Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch control systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

Launch Vehicle Control Center Architectures

Launch vehicles within the international community vary greatly in their configuration and processing. Each launch site has a unique processing flow based on the specific launch vehicle configuration. Launch and flight operations are managed through a set of control centers associated with each launch site. Each launch site has a control center for launch operations; however flight operations support varies from being co-located with the launch site to being shared with the space vehicle control center. There is also a nuance of some having an engineering support center which may be co-located with either the launch or flight control center, or in a separate geographical location altogether. A survey of control center architectures is presented for various launch vehicles including the NASA Space Launch System (SLS), United Launch Alliance (ULA) Atlas V and Delta IV, and the European Space Agency (ESA) Ariane 5. Each of these control center architectures shares some similarities in basic structure while differences in functional distribution also exist. The driving functions which lead to these factors are considered and a model of control center architectures is proposed which supports these commonalities and variations.

Watson, Michael D.↗

Validation & Verification of Electrical Components B2 Test Facility

The research focus of this project is to assist in the closure of Measurement, Monitoring and Control System (MMCS) and other electrical requirements in support of the B2 Space Launch System (SLS) Core Stage Green Run Test Project. Alongside this goal I am to understand project management tools to analyze and control activities/tasks associated with those items. The project I am working on will assist electrical engineers in developing and or identifying closure rationale for the MMCS and electrical requirements. Also as serving the role of a training project manager, I am to develop and maintain a method for tracking progress with estimate completion dates specifically identifying those items during this performance window. The methods I used in order to perform the research consisted of worddocuments, excel sheets, and pdf documents needed for review. For example, documents consisted of: a SLS Core Stage Green Run Facility Requirement Document (FRD) identifying the SSC MMCS and electrical requirements, a Stage Controller to SSC Interface Control Document (ICD) identifying the SSC requirements, and the B2 SLS Core Stage Green Run Test project System Requirements Document (SRD) which identifies the MMCS and electrical requirements. The files were sent to me by both mentors, Mr. Barry Robinson and Ms. Dawn Davis. Overall, the review process for the word documents and excel spreadsheets proved to be successful. The data for the electrical components were accurate and were consistent with the original recorded data. However, the consistency with the pdf documents did not follow up all the way. Attention to this mistake was made and further revisions were done in order for the data to agree with each other. Furthermore, an itinerary was designed using Microsoft Outlook in order to track progress with estimated completion dates. This project contributes to NASA/Center Missions and Goals through the Waterfall Model. The Waterfall Model is a linear system used for engineering design. In the Waterfall Model, the fourth step is Verification and Validation. This involves installation, testing, and debugging of the B2 SLS Core Stage electrical components. For the SLS Core Stage Green Run Test Project, each requirement contained in this approved requirements set will have at least one Verification Item (VI) assigned to it. During the design phase, VIs will mostly consist of Analysis or Inspection types. Design phase VIs and closure information will be documented in Dynamics Data Management System (DDMS) in the form of analysis reports and design documentation.

Bastian, Tyler↗

GN&C Flight Experience and Lessons Learned from BioSentinel: A 6U Deep Space Cubesat

This paper reviews the flight experiences of the BioSentinel propulsion and Attitude Determination and Control System (ADCS) teams. BioSentinel is a 6U cubesat that launched as a secondary payload aboard the Space Launch System's (SLS) maiden flight in November of 2022 and is now operating in an Earth trailing heliocentric orbit. We discuss the mission's original GNC approach as well as several improvements made in-flight, in particular a novel approach to gyro bias estimation in the spacecraft’s sun safe controller. The development and flight experience of the spacecraft's RCS propulsion system is also discussed, along with modifications made to the momentum management approach in response to a failed thruster valve. Finally, we present lessons learned and recommendations for GNC design in future deep-space cubesats.

BioSentinel↗

Variable-Structure Control of a Model Glider Airplane

A variable-structure control system designed to enable a fuselage-heavy airplane to recover from spin has been demonstrated in a hand-launched, instrumented model glider airplane. Variable-structure control is a high-speed switching feedback control technique that has been developed for control of nonlinear dynamic systems.

Waszak, Martin R.↗

Constellation Program Thermal and Environmental Control and Life Support System Status: 2009 - 2010

The Constellation Program (CxP) consists of spacecrafts, launch vehicles, and support systems to execute the Exploration Architecture. The Program is currently divided into three distinct phases. The first phase is to develop a vehicle to provide limited cargo resupply capability and allow crew member rotation to the International Space Station (ISS). The second phase is to support the return of humans to the moon. The final phase is currently envisioned to allow the delivery of humans and cargo to Mars for an extended time. To implement this phased approach the CxP is currently working on the first vehicle and support systems to replace the Space Shuttle and allow continued access to space. This paper provides a summary of the CxP Thermal and Environmental Control and Life Support (ECLS) work that that has occurred across the different parts of the Program in support of these three phases over the past year.

Williams, David E.↗

Controls and Automation Research in Space Life Support

A highly controlled and automated life support system has long been a NASA goal. It is usually assumed that life support for future long duration missions will use physical/chemical recycling systems that substantially close the oxygen and water circulation loops. Such a tightly coupled life support system has been thought to require an overall supervisory control system to minimize crew operation and maintenance activities. The International Space Station (ISS) Environmental Control and Life Support System (ECLSS) was at first expected to have supervisory control and automation. After this was found infeasible during the design of the ISS ECLSS in the early 1990's, it was then expected that the ISS or future mission systems would be upgraded to meet the original expectations. Since then NASA has extensively researched life support system controls and automation. Automation and Artificial Intelligence (AI) have gone through several cycles of enthusiasm and neglect before their recent great achievements, and NASA life support interest has similarly varied. Since the ISS ECLSS was launched, its on-board operational problems have led NASA to deemphasize system level controls and automation in favor of improving subsystem reliability and maintainability. Recent work has investigated supervisory control for a system similar to the ISS ECLSS. This paper reviews past planning and work on the supervisory control of closed, integrated physical/chemical life support systems similar to the ISS ECLSS and its precursors dating back to the 1960's.

life support↗

International Space Station Water Balance Operations

In November 2008, the Water Regenerative System racks were launched aboard Space Shuttle flight, STS-126 (ULF2) and installed and activated on the International Space Station (ISS). These racks, consisting of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA), completed the installation of the Regenerative (Regen) Environmental Control and Life Support Systems (ECLSS), which includes the Oxygen Generation Assembly (OGA) that was launched 2 years prior. With the onset of active water management on the US segment of the ISS, a new operational concept was required, that of water balance . In November of 2010, the Sabatier system, which converts H2 and CO2 into water and methane, was brought on line. The Regen ECLSS systems accept condensation from the atmosphere, urine from crew, and processes that fluid via various means into potable water, which is used for crew drinking, building up skip-cycle water inventory, and water for electrolysis to produce oxygen. Specification (spec) rates of crew urine output, condensate output, O2 requirements, toilet flush water, and drinking needs are well documented and used as the best guess planning rates when Regen ECLSS came online. Spec rates are useful in long term planning, however, daily or weekly rates are dependent upon a number of variables. The constantly changing rates created a new challenge for the ECLSS flight controllers, who are responsible for operating the ECLSS systems onboard ISS from Mission Control in Houston. This paper reviews the various inputs to water planning, rate changes, and dynamic events, including but not limited to: crew personnel makeup, Regen ECLSS system operability, vehicle traffic, water storage availability, and Carbon Dioxide Removal Assembly (CDRA), Sabatier, and OGA capability. Along with the inputs that change the various rates, the paper will review the different systems, their constraints, and finally the operational challenges and means by which flight controllers manage this new concept of "water balance."

Tobias, Barry↗

Saturn v instrument unit.

Saturn V instrument unit including structural, environmental control and guidance and control systems

SATURN V LAUNCH VEHICLE↗

Deployment loads data from a free-flight investigation of all flexible parawings having 371.612 sq meters (4000 sq feet) of wing area

A free-flight test program to determine the deployment characteristics of all-flexible parawings was conducted. Both single-keel and twin-keel parawings having a wing area of 4000 square feet with a five-stage reefing system were tested by use of a bomb-type instrumented test vehicle. Several twin-keel-parawing tests were also made by using an instrumented controllable sled-type test vehicle. The systems were launched from either a C-130 or a C-119 carrier airplane, and a programer parachute was used to bring the test vehicle to a proper dynamic pressure and near-vertical flight path prior to deployment of the parawing system. The free-flight deployment loads data are presented in the form of time histories of individual suspension-line loads and total loads.

Croom, D. R.↗

High Energy Astronomy Observatory, Mission C, Phase A. Volume 2: Preliminary analyses and conceptual design

An analysis and conceptual design of a baseline mission and spacecraft are presented. Aspects of the HEAO-C discussed include: baseline experiments with X-ray observations of space, analysis of mission requirements, observatory design, structural analysis, thermal control, attitude sensing and control system, communication and data handling, and space shuttle launch and retrieval of HEAO-C.

Source record↗

Tracking and Data Relay Satellite System configuration and tradeoff study. Volume 3: Atlas Centaur launched TDRSS. Part 2: Final Report, 22 August 1972 - 1 April 1973

Configuration data and design information for the Atlas Centaur launched configuration are presented. Overall system definition, operations and control, and telecommunication service system, including link budgets, are discussed. A brief description of the user telecommunications equipment and ground station is presented. A summary description of the TDR spacecraft and all the subsystems is included. The data presented are largely in tabular form. A brief treatment of an optional configuration with enhanced telecommunications service is described.

Source record↗

Lightning Detector

The antenna pictured below is part of a NASA-developed system for pinpointing the location and altitude of lightning activity in the atmosphere. Developed by Kennedy Space Center, it is called the Lightning Detection and Ranging (LDAR) system. Its original purpose was to give space launch controllers additional information on which to base launch or no launch decisions. It may also have utility in civil aviation. Last summer, NASA and the Federal Aviation Administration jointly conducted at Patrick Air Force Base, Florida-tests of LDAR's potential as an aid to air traffic control. The results are being evaluated.

Source record↗

A New Aerodynamic Data Dispersion Method for Launch Vehicle Design

A novel method for implementing aerodynamic data dispersion analysis is herein introduced. A general mathematical approach combined with physical modeling tailored to the aerodynamic quantity of interest enables the generation of more realistically relevant dispersed data and, in turn, more reasonable flight simulation results. The method simultaneously allows for the aerodynamic quantities and their derivatives to be dispersed given a set of non-arbitrary constraints, which stresses the controls model in more ways than with the traditional bias up or down of the nominal data within the uncertainty bounds. The adoption and implementation of this new method within the NASA Ares I Crew Launch Vehicle Project has resulted in significant increases in predicted roll control authority, and lowered the induced risks for flight test operations. One direct impact on launch vehicles is a reduced size for auxiliary control systems, and the possibility of an increased payload. This technique has the potential of being applied to problems in multiple areas where nominal data together with uncertainties are used to produce simulations using Monte Carlo type random sampling methods. It is recommended that a tailored physics-based dispersion model be delivered with any aerodynamic product that includes nominal data and uncertainties, in order to make flight simulations more realistic and allow for leaner spacecraft designs.

Pinier, Jeremy T.↗