Search NASA⌕ Search

SEARCH · Search NASA

Results for “building operations optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Additive Manufacturing Case Study

Geothermal technologies include an extremely wide range of products required for well construction, completion, production, intervention and surface energy conversion activities. Many of these products are geometrically complex, require multi-step and highly specialized fabrication processes, and are expensive due to the low production numbers typically associated with the geothermal market. These challenges along with the high temperature demands of the geothermal environment have also hindered the adoption of many tools routinely used in the oil & gas industry.Recent advancements in Additive Manufacturing (AM) materials of construction, build volumes and part quality have transitioned the technology from primarily cosmetic prototyping applications to the point where AM can be used to make production parts, even for the most demanding applications. These improved AM capabilities along with the inherent ability of AM to produce complex parts and, in some cases, geometries that cannot be manufactured using conventional casting, machining and joining fabrication approaches motivate an exploration of its potential to positively impact geothermal well construction and operations technologies.Sandia National Labs collaborated with Oak Ridge National Laboratory on a case study examining additive manufacturing opportunities for Geothermal applications. The study focused on designing components with improved performance characteristics that cannot be fabricated conventionally. A rotor for a downhole motor was chosen based on the potential for improving its rotational dynamics. Topology optimization was used as a design method to reduce the rotational inertia of the part while preserving sufficient rotational stiffness to transmit the torque required for the drilling application. The optimization resulted in a nearly 50% reduction in polar moment of inertia while maintaining other desired performance characteristics. The design developed using the topology optimization approach was fabricated using additive manufacturing and cannot be fabricated conventionally. This paper will discuss the design approach, performance improvements and manufacturing methods used to produce the part.

Polsky, Yarom↗

Model-based predictive control of multi-stage air-source heat pumps integrated with phase change material-embedded ceilings

This paper presents a model-based predictive control strategy to optimize the operations of phase change material (PCM) ceiling panels coupled with a multi-stage air-source heat pump. A three-stage prototype heat pump unit has been built and tested in the laboratory, with the low and medium stages designed for space heating/cooling and the high compression stage dedicated to charging of the PCM energy storage. To facilitate optimal control of the integrated heat pump system, a mixed-integer linear programming formulation is derived through linearization of the heat pump model and a mixed-integer reformulation of the PCM dynamic governing equations. A predictive control strategy is synthesized based on the resultant control formulation and implemented in a receding horizon scheme that optimizes the PCM charging and the zone temperature schedules simultaneously to leverage both the passive (associated with building construction materials) and active (PCM) storage capacities of a building. The control strategy has been tested along with three benchmarking control scenarios using a co-simulation platform for a prototypical detached house in Atlanta, GA. In this study, test results showed that application of the proposed control strategy to the PCM-integrated heat pump could provide 27.1% electricity cost savings while a fine tuned rule-based control strategy could achieve cost savings of 20.4%, compared to a baseline case without PCM storage, under a time-of-use rate tariff.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Re-Envisioning RCx: Achieving Max Potential HVAC Controls Retrofits through Modernized BAS Hardware and Software

Most existing buildings have sub-optimal heating, ventilation, and air conditioning (HVAC) controls, resulting in wasted energy and occupant discomfort. Retro-commissioning (RCx) addresses many of these issues, but it is a lengthy and highly customized process. Limited capabilities of existing building automation system hardware restricts the scope of most RCx projects. Incentive programs consider building automation system (BAS) hardware retrofits to be high-capital investments and do not allow them in typical RCx programs. This paper describes work that the authors are leading to facilitate technical and market innovation in the BAS industry to unlock large savings in existing commercial buildings through deep retrofits of BAS hardware and software. California and New York research projects are demonstrating BAS retrofits leveraging the American Society of Heating, Refrigeration, and Air Conditioning Engineers’ (ASHRAE) new Guideline 36 high performance sequences of operation to achieve greater than 20 percent whole building energy savings, while saving costs and reducing risk through streamlined processes and standardization across BAS manufacturer product lines and across implementation practices. This paper describes market barriers that impede achieving deep savings from BAS retrofits in custom incentive and traditional RCx programs and presents a new maximum potential BAS retrofit model that addresses these barriers. The new model leverages the authors’ efforts in market enablement through open standards, BAS industry partnerships, and tools for cost-effective scaling that includes tools for project screening, savings calculations, and measurement and verification (M&V). This approach is widely applicable and will be ready for at-scale implementation within two years.

Paliaga, Gwelen↗

Virtual Metering for Monitoring Building Energy Consumption

The United States Department of Energy (DOE) has standard metering requirements of commercial buildings for optimizing energy performance. The guiding principles are to continuously track and optimize energy performance and install building-level meters for electricity, natural gas, and steam. Some buildings at Los Alamos National Laboratory (LANL) have physical submeters monitoring their energy consumption, but these meters have proven to be unreliable. And, in most cases, replacing them has proven to be a slow process. Installing new submeters also requires a temporary lockout of the circuit on which they are being installed. Many buildings at LANL contain laboratories with ongoing experiments or data centers, which makes an equipment power outage nearly impossible to plan. This inability to plan power outages results in long-term submeter failures. Although most submeters are eventually replaced, failures lead to missing consumption data for some unpredictable, extended time. A building automation system (BAS) is a system that provides control and monitoring on a building to maintain the operational performance of the building and occupancy comfort. Many buildings at LANL currently have a BAS, and all new renovations and installs will include installing a BAS if one does not already exist. The intended purpose for a BAS is primarily to monitor the health and efficiency of a building; however, it is also possible to calculate equipment power and energy consumption using BAS information. This project aims to use virtual meters to monitor building energy consumption as a cost-effective and minimally labor-intensive alternative to installing physical submeters. The fault detection and diagnostics tool, SkySpark, provides a centralized database for all the data from the various BAS that are active at LANL. This data includes the information that is needed to create virtual meters for heating, ventilating, and air conditioning (HVAC) systems in most buildings, including heating and cooling loads. 9 This report begins with a detailed summary of the project, including the reasoning, procedure, and results. The specific processes of creating the various virtual meters are then identified. Then the limitations are discussed. And, lastly, the results and future potential are presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Fundamental Creep Behavior Model of Gr.91 Alloy by ICME Approach (Final Report)

The current project mainly focused on the fundamental creep cracking mechanism of the Grade 91 system during the operation conditions in the advanced technologies FE power plants and build the link among Composition-Processing Parameters-Phase Stability-Microstructure-Creep Resistance. A model based on computational thermodynamics and diffusion kinetics will be developed to provide guidance on how to improve the creep resistance of the alloy system. The PI mainly investigate the Gr.91 base alloy and weldment with the Integrated Computational Materials Engineering (ICME) approach. The long-term goal of the proposed program is to develop a model for creep and fatigue resistant alloys with different elemental systems, compositions, and processing parameters of weldment and heat-treatment. In addition, new creep and fatigue resistant alloys are to be designed based on the predictions from the model. The computational as well as experimental results include three sections: 1) The compositional optimization and secondary phases evaluation regarding the creep resistance in Grade 91 steel through the CALPHAD approach. In this section, the formation of the critical secondary phases, M23C6, MX and Z-phase were well predicted based on many conditions like the temperature as well as compositions. Meanwhile, the role of different alloying elements was also considered as they will directly affect the formation of the secondary phases mentioned above based on the compositional evolution of the alloying elements. 2) An investigation of Creep Resistance in Grade 91 Steel through Computational Thermodynamics. We systematically considered the evolution of the four critical temperatures, Ac3, Ac1, the threshold of M23C6 and Z-phase, on basis of the computational approach. Meanwhile, the equilibrium cooling as well as Scheil simulations were also considered to perform further predictions based on the different cooling rates. 3) Creep lifetime and microstructural evolution of the Grade 91 steel. In this part, mainly experimental approach was performed on the real creep test from the beginning of the commercial Gr.91 alloys. The alloys were normalized, tempered, welded (Gleeble) and PWHT and finally subjected to the creep lifetime analyses. Finally, all the samples after each process were further characterized based on the OM, XRD and SEM technique to draw final conclusions.

01 COAL, LIGNITE, AND PEAT↗

Analysis of basic airflow configurations for separate sensible and latent cooling systems with indoor air recirculation

Separate sensible and latent cooling (SSLC) is a technology with efficiency and comfort advantages over conventional cooling systems used for space conditioning of buildings. Using multiple cooling processes at different temperatures allows SSLC to save energy by raising the evaporation temperature of the sensible cooling process. In this paper, all possible airflow configurations of SSLC systems are enumerated under the following constraints: exactly two heat exchangers are used, and air is recirculated to the conditioned space (no exhaust or outdoor air treatment). Seven designs are identified, with varying free operating variables, and each is modeled. Analysis reveals that several configurations are equivalent, and there is only one unique basic airflow SSLC configuration: the one with the sensible and latent heat exchangers placed in series. The efficiency of the SSLC system is compared against that of the conventional system. Under standard conditions, an SSLC system can improve the coefficient of performance by 14.8%. In addition to the numerical simulation, the optimal operating condition of the basic air configuration of the SSLC system is derived analytically. The basic SSLC system is shown to offer the highest performance improvement when the outdoor temperature is relatively cool and the space sensible heat ratio is high.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Parametric optimization of PCM-enhanced underground thermal energy storage for buildings in moderate cold climates

This study presents a novel underground thermal energy storage (UTES) system designed for space heating in buildings located in moderate cold climates. The proposed UTES features a borehole with a depth of 25 ft. (7.62 m) and a diameter of 3 ft. (0.91 m), containing two helical pipe loops-one for discharge fluid and another for recharge fluid-and a thermally enhanced phase change material (PCM) layer that provides high energy storage capacity. The system requires daily thermal recharging using a low-grade heat source for a few hours and delivers continuous heating at a nearly constant discharge rate without significant performance degradation over a 24-h period. This study demonstrates that the optimized UTES, when recharged with hot fluid at an inlet temperature of 40 degrees C for 6 h daily, can provide a continuous heat discharge rate of approximately 2.9 kW for 24 h or 3.4 kW if operated under a shorter discharge period of 15 h (17:00-08:00). With a round-trip efficiency of 72-97%, the proposed UTES offers an efficient and reliable solution for short- and long-duration thermal energy storage technology, making it a promising technology for cold climates.

15 GEOTHERMAL ENERGY↗

Compatibility of molten plutonium with wrought and additively manufactured metal crucibles

Understanding plutonium’s interaction with metals is crucial for optimizing pyrochemical operations, nuclear fuel containment, and various actinide processing techniques. Traditionally, tantalum crucibles are employed for plutonium processing due to their high durability, excellent temperature stability, and low solubility in plutonium. However, tantalum faces challenges such as plutonium wetting and diffusion, making surface coatings particularly important for crucibles in pyrochemical applications to enhance corrosion resistance against plutonium. Tantalum is also expensive and difficult to machine, prompting the need for advanced manufacturing techniques to address these challenges. Here, in this work, we investigate the interaction of Pu with tantalum and titanium crucibles fabricated using both traditional machining methods and laser powder bed fusion (LPBF) additive manufacturing (AM). LPBF-AM is an advanced technique that allows for the creation of complex geometries from traditionally difficult-to-machine metals by using a high-powered laser to build parts. Previous studies of conventional manufactured tantalum have utilized oxidation and carburization of the surface to mitigate plutonium wetting; however, no studies of surface modified LPBF-AM material have been undertaken. These studies are crucial, given the typical differences in the grain structure between conventional and LPBF-AM materials. All crucibles underwent differential scanning calorimetry to confirm the melting of plutonium. Subsequently, the crucibles were sectioned and mounted in epoxy for microstructural analysis using optical microscopy and scanning electron microscopy. This investigation, comparing the performance of wrought vs AM metal crucibles, provides a basis for future tooling applications in actinide processing techniques and can address the challenges associated with traditional machining, particularly in pyrochemical applications.

Actinides↗

Flexible Stellarator Physics Facility

We propose to build a Flexible Stellarator Physics Facility to explore promising regions of the vast parameter space of disruption-free stellarator solutions for Fusion Pilot Plants (FPPs). The FESAC Long Range Plan recognized the quasi-symmetric stellarator as “the leading US approach to developing disruption-free, low-recirculating-power fusion configurations”. To deliver the ambitious Decadal Vision for Commercial Fusion Energy, we must establish a persuasive stellarator program in parallel to the tokamak one: the stellarator will prove to be a better path to a reactor if theoretical predictions are confirmed and novel optimization techniques and strategies work as desired. Since the release of the Long Range Plan in 2020, stellarators have arguably made the most significant advances of all fusion concepts. Groundbreaking results from W7-X demonstrated low neoclassical transport and the successful operation of the island divertor. Advances in theory and modeling now allow us to minimize turbulent transport, to achieve equilibria with precise quasisymmetry, to reduce neoclassical transport and fast ion loss to levels far below what has been previously achieved, and to minimize the effect of coil manufacturing errors. If realized, these advances will lead to cost-effective stellarator designs with confinement comparable to tokamaks but without the fundamental challenges of disruptions and current drive.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Challenges and Opportunities for HVAC + Phase Change Material Thermal Energy Storage in Buildings

Phase-change material (PCM) thermal-energy storage (TES) integrated with HVAC and domestic hot water (DHW) can shift a large share of building thermal loads. By flattening and shifting loads, PCM TES reduces peak electricity use, eases stress on local and grid infrastructure, and lowers costs. It can also defer costly upgrades to service panels, distribution, and transmission. Higher energy density relative to chilled or hot water storage makes PCM TES practical for small, space limited, and retrofit projects, while packaged HVAC-integrated systems expand cost-effective load shifting to commercial buildings that previously lacked options. Despite this promise, deployment faces barriers. This paper presents challenges, opportunities, and lessons learned from lab and field integrations of PCM TES with packaged HVAC systems. Key challenges include misalignment between default heat pump controls tuned for direct-to-load operation and TES charge/discharge objectives, PCM properties that diverge from manufacturer claims and evolve with cycling, and high integration and deployment costs with off-the-shelf products. These studies underscore the need for factory built, integrated systems that arrive as prepackaged modules with proven controls, reducing design and installation effort and delivering predictable performance across projects. The paper outlines steps to enable viable and scalable PCM TES HVAC and DHW systems, including 1) validated methods that can be used to characterize PCM properties and TES system performance, 2) supervisory controls that optimize charge/discharge scheduling, and 3) factory integrated packaging that eliminates bespoke field engineering.

Dutton, Spencer↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hamilton: Flexible, Open Source $10 Wireless Sensor System for Energy Efficient Building Operation

Sensors for improving building performance are rapidly populating the market, driven in part by the drive to reduce greenhouse gas emissions resulting from energy production as well as improve the interior environment for healthy and more productive spaces. UC Berkeley has led wireless sensor development over the past 25 years (e.g., Telos mote), with the Hamilton (named after Alexander Hamilton on the US $10 bill) as the most recent. The Hamilton sensor was designed as a low-cost high-performance sensor that is modular and interoperable. The objective of the Hamilton project was to create, evaluate and establish the technological foundations for secure and easy to deploy building energy efficiency applications utilizing pervasive, low-cost wireless sensors integrated with traditional Building Management Systems (BMS), consumer-sector building components, and powerful data analytics. The project included iterative hardware design, incorporating a high-performance database (BTrDb, http://btrdb.io/), creating and iterating the development of secure data middleware (BOSSwave, WAVE/WAVEMQ), working with and pushing the development of an open-source tiny operating system RiotOS, and implementing and improving protocols such as Thread/OpenThread and TCP/IP. The hardware benefited from careful design to drive down the cost; the design included a System-on-a-Chip (SoC), chip antenna, single crystal and five passive components. Careful design of the operating system created a low-power design to enable a long life with small batteries. The hardware included several sensors: temperature, radiant temperature, relative humidity, magnetometer, accelerometer, and light, with an optional occupancy (Passive InfraRed) sensor. The project was the basis of several applications, both internal to the research team and other researchers and professionals at other institutions. Several applications used the sensor hardware as the basis for other complex devices. Other applications used the sensors to improve building performance through interoperating with the building Heating Ventilation and Air-Conditioning (HVAC) system, such as using occupancy and/or distributed temperature sensing to reduce HVAC zone energy while still providing thermal comfort and to reduce peak loads in small commercial buildings. We demonstrated cloud-based energy analytics, implemented a schedule and a Model Predictive Controller in a small commercial building to optimize HVAC energy, occupancy and electricity price. Initial integration of these technological innovations was performed through the creation of execution containers containing the WAVE agent and various driver, proxy, or building system function logic. The research added to the understanding of efficient sensor hardware, secure middleware, time-series data management (high performance database), efficient communication protocols, and interoperating with applications and building systems. The project showed the technical effectiveness and economic feasibility of creating a low-cost, modular, and easy-to-deploy sensor. Through conversations with multiple end users, the research team discovered that many customers wanted data management and services in addition to the sensors. HamiltonIOT developed packages of sensors, border router, and data services to provide a seamless “plug-and-play” sensor deployment. Some customers were willing to pay for higher quality sensors (such as light); some customers wanted a robust enclosure (waterproof).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

How Can Construction Process Simulation Modeling Aid the Integration of Lean Principles in the Factory-Built Housing Industry?

New and existing factories that produce and deliver factory-built housing can benefit from construction process simulation modeling to explore the integration of Lean principles in their operations. Construction process simulation modeling provides digital or virtual recreations of the real-world factory environments to visualize, quantify, analyze, and optimize their underlying behavior, including factory productivity, material flow, labor dynamics, bottlenecks, and work scope. One of the key benefits of process simulation modeling is the ability to create and compare "what-if" scenarios, including integrating Lean principles such as reducing waste (for example, transportation, waiting), line balancing, and just-in-time concepts. In general, three process simulation methods are widely used: discrete event simulation (DES), agentbased modeling (ABM), and system dynamics (SD). Myriad process simulation software also is available, but depending on the industry, complexity of the system, and purposes of the simulation, some software might be more appropriate. Similar to how computer-aided design (CAD) software such as AutoCAD and Rhinoceros enable building design of modular or factory-built housing, process simulation modeling software such as jStrobe, ProModel, and AnyLogic can enable factory design of new and existing factories to deliver modular affordable housing at scale, as opposed to traditional site-built construction. Software with DES capabilities can help generate a process model that is a logical representation of resources and activities in a factory. Software with CAD-DES integration can leverage product-process data integration to help spatially visualize a DES model of the factory in the CAD environment. Software with multimethod simulation capabilities, widely used in the manufacturing industry, brings together DES, ABM, and SD in a single platform that allows visualization, quantification, analyses, and optimization at varying data fidelities. Near-real-time data from an existing factory can be directly plugged into multimethod simulation software so that the construction process simulation model is a near-accurate representation of the real-world factory conditions. This report provides insights into the use of simulation as an aid to integrate Lean concepts in factories, including guidelines for selecting the appropriate process simulation modeling method and software. These insights have been developed as part of ongoing process simulation modeling research, development, and demonstration projects at the U.S. Department of Housing and Urban Development, the U.S. Department of Energy, and the National Renewable Energy Laboratory focused on how process simulation models can enable better integration of resilience, energy efficiency, and low-carbon design strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ILAW Container Cost Reduction and Optimization Study

This study, performed on behalf of Washington River Protection Solutions (WRPS), examines the potential for making cost savings for the Immobilized Low Active Waste (ILAW) containers over the mission life of the Waste Treatment and Immobilization Plant (WTP). it builds on earlier study assessments 24590-LAW-RPT-M-01-001 Rev 0 ILAW Product Container Specifications Optimization Study and DOE/ORP-2013-02 Rev 0 Decision Analysis of Low-Active Waste Container Finishing Handling System Alternatives. The WTP design and installed equipment has evolved over an extended period ~20 years. Consequently, some of the existing requirements relating the ILAW containers may no longer be applicable under current mission plans where the glass filled containers are placed into the Integrated Disposal Facility (IDF) rather than stacked in an engineered purpose-built ventilated store as originally envisioned. The study team reviewed available WTP project reference documents to establish the functions the container must perform and assign requirements against each of these functions. With the assumptions that some of the existing WTP contract restrictions would not necessarily apply to the subsequent facility operations contract the container requirements were reviewed to identify those which were ‘hard constraints‘, imposed by regulatory requirements. Initially each of these hard constraints were reviewed, evaluated and documented to see if they precluded the use of an alternate less expensive material of construction, carbon steel, to the existing 304 L stainless steel in the current container specification. That review did not generate any fatal flaws for a change in material of construction to carbon steel allowing the study team to examine the impacts of material cost savings, potential changes to the design and requirements and impacts on interfaces of the containers with the existing WTP process equipment from container receipt, transfers, glass filling, cooling and export. In addition, a change in container target fill level was evaluated and qualitative, and quantitative where feasible, impacts to the container fabrication process assessed. Lastly, additional follow on development or testing activities to support the use of carbon steel were assessed and a recommended path forward with a ROM cost and timescale developed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Reinforcement Learning for Autonomous Water Heater Control

Electric water heaters represent 14% of the electricity consumption in residential buildings. An average household in the United States (U.S.) spends about USD 400–600 (0.45 ¢/L–0.68 ¢/L) on water heating every year. In this context, water heaters are often considered as a valuable asset for Demand Response (DR) and building energy management system (BEMS) applications. To this end, this study proposes a model-free deep reinforcement learning (RL) approach that aims to minimize the electricity cost of a water heater under a time-of-use (TOU) electricity pricing policy by only using standard DR commands. In this approach, a set of RL agents, with different look ahead periods, were trained using the deep Q-networks (DQN) algorithm and their performance was tested on an unseen pair of price and hot water usage profiles. The testing results showed that the RL agents can help save electricity cost in the range of 19% to 35% compared to the baseline operation without causing any discomfort to end users. Additionally, the RL agents outperformed rule-based and model predictive control (MPC)-based controllers and achieved comparable performance to optimization-based control.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Transmission Technologies –GETs and HPCs Session 3: HPCs and Building Actions Plans to Digital Assurance Risks

The third session of the Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program, held on November 11, 2025, centered on High Performance Conductors (HPCs) and the formulation of action plans to address digital assurance risks associated with Grid-Enhancing Technologies (GETs). This session convened experts from utilities, vendors, and government agencies to examine the technical, operational, and cybersecurity aspects of HPC deployment. Discussions highlighted the benefits of HPCs, such as their ability to rapidly increase transmission capacity using existing corridors, improve grid resilience, reduce system losses, and align with FERC Orders 2023 and 1920. Participants evaluated supply chain and digital assurance risks, including reliance on imported materials, limited domestic manufacturing capacity, workforce shortages, and traceability issues. The session also emphasized the importance of digital trust, integration-layer cybersecurity, and unified risk frameworks, introducing tools like intrusion detection systems, encryption, zero trust networking, and firmware integrity. Recaps of earlier workshops on Dynamic Line Ratings (DLRs), Advanced Power Flow Control (APFC), and Transmission Topology Optimization (TTO) underscored institutional barriers and integration challenges. Action plans were proposed to mitigate issues such as inconsistent cybersecurity practices, SBOM usage, supply chain visibility, operator trust, and misaligned incentives. Additionally, INL presented its supply chain risk management tools and Cyber-Informed Engineering (CIE) principles to support secure procurement and system design. The session concluded with a commitment to share key takeaways, incorporate cohort feedback into future policy development, and continue collaborative engagement through upcoming pilot activities. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

EXPERIMENTAL AND MODELLING ANALYSIS OF A LARGE-SCALE TWO-PHASE LOOP THERMOSYPHON

Liquid pumping requires large quantities of electrical energy, including about 7% of the energy of building heating, ventilation, and air conditioning (HVAC) systems. To replace pumped condenser-cooling tower water loops with a passive alternative system, we implemented a commercial-scale two-phase loop thermosyphon (TPLT). The unit consists of a 13 m riser integrated with a commercially available cooling tower and circulation water heater that simulates heat loads up to 25 kW. In addition to providing passive cooling capabilities, the cooling tower unit is also maintenance free, reliable, and can operate in both dry and wet modes. This study characterizes the performance (temperature difference between the evaporator and condenser) and the two-phase flow behavior of the loop under various refrigerant charges. Sight glasses installed throughout the loop are used to identify the operating flow regimes in the riser and downcomer. Over the range of operating conditions, we identified that there is an optimal refrigerant charge range for a specific heat load at which near-isothermal operation can be achieved. We further developed a model to predict the operating flow rate and gravitational height in the downcomer and compared it with the experimental data. The results show that the model agrees with the experimental data, in particular the threshold gravitational head height at which there will be subcooled liquid at the condenser exit, indicating that it can be used as a predictive tool for identifying the optimal loop charge for a given heat load.

Loop thermosyphon, passive two phase↗