Search NASA⌕ Search

SEARCH · Search NASA

Results for “network scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Satellite laser station Helwan status 1992

The Satellite Laser Station Helwan has been operated jointly by the National Research Institute of Astronomy and Geophysics in Helwan, Egypt and the Czech Technical University in Prague, Czechslovakia. The station components have been carefully tuned to increase the systems overall stability and reliability critical for the remote location. The mount correction model based on the Gaussian smoothing has been implemented to simplify the blind satellite acquisition and tracking. The on-site normal points generation algorithm has been implemented, the station has been connected to the international information network. The ERS-1 satellite has been included into the tracking schedule. The station range capability has been verified by experimental Etalon 1 ranging by April 1992. The ranging precision of 2-3 centimeters is obtained when ranging to ERS-1, Starlette, and Lageos satellites.

Cech, M.↗

Deep Space Network (DSN), Network Operations Control Center (NOCC) computer-human interfaces

The Network Operations Control Center (NOCC) of the DSN is responsible for scheduling the resources of DSN, and monitoring all multi-mission spacecraft tracking activities in real-time. Operations performs this job with computer systems at JPL connected to over 100 computers at Goldstone, Australia and Spain. The old computer system became obsolete, and the first version of the new system was installed in 1991. Significant improvements for the computer-human interfaces became the dominant theme for the replacement project. Major issues required innovating problem solving. Among these issues were: How to present several thousand data elements on displays without overloading the operator? What is the best graphical representation of DSN end-to-end data flow? How to operate the system without memorizing mnemonics of hundreds of operator directives? Which computing environment will meet the competing performance requirements? This paper presents the technical challenges, engineering solutions, and results of the NOCC computer-human interface design.

Ellman, Alvin↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗

Wireless Sensor Node Power Profiling Based on IEEE 802.11 and IEEE 802.15.4 Communication Protocols. Modeling and Simulation

Most wireless sensor network (comprising of thousands of WSNs) applications require operation over extended periods of time beginning with their deployment. Network lifetime is extremely critical for most applications and is one of the limiting factors for energy-constrained networks. Based on applications, there are wide ranges of different energy sources suitable for powering WSNs. A battery is traditionally used to power WSNs. The deployed WSN is required to last for long time. Due to finite amount of energy present in batteries, it is not feasible to replace batteries. Recently there has been a new surge in the area of energy harvesting were ambient energy in the environment can be utilized to prolong the lifetime of WSNs. Some of the sources of ambient energies are solar power, thermal gradient, human motion and body heat, vibrations, and ambient RF energy. The design and development of TEGs to power WSNs that would remain active for a long period of time requires comprehensive understanding of WSN operational. This motivates the research in modeling the lifetime, i.e., power consumption, of a WSN by taking into consideration various node and network level activities. A WSN must perform three essential tasks: sense events, perform quick local information processing of sensed events, and wirelessly exchange locally processed data with the base station or with other WSNs in the network. Each task has a power cost per unit tine and an additional cost when switching between tasks. There are number of other considerations that must also be taken into account when computing the power consumption associated with each task. The considerations includes: number of events occurring in a fixed active time period and the duration of each event, event-information processing time, total communication time, number of retransmission, etc. Additionally, at the network level the communication of information data packets between WSNs involves collisions, latency, and retransmission, which result in unanticipated power losses. This report focuses rigorous stochastic modeling of power demand for a schedule-driven WSN utilizing Institute of Electrical and Electronics Engineers 802.11 and 802.15.4 communication protocols. The model captures the generic operation of a schedule-driven WSN when an external event occurs, i.e., sensing, following by processing, and followed by communication. The report will present development of an expression to compute the expected energy consumption per operational cycle of a schedule-driven WSN by taking into consideration the node level activities, i.e., sensing and processing, and the network level activities, i.e., channel access, packet collision, retransmission attempts, and transmission of a data packet.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Technical Report: Commercial Advanced Lighting Control (ALC) Demonstration and Deployment

This three-year demonstration and deployment project sought to address market barriers to accelerating the adoption of Advanced Lighting Controls (ALCs), an underutilized technology with low market penetration. ALCs are defined as networked, addressable lighting control systems that utilize software or intelligent controllers to combine multiple energy-saving lighting control strategies in a single space (e.g., smart-time scheduling, daylight harvesting, task tuning, occupancy control, personal control, variable load-shedding, and plug-load control). The networked intelligent aspect of these systems allows applicable lighting control strategies to be combined in a single space, layered over one another, maximizing overall energy-savings. The project included five real building demonstrations of ALCs across the Northeast US region. The demonstrations provided valuable data and experience to support deployment tasks that are necessary to overcome market barriers. These deployment tasks included development of training resources for building designers, installers, and trades, as well as development of new energy efficiency rebates for the technology from Efficiency Forward’s utility partners. Educating designers, installers, and trades on ALCs is a critical task for reducing the cost of the technology that is currently inflated due to perceived complexity and unfamiliarity with how to design and install the systems. Further, utility and non-utility energy efficiency programs continue to relegate the technology to custom or ill-suited prescriptive program designs that do not effectively deploy the technology at scale. This project developed new, scalable rebate approaches for the technology. Efficiency Forward utilized their DesignLights Consortium® (DLC) brand and network of 81 DLC member utilities to develop and deploy the results of the project. The outputs of the project have included five published case studies, a six-hour ALC technology training curriculum that has already been deployed in five US states, and new rebates offered for the technology that have been deployed by a dozen utilities across the US. Widespread adoption of ALC technology in commercial buildings would provide tremendous benefits. The current market penetration of ALC systems is estimated at <0.1% in commercial buildings. If ALC systems were installed in all commercial buildings, approximately 1,051 TBtu of energy could be saved. This would translate into customer cost savings of approximately $10.7 billion annually.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Coordinating, Scheduling, Processing and Analyzing IYA09

The IVS scheduled a special astrometric VLBI session for the International Year of Astronomy 2009 (IYA09) commemorating 400 years of optical astronomy and 40 years of VLBI. The IYA09 session is the most ambitious geodetic session to date in terms of network size, number of sources, and number of observations. We describe the process of designing, coordinating, scheduling, pre-session station checkout, correlating, and analyzing this session.

Gipson, John↗

Data fusion in predicting internal heat gains for office buildings through a deep learning approach

Heating, Ventilation, and Air Conditioning (HVAC) is a major energy consumer in buildings. The predictive control has demonstrated a potential to reduce HVAC energy use. To facilitate predictive HVAC control, internal heat gains prediction is required. Here, we applied Long Short-Term Memory Networks, a special form of deep neural network, to predict miscellaneous electric loads, lighting loads, occupant counts and internal heat gains in two United States office buildings. Compared with the predetermined schedules used in American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) standard 90.1, the Long Short-Term Memory Networks method could reduce the prediction errors of internal heat gains from 12% to 8% in Building A, and from 26% to 16% in Building B. It was also found that for internal heat gains prediction, miscellaneous electric loads is a more important feature than occupant counts for two reasons. First, miscellaneous electric loads is the best proxy variable for internal heat gains, as it is the major component of and has the highest correlation coefficient with the internal heat gains. Second, miscellaneous electric loads contain valuable information to predict occupant count, while occupant count could not help improve miscellaneous electric loads prediction. Lastly, these findings could help researchers and practitioners select the most relevant features to more accurately predict internal heat gains for the implementation of predictive HVAC control in buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated RF/Optical Interplanetary Networking Preliminary Explorations and Empirical Results

Over the last decade interplanetary telecommunication capabilities have been significantly expanded--specifically in support of the Mars exploration rover and lander missions. NASA is continuing to drive advances in new, high payoff optical communications technologies to enhance the network to Gbps performance from Mars, and the transition from technology demonstration to operational system is examined through a hybrid RF/optical approach. Such a system combines the best features of RF and optical communications considering availability and performance to realize a dual band trunk line operating within characteristic constraints. Disconnection due to planetary obscuration and solar conjunction, link delays, timing, ground terminal mission congestion and scheduling policy along with space and atmospheric weather disruptions all imply the need for network protocol solutions to ultimately manage the physical layer in a transparent manner to the end user. Delay Tolerant Networking (DTN) is an approach under evaluation which addresses these challenges. A multi-hop multi-path hybrid RF and optical test bed has been constructed to emulate the integrated deep space network and to support protocol and hardware refinement. Initial experimental results characterize several of these challenges and evaluate the effectiveness of DTN as a solution to mitigate them.

Raible, Daniel E.↗

S-band and Ku-band return service interference between TDRSS users

The Tracking Data Relay Satellite System (TDRSS) return service performance can be degraded by interference from another user when two or more spacecraft communicate with the same Tracking Data Relay Satellite (TDRS) at the same time. This paper describes the S-band and Ku-band return service self interference environment expected in the 1996 - 2010 timeframe and shows the self-interference expected for selected TDRSS users based on Communications Link Analysis and Simulation System (CLASS) Automated Conflict Resolution System (ACRS) and Interference Monitor (IM) tools. The results show: which user links are susceptible to interference from other users, the interference statistics, and whether or not interference can be avoided with appropriate interference mitigation techniques such as scheduling, cross-polarization, or Pseudo random Noise (PN) spreading. The analysis results enable Space Network (SN) managers to determine the impacts of self-interference on the TDRSS service availability. They also enable project offices to determine whether they should select return service communications parameters, such as polarization and PN spreading, to minimize the probability of being impacted by self-interference; try to schedule TDRSS support around other user spacecraft communications schedules; or accept communication outages due to self-interference.

Harrell, Linda↗

FFTSF: Revisiting Sub-Seasonal Streamflow Forecasting with Simple Feedforward Network

Accurate short-to-subseasonal streamflow forecasts are vital for water management, including flood preparedness, drought mitigation, hydropower scheduling, and ecosystem protection. However, extending a forecast beyond a few days remains challenging due to complexity of hydrological processes. While recent self-attention based transformer architectures such as iTransformer have gained traction in time-series forecasting, these models suffer from several critical limitations: (1) significant computational overhead that scales quadratically with sequence length, (2) vulnerability to overfitting on limited hydrological datasets, (3) degraded performance on long-horizon forecasts due to attention decay, and (4) excessive architectural complexity that hampers interpretability and operational deployment. In this study, we propose a simple Feedforward Time Series Forecasting (FFTSF) network that directly addresses these limitations through its lightweight architecture and long-range forecasting capabilities. We evaluate FFTSF across 178 USGS stream gauges spanning diverse climate regimes by forecasting lead times of 1-, 7-, 14-, and 30-days. Our results demonstrate that FFTSF achieves competitive performance at short lead times (NSE of 0.778 for 1-day forecasts) while substantially outperforming complex baselines at longer forecast period, achieving the highest NSE (0.271) at 30-day forecasts with greater robustness and stability. For 30-day forecasts, FFTSF achieves a 71% improvement over NLinear, 57% improvement over DLinear and 12% improvement over the computationally intensive iTransformer while requiring fewer computational resources. Our findings reveal that architectural complexity is not necessary for hydrological forecasting, demonstrating that well-designed simple models can outperform attention mechanisms for subseasonal streamflow forecasting. The computational efficiency and consistent long-range performance of FFTSF make it suitable for water management applications where reliable extended forecasts are essential.

Krishnan Kutty Ambika, Anukesh [ORNL] (ORCID:00000↗

Deep reinforcement learning assisted co-optimization of Volt-VAR grid service in distribution networks

With the increasing penetration of distributed energy resources in distribution networks, Volt-VAR control and optimization (VVC/VVO) have become very important to ensure an acceptable quality of service to all customers. System operators can rely on slow-responding utility devices, including capacitor banks and on-load tap changing transformers, along with fast-responding battery and photovoltaic (PV) inverters for the VVC/VVO implementation. Because of variations in response time of these two classes of devices, and different control actions (discrete versus continuous), coordinated and optimal scheduling and operation have become of utmost importance. Here, this paper develops a look-ahead deep reinforcement learning (DRL)-based multi-objective VVO technique to improve the voltage profile of active distribution networks, decrease network and inverter power loss, and save the operational cost of the grid. It proposes a deep deterministic policy gradient (DDPG)-based approach to schedule the optimal reactive and/or active power set-points of fast-responding inverters, and a deep Q-network (DQN)-based DRL agent to schedule the discrete decisions variables of slow-responding assets. The reactive power output of PV and battery smart inverters are scheduled at 30-minute intervals and the capacitors’ commitment status is scheduled with several hour intervals. The proposed framework is validated on the modified IEEE 34-bus and 123-bus test cases with embedded PV and PV-plus-storage. To validate the efficacy of the proposed VVO, it is compared with several scenarios, including the base case without VVO, localized droop control of DERs, DDPG-only, and twin delayed DDPG (TD3) agent-based DRL techniques. The results justify the superior performance of the proposed method to improve the voltage profile, reduce network power loss, and minimize the look-ahead grid operational cost while minimizing the undesirable power losses in inverters as a result of power factor adjustments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Transmission and Distribution Systems Restoration with Distributed Generation Scheduling

The self-healing smart grids enable system operators to quickly and efficiently recover transmission and distribution systems from outages and blackouts. The current restoration procedure solves the transmission and distribution system restoration problems separately without considering their impacts on each other, which may prolong the restoration process. However, with the emerging active distribution networks, distributed generators can contribute into the bottom-up restoration strategy. The interaction between the restoration of two interconnected systems should be taken into account. In this paper, a hybrid model of transmission and distribution systems restoration (HTDSR) is proposed by exchanging data of power and voltage between two separate optimization problems. The effectiveness of the HTDSR algorithm is demonstrated through case studies of the integrated IEEE 13-bus distribution network and IEEE 39-bus transmission grid. Simulation results demonstrate that the integrated restoration strategy with optimal scheduling of distributed generation sources can expedite the restoration process.

Distributed generation↗

Scheduling with Automatic Resolution of Conflicts

DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

Clement, Bradley↗

Is Short-Interval Mammography Necessary After Breast Conservation Surgery and Radiation Treatment in Breast Cancer Patients?

Purpose: The optimum timing and frequency of mammography in breast cancer patients after breast-conserving therapy (BCT) are controversial. The American Society of Clinical Oncology recommends the first posttreatment mammogram 1 year after diagnosis but no earlier than 6 months after completion of radiotherapy. The National Comprehensive Cancer Network recommends annual mammography. Intermountain Healthcare currently follows a more frequent mammography schedule during the first 2 years in BCT patients. This retrospective study was undertaken to determine the cancer yield mammography during the first 2 years after BCT. Methods and Materials: 1,435 patients received BCT at Intermountain Healthcare between 2003 and 2007, inclusive. Twenty-three patients had bilateral breast cancer (1,458 total breasts). Patients were followed up for 24 months after diagnosis. The 1- and 2-year mammography yields were determined and compared with those of the general screening population. Results: 1,079 breasts had mammography at less than 1 year, and two ipsilateral recurrences (both noninvasive) were identified; 1,219 breasts had mammography during the second year, and nine recurrences (three invasive, six noninvasive) were identified. Of the 11 ipsilateral recurrences during the study, three presented with symptoms and eight were identified by mammography alone. The mammography yield was 1.9 cancers per 1,000 breasts the first year and 4.9 per 1,000 the second year. Conclusions: These data demonstrate that the mammography yield during the first 2 years after BCT is not greater than that in the general population, and they support the policy for initiating followup mammography at 1 year after BCT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CRADA Number NFE-24-10110 with Qubit Engineering Inc. (CRADA Final Report)

Over the past year, the Qubit Engineering team has pushed the frontiers of power‑grid optimization, working in close collaboration with Oak Ridge National Laboratory (ORNL) and the Tennessee Valley Authority (TVA). Their progress is reflected in three newly submitted conference papers, “Unified Relational GNN Architecture for AC Optimal Power Flow Calculations in Electric Grids,” “Graph‑Based Attention Mechanisms for Solving the AC Optimal Power Flow Problem in Electrical‑Power Networks,” and “Enhanced Power‑Grid Maintenance Planning and Quantum‑Inspired Combinatorial Prospects.” These publications showcase state‑of‑the‑art graph‑neural‑network methods for AC‑OPF and novel quantum‑inspired heuristics for maintenance scheduling. Beyond the academic results, the Qubit team has converted the research into two production‑grade tools built on TVA data: Neuro‑Grid, an AI‑driven power‑flow simulator that provides instant, interactive full‑grid load‑flow visualizations, and Quanta‑Grid, a quantum‑inspired maintenance‑scheduling engine to support logistics optimization for power utilities. Together, these advances demonstrate how Qubit’s partnership with ORNL and TVA is delivering practical, physics‑grounded analytics for next‑generation grid management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cross-Feature Transfer Learning for Efficient Tensor Program Generation

Tuning tensor program generation involves navigating a vast search space to find optimal program transformations and measurements for a program on the target hardware. The complexity of this process is further amplified by the exponential combinations of transformations, especially in heterogeneous environments. This research addresses these challenges by introducing a novel approach that learns the joint neural network and hardware features space, facilitating knowledge transfer to new, unseen target hardware. A comprehensive analysis is conducted on the existing state-of-the-art dataset, TenSet, including a thorough examination of test split strategies and the proposal of methodologies for dataset pruning. Leveraging an attention-inspired technique, we tailor the tuning of tensor programs to embed both neural network and hardware-specific features. Notably, our approach substantially reduces the dataset size by up to 53% compared to the baseline without compromising Pairwise Comparison Accuracy (PCA). Furthermore, our proposed methodology demonstrates competitive or improved mean inference times with only 25–40% of the baseline tuning time across various networks and target hardware. The attention-based tuner can effectively utilize schedules learned from previous hardware program measurements to optimize tensor program tuning on previously unseen hardware, achieving a top-5 accuracy exceeding 90%. This research introduces a significant advancement in autotuning tensor program generation, addressing the complexities associated with heterogeneous environments and showcasing promising results regarding efficiency and accuracy.

97 MATHEMATICS AND COMPUTING↗

NASCOM network ground communications availability report

A performance analysis of NASCOM Network circuits is presented. An objective of 99.80 percent availability has been established for all network circuits and an acceptable level of 99.50. A network narrative summary for the current month includes changes in network configurations, current month's totals for modes of service and trouble category losses, a discussion of trends, and significant losses that affected the performance indexes of individual or groups of circuits. A table and narrative summary of those circuits that failed to meet the objective of 99.80% availability for all network circuits and an acceptable level of 99.50. Lost time and interruption tables showing all circuits affected by outages, by trouble category, with their total time and events, scheduled operating hours, and individual availability indexes also are included. Selected circuits whose availabilities have or continue to affect the overall network availability are also analyzed.

Source record↗