Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerator test facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Towards 20 A negative hydrogen ion beams for up to 1 h: Achievements of the ELISE test facility (invited)

The large-scale RF-driven ion source of the test facility extraction from a large ion source experiment is aimed to deliver an accelerated ion current of 20 A D{sup −} (23 A H{sup −}) with an extracted electron-to-ion ratio below one for up to 1 h. Since the first plasma pulses for 20 s in volume operation in early 2013, followed by caesiation of the ion source, substantial progress has been achieved in extending the pulse length and the RF power. The record pulses in hydrogen are stable 400 s pulses with an extracted ion current of 18.3 A at 180 kW total RF power and 9.3 A at 80 kW stable for 1 h. For deuterium pulse, length and RF power are limited by the amount of co-extracted electrons.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning of the IOTA Proton Injector

The IOTA Proton Injector (IPI) at the Fermilab Accelerator Science and Technology facility (FAST) is a machine capable of delivering up to 14 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. Its construction was completed in the fall of 2025, followed by a successful commissioning run scheduled to conclude at the end of May 2026. It operates alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the current operational profile, known challenges, and future plans for the proton program development at FAST.

Romanov, A. [Fermilab] (ORCID:0000000287065709)↗

Introduction of the PELICAN loop, a Full-Scale Pressure Drop Test Facility

The Versatile Test Reactor (VTR) is a test reactor currently under development by the US Department of Energy. This reactor will rely on fast neutrons enabling novel and wide-ranging experiment to support the development of the various advanced reactor technologies. With the high flux achievable, accelerated testing of fluid and materials will be made possible. To support VTR design efforts [1], an experimental facility has been designed and constructed at Argonne National Laboratory to recreate the hydraulic flow conditions within the VTR’s primary heat transport system (PHTS). This facility, the Pressure drop Experimental Loop for Investigations of Core Assemblies in advanced Nuclear reactors, PELICAN, measures the pressure drop across a full-scale fuel assembly containing prototypic axial reflectors, fuel, and plena components. Here, we first describe the design considerations required to recreate aspects of the VTR. Then we discuss the design and construction of PELICAN to address these design requirements, the design and construction of the test articles placed inside PELICAN’s test section, and finally present some of the first experimental results.

Grannan, A. M.↗

A New Control Room for SLAC Accelerators

We are planning to construct a new control room at SLAC to unify and improve the operation of the LCLS, SPEAR3, and FACET accelerator facilities, and to provide the space and flexibility needed to support the LCLS-II and proposed new test beam facilities. The existing control rooms for the linac and SPEAR3 have been upgraded in various ways over the last decade, but their basic features have remained unchanged. We propose to build a larger modern Accelerator Control Room (ACR) in the new Research Support Building (RSB) which is currently under construction at SLAC. Shifting the center of control for the accelerator facilities entails both technical and administrative challenges. In this paper, we describe the history, concept, and status of this project.

43 PARTICLE ACCELERATORS↗

A Parasitic Electron Beam and Tagged Photon Beam

A parasitic electron beam facility has been developed at the Mark III linear accelerator, Stanford University. The beam has been used both for physics experiments and for counter and spark chamber tests, even though the beam intensity is very low. A tagged photon beam was installed as part of the facility. A description of the two beams and a short discussions of the applications of these beams is included.

43 PARTICLE ACCELERATORS↗

Design and commissioning of an e-beam irradiation beamline at the Upgraded Injector Test Facility at Jefferson Lab

We report the Upgraded Injector Test Facility (UITF) at Jefferson Lab is a continuous-wave superconducting linear accelerator capable of providing an electron beam with energy up to 10 MeV. A beamline for electron-beam irradiation has been designed, installed and successfully commissioned at this facility, aimed at the degradation study of 1,4-dioxane and per- and polyfluoroalkyl substances (PFAS) in wastewater treatment. A solenoid with a peak axial magnetic field of up to 0.28 T and a set of raster coils were used to obtain a Gaussian beam profile with a transverse standard deviation of ~ 15.0 mm at the target location. Monte-Carlo simulations using FLUKA were carried out to calculate the total absorbed dose and the dose distribution in the sample volume inside the target cell. The simulations were benchmarked experimentally by dosimetry mapping using optichromic dosimeters. The results of the irradiation experiments showed a ~ 95% reduction of 1,4-dioxane in ultra-pure water for a dose of 1 kGy, demonstrating the potential of electron-beam irradiation towards addressing growing challenges in environmental remediation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Reduction of ablated surface expansion in pulsed-power-driven experiments using an aerosol dielectric coating

The quality of warm dense matter samples created by magnetic compression can be largely affected by material ablation. When the ablated material carries currents, local instabilities can grow, which can lead to nonuniformities in the final magnetic pressure. Extending the previous work by Peterson et al., Awe et al., and Hutchison et al., the experiments reported here demonstrate that the expansion of the ablated material can be significantly reduced by using a simple aerosol spray technique. Coating the current-carrying surfaces with a 30–60-μm layer of polyurethane reduced the expansion of the ablated material by a factor of 2 and eliminated material ejections from sharp corners. Here, this technique, tested at the Michigan Accelerator for Inductive Z-Pinch Experiments pulsed power facility at the University of Michigan with currents up to 400 kA, could allow the production of homogeneous warm dense matter samples on pulsed-power drivers. Because of the simplicity of this method, this work brings forth an important contribution to pulsed-power-driven experiments designed to study nuclear fusion, material properties, and radiation science.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Earth's Magnetic Field Measurements for the LCLS Undulators

Measurements of the earth's magnetic field at several locations at SLAC were conducted to determine the possible field error contribution from tuning the undulators in a location with a different magnetic field than that which will be found in the undulator hall. An average difference of 0.08 {+-} 0.04 Gauss has been measured between the downward earth's field components in the test facility and SLAC tunnel locations.

43 PARTICLE ACCELERATORS↗

Reduction of ablated surface expansion in pulsed-power-driven experiments using an aerosol dielectric coating (Final Technical Report)

The quality of warm dense matter samples created by magnetic compression can be largely affected by material ablation. When the ablated material carries currents, local instabilities can grow, which can lead to nonuniformities in the final magnetic pressure. Extending the previous work by Peterson et al. [Phys. Rev. Lett. 112, 135002 (2014)], Awe et al. [Phys. Rev. Lett. 116, 065001 (2016)], and Hutchison et al. [Phys. Rev. E 97, 053208 (2018)], the experiments reported here demonstrate that the expansion of the ablated material can be significantly reduced by using a simple aerosol spray technique. Coating the current-carrying surfaces with a 30–60-μm layer of polyurethane reduced the expansion of the ablated material by a factor of 2 and eliminated material ejections from sharp corners. This technique, tested at the Michigan Accelerator for Inductive Z-Pinch Experiments pulsed power facility at the University of Michigan with currents up to 400 kA, could allow the production of homogeneous warm dense matter samples on pulsed-power drivers. Because of the simplicity of this method, this work brings forth an important contribution to pulsed-power-driven experiments designed to study nuclear fusion, material properties, and radiation science.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

DARHT Axis 1 Bremsstrahlung Dose Measurements

he Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility provides flash radiography ca pabilities using two electron Linear Induction Accelerators (LIA’s). Axis-1 of DARHT produces, nominally, a 20-MeV, 1.5-kA, 80-ns-Full Width at Half Max (FWHM) electron beam. The elec tron beam is focused on to a tantalum target to produce a Bremsstrahlung x-ray dose for flash radiography of dynamic systems. This paper will describe and compare a variety of techniques for determining the x-ray dose for two different beam currents produced by a 55mm and 70mm diameter cathode. The data was taken in November of 2022 on DARHT Axis 1. The experimen tal measurement techniques include a platinum calorimeter, a diamond radiation detector (DRD), and a Compton diode (CD). Gafchromic EBT3 self-developing dosimetry film was also used, but no useful results were obtained. Beam charge and energy were recorded and dose was calculated with this information using xtr with Dosecalcx, and simple dose charge-energy scaling. In this pa per, we will discuss the target geometry and experimental layout, the methods of measuring dose, dose diagnostics and measurement of beam charge and energy, and the comparisons of data and calculations.

43 PARTICLE ACCELERATORS↗

Development of a machine protection system for the Superconducting Beam Test Facility at Fermilab

Fermilab's Superconducting RF Beam Test Facility currently under construction will produce electron beams capable of damaging the acceleration structures and the beam line vacuum chambers in the event of an aberrant accelerator pulse. The accelerator is being designed with the capability to operate with up to 3000 bunches per macro-pulse, 5Hz repetition rate and 1.5 GeV beam energy. It will be able to sustain an average beam power of 72 KW at the bunch charge of 3.2 nC. Operation at full intensity will deposit enough energy in niobium material to approach the melting point of 2500 C. In the early phase with only 3 cryomodules installed the facility will be capable of generating electron beam energies of 810 MeV and an average beam power that approaches 40 KW. In either case a robust Machine Protection System (MPS) is required to mitigate effects due to such large damage potentials. This paper will describe the MPS system being developed, the system requirements and the controls issues under consideration.

43 PARTICLE ACCELERATORS↗

Animation of Fermilab's Accelerator Complex

The 6,800-acre Fermilab site is home to a chain of particle accelerators that provide particle beams to numerous experiments and R&D programs. This 2-minute animation explains how the proton source provides the particles that get accelerated and travel through the accelerator complex at close to the speed of light. Scientists use these beams to generate protons, neutrons, muons, pions and neutrinos for various research areas across the Fermilab site. More than 4,000 scientists from over 50 countries use Fermilab and its particle accelerators, detectors and computers for their research. More information is at http://www.fnal.gov/pub/science/.

43 PARTICLE ACCELERATORS↗

Sub-nanosecond switching and acceleration to relativistic energies of field emission electron bunches from metallic nano-tips

The authors explore the generation of short electron bunches from a field-emitter array cathode consisting of nanometer-sized metallic tips that is compatible with an acceleration electric field above 10 MV/m. Sub-nanosecond field emission electron bunches were generated by applying fast electrical pulses to an on-chip electron extraction gate electrode of the cathode. The subsequent acceleration of the field emission electron bunches to 5 MeV was demonstrated using the combined diode-RF cavity SwissFEL electron gun test facility.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Investigation of ion beam space charge compensation with a 4-grid analyzer

Experiments to investigate the space charge compensation of pulsed high-current heavy ion beams are performed at the GSI ion source text benches with a 4-grid analyzer provided by CEA/Saclay. The technical design of the 4-grid analyzer is revised to verify its functionality for measurements at pulsed high-current heavy ion beams. The experimental investigation of space charge compensation processes is needed to increase the performance and quality of current and future accelerator facilities. Measurements are performed directly downstream a triode extraction system mounted to a multi-cusp ion source at a high-current test bench as well as downstream the post-acceleration system of the high-current test injector (HOSTI) with ion energies up to 120 keV/u for helium and argon. At HOSTI, a cold or hot reflex discharge ion source is used to change the conditions for the measurements. The measurements were performed with helium, argon, and xenon and are presented. Results from measurements with single aperture extraction systems are shown.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Helium recovery system at IB3a

The increasing need for optimal and sustainable use of cryogenic resources to support Fermilab’s scientific mission has highlighted the necessity of improving the Laboratory’s helium management practices. An assessment of cryogenic test facilities identified the Technical Division’s Industrial Building 3a (IB3A) as a key site requiring upgrades to integrate a helium recovery system. The IB3A facility is essential for characterizing and testing superconductors, cables, and coils for various R&D projects, including the US High-Luminosity LHC Accelerator Upgrade Project (AUP), Mu2e, and other external collaborations. Currently, the facility relies on 500 L helium Dewars and vents the vaporized helium directly into the atmosphere, leading to significant helium loss. Given the non-renewable nature of helium, recovering and reusing this resource is critical for the sustainability of Fermilab’s operations. To address this challenge, a project has been initiated to connect IB3A to an existing helium purification station and refrigeration system located in another building via a dedicated pipeline pass over the roof of several buildings. This solution will enable the efficient capture of vented helium, its transfer to the purification station, and subsequent liquefaction for reuse in future operations. The project includes a detailed design phase, specifying the pipeline route, flow control mechanisms, and integration with the existing cryogenic infrastructure, followed by phased implementation and commissioning. By implementing this pipeline connection and upgrading IB3A, Fermilab aims to significantly reduce helium waste, lower operational costs, and align with its commitment to sustainability. This initiative provides a model for resource-efficient cryogenic operations and reinforces the Laboratory’s capacity to support its science mission for the long term.

Porwisiak, D. [Fermilab]↗

Test Results of the LQXFA/B02 and LQXFA/B03 Cryo-Assemblies for the High Luminosity LHC Upgrade

Here, the US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.

Chlachidze, Guram [Fermi National Accelerator Labo↗

Fermilab Antiproton source, Recycler ring and Main Injector

The antiproton source for a proton-antiproton collider at Fermilab was proposed in 1976 [1]. The proposal argued that the requisite luminosity (~10 29 cm -2 sec -1 ) could be achieved with a facility that would produce and cool approximately 10 11 antiprotons per day. Funding for the Tevatron I project (to construct the Antiproton source) was initiated in 1981 and the Tevatron ring itself was completed, as a fixed target accelerator, in the summer of 1983 and the Antiproton Source was completed in 1985. At the end of its operations in 2011, the Fermilab antiproton production complex consisted of a sophisticated target system, three 8-GeV storage rings (namely the Debuncher, Accumulator and Recycler), 25 independent multi-GHz stochastic cooling systems, the world’s only relativistic electron cooling system and a team of technical experts equal to none. Sustained accumulation of antiprotons was possible at the rate of greater than 2.5×10 11 per hour. Record-size stacks of antiprotons in excess of 3×10 12 were accumulated in the Accumulator ring and 6×10 12 in the Recycler. In some special cases, the antiprotons were stored in rings for more than 50 days. Note, that over the years, some 10 16 antiprotons were produced and accumulated at Fermilab, which is about 17 nanograms and more than 90% of the world’s total man-made quantity of nuclear antimatter. The accelerator complex at Fermilab supported a broad physics program including the Tevatron Collider Run II [2], neutrino experiments using 8 GeV and 120 GeV proton beams, as well as a test beam facility and other fixed target experiments using 120 GeV primary proton beams. The following sections provide a brief description of Fermilab accelerators as they operated at the end of the Collider Run II (2011).

Nagaitsev, Sergei↗