Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch separation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Active rendezvous between a low-earth orbit user spacecraft and the Space Transportation System (STS) shuttle

Active rendezvous of an unmanned spacecraft with the Space Transportation System (STS) Shuttle is considered. The various operational constraints facing both the maneuvering spacecraft and the Shuttle during such a rendezvous sequence are discussed. Specifically, the actively rendezvousing user spacecraft must arrive in the generic Shuttle control box at a specified time after Shuttle launch. In so doing it must at no point violate Shuttle separation requirements. In addition, the spacecraft must be able to initiate the transfer sequence from any point in its orbit. The four-burn rendezvous sequence incorporating two Hohmann transfers and an intermediate phasing orbit as a low-energy solution satisfying the above requirements are discussed. The general characteristics of the four-burn sequence are discussed, with emphasis placed on phase orbit altitude and delta-velocity requirements. The planning and execution of such a sequence in the operational environment are then considered. Factor crucial in maintaining the safety of both spacecraft, such as spacecraft separation and contingency analysis, are considered in detail.

Hooper, H. L.↗

STS-82 Mission Highlight Presentation

The STS-82 is the second in a series of planned service missions to the Hubble Space Telescope (HST). The flight crew of STS-82, Cmdr. Kenneth D. Bowersox, Pilot Scott J. Horowitz, Mission specialists, Mark C. Lee, Steven A. Hawley, Gregory J. Harbaugh, Steven L. Smith, and Joseph R. Tanner can be seen performing pre-launch activities preparing for the night launch. The crew meets the press for pre-launch photos before being transported to the launch pad. Several views can be seen of the final inspection team on the O level and the crew being readied in the 'white room'. Launch activities such as the oxygen vent hood retraction, liftoff, SRB separation, and personnel activities in the Houston Integrated Mission Control room are viewed. Subsequent footage is provided of the crew's activities during the HST rendezvous and docking, Extravehicular Activities (EVA's) preparation and EVA numbers 1, 3 and 5. During the first EVA the earth can be seen clearly in a reflection off of HST's offshroud during its 60th orbit crossing the equator. The HST deployment and views of the Hale-Bopp comet are clearly seen before Discovery's reentry and landing. After reentry a beautiful view of Discovery moving at 10,400 mph can be seen looking east from Mission Control. The ususal twin sonic boom precedes Discovery's touchdown on runway 15 at Kennedy Space Center. This second HST service mission orbited Earth 150 times and traveled 1.4 million miles.

Source record↗

Apollo 11: The Twentieth Year

Live footage shows the Apollo 11 crew, Commander Neil A. Armstrong, Lunar Module Pilot Edwin E. Aldrin, Jr., and Command Module Pilot Michael Collins, preparing for their mission. The crewmembers are seen getting their medical examinations, suiting up, and walking out to the Astro-van. Scenes include a brief view of the Launch Control Center (LCC), ignition, liftoff, and shell and engine skirt separation. The most important images are those of the moon landing and astronauts walk on the moon. Also shown are the parachute landing of the shuttle and the celebration of the world.

Source record↗

STS-101: Flight Day Highlights / CAR

The primary mission objective for STS-101 was to deliver supplies to the International Space Station, perform a space walk, and reboost the station from 230 statute miles to 250 statute miles. The commander of this mission was, James D. Halsell. The crew was Scott J. Horowitz, the pilot, and mission specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev. This videotape shows the launch of STS-101, beginning with the pre-flight breakfast and the crew's introduction. The videotape next shows a pre-dawn view of the orbiter waiting the crew's arrival. The crew is shown getting into their space suits and then climbing onboard the shuttle. In this videotape we are shown a few of the crew getting into their places onboard the shuttle. We are also shown the newly designed "glass cockpit", which gives the pilot and the commander better views and are told that this is the first flight of the shuttle with the new design. After the hatch is closed, we see the shuttle launch into the night, followed by the Solid Rocket Boosters (SRB) separation.

Source record↗

Effect of Spaceflight on the Functions of NK and LAK Cells

Spaceflight-associated stress alters some aspects of the human immune response. In this study, we determined the effects of 10 days aboard the Space Shuttle on the cytotoxic activity of NK and LAK cells. The subjects of this study were crewmembers of two 10-day shuttle flights. Ten-ml blood specimens were obtained from ten astronauts 10 days before launch, immediately after landing, and 3 days after landing. PBMCs were separated from the blood specimens and stored at -800 C. All PBMCs were thawed simultaneously, and the cytotoxic activities of NK and LAK cells were measured by a 4-hour Cr-51 release assay. K562 cells were used to assess NK-cell cytotoxicity. After 4 days of IL-2 activation, the LAK cell cytotoxic activity was determined using K562 and Daudi cells as the target cells. NK-cell cytotoxicity was decreased at landing (p less than 0.0005) in 9/10 astronauts, and in most cases recovered to preflight levels by 3 days after landing; NK-cell cytotoxicity was increased in one astronaut at landing. LAK cytotoxic activity against K562 cells was decreased at landing in 6/10 astronauts (p=0.018), and activity against Daudi cells was decreased in 7/10 astronauts (p=0.01). Phenotyping of PBMCs and LAK cells showed alterations in some surface markers and adhesion molecules (CD1 1 b, CD1 1 c, CD1 1 a, CD1 6, L-Selectin and CD3). Thus spaceflight leads to a decrease in the functions of NK and LAK cells in most astronauts.

Pierson, Duane L.↗

Launch Abort System Flight Test Overview

This viewgraph presentation is an overview of the Launch Abort System (LAS) for the Constellation Program. The purpose of the paper is to review the planned tests for the LAS. The program will evaluate the performance of the crew escape functions of the Launch Abort System (LAS) specifically: the ability of the LAS to separate from the crew module, to gather flight test data for future design and implementation and to reduce system development risks.

Williams-Hayes, Peggy↗

DXL: A Sounding Rocket Mission for the Study of Solar Wind Charge Exchange and Local Hot Bubble X-Ray Emission

The Diffuse X-rays from the Local galaxy (DXL) mission is an approved sounding rocket project with a first launch scheduled around December 2012. Its goal is to identify and separate the X-ray emission generated by solar wind charge exchange from that of the local hot bubble to improve our understanding of both. With 1,000 square centimeters proportional counters and grasp of about 10 square centimeters sr both in the 1/4 and 3/4 keV bands, DXL will achieve in a 5-minute flight what cannot be achieved by current and future X-ray satellites.

Galeazzi, M.↗

Flight Mechanics Modeling and Post-Flight Analysis of ADEPT SR-1

Sounding Rocket One (SR-1), the first flight test of the Adaptable Deployable Entry and Placement Technology (ADEPT), was performed on Sept. 12, 2018. ADEPT is a deployable aeroshell that can be stowed during launch and then opened after launch to increase the drag area of the spacecraft when entering into a planetary atmosphere. The main objectives of the SR-1 flight test were to demonstrate that the ADEPT vehicle can be opened exo-atmospherically and to characterize the stability of the vehicle during atmospheric flight. The SR-1 test vehicle was a 0.7 m diameter 70 degree half-angle, faceted, sphere-cone, which was the primary payload on an UP Aerospace Spaceloft (SL) launch vehicle from the White Sands Missile Range (WSMR). ADEPT successfully separated from the spent booster in its stowed configuration, opened above 100 km altitude, and then landed in the deployed configuration within WSMR. The flight mechanics of the vehicle was modeled pre-flight for performance and range safety predictions. This paper describes the pre-flight ADEPT trajectory simulation and how the flight data compared with the predictions from the simulations.

Dutta, Soumyo↗

A Crew and Logistics Lander for the Common Habitat Architecture

The Common Habitat Architecture is a conceptual study that explores the use of a large habitat derived from the Space Launch System (SLS) liquid oxygen tank as a core habitation element that can be used for crew missions or training in 0g, 1/6g, 3/8g, and 1g. This is not part of current NASA Artemis mission planning, but instead represents an architecture that could potentially follow after the Artemis missions and initial human Mars landings. This architecture leverages Starship-derived vehicles for crew landing on and ascent from the Moon and Mars in support of long-duration surface missions with pressurized crew transfer baselined as a nominal capability. This is not the Human Landing System variant of Starship but represents a number of modifications to enable long-duration surface missions with an eight-person crew size. A rapid brainstorming study was conducted in February of 2021, using only public data, to identify options to deliver the 90-ton Common Habitat to the surface and emplace it at the intended habitation site. This study compared three lunar lander concepts and three Mars lander concepts before ultimately selecting the SpaceX Starship as the most viable lander. The Common Habitat Architecture assumes that this Starship variant can further be modified for crew and cargo delivery, assuming that the use of a common system will lead to cost benefits. It is assumed that the Starship will expend too much propellant in landing crew and logistics to be able to launch, given the assumed absence of surface propellant production. Consequently, a separable ascent stage is used for crew ascent. The pressurized elements of this modified Starship are discussed: Starship Ascent Module, Airlock, Transfer Tunnel, Pressurized Crew Transfer Module, and Logistics Modules. For each element, a description, dimensions, rough mass estimates, core capabilities, and design features are presented. Key mechanisms and internal structures of the starship are also discussed. This will include flame diverters for the ascend module, the orbital docking hatch, Pressurized Crew Transfer Module Garage door, Starship Ascent Module fairing, flame diverter blow-out panels, Pressurized Crew Transfer Module lift system, logistics module lift system, contingency crew ascent via the logistics module lift system, internal catwalks, and structural interfaces. Concept of Operations will be discussed for both Moon and Mars. This will include in-space crew rendezvous and transfer, crewed landing, shirtsleeve crew transfer, crew departure, contingency surface operations, and final element disposition. Key differences for Mars will be discussed, such as the Martian atmosphere, dust storms, the absence of crew handover, and Deep Space Exploration Vehicle rendezvous. Contingency microgravity maintenance access will also be discussed. This work will demonstrate viable pressurized crew transfer with a Starship-based lander architecture. Forward work includes Garage lighting and camera systems, Starship Ascent Module propulsion system and docking port trades, contingency habitation trades, and mass/power equipment estimation. Finally, forward work includes developing a heavy cargo return system derived from the Crew and Logistics Starship. The goal of this system is the return of at least 10,000 kg payloads from the surfaces of the Moon and Mars.

Lunar Lander↗

Design of a lunar propellant processing facility. NASA/USRA advanced program

Mankind's exploration of space will eventually lead to the establishment of a permanent human presence on the Moon. Essential to the economic viability of such an undertaking will be prudent utilization of indigenous lunar resources. The design of a lunar propellant processing system is presented. The system elements include facilities for ore processing, ice transportation, water splitting, propellant storage, personnel and materials transportation, human habitation, power generation, and communications. The design scenario postulates that ice is present in the lunar polar regions, and that an initial lunar outpost was established. Mining, ore processing, and water transportation operations are located in the polar regions. Water processing and propellant storage facilities are positioned near the equator. A general description of design operations is outlined below. Regolith containing the ice is mined from permanently-shaded polar craters. Water is separated from the ore using a microwave processing technique, and refrozen into projectiles for launch to the equatorial site via railgun. A mass-catching device retrieves the ice. This ice is processed using fractional distillation to remove impurities, and the purified liquid water is fed to an electrolytic cell that splits the water into vaporous hydrogen and oxygen. The hydrogen and oxygen are condensed and stored separately in a tank farm. Electric power for all operations is supplied by SP-100 nuclear reactors. Transportation of materials and personnel is accomplished primarily using chemical rockets. Modular living habitats are used which provide flexibility for the placement and number of personnel. A communications system consisting of lunar surface terminals, a lunar relay satellite, and terrestrial surface stations provides capabilities for continuous Moon-Moon and Moon-Earth transmissions of voice, picture, and data.

Batra, Rajesh↗

Accelerance Decoupling: Removing the Influence of the Mobile Launcher from the Space Launch System Integrated Modal Test

Main objective for launch vehicle (LV) modal testing is to quantify the LV’s modal properties in the free-free state (i.e., post pad separation). Given the size of most LVs, free-free testing is a challenge and often not feasible. A test stand, typically the launch pad itself, is utilized as the means to support the LV an Integrated Modal Test (IMT). This shifts the challenge to developing robust numerical methods for removing the influence of the launch pad from the IMT. Preferably fully test driven (method’s that operate based on measured data only). The Accelerance Decoupling (AD) approach, developed and verified by NASA and ASD, is a method with the capability to “subtract out” the influence of the test stand from the IMT using measured data only

Joel Sills↗

Technical Progress on the Ares I-X Flight Test

Ares I-X will be NASA's first test flight for a new human-rated launch vehicle since 1981, and the team is well on its way toward completing the vehicle's design and hardware fabrication for an April 2009 launch. This uncrewed suborbital development test flight gives NASA its first opportunities to: gather critical data about the flight dynamics of the integrated launch vehicle; understand how to control its roll during flight; better characterize the stage separation environments during future flight; and demonstrate the first stage recovery system. The Ares I-X Flight Test Vehicle (FTV) incorporates a mix of flight and mockup hardware. It is powered by a four-segment solid rocket booster, and will be modified to include a fifth, spacer segment; the upper stage, Orion crew exploration vehicle, and launch abort system are simulator hardware to make the FTV aerodynamically similar to the same size, shape, and weight of Ares I. The Ares IX first stage includes an existing Shuttle solid rocket motor and thrust vector control system controlled by an Ascent Thrust Vector Controller (ATVC) designed and built by Honeywell International. The avionics system will be tested in a dedicated System Integration Laboratory located at Lockheed Martin Space Systems (LMSS) in Denver, Colorado. The Upper Stage Simulator (USS) is made up of cylindrical segments that will be stacked and integrated at Kennedy Space Center (KSC) for launch. Glenn Research Center is already building these segments, along with their internal access structures. The active Roll Control System (RoCS) includes two thruster units harvested from Peacekeeper missiles. Duty cycle testing for RoCS was conducted, and fuel tanking and detanking tests will occur at KSC in early 2008. This important flight will provide valuable experience for the ground operations team in integrating, stacking, and launching Ares I. Data from Ares I-X will ensure the safety and reliability of America's newest launch vehicle.

Davis, S.R.↗

Effect of gaseous and solid simulated jet plumes on a 040A space shuttle launch configuration at Mach numbers from 1.6 to 2.2

An experimental investigation was conducted in a 9- by 7-foot supersonic wind tunnel to determine the effect of plume-induced flow separation and aspiration effects due to operation of both the orbiter and the solid rocket motors on a 0.019-scale model of the launch configuration of the space shuttle vehicle. Longitudinal and lateral-directional stability data were obtained at Mach numbers of 1.6, 2.0, and 2.2 with and without the engines operating. The plumes exiting from the engines were simulated by a cold gas jet supplied by an auxiliary 200 atmosphere air supply system, and by solid body plume simulators. Comparisons of the aerodynamic effects produced by these two simulation procedures are presented. The data indicate that the parameters most significantly affected by the jet plumes are the pitching moment, the elevon control effectiveness, the axial force, and the orbiter wing loads.

Lanfranco, M. J.↗

Mission and Implementation of an Affordable Lunar Return

We present an architecture that establishes the infrastructure for routine space travel by taking advantage of the Moon's resources, proximity and accessibility. We use robotic assets on the Moon that are teleoperated from Earth to prospect, test, demonstrate and produce water from lunar resources before human arrival. This plan is affordable, flexible and not tied to any specific launch vehicle solution. Individual surface pieces are small, permitting them to be deployed separately on small launchers or combined together on single large launchers. Schedule is our free variable; even under highly constrained budgets, the architecture permits this program to be continuously pursued using small, incremental, cumulative steps. The end stage is a fully functional, human-tended lunar outpost capable of producing 150 metric tonnes of water per year enough to export water from the Moon and create a transportation system that allows routine access to all of cislunar space. This cost-effective lunar architecture advances technology and builds a sustainable transportation infrastructure. By eliminating the need to launch everything from the surface of the Earth, we fundamentally change the paradigm of spaceflight.

Spudis, Paul↗

NASA Collaborative Design Processes

This is Block 1, the first evolution of the world's most powerful and versatile rocket, the Space Launch System, built to return humans to the area around the moon. Eventually, larger and even more powerful and capable configurations will take astronauts and cargo to Mars. On the sides of the rocket are the twin solid rocket boosters that provide more than 75 percent during liftoff and burn for about two minutes, after which they are jettisoned, lightening the load for the rest of the space flight. Four RS-25 main engines provide thrust for the first stage of the rocket. These are the world's most reliable rocket engines. The core stage is the main body of the rocket and houses the fuel for the RS-25 engines, liquid hydrogen and liquid oxygen, and the avionics, or "brain" of the rocket. The core stage is all new and being manufactured at NASA's "rocket factory," Michoud Assembly Facility near New Orleans. The Launch Vehicle Stage Adapter, or LVSA, connects the core stage to the Interim Cryogenic Propulsion Stage. The Interim Cryogenic Propulsion Stage, or ICPS, uses one RL-10 rocket engine and will propel the Orion spacecraft on its deep-space journey after first-stage separation. Finally, the Orion human-rated spacecraft sits atop the massive Saturn V-sized launch vehicle. Managed out of Johnson Space Center in Houston, Orion is the first spacecraft in history capable of taking humans to multiple destinations within deep space. 2) Each element of the SLS utilizes collaborative design processes to achieve the incredible goal of sending human into deep space. Early phases are focused on feasibility and requirements development. Later phases are focused on detailed design, testing, and operations. There are 4 basic phases typically found in each phase of development.

Jones, Davey↗

Risk Reduction Project in Pad Abort-1 Launch Vehicle Loads & Dynamics

The Pad Abort (PA-1) system includes the Launch Abort System (LAS) and the Command Module (CM). The PA-1 abort flight test will launch from the White Sands Missile Range. Prior to the ignition, the vehicle will be resting, without restraints, on a short support structure. The Launch Abort Motor will ignite and burn for less than 5 seconds before a 20 second coast. Then the LAS will separate from the CM and the CM will descend via parachute to a soil landing. The static firing of the Abort Motor (ST-1) for PA-1 Launch Vehicle resulted in unexpected higher levels that superseded the environment predictions and all the design and test loads of all subassemblies and components. A rapid project was put in place to develop the flight environments, loads and associated uncertainties for the Verification Load Cycle (VLC) of PA-1. An acoustic test and shaker test of the CM were planned and executed in support of the developments of damping and transfer functions. Instead of using the traditional structure-borne envelops, the actual ST-1 pressures and forces were used to develop the internal accelerations. The PA-1 motor was cooled to 60 Deg F using thermal conditioning to reduce the thrust profile. The plumes of the abort motor were studied to determine if the airborne environments would be reduced. The combination of all items, noted above, allowed a reduction in loads for VLC.

Sasan C Armand↗

Accelerance Decoupling: An Approach for Removing the Influence of the Test Stand from the Integrated Modal Test

The main objective for launch vehicle (LV) modal testing is to quantify the LV’s modal properties in the free-free state (post pad separation). However, given the size of most LV systems, free-free testing is a challenge and often not feasible. With this, a test stand, typically the launch pad itself, is introduced as the means of support. This shifts the challenge to developing robust numerical methods for removing the influence of the launch pad from the integrated system modal test. The Space Launch System (SLS) is no exception where the mobile launcher (ML) is used to support the vehicle for the integrated modal test (IMT). For the IMT, it is well understood from pre-test analysis with finite element models (FEMs) of the SLS and SLS coupled to ML that the ML has a significant influence on the SLS modal properties especially in the lower frequency range where the primary SLS bending modes exist. An accelerance decoupling (AD) method has been formulated for the purpose of “subtracting out” the influence of the ML from the IMT results. With AD, the SLS decoupled frequency response functions (FRFs) are directly extracted from the IMT FRFs. The subject approach is aimed to utilize measured data only and achieve a robust FRF decoupling scheme. AD is derived from a widely used coupling technique called “Receptance Coupling” (RC). The AD core equation reverses the RC process and utilizes a pair of auxiliary equations that enable the core equation to be resolved based on measured data only. In AD, the decoupled component FRFs are extracted from the coupled system FRFs with a transformation to remove the contribution of the “subtractive component”. This paper addresses the AD’s operational flexibility to resolve SLS free-free modal properties from coupled system measured data but also the possibility to include data from FEM if there is enough confidence in the FEM or if it is asserted that the effect to the final outcome is reasonable.

Accelerance decoupling↗