Search NASA⌕ Search

SEARCH · Search NASA

Results for “WASTE PROCESSING PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Panel Session 2: Hot Topics in US DOE Environmental Management

The well-attended Panel Session was chaired by Martin Schneider. The four panelists did not provide presentations. Rather the session was a discussion focusing on pressing issues facing US DOE Environmental Management (EM) sites and how the program is moving forward. The session began by momentarily reflecting on a success: the three Tank Waste Treatment Facilities will soon be coming online. These three facilities will treat as much waste in two years as was treated in the past 30 years. That is a significant milestone in progress. Also, safety enhancements at WIPP are a big success. The panelists noted that there will be challenges with the victories of the startup of the Waste Treatment Facilities. Treating tank waste is the last EM mission and will help with the relationships with the stakeholders, regulators and Congress. One of the biggest challenges will be moving back to full operation mode. Although the operation will increase productivity of reducing/managing the tank waste, it will decrease life cycle cost and lessen years of cleanup. The challenge will be having people understand that EM will be operating 24/7 and that maintenance will be key in keeping the operations. EM will be working together with the regulators to show tangible progress that will be effective and efficient. By working together, they can find opportunities/technologies for streamlining and accelerating cleanup. Recent changes to the regulatory framework between DOE-EM Los Alamos Field Office and New Mexico Environmental Department have helped cleanup in Los Alamos. Every year EM and the agencies review progress and come to agreements on the next work priorities. At Savannah River Site, the Federal Facility Agreement among EM, South Carolina Department of Health and Environmental Control, and Environmental Protection Agency (EPA) has developed a small core team that work are shared by together in resolving issues that come up. The discussion moved on to how progress can be made by sharing lessons learned among the contractors. An example of how these learned lessons can be shared is that key representatives from projects across the EM sites participate in various forums to review/contribute to the work planned. Other opportunities can be by temporary assignments of DOE staff to gain experience and by monthly EM Headquarters report that provide the lessons learned across the EM sites. The panelists discussed how skyline changes are the best examples of tangible progress. Decontamination and Demolition (D and D) of structures are the easiest tangible progress that can be seen. Whereas tank waste cleanup is the hardest to see. Disposal of waste onsite versus offsite is another challenge, and timely discussions are necessary to get to the best value to the government.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Evaporation on Vapor Space Flammability in DWPF Process Vessels - 20278

The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) processes liquid high-level waste (HLW) and encapsulates it in glass within stainless-steel containers suitable for safe, long-term storage and disposal. Radiolytic and chemical decomposition of the liquid waste generates hydrogen and other flammable gases creating a hazard. The rate of flammable gas generation increases by an order of magnitude as temperature increases from sub-boiling to boiling. DWPF controls this hazard in process tanks by ensuring a minimum purge flow through each tank's head space. The minimum purge flow rate is established assuming dry air and neglecting evaporation. However, this study determined that steam from boiling in a representative process tank is sufficient to dilute flammable gases and, thereby, preclude flammability. For sub-boiling, water vapor is an insufficient diluent considering hydrogen's lower flammable limit (LFL) in air. However, the upper and lower flammable limits approach each other in a hydrogen-air-water-vapor environment as the water vapor concentration increases. This effect may preclude flammable conditions if water vapor concentration is about 60 volume percent or higher. A saturated, constant-pressure air-water system would achieve 60 volume percent water vapor at 86 deg. C. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOWNSTREAM IMPACTS OF SLUDGE MASS REDUCTION VIA ALUMINUM DISSOLUTION ON DWPF PROCESSING OF SAVANNAH RIVER SITE HIGH LEVEL WASTE - 9382

The SRS sludge that was to become a major fraction of Sludge Batch 5 (SB5) for the Defense Waste Processing Facility (DWPF) contained a large fraction of H-Modified PUREX (HM) sludge, containing a large fraction of aluminum compounds that could adversely impact the processing and increase the vitrified waste volume. It is beneficial to reduce the non-radioactive fraction of the sludge to minimize the number of glass waste canisters that must be sent to a Federal Repository. Removal of aluminum compounds, such as boehmite and gibbsite, from sludge can be performed with the addition of NaOH solution and heating the sludge for several days. Preparation of SB5 involved adding sodium hydroxide directly to the waste tank and heating the contents to a moderate temperature through slurry pump operation to remove a fraction of this aluminum. The Savannah River National Laboratory (SRNL) was tasked with demonstrating this process on actual tank waste sludge in our Shielded Cells Facility. This paper evaluates some of the impacts of aluminum dissolution on sludge washing and DWPF processing by comparing sludge processing with and without aluminum dissolution. It was necessary to demonstrate these steps to ensure that the aluminum removal process would not adversely impact the chemical and physical properties of the sludge which could result in slower processing or process upsets in the DWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STEAM REFORMING TECHNOLOGY DEMONSTRATION FOR THE DESTRUCTION OF ORGANICS ON ACTUAL DOE SAVANNAH RIVER SITE TANK 48H WASTE 9138

This paper describes the design of the Bench-scale Steam Reformer (BSR); a processing unit for demonstrating steam reforming technology on actual radioactive waste [1]. It describes the operating conditions of the unit used for processing a sample of Savannah River Site (SRS) Tank 48H waste. Finally, it compares the results from processing the actual waste in the BSR to processing simulant waste in the BSR to processing simulant waste in a large pilot scale unit, the Fluidized Bed Steam Reformer (FBSR), operated at Hazen Research Inc. in Golden, CO. The purpose of this work was to prove that the actual waste reacted in the same manner as the simulant waste in order to validate the work performed in the pilot scale unit which could only use simulant waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PILOT-SCALE HYDRAULIC TESTING OF RESORCINOL FORMALDEHYDE ION EXCHANGE RESIN

Savannah River National Laboratory (SRNL) performed pilot-scale hydraulic/chemical testing of spherical resorcinol formaldehyde (RF) ion exchange (IX) resin for the River Protection Project-Hanford Tank Waste Treatment & Immobilization Plant (WTP) Project. The RF resin hydraulic cycle testing was conducted in two pilot-scale IX columns, 1/4 and 1/2 scale. A total of twenty-three hydraulic/chemical cycles were successfully completed on the spherical RF resin. Sixteen of these cycles were completed in the 24-inch IX Column (1/2 scale column). Hydraulic testing showed that the permeability of the RF resin remained essentially constant, with no observed trend in the reduction of the permeability as the number of cycles increased. The permeability during the pilot-scale testing was 3 times better than the design requirements of the WTP full-scale IX system. The RF resin bed showed no tendency to form fissures or pack more densely as the number of cycles increased. Particle size measurements of the RF resin showed no indication of particle size change (for a given chemical) with cycles and essentially no fines formation. The permeability of the resin bed was uniform with respect to changes in bed depth. Upflow Regeneration and Simulant Introduction in the IX columns revealed another RF resin benefit; negligible radial pressures to the column walls from the swelling of resin beads. The hydraulic and chemical performance of the spherical RF resin during cycle testing was found to be superior to all other tested IX resins. The pilot-scale testing indicates that the RF resin is durable and should hold up to many hydraulic cycles in actual radioactive Cesium (Cs) separation.

99 GENERAL AND MISCELLANEOUS↗

SUCCESSES AND EMERGING ISSUES IN SIMULATING THE MIXING BEHAVIOR OF LIQUID-PARTICLE NUCLEAR WASTE SLURRIES AT THE SAVANNAH RIVER SITE - 211B

Aqueous radioactive high-level waste slurries are combined during processing steps that ultimately produce a stable borosilicate glass waste form. Chemically treated waste slurries are combined with each other and with glass frit-water slurries to produce the melter feed. Understanding the evolution of the rheological properties of the slurries is an important aspect of removing and treating the stored waste. To a first approximation, combinations of colloidal waste slurry with {approx}0.1-mm mean diameter glass frit or glass beads act in an analogous matter to slurries of spherical beads in Newtonian liquids. The non-Newtonian rheological properties of the waste slurries without frit, however, add complexity to the hydrodynamic analysis. The use of shear rate dependent apparent viscosities with the modified Einstein equation was used to model the rheological properties of aqueous frit-waste slurries.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CHARACTERIZATION OF INDIVIDUAL CHEMICAL REACTIONS CONSUMING ACID DURING NUCLEAR WASTE PROCESSING AT THE SAVANNAH RIVER SITE - 136B

Conversion of legacy radioactive high-level waste at the Savannah River Site into a stable glass waste form involves a chemical pretreatment process to prepare the waste for vitrification. Waste slurry is treated with nitric and formic acids to achieve certain goals. The total quantity of acid added to a batch of waste slurry is constrained by the catalytic activity of trace noble metal fission products in the waste that can convert formic acid into hydrogen gas at many hundreds of times the radiolytic hydrogen generation rate. A large block of experimental process simulations were performed to characterize the chemical reactions that consume acid prior to hydrogen generation. The analysis led to a new equation for predicting the quantity of acid required to process a given volume of waste slurry.

08 HYDROGEN↗

DEVELOPMENT AND DEPLOYMENT OF VACUUM SALT DISTILLATION AT THE SAVANNAH RIVER SITE

The Savannah River Site has a mission to dissolve fissile materials and disposition them. The primary fissile material is plutonium dioxide (PuO{sub 2}). To support dissolution of these materials, the Savannah River National Laboratory (SRNL) designed and demonstrated a vacuum salt distillation (VSD) apparatus using both representative radioactive samples and non-radioactive simulant materials. Vacuum salt distillation, through the removal of chloride salts, increases the quantity of materials suitable for processing in the site's HB-Line Facility. Small-scale non-radioactive experiments at 900-950 C show that >99.8 wt % of the initial charge of chloride salt distilled from the sample boat with recovery of >99.8 wt % of the ceric oxide (CeO{sub 2}) - the surrogate for PuO{sub 2} - as a non-chloride bearing 'product'. Small-scale radioactive testing in a glovebox demonstrated the removal of sodium chloride (NaCl) and potassium chloride (KCl) from 13 PuO{sub 2} samples. Chloride concentrations were distilled from a starting concentration of 1.8-10.8 wt % to a final concentration <500 mg/kg chloride. Initial testing of a non-radioactive, full-scale production prototype is complete. A designed experiment evaluated the impact of distillation temperature, time at temperature, vacuum, product depth, and presence of a boat cover. Significant effort has been devoted to mechanical considerations to facilitate simplified operation in a glovebox.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste heat utilization in industrial processes

A survey is given of new developments in heat exchangers and heat pumps. With respect to practical applications, internal criteria for plant operation are discussed. Possibilities of government support are pointed out. Waste heat steam generators and waste heat aggregates for hot water generation or in some cases for steam superheating are used. The possibilities of utilization can be classified according to the economic improvements and according to their process applications, for example, gascooling. Examples are presented for a large variety of applications.

Weichsel, M.↗

Wastewater to Plant Nutrient System

Vision and Mission Statement During human space exploration missions longer than 30 days (500 days to indefinite; as defined by NASA strategic plan), a spacefaring crew will generate liquid waste that can be recovered and processed to create nutrients for a plant food production system. In addition, the sodium in urine has a potential to build-up in the system and is not useful as a plant fertilizer since it can stress plants at high concentrations. Finding a way to separate these products and retrieve them for other use is critical for long duration missions. This is useful since it can greatly reduce the amount of overall mission mass.

Robert Gitten↗

Hydrothermal Liquefaction and Upgrading of Municipal Wastewater Treatment Plant Sludge: A Preliminary Techno-Economic Analysis, Rev.1

A preliminary process model and techno-economic analysis (TEA) was completed for fuel produced from hydrothermal liquefaction (HTL) of sludge waste from a municipal wastewater treatment plant (WWTP) and subsequent biocrude upgrading. The model is adapted from previous work by Jones et al. (2014) for algae HTL, using experimental data generated in fiscal year 2015 (FY15) bench-scale HTL testing of sludge waste streams. Testing was performed on sludge samples received from Metro Vancouver’s Annacis Island WWTP (Vancouver, B.C.) as part of a collaborative project with the Water Environment and Reuse Foundation (WERF). The full set of sludge HTL testing data from this effort will be documented in a separate report to be issued by WERF. This analysis is based on limited testing data and therefore should be considered preliminary. In addition, the testing was conducted with the goal of successful operation, and therefore does not represent an optimized process. Future refinements are necessary to improve the robustness of the model, including a cross-check of modeled biocrude components with the experimental GCMS data and investigation of equipment costs most appropriate at the relatively small scales used here. Environmental sustainability metrics analysis is also needed to understand the broader impact of this technology pathway. The base case scenario for the analysis consists of 10 HTL plants, each processing 100 dry U.S. ton/day (92.4 ton/day on a dry, ash-free basis) of sludge waste and producing 234 barrel per stream day (BPSD) biocrude, feeding into a centralized biocrude upgrading facility that produces 2,020 barrel per standard day of final fuel. This scale was chosen based upon initial wastewater treatment plant data collected by PNNL’s resource assessment team from the EPA’s Clean Watersheds Needs Survey database (EPA 2015a) and a rough estimate of what the potential sludge availability might be within a 100-mile radius. In addition, we received valuable feedback from the wastewater treatment industry as part of the WERF collaboration that helped form the basis for the selected HTL and upgrading plant scales and feedstock credit (current cost of disposal). It is assumed that the sludge is currently disposed of at $16.20/wet ton ($46/dry ton at 35% solids; $50/ton dry, ash-free basis) and this is included as a feedstock credit in the operating costs. The base case assumptions result in a minimum biocrude selling price of $3.8/gge and a minimum final upgraded fuel selling price of $4.9/gge. Several areas of process improvement and refinements to the analysis have the potential to significantly improve economics relative to the base case: •Optimization of HTL sludge feed solids content •Optimization of HTL biocrude yield •Optimization of HTL reactor liquid hourly space velocity (LHSV) •Optimization of fuel yield from hydrotreating •Combined large and small HTL scales specific to regions (e.g., metropolitan and suburban plants) Combined improvements believed to be achievable in these areas can potentially reduce the minimum selling price of biocrude and final upgraded fuel by about 50%. Further improvements may be possible through recovery of higher value components from the HTL aqueous phase, as being investigated under separate PNNL projects. Upgrading the biocrude at an existing petroleum refinery could also reduce the MFSP, although this option requires further testing to ensure compatibility and mitigation of risks to a refinery. And finally, recycling the HTL aqueous phase product stream back to the headworks of the WWTP (with no catalytic hydrothermal gasification treatment) can significantly reduce cost. This option is uniquely appropriate for application at a water treatment facility but also requires further investigation to determine any technical and economic challenges related to the extra chemical oxygen demand (COD) associated with the recycled water.

09 BIOMASS FUELS↗

Chemicals from biomass - The U.S. prospects for the turn of the century

Historically, chemicals from biomass have been and are expected to be economical in three major areas: byproducts, specialty items and polymers. Assessments of producing major chemicals from biomass in a processing plant based on the available conversion techniques indicate that they are not economically attractive, with the possible exception of conversion to ammonia and ethanol. The deterrents are the heavy capital investments, dependability of raw material supply and transportation costs for large plants, lack of operation experience, inadaptability of market variations, and competition from petroleum and coal. More importantly, it is also shown that even if chemicals from biomass were economical today, the resultant savings in petroleum would be far less than those achieved through other options available for the utilization of biomass as fuel and structural material. Thus, it is concluded that near-term research and development must be toward improved conversion processes, recovery of valuable products from waste streams at existing plants, more efficient use of biomass of energy and more efficient production of superior material products.

Sarbolouki, M. N.↗

FY24 Task 5: Leachate Disposition

Directly feeding sludge solids to the high-level waste (HLW) Waste Treatment Plant represents an alternative flowsheet seeking to initiate sludge processing as soon as possible. Key processing functions previously captured during baseline pretreatment operations include leaching and washing prior to solids concentration. These operations should be considered in the potential direct feed flowsheets to maximize waste feed loading, minimize HLW volume, and mitigate corrosion challenges associated with vitrification of high phosphate and fluoride concentrations. Additionally, single-shell tank (SST) retrievals and waste transfers to double-shell tanks (DSTs) in a direct feed flowsheet would likely also benefit from some level of leaching, washing, and solids concentration in order to reduce DST space and mission duration. These operations could occur in a new facility or potentially in available DSTs. If washing and leaching are utilized, an effective disposition pathway for the wash water and leachate solutions are needed. Three target species that benefit significantly from leaching and washing are phosphate, fluoride and aluminum. Phosphate (PO 4 3- ) and fluoride (F - ) can contribute substantially to the amount of carrier fluid needed for dissolution, and the resulting volume of liquid generated. Disposition of this retrieval solution should be evaluated in order to prevent crystallization of these anions throughout system processing. Since there is a high probability that any retrieval solutions will be at or near their PO 4 3- and F - solubility limits, evaporation or blending with a high Na supernate (>3.5 M) is not recommended for the wash water streams without a method to remove precipitants prior to solution disposal. Additionally, aluminum present in the southeast quadrant of the Hanford site represents roughly 60% of the waste solids in the initial processing tanks. These aluminum solids are in the form of gibbsite (Al(OH) 3 ) and can pose significant challenges for processing due to the fast-settling times and high solids loading associated with these materials. Easily remediated by caustic addition to the solids, these wash solutions could be processed through crystalline silicotitanate (CST) ion exchange columns to prepare the supernate solutions for disposition. The current target for feed conditions to the Low Activity Waste (LAW) melter are waste streams that contain nominally 5-6 M Na. Fractions within the tanks contain upwards of 0.2 M phosphate and fluoride in solution at 3.5 M Na. Concentrating these solutions above 5 M Na would result in an exceedance of the solubility limits, and potential for uncontrolled precipitation of the phosphate and fluoride crystal material. The resulting crystalline salt material is typically sodium fluoride phosphate, also referred to as natrophosphate (Na 7 FPO 4 ·19H 2 O). Salt phases are of importance in tank waste due to their chemical reactivity, which can result in precipitation, dissolution, or transformation, impacting any downstream processes (Bolling et al. 2020, Russell, Snow, and Peterson 2010). Salt generation and precipitation could pose challenges by causing system plugging and melter corrosion if left in the supernate stream, or limit sodium molarity of the supernate that would be accepted without incident in waste operations. To understand the impact of this salt generation, the crystallization of natrophosphate in multiple simulant feed matrices was studied to understand the implications of various tank waste supernate chemistries. Three matrices were examined: high PO 4 3- /low F - , low PO 4 3- /high F - , and an average matrix. Subsequent testing was performed with the average matrix with the inclusion of CsNO 3 , and a final run with the average matrix including CsNO 3 and a 137 Cs spike for tracer purposes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transitioning from Construction to Startup at WTP from a Plant Engineering Perspective - 16461

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind facility being designed, built and commissioned for the U.S. Department of Energy by Bechtel National, Inc. and principal subcontractor URS to solidify liquid radioactive waste stored in underground tanks at the Hanford Site. WTP consists of 20 infrastructure facilities and structures, known as Balance of Facilities, designed to support the Plant's four major facilities - Pretreatment Facility, High-Level Waste Vitrification Facility, Low-Activity Waste Vitrification Facility and the Analytical Laboratory. As construction moves toward startup and commissioning, a turnover process facilitates the transition of facilities and systems between organizations. The transition from Construction is initiated by an approved Design Completion List, which documents that design and construction have been completed, and the facility or system is ready for startup testing. Qualified individuals perform an inspection to ensure the facility or system has been constructed per the design during an eight-week engineering walk-down. During this phase in turnover, Plant Engineering personnel are responsible for updating and maintaining the Master Equipment List, developing spare parts recommendations, developing and issuing instrument calibration data sheets, evaluating temporary modifications, and supporting plant operations and maintenance activities. As of 2015, two electrical switchgear buildings and the non-radioactive liquid waste disposal system have been turned over from Construction to Startup. This paper discusses the turnover process, organizational interfaces, and experiences from a Plant Engineering perspective. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH-TRU Waste Streams: HFDA Crucibles Create New Complex Waste Stream

This project focuses on the removal of the Hot Fuel Dissolution Apparatus (HFDA) crucibles from the Hot Fuel Examination Facility’s (HFEF) hot cells to create space for upcoming projects. The project team has created a crucible and pyro-salt non-debris waste stream that can be disposed of at Waste Isolation Pilot Plant (WIPP). Chemical Compatibility Examinations (CCEs) must be performed on candidate waste by reviewing the types of chemicals used in the experiments, information found in INL Process Knowledge Summary Reports (PKSRs), and Environmental Protection Agency guides on chemical compatibility. The CCEs identify which chemicals can be safely combined to ensure adverse reactions do not occur in the waste packages. The CCEs are then used to update the PKSR, Basis of Knowledge, and Acceptable Knowledge documents and demonstrate compliance with the WIPP Waste Acceptance Criteria. Once documents are finalized, they are reviewed and approved by the WIPP Central Characterization Project (CCP) to ensure proper waste stream characterization. After the documents are approved, the crucibles can be packaged and shipped to the Idaho Nuclear Technical and Engineering Center for storage awaiting certification. CCP will certify the waste using the approved documents and a series of confirmatory testing before being shipped and disposed in WIPP’s deep geological repository. Currently, the CCE is in progress and the PKSRs are being updated.

Basis of Knowledge↗

Performance-based simulants for Hanford radioactive waste treatment process testing

Radioactive wastes from nuclear fuel processing are stored in large underground storage tanks at the Hanford Nuclear Reservation. Treatment and remediation require that waste feed from the storage tanks be delivered to the Hanford Tank Waste Treatment and Immobilization Plant continually for the duration of the treatment mission. Furthermore, the complex physical and chemical processes required for this mission, the significant scale, and the hazardous nature of the waste necessitate the use of simulants in process testing. A new class of simulants, “performance-based simulants,” has been developed to match the process performance of the simulant to actual waste performance data.

Hanford tank waste treatment↗

Optimising energy recovery and use of chemicals, resources and materials in modern waste-to-energy plants

Highlights: • WtE plants are to be optimized beyond current acceptance levels. • Emission and consumption data before and after 5 technical improvements are discussed. • Plant performance can be increased without introduction of new techniques or re-design. • Diagnostic skills and a thorough understanding of processes and operation are essential. - Abstract: Due to ongoing developments in the EU waste policy, Waste-to-Energy (WtE) plants are to be optimized beyond current acceptance levels. In this paper, a non-exhaustive overview of advanced technical improvements is presented and illustrated with facts and figures from state-of-the-art combustion plants for municipal solid waste (MSW). Some of the data included originate from regular WtE plant operation – before and after optimisation – as well as from defined plant-scale research. Aspects of energy efficiency and (re-)use of chemicals, resources and materials are discussed and support, in light of best available techniques (BAT), the idea that WtE plant performance still can be improved significantly, without direct need for expensive techniques, tools or re-design. In first instance, diagnostic skills and a thorough understanding of processes and operations allow for reclaiming the silent optimisation potential.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS SWPF Construction Completion

Now that construction is complete, DOE and construction contractor Parsons, are focusing on testing the Savannah River Site’s Salt Waste Processing Facility (SWPF) systems and training the workforce to operate the plant in preparation for the start of operations. Once in operation, the SWPF will significantly increase processing rates at SRS tank farms in an effort to empty the site’s high-level radioactive waste tanks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗