Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch separation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Three Orbital Burns to Molniya Orbit via Shuttle Centaur G Upper Stage

An unclassified analytical trajectory design, performance, and mission study was done for the 1982-86 joint NASA-USAF Shuttle/Centaur G upper stage development program to send performance-demanding payloads to high orbits such as Molniya using an unconventional orbit transfer. This optimized three orbital burn transfer to Molniya orbit was compared to the then-baselined two burn transfer. The results of the three dimensional trajectory optimization performed include powered phase steering data and coast phase orbital element data. Time derivatives of the orbital elements as functions of thrust components were evaluated and used to explain the optimization's solution. Vehicle performance as a function of parking orbit inclination was given. Performance and orbital element data was provided for launch windows as functions of launch time. Ground track data was given for all burns and coasts including variation within the launch window. It was found that a Centaur with fully loaded propellant tanks could be flown from a 37deg inclination low Earth parking orbit and achieve Molniya orbit with comparable performance to the baselined transfer which started from a 57deg inclined orbit: 9,545 lb vs. 9,552 lb of separated spacecraft weight respectively. There was a significant reduction in the need for propellant launch time reserve for a one hour window: only 78 lb for the three burn transfer vs. 320 lb for the two burn transfer. Conversely, this also meant that longer launch windows over more orbital revolutions could be done for the same amount of propellant reserve. There was no practical difference in ground tracking station or airborne assets needed to secure telemetric data, even though the geometric locations of the burns varied considerably. There was a significant adverse increase in total mission elapsed time for the three vs. two burn transfer (12 vs. 11/4 hrs), but could be accommodated by modest modifications to Centaur systems. Future applications were discussed. The three burn transfer was found to be a viable, arguably preferable, alternative to the two burn transfer.

Orbital trajectory design↗

Aerodynamic separation and glideback of a Mach 3 staged booster

A study has been conducted of the staging maneuver for a two-stage, vertical-takeoff, launch vehicle and the subsequent glideback of the booster to a launch site runway. The booster and orbiter are both winged, fully reusable, and have liquid rocket main propulsion. for the staging maneuver, which nominally occurs at Mach 3, a flight control system and separation technique were devised which produced successful separations over a wide range of staging angles of attack. A guidance algorithm was developed for the unpowered glide-back of the booster from the completion of the staging maneuver to touchdown on a runway in the vicinity of the launch site. Using this guidance technique, the booster successfully touched down on the runway while being subjected to a wide range of seasonal and perturbed atmospheric conditions with and without wids as well as errors in staging state conditions and errors in predicted aerodynamics.

Naftel, J. C.↗

Nondestructive Evaluation of Space Shuttle External Tank Foam

During launch of Shuttle Columbia, mission STS-107, a large piece of spray on foam insulation (SOFI) separated from the external tank left bipod ramp area impacting the shuttle orbiter left wing leading edge. "Analysis showed that this large piece of foam struck Columbia on the underside of the left wing after launch. Later, analysis showed that the larger piece struck Columbia on the underside of the left wing, around Reinforced Carbon-Carbon (RCC) panels 5 through 9, at 81.9 seconds after launch. Further photographic analysis revealed that the large foam piece was approximately 21 to 27 inches long and 12 to 18 inches wide and was moving at a relative velocity to the Shuttle stack of 625 to 840 feet per second (416 to 573 miles per hour) at the time of impact." This impact damaged the wing leading edge resulting in loss of orbiter thermal protection. The piece of errant foam was part of a bipod ramp which was designed to meet thermal and aerodynamic requirements in that region of the external tank (ET).

Thom, Robert L.↗

Three Orbital Burns to Molniya Orbit Via Shuttle_Centaur G Upper Stage

An unclassified analytical trajectory design, performance, and mission study was done for the 1982 to 1986 joint National Aeronautics and Space Administration (NASA)-United States Air Force (USAF) Shuttle/Centaur G upper stage development program to send performance-demanding payloads to high orbits such as Molniya using an unconventional orbit transfer. This optimized three orbital burn transfer to Molniya orbit was compared to the then-baselined two burn transfer. The results of the three dimensional trajectory optimization performed include powered phase steering data and coast phase orbital element data. Time derivatives of the orbital elements as functions of thrust components were evaluated and used to explain the optimization's solution. Vehicle performance as a function of parking orbit inclination was given. Performance and orbital element data was provided for launch windows as functions of launch time. Ground track data was given for all burns and coasts including variation within the launch window. It was found that a Centaur with fully loaded propellant tanks could be flown from a 37 deg inclination low Earth parking orbit and achieve Molniya orbit with comparable performance to the baselined transfer which started from a 57 deg inclined orbit: 9,545 versus 9,552 lb of separated spacecraft weight, respectively. There was a significant reduction in the need for propellant launch time reserve for a 1 hr window: only 78 lb for the three burn transfer versus 320 lb for the two burn transfer. Conversely, this also meant that longer launch windows over more orbital revolutions could be done for the same amount of propellant reserve. There was no practical difference in ground tracking station or airborne assets needed to secure telemetric data, even though the geometric locations of the burns varied considerably. There was a significant adverse increase in total mission elapsed time for the three versus two burn transfer (12 vs. 1-1/4 hr), but could be accommodated by modest modifications to Centaur systems. Future applications were discussed. The three burn transfer was found to be a viable, arguably preferable, alternative to the two burn transfer.

Orbital trajectory design↗

Active rendezvous between a low-earth orbit user spacecraft and the Space Transportation System (STS) shuttle

Active rendezvous of an unmanned spacecraft with the Space Transportation System (STS) Shuttle is considered. The various operational constraints facing both the maneuvering spacecraft and the Shuttle during such a rendezvous sequence are discussed. Specifically, the actively rendezvousing user spacecraft must arrive in the generic Shuttle control box at a specified time after Shuttle launch. In so doing it must at no point violate Shuttle separation requirements. In addition, the spacecraft must be able to initiate the transfer sequence from any point in its orbit. The four-burn rendezvous sequence incorporating two Hohmann transfers and an intermediate phasing orbit as a low-energy solution satisfying the above requirements are discussed. The general characteristics of the four-burn sequence are discussed, with emphasis placed on phase orbit altitude and delta-velocity requirements. The planning and execution of such a sequence in the operational environment are then considered. Factor crucial in maintaining the safety of both spacecraft, such as spacecraft separation and contingency analysis, are considered in detail.

Hooper, H. L.↗

STS-82 Mission Highlight Presentation

The STS-82 is the second in a series of planned service missions to the Hubble Space Telescope (HST). The flight crew of STS-82, Cmdr. Kenneth D. Bowersox, Pilot Scott J. Horowitz, Mission specialists, Mark C. Lee, Steven A. Hawley, Gregory J. Harbaugh, Steven L. Smith, and Joseph R. Tanner can be seen performing pre-launch activities preparing for the night launch. The crew meets the press for pre-launch photos before being transported to the launch pad. Several views can be seen of the final inspection team on the O level and the crew being readied in the 'white room'. Launch activities such as the oxygen vent hood retraction, liftoff, SRB separation, and personnel activities in the Houston Integrated Mission Control room are viewed. Subsequent footage is provided of the crew's activities during the HST rendezvous and docking, Extravehicular Activities (EVA's) preparation and EVA numbers 1, 3 and 5. During the first EVA the earth can be seen clearly in a reflection off of HST's offshroud during its 60th orbit crossing the equator. The HST deployment and views of the Hale-Bopp comet are clearly seen before Discovery's reentry and landing. After reentry a beautiful view of Discovery moving at 10,400 mph can be seen looking east from Mission Control. The ususal twin sonic boom precedes Discovery's touchdown on runway 15 at Kennedy Space Center. This second HST service mission orbited Earth 150 times and traveled 1.4 million miles.

Source record↗

Apollo 11: The Twentieth Year

Live footage shows the Apollo 11 crew, Commander Neil A. Armstrong, Lunar Module Pilot Edwin E. Aldrin, Jr., and Command Module Pilot Michael Collins, preparing for their mission. The crewmembers are seen getting their medical examinations, suiting up, and walking out to the Astro-van. Scenes include a brief view of the Launch Control Center (LCC), ignition, liftoff, and shell and engine skirt separation. The most important images are those of the moon landing and astronauts walk on the moon. Also shown are the parachute landing of the shuttle and the celebration of the world.

Source record↗

STS-101: Flight Day Highlights / CAR

The primary mission objective for STS-101 was to deliver supplies to the International Space Station, perform a space walk, and reboost the station from 230 statute miles to 250 statute miles. The commander of this mission was, James D. Halsell. The crew was Scott J. Horowitz, the pilot, and mission specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev. This videotape shows the launch of STS-101, beginning with the pre-flight breakfast and the crew's introduction. The videotape next shows a pre-dawn view of the orbiter waiting the crew's arrival. The crew is shown getting into their space suits and then climbing onboard the shuttle. In this videotape we are shown a few of the crew getting into their places onboard the shuttle. We are also shown the newly designed "glass cockpit", which gives the pilot and the commander better views and are told that this is the first flight of the shuttle with the new design. After the hatch is closed, we see the shuttle launch into the night, followed by the Solid Rocket Boosters (SRB) separation.

Source record↗

Effect of Spaceflight on the Functions of NK and LAK Cells

Spaceflight-associated stress alters some aspects of the human immune response. In this study, we determined the effects of 10 days aboard the Space Shuttle on the cytotoxic activity of NK and LAK cells. The subjects of this study were crewmembers of two 10-day shuttle flights. Ten-ml blood specimens were obtained from ten astronauts 10 days before launch, immediately after landing, and 3 days after landing. PBMCs were separated from the blood specimens and stored at -800 C. All PBMCs were thawed simultaneously, and the cytotoxic activities of NK and LAK cells were measured by a 4-hour Cr-51 release assay. K562 cells were used to assess NK-cell cytotoxicity. After 4 days of IL-2 activation, the LAK cell cytotoxic activity was determined using K562 and Daudi cells as the target cells. NK-cell cytotoxicity was decreased at landing (p less than 0.0005) in 9/10 astronauts, and in most cases recovered to preflight levels by 3 days after landing; NK-cell cytotoxicity was increased in one astronaut at landing. LAK cytotoxic activity against K562 cells was decreased at landing in 6/10 astronauts (p=0.018), and activity against Daudi cells was decreased in 7/10 astronauts (p=0.01). Phenotyping of PBMCs and LAK cells showed alterations in some surface markers and adhesion molecules (CD1 1 b, CD1 1 c, CD1 1 a, CD1 6, L-Selectin and CD3). Thus spaceflight leads to a decrease in the functions of NK and LAK cells in most astronauts.

Pierson, Duane L.↗

Launch Abort System Flight Test Overview

This viewgraph presentation is an overview of the Launch Abort System (LAS) for the Constellation Program. The purpose of the paper is to review the planned tests for the LAS. The program will evaluate the performance of the crew escape functions of the Launch Abort System (LAS) specifically: the ability of the LAS to separate from the crew module, to gather flight test data for future design and implementation and to reduce system development risks.

Williams-Hayes, Peggy↗

DXL: A Sounding Rocket Mission for the Study of Solar Wind Charge Exchange and Local Hot Bubble X-Ray Emission

The Diffuse X-rays from the Local galaxy (DXL) mission is an approved sounding rocket project with a first launch scheduled around December 2012. Its goal is to identify and separate the X-ray emission generated by solar wind charge exchange from that of the local hot bubble to improve our understanding of both. With 1,000 square centimeters proportional counters and grasp of about 10 square centimeters sr both in the 1/4 and 3/4 keV bands, DXL will achieve in a 5-minute flight what cannot be achieved by current and future X-ray satellites.

Galeazzi, M.↗

Flight Mechanics Modeling and Post-Flight Analysis of ADEPT SR-1

Sounding Rocket One (SR-1), the first flight test of the Adaptable Deployable Entry and Placement Technology (ADEPT), was performed on Sept. 12, 2018. ADEPT is a deployable aeroshell that can be stowed during launch and then opened after launch to increase the drag area of the spacecraft when entering into a planetary atmosphere. The main objectives of the SR-1 flight test were to demonstrate that the ADEPT vehicle can be opened exo-atmospherically and to characterize the stability of the vehicle during atmospheric flight. The SR-1 test vehicle was a 0.7 m diameter 70 degree half-angle, faceted, sphere-cone, which was the primary payload on an UP Aerospace Spaceloft (SL) launch vehicle from the White Sands Missile Range (WSMR). ADEPT successfully separated from the spent booster in its stowed configuration, opened above 100 km altitude, and then landed in the deployed configuration within WSMR. The flight mechanics of the vehicle was modeled pre-flight for performance and range safety predictions. This paper describes the pre-flight ADEPT trajectory simulation and how the flight data compared with the predictions from the simulations.

Dutta, Soumyo↗

A Crew and Logistics Lander for the Common Habitat Architecture

The Common Habitat Architecture is a conceptual study that explores the use of a large habitat derived from the Space Launch System (SLS) liquid oxygen tank as a core habitation element that can be used for crew missions or training in 0g, 1/6g, 3/8g, and 1g. This is not part of current NASA Artemis mission planning, but instead represents an architecture that could potentially follow after the Artemis missions and initial human Mars landings. This architecture leverages Starship-derived vehicles for crew landing on and ascent from the Moon and Mars in support of long-duration surface missions with pressurized crew transfer baselined as a nominal capability. This is not the Human Landing System variant of Starship but represents a number of modifications to enable long-duration surface missions with an eight-person crew size. A rapid brainstorming study was conducted in February of 2021, using only public data, to identify options to deliver the 90-ton Common Habitat to the surface and emplace it at the intended habitation site. This study compared three lunar lander concepts and three Mars lander concepts before ultimately selecting the SpaceX Starship as the most viable lander. The Common Habitat Architecture assumes that this Starship variant can further be modified for crew and cargo delivery, assuming that the use of a common system will lead to cost benefits. It is assumed that the Starship will expend too much propellant in landing crew and logistics to be able to launch, given the assumed absence of surface propellant production. Consequently, a separable ascent stage is used for crew ascent. The pressurized elements of this modified Starship are discussed: Starship Ascent Module, Airlock, Transfer Tunnel, Pressurized Crew Transfer Module, and Logistics Modules. For each element, a description, dimensions, rough mass estimates, core capabilities, and design features are presented. Key mechanisms and internal structures of the starship are also discussed. This will include flame diverters for the ascend module, the orbital docking hatch, Pressurized Crew Transfer Module Garage door, Starship Ascent Module fairing, flame diverter blow-out panels, Pressurized Crew Transfer Module lift system, logistics module lift system, contingency crew ascent via the logistics module lift system, internal catwalks, and structural interfaces. Concept of Operations will be discussed for both Moon and Mars. This will include in-space crew rendezvous and transfer, crewed landing, shirtsleeve crew transfer, crew departure, contingency surface operations, and final element disposition. Key differences for Mars will be discussed, such as the Martian atmosphere, dust storms, the absence of crew handover, and Deep Space Exploration Vehicle rendezvous. Contingency microgravity maintenance access will also be discussed. This work will demonstrate viable pressurized crew transfer with a Starship-based lander architecture. Forward work includes Garage lighting and camera systems, Starship Ascent Module propulsion system and docking port trades, contingency habitation trades, and mass/power equipment estimation. Finally, forward work includes developing a heavy cargo return system derived from the Crew and Logistics Starship. The goal of this system is the return of at least 10,000 kg payloads from the surfaces of the Moon and Mars.

Lunar Lander↗

Design of a lunar propellant processing facility. NASA/USRA advanced program

Mankind's exploration of space will eventually lead to the establishment of a permanent human presence on the Moon. Essential to the economic viability of such an undertaking will be prudent utilization of indigenous lunar resources. The design of a lunar propellant processing system is presented. The system elements include facilities for ore processing, ice transportation, water splitting, propellant storage, personnel and materials transportation, human habitation, power generation, and communications. The design scenario postulates that ice is present in the lunar polar regions, and that an initial lunar outpost was established. Mining, ore processing, and water transportation operations are located in the polar regions. Water processing and propellant storage facilities are positioned near the equator. A general description of design operations is outlined below. Regolith containing the ice is mined from permanently-shaded polar craters. Water is separated from the ore using a microwave processing technique, and refrozen into projectiles for launch to the equatorial site via railgun. A mass-catching device retrieves the ice. This ice is processed using fractional distillation to remove impurities, and the purified liquid water is fed to an electrolytic cell that splits the water into vaporous hydrogen and oxygen. The hydrogen and oxygen are condensed and stored separately in a tank farm. Electric power for all operations is supplied by SP-100 nuclear reactors. Transportation of materials and personnel is accomplished primarily using chemical rockets. Modular living habitats are used which provide flexibility for the placement and number of personnel. A communications system consisting of lunar surface terminals, a lunar relay satellite, and terrestrial surface stations provides capabilities for continuous Moon-Moon and Moon-Earth transmissions of voice, picture, and data.

Batra, Rajesh↗

Accelerance Decoupling: Removing the Influence of the Mobile Launcher from the Space Launch System Integrated Modal Test

Main objective for launch vehicle (LV) modal testing is to quantify the LV’s modal properties in the free-free state (i.e., post pad separation). Given the size of most LVs, free-free testing is a challenge and often not feasible. A test stand, typically the launch pad itself, is utilized as the means to support the LV an Integrated Modal Test (IMT). This shifts the challenge to developing robust numerical methods for removing the influence of the launch pad from the IMT. Preferably fully test driven (method’s that operate based on measured data only). The Accelerance Decoupling (AD) approach, developed and verified by NASA and ASD, is a method with the capability to “subtract out” the influence of the test stand from the IMT using measured data only

Joel Sills↗

Technical Progress on the Ares I-X Flight Test

Ares I-X will be NASA's first test flight for a new human-rated launch vehicle since 1981, and the team is well on its way toward completing the vehicle's design and hardware fabrication for an April 2009 launch. This uncrewed suborbital development test flight gives NASA its first opportunities to: gather critical data about the flight dynamics of the integrated launch vehicle; understand how to control its roll during flight; better characterize the stage separation environments during future flight; and demonstrate the first stage recovery system. The Ares I-X Flight Test Vehicle (FTV) incorporates a mix of flight and mockup hardware. It is powered by a four-segment solid rocket booster, and will be modified to include a fifth, spacer segment; the upper stage, Orion crew exploration vehicle, and launch abort system are simulator hardware to make the FTV aerodynamically similar to the same size, shape, and weight of Ares I. The Ares IX first stage includes an existing Shuttle solid rocket motor and thrust vector control system controlled by an Ascent Thrust Vector Controller (ATVC) designed and built by Honeywell International. The avionics system will be tested in a dedicated System Integration Laboratory located at Lockheed Martin Space Systems (LMSS) in Denver, Colorado. The Upper Stage Simulator (USS) is made up of cylindrical segments that will be stacked and integrated at Kennedy Space Center (KSC) for launch. Glenn Research Center is already building these segments, along with their internal access structures. The active Roll Control System (RoCS) includes two thruster units harvested from Peacekeeper missiles. Duty cycle testing for RoCS was conducted, and fuel tanking and detanking tests will occur at KSC in early 2008. This important flight will provide valuable experience for the ground operations team in integrating, stacking, and launching Ares I. Data from Ares I-X will ensure the safety and reliability of America's newest launch vehicle.

Davis, S.R.↗

Effect of gaseous and solid simulated jet plumes on a 040A space shuttle launch configuration at Mach numbers from 1.6 to 2.2

An experimental investigation was conducted in a 9- by 7-foot supersonic wind tunnel to determine the effect of plume-induced flow separation and aspiration effects due to operation of both the orbiter and the solid rocket motors on a 0.019-scale model of the launch configuration of the space shuttle vehicle. Longitudinal and lateral-directional stability data were obtained at Mach numbers of 1.6, 2.0, and 2.2 with and without the engines operating. The plumes exiting from the engines were simulated by a cold gas jet supplied by an auxiliary 200 atmosphere air supply system, and by solid body plume simulators. Comparisons of the aerodynamic effects produced by these two simulation procedures are presented. The data indicate that the parameters most significantly affected by the jet plumes are the pitching moment, the elevon control effectiveness, the axial force, and the orbiter wing loads.

Lanfranco, M. J.↗