Search NASA⌕ Search

SEARCH · Search NASA

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

TCR Data Management Plan

The Oak Ridge National Laboratory (ORNL) Transformation Challenge Reactor (TCR) program is developing additive manufacturing and artificial intelligence (AI) to deliver enabling technologies for advanced reactors. Through the application of these advanced technologies, the program targets delivering solutions to the high costs and lengthy deployment timelines that threaten the future of nuclear energy—the country’s largest source of carbon-free energy. This document describes the plan for integrating and managing TCR data from multiple sources throughout ORNL and external sources, including novel data sources associated with advanced manufacturing, characterization systems, and the TCR Digital Platform that incorporates various levels of AI and data analytics.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Mars Science Laboratory Entry, Descent, and Landing Flight Software

This paper describes the design, development, and testing of the EDL program from the perspective of the software engineer. We briefly cover the overall MSL flight software organization, and then the organization of EDL itself. We discuss the timeline, the structure of the GNC code (but not the algorithms as they are covered elsewhere in this conference) and the command and telemetry interfaces. Finally, we cover testing and the influence that testability had on the EDL flight software design.

Entry, Descent, Landing (EDL)↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

PersEIDS: A Biomedical Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

Developing a New National Programme and Implementation Plan for the Management and Disposal of Spent Fuel and Radioactive Wastes in Romania - 16391

The European 'Waste Directive' (2011/70/Euratom) required each Member State to report by August 2015 on their National Programme for management of spent fuel and radioactive wastes. In Romania, the Nuclear Agency (ANDR) was responsible for preparing the National Programme report, and this was done in a step-wise manner that involved the regulators and waste producers. The starting point for the process was an assessment of existing policy against the evolving situation in the nuclear sector in the country, most notably the decision to progress with the construction of two new CANDU reactors. The final agreed National Programme report submitted to the European Commission describes the activities currently undertaken to manage spent fuel and radioactive wastes in Romania. The report also sets out, at a high-level, the additional activities that will need to be taken in the future (and an indicative timeline), including those steps that will be required to implement a new surface repository for short-lived wastes, and a geological repository for spent fuel and long-lived wastes. Additional, on-going work is intended to lead to a revision of Government policy and the development of a more detailed implementation strategy, underpinned by a programme of R and D and robust financing plans. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced technology needs for a global change science program: Perspective of the Langley Research Center

The focus of the NASA program in remote sensing is primarily the Earth system science and the monitoring of the Earth global changes. One of NASA's roles is the identification and development of advanced sensing techniques, operational spacecraft, and the many supporting technologies necessary to meet the stringent science requirements. Langley Research Center has identified the elements of its current and proposed advanced technology development program that are relevant to global change science according to three categories: sensors, spacecraft, and information system technologies. These technology proposals are presented as one-page synopses covering scope, objective, approach, readiness timeline, deliverables, and estimated funding. In addition, the global change science requirements and their measurement histories are briefly discussed.

Rowell, Lawrence F.↗

Planning and scheduling research at NASA Ames Research Center

Planning and scheduling is the area of artificial intelligence research that focuses on the determination of a series of operations to achieve some set of (possibly) interacting goals and the placement of those operations in a timeline that allows them to be accomplished given available resources. Work in this area at the NASA Ames Research Center ranging from basic research in constrain-based reasoning and machine learning, to the development of efficient scheduling tools, to the application of such tools to complex agency problems is described.

Friedland, Peter↗

Creating Communications, Computing, and Networking Technology Development Road Maps for Future NASA Human and Robotic Missions

For human and robotic exploration missions in the Vision for Exploration, roadmaps are needed for capability development and investments based on advanced technology developments. A roadmap development process was undertaken for the needed communications, and networking capabilities and technologies for the future human and robotics missions. The underlying processes are derived from work carried out during development of the future space communications architecture, an d NASA's Space Architect Office (SAO) defined formats and structures for accumulating data. Interrelationships were established among emerging requirements, the capability analysis and technology status, and performance data. After developing an architectural communications and networking framework structured around the assumed needs for human and robotic exploration, in the vicinity of Earth, Moon, along the path to Mars, and in the vicinity of Mars, information was gathered from expert participants. This information was used to identify the capabilities expected from the new infrastructure and the technological gaps in the way of obtaining them. We define realistic, long-term space communication architectures based on emerging needs and translate the needs into interfaces, functions, and computer processing that will be required. In developing our roadmapping process, we defined requirements for achieving end-to-end activities that will be carried out by future NASA human and robotic missions. This paper describes: 10 the architectural framework developed for analysis; 2) our approach to gathering and analyzing data from NASA, industry, and academia; 3) an outline of the technology research to be done, including milestones for technology research and demonstrations with timelines; and 4) the technology roadmaps themselves.

Bhasin, Kul↗

Flattening the Radial Temperature Profile across the Transformational Challenge Reactor Core

The Transformational Challenge Reactor (TCR) program is demonstrating an agile development approach to advanced nuclear reactor design, which has traditionally utilized a linear design process. In leveraging artificial intelligence, additive manufacturing, advanced materials, and cutting-edge modeling and simulation, the TCR program aims to minimize the high cost and lengthy deployment timelines now standard in the nuclear industry. Within a relatively short period of time, a robust and mature advanced gas-cooled reactor was iteratively designed under the TCR program, using these cutting-edge technologies. The TCR is a 3 MWt gas-cooled microreactor fueled with uranium nitride (UN) tristructural isotropic (TRISO) fuel particles. Though manufactured via traditional means, these UN TRISO particles are loaded into additively manufactured silicon carbide (SiC) cans [4]. Once loaded with TRISO particles, the SiC cans are densified using a chemical vapor infiltration process. The additively manufactured SiC enables significantly more freedom in the design of the fuel form than could ever be achieved using traditionally manufactured SiC. The helium coolant, pressurized to 5 MPa, enters the core at 300°C and nominally exits it at 500°C. Typically, the most thermally limiting components in any reactor design are the fuel assemblies in the core center. To provide a wide thermal margin in these central fuel assemblies, the flow may be biased toward the center of the core to more effectively cool these fuel assemblies with more power deposition and flatten the core’s radial temperature distribution. An analytical fluid model of the TCR core was developed to explore methods for biasing the flow away from the cooler outer fuel assemblies and towards the hotter inner ones. Higher-fidelity models developed in STAR-CCM+ 2020.3.1, a computational fluid dynamics code, were then utilized to verify the analytical model’s findings.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cryogenic Propellant Storage and Transfer Technology Demonstration: Prephase A Government Point-of-Departure Concept Study

The primary purpose of this study was to define a point-of-departure prephase A mission concept for the cryogenic propellant storage and transfer technology demonstration mission to be conducted by the NASA Office of the Chief Technologist (OCT). The mission concept includes identification of the cryogenic propellant management technologies to be demonstrated, definition of a representative mission timeline, and definition of a viable flight system design concept. The resulting mission concept will serve as a point of departure for evaluating alternative mission concepts and synthesizing the results of industry- defined mission concepts developed under the OCT contracted studies

Mulqueen, J. A.↗

Advanced Speckle Sensing for Internal Coronagraphs

A 4-8m telescope carrying a coronagraph instrument is a leading candidate for an anticipated flagship mission to detect and characterize Earth-size exoplanets in the 2020s. Many candidate coronagraph instruments have been proposed, and one has met many of the principal requirements for that mission. But the telescope and instrument will need exquisite stability and precise control of the incoming wavefront to enable detection of faint companions (10(exp -10) of the star) at an angular separation of 2-4 Airy radii. In particular, wavefront errors cause speckles in the image, and variations in those speckles can confound the exoplanet detection. This challenge is compounded by the background light from zodiacal dust around our Sun and the target star, which limits the speed with which we can estimate and correct the speckles. We are working on developing coherent speckle detection techniques that will allow rapid calibration of speckles on the science detector, allowing subtraction in post-processing or correction with deformable mirrors. The expected speed improvement allows a much quicker timeline for measurement & calibration, which reduces the required telescope stability requirement and eases both the flight system design and the challenge of ground testing. We will describe the experiments and summarize progress to date.

Terrestrial Planet Finder↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Within the next few decades, humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant two-way communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) performing an EVA and an Earth-based mission control. Next-generation operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the on-planet extravehicular crewmember(s), and intermediate mission support from intravehicular crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. For this purpose, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automating the tracking and projection of consumables usage over an EVA timeline, providing real-time probabilistic safety assessments of an EVA timeline given consumables constraints, and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the intravehicular crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g. training bias.

Mars↗

X-Hab 2026: LiDAR-Powered Autonomous Charging Service Capability for Surface Rovers and Systems

This document details the timeline of the LiDAR-Powered Autonomous Charging Service Capability for Surface Rovers and Systems project, initiated by the Fall 2025 semester class and completed by the Spring 2026 semester class. This project focuses on developing a fully autonomous system composed of a mobile surface rover and an induction charging station with a robotic arm, both controlled by their own NVIDIA Jetson Orin Nano. Structural improvements to the rover suspension system and body eliminated excessive camber, reduced stress and strain on the plexiglass body, and improved maneuverability and durability of the rover. The charging station robotic arm was fully redesigned to increase reach while minimizing weight and increasing misalignment tolerance during docking on uneven terrain. Electrical system improvements addressed previous torque and power limitations of both the rover and charging station arm. High-torque servo motors were selected based on updated calculations which incorporated terrain slope and Factor of Safety, enabling zero-point turning for the rover and increased payload capacity of the charging station arm. Significant progress was made in autonomy and perception. The rover now employs 3D LiDAR and SLAM mapping for localization, mapping, and path planning. The Battery Monitoring System (BMS) was created to coordinate battery management between the rover and charging station. The BMS provides continuous monitoring of battery state of charge, temperature, current, and will enable the autonomous initiation, execution, and termination of the charging cycle via Bluetooth communication. Testing of the WIBOTIC induction charging system demonstrated reliable power transfer under both aligned and misaligned conditions. This project demonstrated the ability of an autonomously navigating surface rover to independently plan a path to the charging station, dock, and the charging station to autonomously deploy a robotic charging arm and initiate charging of the rover. This work details the progress made to demonstrate the feasibility of autonomous surface rover navigation and recharging systems.

Megan Steele↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

LEIA: An Investigation of Radiation Risks to Biology at the Lunar South Pole

Radiation and reduced gravity pose biological risks to crewed deep space exploration. At the cellular level, radiation damage can be amplified by reduced gravity. Empirical evidence on cellular responses to beyond low Earth orbit (BLEO) environments is imperative to develop effective countermeasures for crew health and in-space biomanufacturing. The Lunar Explorer Instrument for Space Biology Applications (LEIA) project is developing an instrument suite to be delivered to the south polar region of the Moon by the Commercial Lunar Payload Services (CLPS) program. This presentation will provide an overview of the LEIA hardware, experiments, and mission timeline. The LEIA instruments include the BioSensor, the ARES charged particle detector, and the Mini-FND. The BioSensor is an autonomous light emitting diode (LED)-based spectrophotometer and microfluidic incubator. The BioSensor activates yeast cultures and can measure cell growth, metabolic activity, and carotenoid production. The ARES is a Timepix-based charged particle radiation detector that measures dose, dose rate, and linear energy transfer spectra. The Mini-FND is a fast neutron detector that measures albedo neutron flux and energy spectra. Combined, these instruments will be used for yeast genetics experiments to quantify growth, metabolism, and synthetic biology-enabled production of human nutrients, while taking real time measurements of biologically relevant radiation exposure on the lunar surface. These data will be used to test the importance of selected DNA damage repair and reactive oxygen species defense pathways in mitigating cellular damage from lunar surface radiation.

Yeast↗

LEIA: An Investigation of Radiation Risks to Biology at the Lunar South Pole

Radiation and reduced gravity pose biological risks to crewed deep space exploration. At the cellular level, radiation damage can be amplified by reduced gravity. Empirical evidence on cellular responses to beyond low Earth orbit (BLEO) environments is imperative to develop effective countermeasures for crew health and in-space biomanufacturing. The Lunar Explorer Instrument for Space Biology Applications (LEIA) project is developing an instrument suite to be delivered to the south polar region of the Moon by the Commercial Lunar Payload Services (CLPS) program. This presentation will provide an overview of the LEIA hardware, experiments, and mission timeline. The LEIA instruments include the BioSensor, the ARES charged particle detector, and the Mini-FND. The BioSensor is an autonomous light emitting diode (LED)-based spectrophotometer and microfluidic incubator. The BioSensor activates yeast cultures and can measure cell growth, metabolic activity, and carotenoid production. The ARES is a Timepix-based charged particle radiation detector that measures dose, dose rate, and linear energy transfer spectra. The Mini-FND is a fast neutron detector that measures albedo neutron flux and energy spectra. Combined, these instruments will be used for yeast genetics experiments to quantify growth, metabolism, and synthetic biology-enabled production of human nutrients, while taking real time measurements of biologically relevant radiation exposure on the lunar surface. These data will be used to test the importance of selected DNA damage repair and reactive oxygen species defense pathways in mitigating cellular damage from lunar surface radiation.

Yeast↗

Full Mission Astronaut Radiation Exposure Assessments for Long Duration Lunar Surface Missions

Risk to astronauts due to ionizing radiation exposure is a primary concern for missions beyond Low Earth Orbit (LEO) and will drive mission architecture requirements, mission timelines, and operational practices. Both galactic cosmic ray (GCR) and solar particle event (SPE) environments pose a risk to astronauts for missions beyond LEO. The GCR environment, which is made up of protons and heavier ions covering a broad energy spectrum, is ever present but varies in intensity with the solar cycle, while SPEs are sporadic events, consisting primarily of protons moving outward through the solar system from the sun. The GCR environment is more penetrating and is more difficult to shield than SPE environments, but lacks the intensity to induce acute effects. Large SPEs are rare, but they could result in a lethal dose, if adequate shielding is not provided. For short missions, radiation risk is dominated by the possibility of a large SPE. Longer missions also require planning for large SPEs; adequate shielding must be provided and operational constraints must allow astronauts to move quickly to shielded locations. The dominant risk for longer missions, however, is GCR exposure, which accumulates over time and can lead to late effects such as cancer. SPE exposure, even low level SPE exposure received in heavily shielded locations, will increase this risk. In addition to GCR and SPE environments, the lunar neutron albedo resulting mainly from the interaction of GCRs with regolith will also contribute to astronaut risk. Full mission exposure assessments were performed for proposed long duration lunar surface mission scenarios. In order to accomplish these assessments, radiation shielding models were developed for a proposed lunar habitat and rover. End-to-End mission exposure assessments were performed by first calculating exposure rates for locations in the habitat, rover, and during extra-vehicular activities (EVA). Subsequently, total mission exposures were evaluated for proposed timelines. A number of computational tools and mathematical models, which have been incorporated into NASA's On-Line Tool for the Assessment of Radiation In Space (OLTARIS), were used for this study. These tools include GCR and SPE environment models, human body models, and the HZETRN space radiation transport code, which is used to calculate the transport of the charged particles and neutrons through shielding materials and human tissue. Mission exposure results, assessed in terms of effective dose, are presented for proposed timelines and recommendations are made for improved astronaut shielding and safer operational practice.

Adamczyk, Anne M.↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗