Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Oxidizer Scoping Studies

The purpose of this report is to present the results of the acceptable knowledge (AK) review of oxidizers present in active waste streams, provide a technical analysis of the oxidizers, and report the results of the scoping study testing. This report will determine the fastest burning oxidizer to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-002, Sorbent Scoping Studies, contains similar information for sorbents identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sorbent Scoping Studies

The Los Alamos National Laboratory–Carlsbad Operations (LANL-CO) office was tasked by the DOE CBFO, Office of the Manager to perform a review of the acceptable knowledge (AK) to identify the oxidizers and sorbents in transuranic (TRU) waste streams, to conduct scoping studies on the oxidizers and sorbents identified in AK review to inform the Quality Level 1 (QL1) testing, and to conduct a series of QL1 tests to provide the scientific data to support a basis of knowledge document for determining the criteria for (1) accepting waste at the Waste Isolation Pilot Plant (WIPP) without treatment, (2) determining waste that will require treatment, and (3) if treatment is required, how the treatment must be performed. The purpose of this report is to present the results of the AK review of sorbents present in active waste streams, provide a technical analysis of the sorbent list, report the results of the scoping studies for the fastest-burning organic sorbent, and provide the list of organic and inorganic sorbents to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-001, Oxidizer Scoping Studies, has similar information for oxidizers identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using the Integrated Vehicle Health Management Research Test and Integration Plan Wiki to Identify Synergistic Test Opportunities

The National Aeronautics and Space Administration (NASA) and the aviation industry have recognized a need for developing a method to identify and combine resources to carry out research and testing more efficiently. The Integrated Vehicle Health Management (IVHM) Research Test and Integration Plan (RTIP) Wiki is a tool that is used to visualize, plan, and accomplish collaborative research and testing. Synergistic test opportunities are developed using the RTIP Wiki, and include potential common resource testing that combines assets and personnel from NASA, industry, academia, and other government agencies. A research scenario is linked to the appropriate IVHM milestones and resources detailed in the wiki, reviewed by the research team members, and integrated into a collaborative test strategy. The scenario is then implemented by creating a test plan when appropriate and the research is performed. The benefits of performing collaborative research and testing are achieving higher Technology Readiness Level (TRL) test opportunities with little or no additional cost, improved quality of research, and increased communication among researchers. In addition to a description of the method of creating these joint research scenarios, examples of the successful development and implementation of cooperative research using the IVHM RTIP Wiki are given.

Koelfgen, Syri J.↗

Terry Turbopump Expanded Operating Band Modeling and Simulation Efforts in Fiscal Year 2021 Extended Period of Performance (Final Report)

This report documents the progress made under the Terry Turbine Expanded Operating Band (TTEXOB) program's modeling and simulation (MODSIM) initiative at Sandia National Laboratories (SNL ). It describes the US Federal Fiscal Year 2021 (FY21) extended period-of-performance MODSIM work completed since the closure of FY20 with due reference to the Texas A&M University (TAMU) hybrid milestone 5/6 experimental program. This work, which falls under Milestone 7 of the program, provides a counterpart to the various experiments. The overall TTEXOB program and its milestone-based approach are described in the program's Summary Plan. Details of the individual milestone test plans can be found in the corresponding detailed test plan, e.g. the Milestone 3 and 4 Detailed Test Plan. SNL MODISM is conducted alongside experiments performed at TAMU, and SNL technical staff regularly consults with TAMU on the experimental program. In FY21, MELCOR code models and capabilities were exercised in two different contexts: experimental comparisons to the TAMU ZS-1 and GS-2, and stand-alone analyses of a station black-out (SBO) scenario in a generic boiling water reactor (BWR). Code to experiment comparisons met with fair success when turbine losses were well characterized as for the ZS-1 turbine. Both deterministic and Bayesian calibration processes were used to find a recommended turbine torque multiplier for ZS-1 type turbines. This process could be repeated for GS-2 type turbines if GS-2 losses were better understood. Stand-alone generic BWR SBO calculations revealed that three different modes of self-regulating turbopump behavior may be observed depending on certain modeling parameters and choices having to do with turbine nozzles. Aspects of this predicted behavior may have been observed in TAMU GS-2 experiments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Reducing Stray Light To Characterize Nirspec Subsystems: The Focal Plane Array And Micro-Shutter Array

The James Webb Space Telescope (JWST) is an infrared, space-based telescope scheduled for launch in 2013. JWST includes four scientific instruments, including the Near Infrared Spectrometer (NIRSpec), which operates in the wavelength range from 0.6 to 5 microns. NASA/Goddard Space Flight Center (GSFC) is responsible for two NIRSpec subsystems: the detector subsystem, with its focal plane array (FPA), and the micro-shutter subsystem, with its micro-shutter array (MSA). The FPA is comprised of two side-by-side Rockwell Scientific HgCdTe 2kx2k detectors, with detectors and readout electronics optimized for low noise. The MSA is a GSFC developed micro-electro-mechanical system (MEMS) that serves as a programmable slit mask, allowing NIRSpec to obtain simultaneous spectra of >100 objects in a single field of view. We present the optical characterization test plan of the FPA. The test plan is driven by many requirements: cryogenic operating temperature, a flight-like beam shape, and multi-wavelength photon flux from 1 to 60,000 per second, thus low stray light is critical. We use commercial optical modeling software to predict stray light effects at the FPA. We also present the optical contrast test plan of the MSA. Since each individual shutter element operates in on/off fashion, the most important optical metric is contrast. The MSA structure is designed to minimize stray and scattered light, and the test setup reduces stray light such that the optical contrast requirement is met.

Connelly, Joseph A.↗

Conceptual Design of Forced Convection Molten Salt Heat Transfer Testing Loop

This report develops a proposal to design and construct a forced convection test loop. A detailed test plan will then be conducted to obtain data on heat transfer, thermodynamic, and corrosion characteristics of the molten salts and fluid-solid interaction. In particular, this report outlines an experimental research and development test plan. The most important initial requirement for heat transfer test of molten salt systems is the establishment of reference coolant materials to use in the experiments. An earlier report produced within the same project highlighted how thermophysical properties of the materials that directly impact the heat transfer behavior are strongly correlated to the composition and impurities concentration of the melt. It is therefore essential to establish laboratory techniques that can measure the melt composition, and to develop purification methods that would allow the production of large quantities of coolant with the desired purity. A companion report describes the options available to reach such objectives. In particular, that report outlines an experimental research and development test plan that would include following steps: •Molten Salts: The candidate molten salts for investigation will be selected. •Materials of Construction: Materials of construction for the test loop, heat exchangers, and fluid-solid corrosion tests in the test loop will also be selected. •Scaling Analysis: Scaling analysis to design the test loop will be performed. •Test Plan: A comprehensive test plan to include all the tests that are being planned in the short and long term time frame will be developed. •Design the Test Loop: The forced convection test loop will be designed including extensive mechanical design, instrument selection, data acquisition system, safety requirements, and related precautionary measures. •Fabricate the Test Loop. •Perform the Tests. •Uncertainty Analysis: As a part of the data collection, uncertainty analysis will be performed to develop probability of confidence in what is measured in the test loop. Overall, the testing loop will allow development of needed heat transfer related thermophysical parameters for all the salts, validate existing correlations, validate measuring instruments under harsh environment, and have extensive corrosion testing of materials of construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Aluminum Clad Spent Nuclear Fuel Task 3: Sealed and Vented Systems Episodic Breathing and Gas Generation Modeling Plan

This document presents the test plan for Task 3 of the Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Technical Issues Action Plan, which covers modeling and predictions of the generations of corrosive gases within both sealed and vented, subject to episodic breathing, storage systems. This includes aluminum clad spent nuclear fuel (ASNF) that is currently or may in the future be held in dry storage for an extended period. The overall objectives of the Task 3 modeling plan are to: 1. Comprehensively model the combined effects of episodic breathing in vented storage systems/canisters using INL INTEC CPP-603 facility as an example. Both bulk gas phase radiolysis reactions and aluminum cladding surface gas generation reactions will be included into a 3-dimensional computational fluid dynamics (CFD) model to model and predict long-term evolutions of the temperature and concentrations of corrosive gases within unsealed canisters subjected to episodic breathing. 2. Comprehensively model sealed and inert canister storage system using DOE standard canister as an example. 3. Closely integrate with Task 1 and Task 2 for identification of main gas-generation reactions and kinetics and provide simulation results back to Task 1 and 2 to further refine experimental designs. This test plan lays out the technical activities that will be performed to achieve the test objectives described above. Simulations will be performed using the Idaho National Laboratory super computer Falcon.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Input Range Testing for the General Mission Analysis Tool (GMAT)

This document contains a test plan for testing input values to the General Mission Analysis Tool (GMAT). The plan includes four primary types of information, which rigorously define all tests that should be performed to validate that GMAT will accept allowable inputs and deny disallowed inputs. The first is a complete list of all allowed object fields in GMAT. The second type of information, is test input to be attempted for each field. The third type of information is allowable input values for all objects fields in GMAT. The final piece of information is how GMAT should respond to both valid and invalid information. It is VERY important to note that the tests below must be performed for both the Graphical User Interface and the script!! The examples are illustrated using a scripting perspective, because it is simpler to write up. However, the test must be performed for both interfaces to GMAT.

Hughes, Steven P.↗

Choosing a reliability inspection plan for interval censored data

Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Results show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.

97 MATHEMATICS AND COMPUTING↗

Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

Identifying and selecting alternative materials and technologies that have the potential to reduce the identified HazMats and hazardous air pollutants (HAPs), while incorporating sound corrosion prevention and control technologies, is a complicated task due to the fast pace at which new technologies emerge and rules change. The alternatives are identified through literature searches, electronic database and Internet searches, surveys, and/or personal and professional contacts. Available test data was then compiled on the proposed alternatives to determine if the materials meet the test objectives or if further)laboratory or field-testing will be required. After reviewing technical information documented in the PAR, government representatives, technical representatives from the affected facilities, and other stakeholders involved in the process will select the list of viable alternative coatings for consideration and testing under the project's Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes and Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, both prepared by ITB. Test results will be reported in a Joint Test Report upon completion oftesting. The selection rationale and conclusions are documented in this PAR. A cost benefit analysis will be prepared to quantify the estimated capital and process costs of coating alternatives and cost savings relative to the current coating processes, however, some initial cost data has been included in this PAR. For this coatings project, isocyanates, as found in aliphatic isocyanate polyurethanes, were identified as the target HazMat to be eliminated. Table 1-1 lists the target HazMats, the related process and application, current specifications, and affected programs.

Lewis, pattie↗

SU-E-T-04: 3D Dose Based Patient Compensator QA Procedure for Proton Radiotherapy

Purpose: In proton double-scattering radiotherapy, compensators are the essential patient specific devices to contour the distal dose distribution to the tumor target. Traditional compensator QA is limited to checking the drilled surface profiles against the plan. In our work, a compensator QA process was established that assess the entire compensator including its internal structure for patient 3D dose verification. Methods: The fabricated patient compensators were CT scanned. Through mathematical image processing and geometric transformations, the CT images of the proton compensator were combined with the patient simulation CT images into a new series of CT images, in which the imaged compensator is placed at the planned location along the corresponding beam line. The new CT images were input into the Eclipse treatment planning system. The original plan was calculated to the combined CT image series without the plan compensator. The newly computed patient 3D dose from the combined patientcompensator images was verified against the original plan dose. Test plans include the compensators with defects intentionally created inside the fabricated compensators. Results: The calculated 3D dose with the combined compensator and patient CT images reflects the impact of the fabricated compensator to the patient. For the test cases in which no defects were created, the dose distributions were in agreement between our method and the corresponding original plans. For the compensator with the defects, the purposely changed material and a purposely created internal defect were successfully detected while not possible with just the traditional compensator profiles detection methods. Conclusion: We present here a 3D dose verification process to qualify the fabricated proton double-scattering compensator. Such compensator detection process assesses the patient 3D impact of the fabricated compensator surface profile as well as the compensator internal material and structure changes. This research receives funding support from CURA Medical Technologies.

60 APPLIED LIFE SCIENCES↗

SU-F-T-249: Application of Human Factors Methods: Usability Testing in the Radiation Oncology Environment

Purpose: As a quality improvement measure, we undertook this work to incorporate usability testing into the implementation procedures for new electronic documents and forms used by four affiliated radiation therapy centers. Methods: A human factors specialist provided training in usability testing for a team of medical physicists, radiation therapists, and radiation oncologists from four radiotherapy centers. A usability testing plan was then developed that included controlled scenarios and standardized forms for qualitative and quantitative feedback from participants, including patients. Usability tests were performed by end users using the same hardware and viewing conditions that are found in the clinical environment. A pilot test of a form used during radiotherapy CT simulation was performed in a single department; feedback informed adaptive improvements to the electronic form, hardware requirements, resource accessibility and the usability testing plan. Following refinements to the testing plan, usability testing was performed at three affiliated cancer centers with different vault layouts and hardware. Results: Feedback from the testing resulted in the detection of 6 critical errors (omissions and inability to complete task without assistance), 6 non-critical errors (recoverable), and multiple suggestions for improvement. Usability problems with room layout were detected at one center and problems with hardware were detected at one center. Upon amalgamation and summary of the results, three key recommendations were presented to the document’s authors for incorporation into the electronic form. Documented inefficiencies and patient safety concerns related to the room layout and hardware were presented to administration along with a request for funding to purchase upgraded hardware and accessories to allow a more efficient workflow within the simulator vault. Conclusion: By including usability testing as part of the process when introducing any new document or procedure into clinical use, associated risks can be identified and mitigated before patient care and clinical workflow are impacted.

60 APPLIED LIFE SCIENCES↗

Joint Test Report for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel

Headquarters National Aeronautics and Space Administration (NASA) chartered the NASA Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) Avoid duplication of effort in actions required to reduce or eliminate hazardous materials through joint center cooperation and technology sharing. The objective of this project was to qualify candidate alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel applications at NASA facilities. This project compares the surface preparation/depainting performance of the proposed alternatives to existing surface preparation/depainting systems or standards. This Joint Test Report (JTR) contains the results of testing as per the outlines of the Joint Test Protocol (JTP), Joint Test Protocol for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, and the Field Test Plan (FTP), Field Evaluations Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, for critical requirements and tests necessary to qualify alternatives for coating removal systems. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of government and industry participants. This JTR documents the results of the testing as well as any test modifications made during the execution of the project. This JTR is made available as a reference for future pollution prevention endeavors by other NASA Centers, the Department of Defense and commercial users to minimize duplication of effort. The current coating removal processes identified herein are for polyurethane, epoxy and other paint systems applied by conventional wet-spray processes. A table summarizes the target hazardous materials, processes and materials, applications, affected programs, and candidate substrates.

Lewis, Pattie↗

Cost-Benefit Analysis for Alternatives to Aliphatic Isocyanate Polyurethanes

NASA and Air Force Space Command (AFSPC) have similar missions and therefore similar facilities and structures in similar environments. The standard practice for protecting metallic substrates in atmospheric environments is the application of an applied coating system. The most common topcoats used in coating systems are polyurethanes that contain isocyanates. Isocyanates are classified as potential human carcinogens and are known to cause cancer in animals. The primary objective of this effort was to demonstrate and validate alternatives to aliphatic isocyanate polyurethanes resulting in one or more isocyanate-free coatings qualified for use at AFSPC and NASA installations participating in this project. This Cost-Benefit Analysis (CBA) quantifies the estimated capital and process costs of coating alternatives and cost savings relative to the current coatings. The estimates in this CBA are to be used for assessing the relative merits of the selected alternatives. The actual economic effects at any specific facility will depend on the alternative material or technology implemented, the number of actual applications converted, future workloads, and other factors . The participants initially considered eighteen (18) alternative coatings as described in the Potential Alternatives Report entitled Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, prepared by ITB. Of those, 8 alternatives were selected for testing in accordance with the Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, and the Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives 10 Aliphatic Isocyanate Polyurethanes, both of which were prepared by ITB. A joint Test Report entitled Joint Test Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, prepared by ITB, documents the results of the laboratory and field testing, as well as any test modifications made during the execution of the testing. The coatings selected for evaluation in this CBA are shown in the table below. Only one control coating system is considered in this analysis. These coatings were either downselected for Phase II or performed well enough to be included in the Qualified Products List in the NASA technical standard NASA-STD-5008, Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment.

Lewis, Pattie↗

Engineering Scale Testing of Transformational Non-Aqueous Solvent-Based CO 2 Capture Process at Technology Center Mongstad

Progress is reported for the period from August 8, 2018 to June 30, 2023. This final report involves work performed under ten tasks spanning two budget periods. The tasks are Task 1 Project Management, Task 2 TCM EH&S Risk Evaluation and Permitting, Task 3 Solvent Qualification, Task 4 Preliminary Design of NAS Optimized System, Task 5 TCM Amine Plant Equipment Procurement, Modification and Commissioning, Task 6 Solvent Production, Task 7 NAS Modified Amine Plant Test Plan Development, Testing, and Data Analysis, Task 8 Decommissioning and Waste Handling, Task 9 Final Techno-Economic Assessment and EH&S Risk Assessment, and Task 10 Cost Benefit Analysis and Technology Maturation Planning.

01 COAL, LIGNITE, AND PEAT↗