Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Apollo Soyuz test project press kit: USA-USSR

The goals and program of the mission are described. Operations from preflight crew training through splashdown are included. Spacecraft and launch vehicle configurations are given. The 27 joint and unilateral experiments to be performed are described. A flight plan and a schedule of activities is included, together with brief crew biographies. The ground support system is discussed; it includes control centers in Houston and Moscow, and an ATS satellite to relay ground-air-ground communications. The global tracking network and the television transmission system are also described.

Source record↗

Modern digital flight control system design for VTOL aircraft

Methods for and results from the design and evaluation of a digital flight control system (DFCS) for a CH-47B helicopter are presented. The DFCS employed proportional-integral control logic to provide rapid, precise response to automatic or manual guidance commands while following conventional or spiral-descent approach paths. It contained altitude- and velocity-command modes, and it adapted to varying flight conditions through gain scheduling. Extensive use was made of linear systems analysis techniques. The DFCS was designed, using linear-optimal estimation and control theory, and the effects of gain scheduling are assessed by examination of closed-loop eigenvalues and time responses.

Broussard, J. R.↗

An effective combined environment test facility

A critical missile component required operational verification while subjected to combined environments within and beyond flight parameters. The testing schedule necessitated the design and fabrication of a test facility in order to provide the specified temperatures combined with humidity, altitude and vibration.

Deitch, A.↗

Early harvest: The upper atmosphere and cosmic rays

Achievements in space science through 1958 are summarized. Topics discussed are: the scheduling of V-2 flights; the development of newer rockets; the testing of spaceborne instruments; the seeking of financial support for space research; and the problems of international cooperation. Special emphasis is placed on atmospheric sounding.

Source record↗

Space Operations Center - A concept analysis

The Space Operations Center (SOC) which is a concept for a Shuttle serviced, permanent, manned facility in low earth orbit is viewed as a major candidate for the manned space flight following the completion of an operational Shuttle. The primary objectives of SOC are: (1) the construction, checkout, and transfer to operational orbit of large, complex space systems, (2) on-orbit assembly, launch, recovery, and servicing of manned and unmanned spacecraft, (3) managing operations of co-orbiting free-flying satellites, and (4) the development of reduced dependence on earth for control and resupply. The structure of SOC, a self-contained orbital facility containing several Shuttle launched modules, includes the service, habitation, and logistics modules as well as construction, and flight support facilities. A schedule is proposed for the development of SOC over ten years and costs for the yearly programs are estimated.

Source record↗

The development of aerodynamic uncertainties for the Space Shuttle Orbiter

The methodology involved in developing the ability to reproduce aerodynamic results between various wind tunnel tests and to determine uncertainties due to differences between preflight aerodynamic predictions and flight results derived from analysis of past aircraft programs is presented. The uncertainties were developed for pitching moment, lateral-directional stability, rudder power, and aileron power, and were formulated to yield aerodynamic uncertainties for an orbital, manned first flight. The compressed development schedule required the aerodynamics results from wind tunnel tests be equipped with tolerances, which accounted for reasonable changes in the vehicle configuration. A worst case scenario was decided on, with the results that every prediction included the widest possible aerodynamic margins. Repeatibility was emphasized between wind tunnel model tests, and was achieved with an accuracy of 0.006 with inclusion of Reynolds effects.

Young, J. C.↗

X-29A technology demonstrator flight test program overview

An overview of the X-29A functional flight program and concept evaluation program is presented, including some of the unique and different preparations for the first flight. Included are a discussion of the many organizational responsibilities and a description of the program management structure for the test team. Also discussed are preflight ground, flight functional envelope expansion, and flight research test objectives and qualitive results to date for both a limited-envelope flight control system and an expanded-envelope system. The aircraft, including the instrumentation system and measurements, is described. In addition, a discussion is included regarding the use of major support facilities, such as ground and flight simulators, the NASA Western Aeronautical Test Range and mission control center, and the Grumman automated telemetry station. An overview of the associated real-time and postflight batch data processing software approaches is presented. The use of hardware-in-the-loop simulation for independent verification and validation and mission planning and practice is discussed. Also included is a description of the flight-readiness review, the airworthiness and flight safety review, work scheduling, technical briefings, and preflight and postflight crew briefings. The configuration control process used on the X-29A program is described, and its relationship to both simulation and aircraft operations is discussed. An X-29A schedule overview is presented with an outline of a proposed follow-on program.

Sefic, W. J.↗

Sleep and wakefulness in aircrew before and after transoceanic flights

The effects of rapid transmeridian flight on sleep and wakefulness were studied in aircrew members before and after flying one of two routes: San Francisco (SFO) to London (LHR) or SFO to Tokyo. After an adaptation night, sleep and daytime sleepiness were measured objectively in SFO and during the first layover (L/O) of the target trip, using the 'core measures' described by Graeber et al. (1986) and respiration parameters, and the Multiple Sleep Latency Test (MSLT) described by Carscadon (1982); postsleep questionnaires provided subjective assessments. It was found that baseline sleep is not an ideal basis for subsequent comparison; nevertheless, there was an indication that L/O sleep periods tended to provide either less total sleep or less efficient sleep. During baseline, there was significant midday sleepiness tendency as measured by the MSLT; this tendency occurred at almost the same time on the second L/O day in LHR. Recommendations are offered for the adjustment of flight times and for scheduling times of permitted napping as accommodations for the periods of sleepiness tendency.

Dement, William C.↗

An aerodynamic tradeoff study of the scissor wing configuration

A scissor wing configuration, consisting of two independently sweeping wings was numerically studied. This configuration was also compared with an equivalent fixed wing baseline. Aerodynamic and stability and control characteristics of these geometries were investigated over a wide range of flight Mach numbers. It is demonstrated that in the purely subsonic flight regime, the scissor wing can achieve higher aerodynamic efficiency as the result of slightly higher aspect ratio. In the transonic regime, the lift to drag ratio of the scissor wing is shown to be higher than that of the baseline, for higer values of the lift coefficient. This tends to make the scissor wing more efficient during transonic cruise at high altitudes as well as during air combat at all altitudes. In supersonic flight, where the wings are maintained at maximum sweep angle, the scissor wing is shown to have a decided advantage in terms of reduced wave drag. From the view point of stability and control, the scissor wing is shown to have distinct advantages. It is shown that this geometry can maintain a constant static margin in supersonic as well as subsonic flight, by proper sweep scheduling. Furthermore, it is demonstrated that addition of wing mounted elevons can greatly enhance control authority in pitch and roll.

Selberg, Bruce P.↗

A noncontacting motion monitoring system for an astronaut translation aid

The development of a noncontacting motion sensing system designed to monitor the movement of a cart along a track in the low earth orbit space environment is described. The system uses Hall effect sensors to detect the position of small permanent magnets located along the track. The measurement criteria are described, the system design is discussed, and estimates of the system error are given. The system will be used on the Crew and Equipment Translation Aid (CETA) experiment scheduled for the STS37 flight in November 1990. It will allow the position, velocity, and acceleration of the cart to be determined as it moves along the track.

Finley, Tom D.↗

Integrated flight/propulsion control design for a STOVL aircraft using H-infinity control design techniques

Results are presented from an application of H-infinity control design methodology to a centralized integrated flight propulsion control (IFPC) system design for a supersonic Short Takeoff and Vertical Landing (STOVL) fighter aircraft in transition flight. The emphasis is on formulating the H-infinity control design problem such that the resulting controller provides robustness to modeling uncertainties and model parameter variations with flight condition. Experience gained from a preliminary H-infinity based IFPC design study performed earlier is used as the basis to formulate the robust H-infinity control design problem and improve upon the previous design. Detailed evaluation results are presented for a reduced order controller obtained from the improved H-infinity control design showing that the control design meets the specified nominal performance objectives as well as provides stability robustness for variations in plant system dynamics with changes in aircraft trim speed within the transition flight envelope. A controller scheduling technique which accounts for changes in plant control effectiveness with variation in trim conditions is developed and off design model performance results are presented.

Garg, Sanjay↗

A balloon-borne payload for imaging hard X-rays and gamma rays from solar flares

Hard X-rays and gamma rays provide direct evidence of the roles of accelerated particles in solar flares. An approach that employs a spatial Fourier-transform technique for imaging the sources of these emissions is described, and the development of a balloon-borne imaging device based on this instrumental technique is presented. The detectors, together with the imaging optics, are sensitive to hard X-ray and gamma-ray emission in the energy-range from 20 to 700 keV. This payload, scheduled for its first flight in June 1992, will provide 11-arc second angular resolution and millisecond time resolution with a whole-sun field of view. For subsequent flights, the effective detector area can be increased by as much as a factor of four, and imaging optics with angular resolution as fine as 2 arcsec can be added to the existing gondola and metering structures.

Crannell, Carol J.↗

Second tracking and data relay satellite system (TDRSS) ground terminal - STGT

The STGT will provide high availability command and control and improved services to users of NASA's Space Network in the 1990s and beyond. The Space Network, comprising the TDRSS, will be the primary communications gateway for Space Station Freedom and other user's spacecraft and their ground support elements. The STGT will contain a redundant, distributed computer system providing configuration and control of redundant RF to baseband equipment chains for throughput of user data, for user tracking services and for control and monitoring of the TDR Satellites. An interface with NASA's Network Control Center, located at the Goddard Space Flight Center, provides automated scheduling and control of the STGT. A local TDRSS Operations Control Center for local monitoring and back-up control and an interface with the Domestic Satellite for data distribution will be provided by the STGT. This paper describes the STGT, with emphasis on configuration, control and monitoring of those elements providing TDRSS services to user spacecraft.

Berndt, Allen K.↗

Shuttle PRCS plume contamination analysis for Astro-2 mission

The Astro-2 mission scheduled for Jan. 1995 flight is co-manifested with the Spartan experiment. The Astro instrument array consists of several telescopes operating in the UV spectrum. To obtain the desired 300 observations with the telescope array in a shorter time than the Astro-1 mission, it will be necessary to use the primary reaction control system (PRCS) rather than just the Vernier reaction control system. The high mass flow rate of the PRCS engines cause considerable concern about contamination due to PRCS plume return flux. Performance of these instruments depends heavily on the environment they encounter. The ability of the optical system to detect a remote signal depends not only on the intensity of the incoming signal, but also on the ensuing transmission loss through the optical train of the instrument. Performance of these instruments is thus dependent on the properties of the optical surface and the medium through which it propagates. The on-orbit contamination environment will have a strong influence on the performance of these instruments. The finding of a two-month study of the molecular contamination environment of the Astro-2 instruments due to PRCS thruster plumes during the planned Astro-2 mission are summarized.

Wang, Francis C.↗

Pluto Fast Flyby Mission and Science Overview

Planning for the Pluto Fast Flyby (PFF) mission centers on the launch of two small (110-160 kg) spacecraft late in the 1990s on fast, 6-8-year trajectories that do not require Jupiter flybys. The cost target of the two-spaceraft PFF mission is $400 million. Scientific payload definition by NASA's Outer Planets Science Working Group (OPSWG) and JPL design studies for the Pluto flyby spacecraft are now being completed, and the program is in Phase A development. Selection of a set of lightweight, low-power instrument demonstrations is planned for May 1993. According to plan, the completion of Phase A and then detailed Phase B spacecraft and payload design work will occur in FY94. The release of an instrument payload AO, followed by the selection of the flight payload, is also scheduled for FY94.

Stern, A.↗

High-Alpha Research Vehicle (HARV) longitudinal controller: Design, analyses, and simulation resultss

This paper describes the design, analysis, and nonlinear simulation results (batch and piloted) for a longitudinal controller which is scheduled to be flight-tested on the High-Alpha Research Vehicle (HARV). The HARV is an F-18 airplane modified for and equipped with multi-axis thrust vectoring. The paper includes a description of the facilities, a detailed review of the feedback controller design, linear analysis results of the feedback controller, a description of the feed-forward controller design, nonlinear batch simulation results, and piloted simulation results. Batch simulation results include maximum pitch stick agility responses, angle of attack alpha captures, and alpha regulation for full lateral stick rolls at several alpha's. Piloted simulation results include task descriptions for several types of maneuvers, task guidelines, the corresponding Cooper-Harper ratings from three test pilots, and some pilot comments. The ratings show that desirable criteria are achieved for almost all of the piloted simulation tasks.

Ostroff, Aaron J.↗

The effects of Crew Resource Mangement (CRM) training in airline maintenance: Results following three years' experience

This report describes three years' evaluation of the effects of one airline's Crew Resources Management (CRM) training operation for maintenance. This evaluation focuses on the post-training attitudes of maintenance managers' and technical support professionals, their reported behaviors, and the safety, efficiency and dependable maintenance performance of their units. The results reveal a strong positive effect of the training. The overall program represents the use of CRM training as a long-term commitment to improving performance through effective communication at all levels in airline maintenance operations. The initial findings described in our previous progress reports are reinforced and elaborated here. The current results benefit from the entire pre-post training survey, which now represents total attendance of all managers and staff professionals. Additionally there are now full results from the two-month, six-month, and 12-month follow-up questionnaires, together with as many as 33 months of post-training performance data, using several indicators. In this present report, we examine participants' attitudes, their reported behaviors following the training, the performance of their work units, and the relationships among these variables. Attitudes include those measured immediately before and after the training as well as participants' attitudes months after their training. Performance includes measures, by work units, of on-time flight departures, on-schedule maintenance releases, occupational and aircraft safety, and efficient labor costs. We report changes in these performance measures following training, as well their relationships with the training participants' attitudes. Highlights of results from this training program include increased safety and improved costs associated with positive attitudes about the use of more assertive communication, and the improved management of stress. Improved on-time performance is also related to those improved attitudes, as well as favorable attitudes about participative management.

Taylor, J. C.↗

Piloted Simulation Investigation of a Supersonic Transport Configuration (LaRC.4)

This report contains a description of the test facilities and software utilized during a joint NASA/aerospace industry study of improved control laws and desired inceptor characteristics for a candidate supersonic transport air-craft design. Details concerning the characteristics of the simulation cockpit, image generator and display systems, and motion platform are described. Depictions of the various display formats are included. The test schedule, session log, and flight cards describing the maneuvers performed is included. A brief summary of high-lights of the study is given. Modifications made to the industry-provided simulation model are described. This report is intended to serve as a reference document for industry researchers.

Jackson, E. Bruce↗