Advanced Hydrogen Turbine Development

Under the sponsorship of the U.S. Department of Energy (DOE) National Energy Technology Laboratories, Siemens has completed the Advanced Hydrogen Turbine Development Program to develop an advanced gas turbine for incorporation into future coal-based Integrated Gasification Combined Cycle (IGCC) plants. All the scheduled DOE Milestones were completed and significant technical progress was made in the development of new technologies and concepts. Advanced computer simulations and modeling, as well as subscale, full scale laboratory, rig and engine testing were utilized to evaluate and select concepts for further development. Program Requirements of: A 3 to 5 percentage point improvement in overall plant combined cycle efficiency when compared to the reference baseline plant; 20 to 30 percent reduction in overall plant capital cost when compared to the reference baseline plant; and NOx emissions of 2 PPM out of the stack. were all met. The program was completed on schedule and within the allotted budget

42 ENGINEERING↗

Irradiation Assisted Stress Corrosion Cracking of Austenitic Stainless Steel in BWR Conditions

As a first step toward full scale utilization of the Advanced Test Reactor (ATR) and associated post irradiation examination (PIE) equipment at INL, the NRC and INL staffs have formulated a test program that is designed to help to establish INL and the Nuclear Science User Facilities (NSUF) as a viable destination for irradiation and PIE of reactor structural materials. This initial research program utilized two materials (304 Stainless Steel weld Heat Affected Zone (HAZ) and sensitized 304L stainless steel) that have previously been irradiated at the Halden reactor in Norway and tested at Argonne National Laboratory (ANL) so that test results may be compared, thereby establishing a measure of comparability between Halden and ATR irradiations. A secondary objective of this test program was to characterize the quality of data produced using INL’s newly constructed irradiation assisted stress corrosion cracking (IASCC) test cells. The specimens were be tested in typical boiling water reactor (BWR) conditions to measure stress corrosion cracking (SCC) and fracture toughness of un-irradiated specimens and then IASCC and fracture toughness of specimens irradiated to a fluence equal to approximately 1.0 X 10 21 n/cm 2 (E > 1 MeV).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technology Acceptance Workshop Meeting Proceedings, April 20-29, 2022

The Renewable Energy Wildlife Institute and the National Renewable Energy Laboratory convened a virtual workshop facilitated by the Consensus Building Institute in April 2022 to identify recommendations on how to accelerate the rate of research and development, evaluation, and adoption of technologies for monitoring or minimizing wildlife impacts from wind energy. The workshop drew on expertise from stakeholder groups including technology developers, federal agencies, conservation nonprofits, and the wind industry. Over the course of four sessions, participants discussed incentives and barriers to technology development beginning with early field testing and validation, through full-scale experimental deployment, and finally broad-scale acceptance and commercial deployment.

17 WIND ENERGY↗

Gripper Test Assembly Status of Fabrication and Assembly Report – FY2023

The Gripper Test Assembly (GrTA) is an experimental test article designed for use at the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The GrTA will test mechanical components intended for use in compact in-vessel fuel handling machines (FHM) for sodium cooled fast reactors (SFR). The GrTA will test radial and thrust ball bearings, radial and thrust roller bearings, ball screws and nuts, spline shafts and ball nuts, radial spur gears, and universal joints submerged in liquid sodium at high temperatures (250°C-650°C). These components will be tested in a prototypic, full-scale gripper head and under prototypic SFR fuel handling loads. The design of the GrTA was completed in FY2022 and has progressed into fabrication and initial assembly. All custom manufactured components have been fabricated and delivered to ANL following inspection. All custom gears have been fabricated and delivered to ANL. Bearings, ball screws, and spline shafts have been purchased to allow for initial assembly in air, and sodium compatible versions have either been purchased or are in design at appropriate manufacturers. The drive motor systems that operate the various functions of the GrTA have been purchased and delivered to ANL. Instrumentation and control hardware has been purchased and delivered to ANL as well. All sodium facing components of the GrTA have been assembled and show proper fit. The three main functions of the GrTA are to raise or lower a gripper head under prototypic fuel handling loads, rotate the gripper head while carrying a fuel handling load, and extend or retract gripper jaws that lock a fuel assembly to the gripper head. All three functions have been demonstrated in air, while under no load. The GrTA project will move forward next fiscal year by completing the initial assembly, incorporating the drive system and I&C, and preparing the assembly for introduction to sodium.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demonstration of Mer-Cure Technology for Enhanced Mercury Control

Alstom Power Inc. has completed a DOE/NETL-sponsored program (under DOE Cooperative Agreement No. De-FC26-07NT42776) to demonstrate Mer-Cure{trademark}, one of Alstom's mercury control technologies for coal-fired boilers. The Mer-Cure{trademark}system utilizes a small amount of Mer-Clean{trademark} sorbent that is injected into the flue gas stream for oxidation and adsorption of gaseous mercury. Mer-Clean{trademark} sorbents are carbon-based and prepared with chemical additives that promote oxidation and capture of mercury. The Mer-Cure{trademark} system is unique in that the sorbent is injected into an environment where the mercury capture kinetics is accelerated. The full-scale demonstration program originally included test campaigns at two host sites: LCRA's 480-MW{sub e} Fayette Unit No.3 and Reliant Energy's 190-MW{sub e} Shawville Unit No.3. The only demonstration tests actually done were the short-term tests at LCRA due to budget constraints. This report gives a summary of the demonstration testing at Fayette Unit No.3. The goals for this Mercury Round 3 program, established by DOE/NETL under the original solicitation, were to reduce the uncontrolled mercury emissions by 90% at a cost significantly less than 50% of the previous target of $60,000/lb mercury removed. The results indicated that Mer-Cure{trademark} technology could achieve mercury removal of 90% based on uncontrolled stack emissions. The estimated costs for 90% mercury control, at a sorbent cost of $0.75 to $2.00/lb respectively, were $13,400 to $18,700/lb Hg removed. In summary, the results from demonstration testing show that the goals established by DOE/NETL were met during this test program. The goal of 90% mercury reduction was achieved. Estimated mercury removal costs were 69-78% lower than the benchmark of $60,000/lb mercury removed, significantly less than 50% of the baseline removal cost.

01 COAL, LIGNITE, AND PEAT↗

A geophysical shock and air blast simulator at the National Ignition Facility

The energy partitioning energy coupling experiments at the National Ignition Facility (NIF) have been designed to measure simultaneously the coupling of energy from a laser-driven target into both ground shock and air blast overpressure to nearby media. The source target for the experiment is positioned at a known height above the ground-surface simulant and is heated by four beams from the NIF. The resulting target energy density and specific energy are equal to those of a low-yield nuclear device. The ground-shock stress waves and atmospheric overpressure waveforms that result in our test system are hydrodynamically scaled analogs of full-scale seismic and air blast phenomena. This report summarizes the development of the platform, the simulations, and calculations that underpin the physics measurements that are being made, and finally the data that were measured. Agreement between the data and simulation of the order of a factor of two to three is seen for air blast quantities such as peak overpressure. Historical underground test data for seismic phenomena measured sensor displacements; we measure the stresses generated in our ground-surrogate medium. We find factors-of-a-few agreement between our measured peak stresses and predictions with modern geophysical computer codes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

BENCH SCALE SALTSTONE PROCESS DEVELOPMENT MIXING STUDY

The Savannah River National Laboratory (SRNL) was requested to develop a bench scale test facility, using a mixer, transfer pump, and transfer line to determine the impact of conveying the grout through the transfer lines to the vault on grout properties. Bench scale testing focused on the effect the transfer line has on the rheological property of the grout as it was processed through the transfer line. Rheological and other physical properties of grout samples were obtained prior to and after pumping through a transfer line. The Bench Scale Mixing Rig (BSMR) consisted of two mixing tanks, grout feed tank, transfer pump and transfer hose. The mixing tanks were used to batch the grout which was then transferred into the grout feed tank. The contents of the feed tank were then pumped through the transfer line (hose) using a progressive cavity pump. The grout flow rate and pump discharge pressure were monitored. Four sampling stations were located along the length of the transfer line at the 5, 105 and 205 feet past the transfer pump and at 305 feet, the discharge of the hose. Scaling between the full scale piping at Saltstone to bench scale testing at SRNL was performed by maintaining the same shear rate and total shear at the wall of the transfer line. The results of scaling down resulted in a shorter transfer line, a lower average velocity, the same transfer time and similar pressure drops. The condition of flow in the bench scale transfer line is laminar. The flow in the full scale pipe is in the transition region, but is more laminar than turbulent. The resulting plug in laminar flow in the bench scale results in a region of no-mixing. Hence mixing, or shearing, at the bench scale should be less than that observed in the full scale, where this plug is non existent due to the turbulent flow. The bench scale tests should be considered to be conservative due to the highly laminar condition of flow that exists. Two BSMR runs were performed. In both cases, wall shearing was shown to reduce the rheological properties of the grout as it was processed through the transfer line. Samples taken at the static feed tank showed that gelling impacted the rheological properties of the grout before it was fed into the pump and transfer line. A comparison of the rheological properties of samples taken at the feed tank and transfer line discharge indicated shearing of the grout was occurring in the transfer line. Bench scale testing of different mixing methods with three different salt solutions showed that method of mixing influences the rheological properties of the grouts. The paddle blade mixing method of the salt solution used for the BMSR testing provided comparable rheological properties of the grout prepared in the BMSR after 14 minutes of processing, B3. The paddle blade mixing method can be used to represent BMSR results and mixing time can be adjusted to represent larger scale mixing.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NaREC Offshore and Drivetrain Test Facility Collaboration: Cooperative Research and Development Final Report, CRADA Number CRD-04-140

The National Renewable Energy Laboratory (NREL) and the National Renewable Energy Centre (NaREC) in the United Kingdom (UK) have a mutual interest in collaborating in the development of full-scale offshore wind energy and drivetrain testing facilities. NREL and NaREC will work together to share resources and experiences in the development of future wind energy test facilities. This Cooperative Research and Development Agreement (CRADA) includes sharing of test protocols, infrastructure cost data, test plans, pro forma contracting instruments, and safe operating strategies. Furthermore, NREL and NaREC will exchange staff for training and development purposes.

17 WIND ENERGY↗

Improved Structure and Fabrication of Large, High-Power KHPS Rotors - Final Scientific/Technical Report

Verdant Power, Inc, working in partnership with the National Renewable Energy Laboratory (NREL), Sandia National Laboratories (SNL), and the University of Minnesota St. Anthony Falls Laboratory (SAFL), among other partners, used evolving Computational Fluid Dynamics (CFD) and Finite Element Analysis (FEA) models and techniques to improve the structure and fabrication of large, high-power composite Kinetic Hydropower System (KHPS) rotor blades. The objectives of the project were to: design; analyze; develop for manufacture and fabricate; and thoroughly test, in the lab and at full scale in the water, the improved KHPS rotor blade.

16 TIDAL AND WAVE POWER↗

Beneficial Use of Harvested Ponded Fly Ash and Landfilled FGD Materials for High-Volume Surface Mine Reclamation

The overall motivation of this project was to demonstrate at laboratory, bench-scale, and full-scale demonstration levels that (a) coal ash surface impoundments can go through closure by removal as per USEPA and state regulations so that the material can be used as is (other than draining free water using CCRs piles) in high-volume beneficial applications, (b) FGD material from closed out FGD facilities can be excavated and recompacted for coal mine reclamation, and (c) harvested CCRs can be beneficially utilized (providing a net environmental gain) in large-volumes for reclamation at abandoned coal mine sites across the US, especially in the Eastern and Midwest coal mining regions. The objectives of this project were to: 1) promote the safe and cost-effective closure by removal of coal ash impoundments, 2) harvest landfilled FGD, and 3) promote the high-volume beneficial use of these harvested CCRs in the reclamation of abandoned surface coal mine sites across the eastern and midwestern coal mining regions of the United States. The major tasks carried out for this project are summarized below: 1) Conesville Full-Scale Demonstration Project: About 2 million tons of harvested CCR materials from the closure by removal of an inactive fly ash pond and an adjacent old FGD landfill were used for the full-scale demonstration project to fully reclaim a nearby partially completed abandoned surface coal mine. Site monitoring for the project duration was carried out and results are discussed. 2) Laboratory Testing: Geotechnical and environmental testing of harvested ponded fly ash and landfilled FGD material at the former Conesville power plant were carried out. Completing the laboratory testing allowed for QA/QC for the full-scale site construction and informed the formulation of the risk analysis. 3) Risk Analysis: We developed a reliable computational model for fate and transport. We used these models and the rich set of monitored data for the Conesville site to analyze risks to human health and ecological risks associated with high-volume surface mine reclamation using harvested CCRs. 4) GIS Siting Study: A Geographic Information System (GIS) study was carried out for three states in the Eastern coal mining region and two states in the Midwest coal region. This effort provided site specific GIS information for five states and allowed us to establish protocols that other states can follow in implementing their own state specific GIS study.

01 COAL, LIGNITE, AND PEAT↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

OFFGAS GENERATION FROM THE DISPOSITION OF SCRAP PLUTONIUM BY VITRIFICATION SIMULANT TESTS

The Department of Energy Office of Environmental Management is supporting R&D for the conceptual design of the Plutonium Disposition Project at the Savannah River Site in Aiken, SC to reduce the attractiveness of plutonium scrap by fabricating a durable plutonium oxide glass form and immobilizing this form within the high-level waste glass prepared in the Defense Waste Processing Facility. A glass formulation was developed that is capable of incorporating large amounts of actinides as well as accommodating many impurities that may be associated with impure Pu feed streams. The basis for the glass formulation was derived from commercial glasses that had high lanthanide loadings. A development effort led to a Lanthanide BoroSilicate (LaBS) glass that accommodated significant quantities of actinides, tolerated impurities associated with the actinide feed streams and could be processed using established melter technologies. A Cylindrical Induction Melter (CIM) was used for vitrification of the Pu LaBS glass. Induction melting for the immobilization of americium and curium (Am/Cm) in a glass matrix was first demonstrated in 1997. The induction melting system was developed to vitrify a non-radioactive Am/Cm simulant combined with a glass frit. Most of the development of the melter itself was completed as part of that work. This same melter system used for Am/Cm was used for the current work. The CIM system used consisted of a 5 inch (12.7 cm) diameter inductively heated platinum-rhodium (Pt-Rh) containment vessel with a control system and offgas characterization. Scrap plutonium can contain numerous impurities including significant amounts of chlorides, fluorides, sodium, potassium, lead, gallium, chromium, and nickel. Smaller amounts of additional elements can also be present. The amount of chlorides present is unusually high for a melter feed. In commercial applications there is no reason to have chloride at such high concentrations. Because the melter operates at 1400-1475 C, many of the impurities present are extremely volatile. An alternative being considered is to pre-treat the impure PuO{sub 2} by water washing to remove the soluble salts, which would significantly reduce the melter emissions. The disadvantage of the washing alternative is the criticality concerns of using water with plutonium. In this paper, the testing that has been conducted at the Savannah River National Laboratory (SRNL) to demonstrate induction melting of impure plutonium simulants will be described. The work described concentrates on quantification of the gaseous and particulate emissions from the induction melter. The Pt-Rh melter vessel is a cylinder with a conical bottom and a tubular drain as shown in Figure 1. A 5-inch (12.7 cm) diameter CIM was used for all of the emissions tests. A 6-inch (15.24 cm) diameter CIM, which is the size of the full-scale melter, has since been constructed for further testing. The 5-inch CIM is heated by three induction coils: one for the 5 inch cylinder, one for the conical section, and one for the 1/4-inch (6.35 mm) drain tube. The 6-inch CIM is similar except the cylinder heater extends lower and also heats the cone. The induction heating system is manufactured by Ameritherm{trademark}. The heating system is controlled by a PC to maintain a specific heat up profile and then maintain a constant energy input that maintains a constant temperature. The CIM is operated in batch mode where the plutonium simulant and the glass-forming frit are first thoroughly mixed in an attrittor mill, then added to the melter. Hafnium oxide (HfO{sub 2}) is used as a simulant for the radioactive PuO{sub 2}. The melter is heated until the mixture begins to melt at about 1100 C, then completely melts at about 1400-1450 C. This temperature is maintained for about three hours. While the temperature is maintained at {approx} 1400 C, an air bubbler is normally used to promote mixing of the glass-forming frit and the waste simulant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BLENDING STUDY FOR SRR SALT DISPOSITION INTEGRATION: TANK 50H SCALE-MODELING AND COMPUTER-MODELING FOR BLENDING PUMP DESIGN, PHASE 2

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where 300,000-800,000 gallons of salt solution will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. Blending requires the miscible salt solutions from potentially multiple source tanks per batch to be well mixed without disturbing settled sludge solids that may be present in a Blend Tank. Disturbing solids may be problematic both from a feed quality perspective as well as from a process safety perspective where hydrogen release from the sludge is a potential flammability concern. To develop the necessary technical basis for the design and operation of blending equipment, Savannah River National Laboratory (SRNL) completed scaled blending and transfer pump tests and computational fluid dynamics (CFD) modeling. A 94 inch diameter pilot-scale blending tank, including tank internals such as the blending pump, transfer pump, removable cooling coils, and center column, were used in this research. The test tank represents a 1/10.85 scaled version of an 85 foot diameter, Type IIIA, nuclear waste tank that may be typical of Blend Tanks used in SDI. Specifically, Tank 50 was selected as the tank to be modeled per the SRR, Project Engineering Manager. SRNL blending tests investigated various fixed position, non-rotating, dual nozzle pump designs, including a blending pump model provided by the blend pump vendor, Curtiss Wright (CW). Primary research goals were to assess blending times and to evaluate incipient sludge disturbance for waste tanks. Incipient sludge disturbance was defined by SRR and SRNL as minor blending of settled sludge from the tank bottom into suspension due to blending pump operation, where the sludge level was shown to remain constant. To experimentally model the sludge layer, a very thin, pourable, sludge simulant was conservatively used for all testing. To experimentally model the liquid, supernate layer above the sludge in waste tanks, two salt solution simulants were used, which provided a bounding range of supernate properties. One solution was water (H{sub 2}O + NaOH), and the other was an inhibited, more viscous salt solution. The research performed and data obtained significantly advances the understanding of fluid mechanics, mixing theory and CFD modeling for nuclear waste tanks by benchmarking CFD results to actual experimental data. This research significantly bridges the gap between previous CFD models and actual field experiences in real waste tanks. A finding of the 2009, DOE, Slurry Retrieval, Pipeline Transport and Plugging, and Mixing Workshop was that CFD models were inadequate to assess blending processes in nuclear waste tanks. One recommendation from that Workshop was that a validation, or bench marking program be performed for CFD modeling versus experiment. This research provided experimental data to validate and correct CFD models as they apply to mixing and blending in nuclear waste tanks. Extensive SDI research was a significant step toward bench marking and applying CFD modeling. This research showed that CFD models not only agreed with experiment, but demonstrated that the large variance in actual experimental data accounts for misunderstood discrepancies between CFD models and experiments. Having documented this finding, SRNL was able to provide correction factors to be used with CFD models to statistically bound full scale CFD results. Through the use of pilot scale tests performed for both types of pumps and available engineering literature, SRNL demonstrated how to effectively apply CFD results to salt batch mixing in full scale waste tanks. In other words, CFD models were in error prior to development of experimental correction factors determined during this research, which provided a technique to use CFD models for salt batch mixing and transfer pump operations. This major scientific advance in mixing technology resulted in multi-million dollar cost savings to SRR. New techniques were developed for both experiment and analysis to complete this research. Supporting this success, research findings are summarized in the Conclusions section of this report, and technical recommendations for design and operation are included in this section of the report.

08 HYDROGEN↗

Report on Year-4 of Water NSTF Matrix Testing: Facility Maintenance and Accident Testing

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report serves as a summary of maintenance and experimental activities during the program’s fourth year of water-based operation. A planned six-month maintenance period began in August 2021, during which major inspections, repairs, cleaning, and installation of new instrumentation and data acquisition hardware were conducted. Most significantly, two heaters that faulted during Year-3 were repaired, allowing the facility to resume use of the full heated section area and full range of available electric power. The remainder of the year consisted of eight months of test operations, during which the facility logged 211 hours of active heating across one bake-out (following the maintenance period) and seven matrix tests; five classifieds as Accepted per NQA-1, one as Trending, and one as Failed. Testing began by performing two repeat cases to confirm expected facility response and behavior during both single- and two-phase flow conditions, ensuring no changes were introduced during the maintenance period that might have altered the thermal-hydraulic characteristics of the facility. In continuation of the power parametric series initiated in previous years, a high-power test case was then performed examining heat removal performance at a decay heat load equivalent to 2.4 MWt, full-scale, a level exceeding maximum design targets. Additional testing then introduced various blockage scenarios along the network piping, examining the effects of partial and complete blockages of the flow paths on the system behavior and heat removal performance. A study of static boiling tests directed at understanding the geysering two-phase instability was also conducted. The loop was filled only to the bottom of the tank outlet, creating an open loop configuration that prevents any natural circulation flow from occurring, and the heaters were powered on until the facility reached saturation conditions. Following, a series of quasi-steady-state conditions were introduced by adjusting the inventory level in the adiabatic chimney piping at decreasingly lower elevations above the heated region. A strong correlation of geysering characteristics and loop level was observed, with flow and temperature excursions decreasing in intensity, but increasing in frequency, as the fill were reduced to lower elevations along the chimney piping. Once the level fell very low in the chimney, at points near the top of the heated section, the system reached a stable state of continuous boiling without any occurrence of geysering eruptions. A final significant testing accomplishment this year was successful completion of an “accident scenario” test, whose operating conditions were based on a prototypic decay heat curve provided by Framatome and scaled for the NSTF. This test began by establishing steady-state, single-phase “normal operation” conditions, before simulating an accident trip where the availability of active cooling systems was lost. Loop temperatures gradually increased until reaching saturation and subsequent two-phase boiling flow. Over the course of an extended operational period along the defined decay heat curve, steam boil-off caused gradual but continued depletion of liquid inventory until reaching a critically low level causing flow stagnation and cessation of natural circulation heat removal. At this point, after nearly 72 hours of continuous operation, a cold refill was performed to replenish the system inventory and allow the facility to re-establish closed loop natural circulation flow and return to a safe operational state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DEVELOPMENT AND DEMONSTRATION OF A SUPERCRITICAL HELIUM-COOLED CRYOGENIC VISCOUS COMPRESSOR PROTOTYPE FOR THE ITER VACUUM SYSTEM

As part of the vacuum system for the ITER fusion project, a cryogenic viscouscompressor (CVC) is being developed to collect hydrogenic exhaust gases from the toruscryopumps and compress them to a high enough pressure by regeneration for pumping tothe tritium reprocessing facility. Helium impurities that are a byproduct of the fusionreactions pass through the CVC and are pumped by conventional vacuum pumps andexhausted to the atmosphere. Before the development of a full-scale CVC, a representative,small-scale test prototype was designed, fabricated, and tested. With cooling provided bycold helium gas, hydrogen gas was introduced into the central column of the test prototypepump at flow rates between 0.001 g/s and 0.008 g/s. Based on the temperatures and flowrates of the cold helium gas, different percentages of hydrogen gas were frozen to the column surface wall as the hydrogen gas flow rate increased. Results from the measured temperatures and pressures will form a benchmark that will be used to judge future heattransfer enhancements to the prototype CVC and to develop a computational fluid dynamicmodel that will help develop design parameters for the full-scale CVC.

08 HYDROGEN↗

Hydraulic Permeability of Resorcinol-Formaldehyde Ion-Exchange Resin - Effects of Oxygen Uptake and Radiation

An ion-exchange process, using spherical resorcinol-formaldehyde (RF) resin is the baseline process for removing cesium from the dissolved salt solution in the high-level waste tanks at the U.S. Department of Energy's (DOE) Hanford site in Washington State. The RF resin is also being evaluated for use in the proposed Small Column Ion Exchange (SCIX) system, which is an alternative treatment option at DOE's Savannah River Site (SRS)in South Carolina. Testing at ORNL will determine the impact of radiation exposure and oxygen uptake by the RF resin on the hydraulic permeability of the resin. Samples of the resin will be removed periodically to measure physical properties (bead size and compressibility) and cesium capacity. The proposed full-scale treatment system at Hanford, the Waste Treatment Plant (WTP), will use an ion-exchange column containing nominally 680 gal of resin, which will treat 30 gpm of waste solution. The ion-exchange column is designed for a typical pressure drop of 6 psig, with a maximum of 9.7 psig. The lab-scale column is 3-in. clear PVC pipe and is prototypic of the proposed Hanford column. The fluid velocity in the lab-scale test will be much higher than for the full-scale column, in order to generate the maximum pressure drop expected in that column (9.7 psig). The frictional drag from this high velocity will produce similar forces on the resin in the lab-scale column as would be expected at the bottom of the full-scale column. The chemical changes in the resin caused by radiation exposure and oxygen uptake are expected to cause physical changes in the resin that could reduce the bed porosity and reduce the hydraulic permeability of the resin bed. These changes will be monitored by measuring the pressure drop through the lab-scale column and by measuring the physical properties of samples of the resin. The test loop with the lab-scale column is currently being fabricated, and operation will start by late May. Testing will be completed by the end of August.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A coupled THC model of the FEBEX in situ test with bentonite swelling and chemical and thermal osmosis

The performance assessment of a geological repository for radioactive waste requires quantifying the geochemical evolution of the bentonite engineered barrier. This barrier will be exposed to coupled thermal (T), hydrodynamic (H), mechanical (M) and chemical (C) processes. This paper presents a coupled THC model of the FEBEX (Full-scale Engineered Barrier EXperiment) in situ test which accounts for bentonite swelling and chemical and thermal osmosis. Model results attest the relevance of thermal osmosis and bentonite swelling for the geochemical evolution of the bentonite barrier while chemical osmosis is found to be almost irrelevant. The model has been tested with data collected after the dismantling of heater 1 of the in situ test. The model reproduces reasonably well the measured temperature, relative humidity, water content and inferred geochemical data. However, it fails to mimic the solute concentrations at the heater-bentonite and bentonite-granite interfaces because the model does not account for the volume change of bentonite, the CO{sub 2}(g) degassing and the transport of vapor from the bentonite into the granite. The inferred HCO{sub 3}{sup -} and pH data cannot be explained solely by solute transport, calcite dissolution and protonation/deprotonation by surface complexation, suggesting that such data may be affected also by other reactions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗