for the approach and landing task. Further, the sun angles for the desirable landing areas in the lunar polar regions create visually powerful, season-long shadow effects. Fortunately, Synthetic and Enhanced Vision (S/EV) technologies, conceived and developed in the aviation domain, may provide solutions to this visibility problem and enable additional benefits for safer, more efficient lunar operations. Piloted simulation evaluations have been conducted to assess the handling qualities of the various lunar landing concepts, including the influence of cockpit displays and the informational data and formats. Evaluation pilots flew various landing scenarios with S/EV displays. For some of the evaluation trials, an eye glasses-mounted, monochrome monocular display, coupled with head tracking, was worn. The head-worn display scene consisted of S/EV fusion concepts. The results of this experiment showed that a head-worn system did not increase the pilot s workload when compared to using just the head-down displays. As expected, the head-worn system did not provide an increase in performance measures. Some pilots commented that the head-worn system provided greater situational awareness compared to just head-down displays.

Arthur, Jarvis J., III↗

X-33/RLV Program Aerospike Engines

Substantial progress was made during the past year in support of the X-33/RLV program. X-33 activity was directed towards completing the remaining design work and building hardware to support test activities. RLV work focused on the nozzle ramp and powerpack technology tasks and on supporting vehicle configuration studies. On X-33, the design activity was completed to the detail level and the remainder of the drawings were released. Component fabrication and engine assembly activity was initiated, and the first two powerpacks and the GSE and STE needed to support powerpack testing were completed. Components fabrication is on track to support the first engine assembly schedule. Testing activity included powerpack testing and component development tests consisting of thrust cell single cell testing, CWI system spider testing, and EMA valve flow and vibration testing. Work performed for RLV was divided between engine system and technology development tasks. Engine system activity focused on developing the engine system configuration and supporting vehicle configuration studies. Also, engine requirements were developed, and engine performance analyses were conducted. In addition, processes were developed for implementing reliability, mass properties, and cost controls during design. Technology development efforts were divided between powerpack and nozzle ramp technology tasks. Powerpack technology activities were directed towards the development of a prototype powerpack and a ceramic turbine technology demonstrator (CTTD) test article which will allow testing of ceramic turbines and a close-coupled gas generator design. Nozzle technology efforts were focused on the selection of a composite nozzle supplier and on the fabrication and test of composite nozzle coupons.

Source record↗

Martian gas, soil sampler tested.

A gas chromatograph mass spectrometer (GCMS) is scheduled to be carried aboard the Mars Viking lander, which is to make a soft landing on the Martian surface. The GCMS has two distinct tasks including a sampling of the Martian atmosphere and an analysis of Martian soil. The instrument is designed to be highly sensitive. It can detect 0.1 part per million of organic compounds in the soil and from 10 to 100 parts per million of atmospheric constituents.

Miller, B.↗

Coal gasification systems engineering and analysis. Appendix H: Work breakdown structure

A work breakdown structure (WBS) is presented which encompasses the multiple facets (hardware, software, services, and other tasks) of the coal gasification program. The WBS is shown to provide the basis for the following: management and control; cost estimating; budgeting and reporting; scheduling activities; organizational structuring; specification tree generation; weight allocation and control; procurement and contracting activities; and serves as a tool for program evaluation.

Source record↗

AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule

The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

Yao, S. S.↗

Inorganic chemical precipitate formation payload design

The Get Away Special payload to investigate the formation of inorganic precipitates (G-405) utilizes six transparent chemical reaction chambers to actively mix a dry powder with a liquid solution. At predetermined intervals the progress of the precipitate formation is photographed and stored as data. The precipitate particles will also be subject to post-flight analysis. The various tasks performed during the 14 hour duration of the experiment are initiated and monitored by a custom-built digital controller. The payload is currently scheduled as a backup payload for STS-29 with a possible launch date of January, 1989.

Friedrich, Craig↗

Piloted rover technology study

This is the May 25, 1990 summary report for Space Transfer Concepts and Analyses (STCA) Study, special study task 9.1, Piloted Rovers Technology Study. Piloted rover concepts, mission scenarios, and the requirements necessary for completion of these missions resulting in the establishment of a lunar base. These tasks were intended to lead to a logical conclusion concerning which piloted rovers technologies are needed to accomplish the various missions, along with a recommended schedule for the development of these technologies.

Thrasher, D. L.↗

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗

National facilities study. Volume 5: Space research and development facilities task group

With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R&D facilities planning for the U.S., and these are discussed in Section 4 of this volume.

Source record↗