Search NASA⌕ Search

SEARCH · Search NASA

Results for “draft”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

SULI Technical Report: WIRE (Draft)

Local climate undoubtedly affects facility maintenance requirements; however, knowledge of the link between weather and facility condition over time is grounded in the 1990s and needs to be updated. WIRE aims to quantify the relationship between climate and infrastructure by calculating climate-based service life estimates to be used in BUILDER, a program the Department of Energy (DOE) uses for facility management. Phase One of this project is a case study on window-or-wall-mounted AC units. The independent variables influencing service life are load, maintenance quality, and effective age, with load calculated from three weather variables: temperature, humidity, and solar radiation. Given sufficient data, service life can be calculated as a function of these variables via regression. WIRE is currently collecting data. Preliminary estimated service life projections as a function of load derived from Lawrence Livermore National Laboratory (LLNL) data support the need for updated analysis on the relationship between climate and facility condition. With the groundwork laid, WIRE can generate deliverables immediately upon arrival of data. The methods used for this case study constitute a framework for deriving the relationship between weather variables and service life for other components.

42 ENGINEERING↗

Key Recovery Planning Factors for a Biological Terrorism Event Draft: April 11, 2012 Key Planning Factors for Recovery from Biological Terrorism Event

If a biological terrorism incident were to occur in a major U.S. city, current response and recovery planning would not support a rapid regional recovery. Identifying issues that should be examined and planned ahead of time will save time, resources, and lives. We have identified Key Planning Factors that will lead to knowledge or planning efforts with the potential to substantially influence the recovery process. Their influence extends to increasing the rate of recovery, reducing recovery costs, improving public health and safety, or addressing major resource limitations or critical decisions that may impact overall recovery success. This document does not provide solutions but lists areas local planners in conjunction with local federal experts (such as EPA On-Scene Coordinators (OSCs)) should consider in advance. Key Planning Factors describe some, but not all, areas where prior planning will significantly aid emergency operations in the event of an incident.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Draft Summary Report on Irradiated Fuel Handling and Management for LOTUS

The National Reactor Innovation Center (NRIC) has conceptualized the design of the Laboratory for Operation and Testing in the United States (LOTUS) test bed to provide the United States Department of Energy (DOE) with the infrastructure necessary to make advanced reactor designs available for commercial developers. LOTUS will provide a test bed to developers with the capabilities of supporting a wide range of experiment design possibilities. Upon completion of the developers’ operations and experiments within the test bed, the irradiated fuel, reactor components, and other experiment materials must be removed. Idaho National Laboratory (INL) possesses significant capabilities for radioactive material handling such as casks, carts, and forklifts. However, given the unique environment presented by the NRIC-LOTUS test bed, located inside the Zero Power Physics Reactor (ZPPR) Perimeter Intrusion Detection and Assessment System (PIDAS) area at the Materials and Fuels Complex (MFC) and the complexity of novel removal activities of recently operated reactor experiments through the new proposed access tunnel. The efficacy was not apparent for existing equipment to provide all the needed capability. To bridge the potential gaps in cask designs, storage, and transportation, NRIC requested the development of trade studies for the transfer, handling, and storage requirements of irradiated fuel salts and other radioactive materials. NRIC directed Boston Government Services, LLC (BGS) to perform the trade studies and develop a report analyzing alternatives. In addition to the BGS reports, the Idaho National Lab’s (INL), provided by the first potential user’s Advanced Reactor Development (ARD) team, prepared a feasibility study for the storage of specific irradiated fuel within the existing ZPPR vault.This summary report is intended to present the trade studies, options, and alternatives that were investigated. The maturity level of LOTUS, the reactor, fuel salt containers, gloveboxes, and reactor testing campaign and concept of operations were not at a level sufficient to base critical decisions on. This report is not intended to present a final recommendation. The final recommendations for fuel storage location, transport, handling equipment, and operations will be made in FY 2024 and will be based on known materials, test campaign requirements, funding, and final analysis of the fuel and equipment to be used.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Draft Specification for Representing Gamma Radiation Spectra in QR codes

This document defines a proposed specification for representing gamma radiation spectra, as commonly produced by handheld Radioisotope Identifiers, as a QR code, or as a Uniform Resource Identifier (URI). The intended primary application is transferring spectra between locations or devices using standard smart-phone capabilities when data transmission would otherwise be challenging or not possible. The proposed encoding also enables embedding of spectra within other documents as hyperlinks.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Draft Prototype Microreactor Transportation Safety Program

Microreactors are compact reactors capable of producing less than 50 megawatts of electrical energy. Typically, these reactors are factory-fabricated and designed to be easily transportable by truck, rail, vessel, or air. Microreactor designs often assume that the unit can be transported containing either unirradiated or irradiated fuel. The interest in microreactors is driven by several factors, including the need to generate power on at remote locations, at military installations, at facilities such as data centers, and in areas recovering from natural disasters. The U.S. Department of Defense is actively pursuing the microreactor concept to meet the increasing energy demands of military operations that require portable and dense power sources. Commercial vendors are also exploring microreactor concepts. The report Microreactor Transportation Emergency Planning Challenges (Maheras et al. 2024) outlined the emergency planning challenges associated with the transportation of microreactors by road, rail, and by barge/ship. The successful commercial deployment and redeployment of microreactors will also require the development of microreactor transportation safety programs. The elements in these safety programs are not specific to microreactors; however, the transport of microreactors may pose unique challenges in these areas. This report builds on the report Microreactor Transportation Emergency Planning Challenges (Maheras et al. 2024) and develops the elements of a prototype microreactor transportation safety program that describes the elements that should be contained vendor-developed microreactor transportation safety programs, identifying the unique elements associated with microreactor transport. This will provide vendors and their transportation contractors a basis for their transportation planning and will accelerate the commercial deployment and redeployment of microreactors by identifying those issues unique to microreactor transport. The emphasis of this report is on highway transport of microreactors. This is based on a U.S. Nuclear Regulatory Commission transportation package approval strategy of crawl-walk-run, where transport by highway is evaluated first (Coles et al. 2021, 2024, Maheras et al. 2021), then other surface modes (rail and barge/ship), and finally air transport. Evaluation of maritime transport of microreactors was recently initiated (Rigato et al. 2024, Maheras et al. 2025). The report first discusses microreactors in general and microreactor transportation safety program planning assumptions. The report then provides a description of the transportation safety planning process and provides an extensive discussion of the elements of transportation safety programs. Specific elements examined included transportation roles and responsibilities, transportation planning, transportation mode and route selection, carrier selection, transportation packaging, advance notification of shipments, public information and communications, emergency response plans and procedures, inspections, security, safe parking, shipment tracking, weather and road conditions, medical preparedness, training and exercises, and program evaluation. The report then identifies the unique elements of a transportation safety program associated with microreactor transport. These unique elements were in the areas of: the unusual nature of microreactor designs, compensatory measures, increased radiation dose rates in the vicinity of microreactors, transportation package approval versus 10 CFR 50.59, and the use of a risk-informed transportation package approval process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Strategic National Level Exercises Program White Paper - Draft

The general objective of this white paper is to share lessons learned and provide interdisciplinary recommendations on how to use NLE to evaluate, assess and improve national nuclear security regimes. The specific objectives of this white paper are: — To describe the type of exercises, benefits and requirements — To outline the different capacity areas and capability performance levels — To provide concrete and actionable recommendations to INS’s partners on how to use NLE to improve national nuclear security regimes.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Design and Development of the Handling Frame Assembly Table for the NIF Sustainment Project (Draft)

The Handling Frame Assembly Table is a custom designed piece of equipment developed to support the NIF Sustainment Project. The NIF Sustainment project's goal is to refurbish the National Ignition Facility (NIF), the world’s largest and most energetic laser, so it can continue advancing research in fusion energy, national security, and high energy density physics. A key aspect of this effort involves replacing all 1,728 blast shields on the NIF, which requires specialized equipment such as the Handling Frame Assembly Table to support the production of new blast shields. This project follows a systems engineering approach that guides the design sequence. This report documents the design process from initial concept through final design, including stakeholder analysis, requirements development, conceptual design, design analysis and validation, and final design. Future work will focus on building and commissioning the system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Application of Electrochemical Methods to Molten Salt Reactors: Draft TLR Documenting Assessment of Electrochemical Monitoring

Nuclear Regulatory Commission (NRC) is developing the regulatory framework and technical expertise to support regulatory review of advanced non-water reactors, including molten salt reactors (MSRs). In an MSR, it is essential that the salt chemistry be maintained in a desired range in terms of redox potential for reliable operation and mitigation of corrosion to structural materials in the reactor, particularly the reactor vessel and heater exchanger. Measuring the redox potential of the salt in the reactor would also allow for the material lifetimes to be predicted more accurately, and chemical issues to be diagnosed more quickly. In addition to the chemical composition analysis by ICP-MS, electrochemical methods including potentiometry and linear wave scanning (LSC) were also used in molten salt reactor experiment (MSRE) for redox potential monitoring purposes. Electrochemcial methods offers unique advantages such as quick turnaround in results and unique capability of in-line monitoring of redox potential, and are considered popular electroanalytical techniques that can be used to monitor redox potentials and salt chemistry including impurities. The last two decades have seen significant advances in science and engineering of electrochemical methods for potential application to molten salts. The primary goal of this report is to assist NRC in understanding the monitoring of the salt chemistry by electrochemical methods and provide NRC reviewers with necessary information and tools to support regulatory review of MSR designs. This reports consists of two majors parts—Part 1, chemical potential of molten salts and effects by fission process in MSR; Part 2, assessment of electrochemical methods for application to MSRs. The TRLs of the typical relevant electrochemical methods for molten salts were evaluated based on the DOE TRL guidelines and upon a review of the current status of the electrochemical methods for two typical salt systems, fluoride and chloride, for MSRs.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CPUC Avoided Transmission and Distribution Cost Study to Support the Avoided Cost Calculator: Avoided Transmission Costs Draft Research Plan

Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) have been contracted by the California Public Utilities Commission (CPUC) Energy Division (ED) to perform a study which explores and selects an improved methodology to estimate avoided electricity transmission and distribution (T&D) infrastructure costs that can be attributed to the presence of distributed energy resources (DERs). PNNL is performing the study for avoided electricity transmission infrastructure costs and LBNL is performing the study for avoided electricity distribution infrastructure costs. This document summarizes CPUC’s research questions related to avoided transmission infrastructure costs and PNNL’s proposed technical approach to answer these questions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume XVIII: Survival and Transportation Effects of Migrating Snake River Wild Chinook Salmon and Steelhead: Historical Estimates From 1996-2004 and Comparison to Hatchery Results. Draft.

The combined juvenile and adult detection histories of PIT-tagged wild salmonids migrating through the Federal Columbia River Power System (FCRPS) were analyzed using the ROSTER (River-Ocean Survival and Transportation Effects Routine) statistical release-recapture model. This model, implemented by software Program ROSTER, was used to estimate survival on large temporal and spatial scales for PIT-tagged wild spring and summer Chinook salmon and steelhead released in the Snake River Basin upstream of Lower Granite Dam from 1996 to 2004. In addition, annual results from wild salmonids were compared with results from hatchery salmonids, which were presented in a previous report in this series (Buchanan, R. A., Skalski, J. R., Lady, J. L., Westhagen, P., Griswold, J., and Smith, S. 2007, 'Survival and Transportation Effects for Migrating Snake River Hatchery Chinook Salmon and Steelhead: Historical Estimates from 1996-2003', Technical report, Bonneville Power Administration, Project 1991-051-00). These results are reported here. Annual estimates of the smolt-to-adult return ratio (SAR), juvenile inriver survival from Lower Granite to Bonneville, the ocean return probability from Bonneville to Bonneville, and adult upriver survival from Bonneville to Lower Granite are reported. Annual estimates of transport-inriver (T/I) ratios and differential post-Bonneville mortality (D) are reported on a dam-specific basis for release years with sufficient numbers of wild PIT-tagged smolts transported. Transportation effects are estimated only for dams where at least 1,000 tagged wild smolts were transported from a given upstream release group. Because few wild Chinook salmon and steelhead tagged upstream of Lower Granite Dam were transported before the 2003 release year, T/I and D were estimated only for the 2003 and 2004 release years. Performance measures include age-1-ocean adult returns for steelhead, but not for Chinook salmon. Spring and summer Chinook salmon release groups were pooled across the entire Snake River Basin upstream of Lower Granite Dam for this report. Annual estimates of SAR from Lower Granite back to Lower Granite averaged 0.92% with an estimated standard error (dSE) of 0.25% for wild spring and summer Chinook salmon for tagged groups released from 1996 through 2004, omitting age-1-ocean (jack) returns. Only for the 1999 and 2000 release years did the wild Chinook SAR approach the target value of 2%, identified by the NPCC as the minimum SAR necessary for recovery. Annual estimates of SAR for wild steelhead from the Snake River Basin averaged 0.63% (dSE = 0.15%), including age-1-ocean returns, for release years 1996 through 2004. For release years when the ocean return probability from Bonneville back to Bonneville could be estimated (i.e., 1999 through 2004), it was estimated that on average approximately 83% of the total integrated mortality for nontransported, tagged wild spring and summer Chinook, and 78% for steelhead (omitting the 2001 release year), occurred during the ocean life stage (i.e., from Bonneville to Bonneville). This suggests that additional monitoring and research efforts should include the ocean and estuary environment. Annual estimates of the dam-specific T/I for Lower Granite Dam were available for the 2003 and 2004 release years for both wild Chinook salmon and wild steelhead. The estimated T/I for Lower Granite was significantly > 1.0 for Chinook in 2004 (P < 0.0001) and for steelhead in both 2003 (P < 0.0001) and 2004 (P < 0.0001), indicating that for these release years, wild fish transported at Lower Granite returned there in higher proportions than fish that were returned to the river at Lower Granite, or that passed Lower Granite without detection as juveniles. Annual estimates of the dam-specific T/I for Little Goose Dam were available for wild Chinook salmon for both 2003 and 2004. The estimated T/I for Little Goose was significantly > 1.0 for wild Chinook in 2004 (P = 0.0024), but not in 2003 (P = 0.1554). Differential post-Bonneville mortality (D) is the ratio of post-Bonneville survival to Lower Granite Dam of transported fish to that of nontransported ('inriver') fish. Estimates of D were available for transportation from Lower Granite and Little Goose dams in 2003 and 2004 for wild Chinook, and from Lower Granite Dam in 2003 and 2004 for wild steelhead. Point estimates ranged from 0.74 (dSE = 0.29) for transportation of wild Chinook salmon from Lower Granite Dam in 2003 to 1.91 (dSE = 0.61) for transportation of wild steelhead from Lower Granite Dam in 2003. Small transport groups resulted in high uncertainty on the point estimates, and only for 2003 steelhead transported from Lower Granite Dam did transported fish have significantly greater post-Bonneville survival than nontransported fish (P = 0.0213).

13 HYDRO ENERGY↗

Research, Monitoring, and Evaluation of Avian Predation on Salmonid Smolts in the Lower and Mid-Columbia River, 2008 Draft Season Summary.

This report describes investigations into predation by piscivorous colonial waterbirds on juvenile salmonids (Oncorhynchus spp.) from throughout the Columbia River basin during 2008. East Sand Island in the Columbia River estuary again supported the largest known breeding colony of Caspian terns (Hydroprogne caspia) in the world (approximately 10,700 breeding pairs) and the largest breeding colony of double-crested cormorants (Phalacrocorax auritus) in western North America (approximately 10,950 breeding pairs). The Caspian tern colony increased from 2007, but not significantly so, while the double-crested cormorant colony experienced a significant decline (20%) from 2007. Average cormorant nesting success in 2008, however, was down only slightly from 2007, suggesting that food supply during the 2008 nesting season was not the principal cause of the decline in cormorant colony size. Total consumption of juvenile salmonids by East Sand Island Caspian terns in 2008 was approximately 6.7 million smolts (95% c.i. = 5.8-7.5 million). Caspian terns nesting on East Sand Island continued to rely primarily on marine forage fishes as a food supply. Based on smolt PIT tag recoveries on the East Sand Island Caspian tern colony, predation rates were highest on steelhead in 2008; minimum predation rates on steelhead smolts detected passing Bonneville Dam averaged 8.3% for wild smolts and 10.7% for hatchery-raised smolts. In 2007, total smolt consumption by East Sand Island double-crested cormorants was about 9.2 million juvenile salmonids (95% c.i. = 4.4-14.0 million), similar to or greater than that of East Sand Island Caspian terns during that year (5.5 million juvenile salmonids; 95% c.i. = 4.8-6.2 million). The numbers of smolt PIT tags recovered on the cormorant colony in 2008 were roughly proportional to the relative availability of PIT-tagged salmonids released in the Basin, suggesting that cormorant predation on salmonid smolts in the estuary was less selective than tern predation. Cormorant predation rates in excess of 30%, however, were observed for some groups of hatchery-reared fall Chinook salmon released downstream of Bonneville Dam. Implementation of the federal plan 'Caspian Tern Management to Reduce Predation of Juvenile Salmonids in the Columbia River Estuary' was initiated in 2008 with construction by the Corps of Engineers of two alternative colony sites for Caspian terns in interior Oregon: a 1-acre island on Crump Lake in the Warner Valley and a 1-acre island on Fern Ridge Reservoir near Eugene. We deployed Caspian tern social attraction (decoys and sound systems) on these two islands and monitored for Caspian tern nesting. Caspian terns quickly colonized the Crump Lake tern island; about 430 pairs nested there, including 5 terns that had been banded at the East Sand Island colony in the Columbia River estuary, over 500 km to the northwest. No Caspian terns nested at the Fern Ridge tern island in 2008, but up to 9 Caspian terns were recorded roosting on the island after the nesting season. There were two breeding colonies of Caspian terns on the mid-Columbia River in 2008: (1) about 388 pairs nested at the historical colony on Crescent Island in the McNary Pool and (2) about 100 pairs nested at a relatively new colony site on Rock Island in the John Day Pool. Nesting success at the Crescent Island tern colony was only 0.28 young fledged per breeding pair, the lowest nesting success recorded at that colony since monitoring began in 2000, while only three fledglings were raised at the Rock Island tern colony. The diet of Crescent Island Caspian terns consisted of 68% salmonid smolts; total smolt consumption was estimated at 330,000. Since 2004, total smolt consumption by Crescent Island terns has declined by 34%, due mostly to a decline in colony size, while steelhead consumption has increased 10% during this same period. In 2008, approximately 64,000 steelhead smolts were consumed by Caspian terns nesting at Crescent Island. Based on smolt PIT tag recoveries on the Crescent Island Caspian tern colony, the average predation rate on in-river migrants from the Snake River (all species and run types combined based on interrogations at Lower Monumental Dam) was at least 1.4%. Predation rates on PIT-tagged steelhead smolts were greater than those for other salmonid species; 6.0% of wild steelhead smolts from the Snake River were consumed by Crescent Island terns. The double-crested cormorant colony on Foundation Island in the mid-Columbia River consisted of at least 360 pairs nesting in trees in 2008. The proportion of juvenile salmonids in stomach samples collected from cormorants nesting on Foundation Island during the peak of the smolt out-migration was about 45% of prey biomass.

13 HYDRO ENERGY↗

Antarctica X-band MiniSAR Crevasse Detection Radar : draft final report.

This document is the final report for the 2009 Antarctica Crevasse Detection Radar (CDR) Project. This portion of the project is referred to internally as Phase 2. This is a follow on to the work done in Phase 1 reported on in [1]. Phase 2 involved the modification of a Sandia National Laboratories MiniSAR system used in Phase 1 to work with an LC-130 aircraft that operated in Antarctica in October through November of 2009. Experiments from the 2006 flights were repeated, as well as a couple new flight tests to examine the effect of colder snow and ice on the radar signatures of 'deep field' sites. This document includes discussion of the hardware development, system capabilities, and results from data collections in Antarctica during the fall of 2009.

54 ENVIRONMENTAL SCIENCES↗

UPC++ Specification v1.0, Draft 8

UPC++ is a C++11 library providing classes and functions that support Partitioned Global Address Space (PGAS) programming. We are revising the library under the auspices of the DOE’s Exascale Computing Project, to meet the needs of applications requiring PGAS support. UPC++ is intended for implementing elaborate distributed data structures where communication is irregular or fine-grained. The UPC++ interfaces for moving non-contiguous data and handling memories with different optimal access methods are composable and similar to those used in conventional C++. The UPC++ programmer can expect communication to run at close to hardware speeds. The key facilities in UPC++ are global pointers, that enable the programmer to express ownership information for improving locality, one-sided communication, both put/get and RPC, futures and continuations. Futures capture data readiness state, which is useful in making scheduling decisions, and continuations provide for completion handling via callbacks. Together, these enable the programmer to chain together a DAG of operations to execute asynchronously as high-latency dependencies become satisfied.

97 MATHEMATICS AND COMPUTING↗