Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

The Deuterium to Hydrogen Ratio in the Water that Formed the Yellowknife Bay Mudstones in Gale Crater

A suite of isotope ratios of light elements in the present martian atmosphere (13C/12C, 15N/14N, 18O/16O, 38Ar/36Ar, and D/H) are all substantially enriched in the heavy element suggesting atmospheric loss to space over the past billions of years with preferential loss of the lighter isotope from each pair. In situ measurements from MSL's Sample Analysis at Mars (SAM) instrument [e.g. 1,2,3] have considerably refined previous measurements from the Viking mass spectrometers [e.g. 4], from remote spectroscopic observations [e.g. 5,6], and from martian meteorite studies [e.g. 7,8]. The persistence of habitable environments such as the ancient Yellowknife Bay lake recently revealed by measurements from the Curiosity rover [9] depends on the surface temperatures and the duration of an atmosphere thicker than that at present. Current and planned measurements from orbit with the Mars Express and MAVEN missions respectively intend to study the processes of atmospheric escape including solar wind interaction, sputtering, thermal escape, and dissociative recombination, and determine or refine the current rate of atmospheric loss caused by these and other mechanisms. The goal of these programs is to understand the physical processes sufficiently well so that robust extrapolations over the past billions of years can be made D/H is measured by both the Tunable Laser Spectrometer (TLS) and the Quadrupole Mass Spectrometer (QMS) of the SAM suite. to predict the atmospheric and surface conditions on early Mars. However, the study of the history of martian atmospheric evolution will be greatly facilitated if we are able to also directly measure the isotopic composition of volatiles captured in rocks that are representative of the ancient atmosphere. To date, D/H is one of the most promising candidates for this study since water is the most abundant volatile thermally released from the Yellowknife Bay phylosilicates discovered by the SAM and CheMin experiments of MSL and its

Yellowknife Bay↗

Technologies for Low Frequency Radio Observations of the Cosmic Dawn

The Jet Propulsion Laboratory (JPL) is developing concepts and technologies for low frequency radio astronomy space missions aimed at observing highly redshifted neutral Hydrogen from the Dark Ages. This is the period of cosmic history between the recombination epoch when the microwave background radiation was produced and the re-ionization of the intergalactic medium by the first generation of stars (Cosmic Dawn). This period, at redshifts greater than about 20, is a critical epoch for the formation and evolution of large-scale structure in the universe. The 21-cm spectral line of Hydrogen provides the most promising method for directly studying the Dark Ages, but the corresponding frequencies at such large redshifts are only tens of MHz and thus require space-based observations to avoid terrestrial RFI and ionospheric absorption and refraction. This paper reports on the status of several low frequency technology development activities at JPL, including deployable bi-conical dipoles for a planned lunar-orbiting mission, and both rover-deployed and inflation-deployed long dipole antennas for use on the lunar surface.

Cosmic Dark Ages↗

NASA JSC EV2 Intern Spring 2016 - Jennie Chung

Exploration Mission 2 (EM-2) is a mission to resume the manned exploration of the Solar System. This mission is the first crewed mission of NASA’s Orion on the Space Launch System. The target for EM-2 is to perform a flyby of a captured asteroid in lunar orbit, which NASA plans to launch in 2023. As an intern working with EV-2 – Avionics Systems Division in Johnson Space Center, we are developing flight instrumentation systems for EM-2 (MISL & RFID). The Modular Integrated Stackable Layer (MISL) is a compact space-related computer system that is modular, scalable and reconfigurable. The RFID (radio frequency identification) sensors are used to take lower frequency (TC) type measurements and be able to stream data real-time to an RF (radio frequency) interrogator upon demand. Our job, in EV-2, is to certify, test, manufacture/assemble and deliver flight EM-2 DFI System (MISL & RFID). Our goal is to propose a development effort to design low-mass wire and wireless data acquisition and sensor solutions for EM-2 DFI (Development Flight Instrumentation). The team is tasked to provide the most effective use of 75 pounds to acquire DFI data and to collect sensor data for 100-200 high priority DFI channels (mass driven).

Chung, Jennie↗

Defining Long-Duration Traverses of Lunar Volcanic Complexes with LROC NAC Images

A long-duration lunar rover [e.g., 1] would be ideal for investigating large volcanic complexes like the Marius Hills (MH) (approximately 300 x 330 km), where widely spaced sampling points are needed to explore the full geologic and compositional variability of the region. Over these distances, a rover would encounter varied surface morphologies (ranging from impact craters to rugged lava shields), each of which need to be considered during the rover design phase. Previous rovers including Apollo, Lunokhod, and most recently Yutu, successfully employed pre-mission orbital data for planning (at scales significantly coarser than that of the surface assets). LROC was specifically designed to provide mission-planning observations at scales useful for accurate rover traverse planning (crewed and robotic) [2]. After-the-fact analyses of the planning data can help improve predictions of future rover performance [e.g., 3-5].

Stopar, J. D.↗

An Eddy Current Case Study using NASA’s Transfer Function and Limited-Sample Probability of Detection Guidebooks

Probability of detection (POD) requirements for NASA fracture-critical human-rated systems can be met by (1) claiming ‘similarity’ to NASA Standard Nondestructive Evaluation (NDE) flaw sizes or (2) by inspector-specific POD demonstration, known as NASA Special NDE. Standard NDE flaw sizes are intended to represent the detection capability of most qualified inspectors, and were primarily based on POD studies in the development of the Space Shuttle Program Orbiter fracture control plan. However, these Standard NDE flaw sizes were based on fatigue cracks in flat panels of one material alloy over a limited range of panel thicknesses. While the POD study was comprehensive, the inspection conditions are relatively narrow. An evaluation of similarity between the Standard NDE POD study and flight component conditions is required to apply Standard NDE to specific flight component inspections. A similarity evaluation may include differences in materials, surface finish, component geometry (e.g., curvature, corners, welds), and inspection access. Similarity is typically based on a qualitative engineering evaluation. Recently, NASA published a quantitative methodology to assess similarity. If similarity is not supported by test and analysis, then the methodology provides a transfer function of flaw size for Special NDE POD demonstration. NASA recommends that Special POD demonstrations use flaws that are flight-like or more difficult to detect than flight component flaws, which are commonly induced fatigue cracks. Often, it is not feasible to induce fatigue cracks in flight component geometry, and therefore, a simpler representative geometry is used, commonly a flat panel, for POD demonstration. Inducing cracks in simple geometry specimens can be time-consuming and expensive, and thus, minimizing the number of flawed specimens is desired. Traditionally, NASA Special NDE demonstration was limited to MIL-HDBK-1823A methods or the binomial point-estimate method (PEM), commonly known as 29/29. Recently, NASA published a limited-sample POD (LS-POD) methodology for signal-response NDE techniques (e.g., eddy current) that provides POD demonstration with fewer specimens than previous approaches. LS-POD suggests a minimum of 10 flawed specimens, compared to 29 in the PEM and the suggested minimum of 40 from MIL-HDBK-1823A. The methodology also includes new guidance on evaluating the probability of false calls. In this presentation, these new transfer function and LS-POD methodologies are described and illustrated through an eddy current detection capability of far-side flaws on thin welded panels. A geometry-based transfer function is developed using electro-discharge machined (EDM) notches in flight component and simple geometry to estimate the Special NDE flaw size that is representative of the critical initial flaw size required by the fracture analysis. Then, fatigue cracks are induced in simple flat panels of the transferred flaw size, and the LS-POD methodology is used for Special NDE demonstration.

P. A. Parker↗

Extremely Accurate On-Orbit Position Accuracy using TDRSS

NASA is planning to launch a new service for Earth satellites providing them with precise GPS differential corrections and other ancillary information enabling decimeter level orbit determination accuracy and nanosecond time-transfer accuracy, onboard, in real-time. The TDRSS Augmentation Service for Satellites (TASS) will broadcast its message on the S-band multiple access forward channel of NASA s Tracking and Data Relay Satellite System (TDRSS). The satellite's phase array antenna has been configured to provide a wide beam, extending coverage up to 1000 km altitude over the poles. Global coverage will be ensured with broadcast from three or more TDRSS satellites. The GPS differential corrections are provided by the NASA Global Differential GPS (GDGPS) System, developed and operated by JPL. The GDGPS System employs global ground network of more than 70 GPS receivers to monitor the GPS constellation in real time. The system provides real-time estimates of the GPS satellite states, as well as many other real-time products such as differential corrections, global ionospheric maps, and integrity monitoring. The unique multiply redundant architecture of the GDGPS System ensures very high reliability, with 99.999% demonstrated since the inception of the system in early 2000. The estimated real time GPS orbit and clock states provided by the GDGPS system are accurate to better than 20 cm 3D RMS, and have been demonstrated to support sub-decimeter real time positioning and orbit determination for a variety of terrestrial, airborne, and spaceborne applications. In addition to the GPS differential corrections, TASS will provide real-time Earth orientation and solar flux information that enable precise onboard knowledge of the Earth-fixed position of the spacecraft, and precise orbit prediction and planning capabilities. TASS will also provide 5 seconds alarms for GPS integrity failures based on the unique GPS integrity monitoring service of the GDGPS System.

Stocklin, Frank↗

Space Shuttle Mission STS-61: Hubble Space Telescope servicing mission-01

This press kit for the December 1993 flight of Endeavour on Space Shuttle Mission STS-61 includes a general release, cargo bay payloads and activities, in-cabin payloads, and STS-61 crew biographies. This flight will see the first in a series of planned visits to the orbiting Hubble Space Telescope (HST). The first HST servicing mission has three primary objectives: restoring the planned scientific capabilities, restoring reliability of HST systems and validating the HST on-orbit servicing concept. These objectives will be accomplished in a variety of tasks performed by the astronauts in Endeavour's cargo bay. The primary servicing task list is topped by the replacement of the spacecraft's solar arrays. The spherical aberration of the primary mirror will be compensated by the installation of the Wide Field/Planetary Camera-II and the Corrective Optics Space Telescope Axial Replacement. New gyroscopes will also be installed along with fuse plugs and electronic units.

Source record↗

Results of investigations (OA20C) on an 0.015-scale configuration 140A/B space shuttle vehicle orbiter model (49-0) in the NASA/Langley Research Center Unitary Plan Wind Tunnel

Data obtained from the wind tunnel tests of a scale model of the space shuttle orbiter configuration 140 A/B are presented. The test was conducted at Mach numbers of 2.5, 3.9, and 4.6 with Reynolds numbers from 1.25 million per foot to 5.0 million per foot. Various control surface settings were used ranging from an angle of attack range from minus 4 to plus 42 degrees at zero angle of yaw. Longitudinal stability and control characteristics of the space shuttle configuration were analyzed.

Nichols, M. E.↗

Solar Dynamics Observatory Guidance, Navigation, and Control System Overview

The Solar Dynamics Observatory (SDO) was designed and built at the Goddard Space Flight Center, launched from Cape Canaveral on February 11, 2010, and reached its final geosynchronous science orbit on March 16, 2010. The purpose of SDO is to observe the Sun and continuously relay data to a dedicated ground station. SDO remains Sun-pointing throughout most of its mission for the instruments to take measurements of the Sun. The SDO attitude control system (ACS) is a single-fault tolerant design. Its fully redundant attitude sensor complement includes sixteen coarse Sun sensors (CSSs), a digital Sun sensor (DSS), three two-axis inertial reference units (IRUs), and two star trackers (STs). The ACS also makes use of the four guide telescopes included as a part of one of the science instruments. Attitude actuation is performed using four reaction wheels assemblies (RWAs) and eight thrusters, with a single main engine used to provide velocity-change thrust for orbit raising. The attitude control software has five nominal control modes, three wheel-based modes and two thruster-based modes. A wheel-based Safehold running in the attitude control electronics box improves the robustness of the system as a whole. All six modes are designed on the same basic proportional-integral-derivative attitude error structure, with more robust modes setting their integral gains to zero. This paper details the final overall design of the SDO guidance, navigation, and control (GN&C) system and how it was used in practice during SDO launch, commissioning, and nominal operations. This overview will include the ACS control modes, attitude determination and sensor calibration, the high gain antenna (HGA) calibration, and jitter mitigation operation. The Solar Dynamics Observatory mission is part of the NASA Living With a Star program, which seeks to understand the changing Sun and its effects on the Solar System, life, and society. To this end, the SDO spacecraft carries three Sun-observing instruments: Helioseismic and Magnetic Imager (HMI), led by Stanford University; Atmospheric Imaging Assembly (AIA), led by Lockheed Martin Space and Astrophysics Laboratory; and Extreme Ultraviolet Variability Experiment (EVE), led by the University of Colorado. The basic mission is to observe the Sun for a very high percentage of the 5-year mission (10-year goal) with long stretches of uninterrupted observations and with constant, high-data-rate transmission to a dedicated ground station to be located in White Sands, New Mexico. These goals guided the design of the spacecraft bus that will carry and service the three-instrument payload. Overarching design goals for the bus are geosynchronous orbit, near-constant Sun observations with the ability to fly through eclipses, and constant HGA contact with the dedicated ground station. A three-axis stabilized ACS is needed both to point at the Sun accurately and to keep the roll about the Sun vector correctly positioned with respect to the solar north pole. This roll control is especially important for the magnetic field imaging of HM I. The mission requirements have several general impacts on the ACS design. Both the AIA and HMI instruments are very sensitive to the blurring caused by jitter. Each has an image stabilization system (ISS) with some ability to filter out high frequency motion, but below the bandwidth of the ISS the control system must compensate for disturbances within the ACS bandwidth or avoid exciting jitter at higher frequencies. Within the ACS bandwidth, the control requirement imposed by AIA is to place the center of the solar disk no more than 2 arc sec, 3 , from a body-defined target based on one of the GTs that accompany the instrument. This body-defined target, called the science reference boresight (SRB), was determined from the postlaunch orientation of the GTs by averaging the bounding telescope boresights for pitch to get a pitch SRB coordinate, and by averaging the bounding boresights for yaw toet the yaw SRB coordinate. The location of this SRB in the 0.5-deg field-of-view for each GT then becomes the central target for each telescope; one GT is selected for use as the ACS controlling guide telescope (CGT) at any given time. Fine Sun-pointing is effected based on this SRB for all three instruments when the Sun is within the linear range of the CGT. In addition to limiting jitter, HMI science requires averaging several observations, making the instrument sensitive to low frequency motion that induces differential motion between each observation. This requires the spacecraft attitude to be stable about the roll axis to approximately 10 arcsec over a ten-minute period. Instrument calibrations require that the spacecraft point the SRB up to 2.5 degrees in pitch and yaw away from the center of the Sun, placing the Sun outside the field-of-view of the guide telescopes. In such instances, when the GTs cannot provide the definitive target for the ACS, on-board attitude determination combined with ephemeris prediction of the Sun direction must provide the definitive target. EVE is capable of observing the Sun with less dependence on attitude control. However, the ground data processing needs for calibrations result in the most strict attitude knowledge requirements for the mission: [35,70,70] arcsec, 3 , of knowledge with respect to the center of the solar disk. In addition to driving the ACS sensor selection, the knowledge requirements, which have their effect primarily during Inertial mode calibrations, drive the accuracy requirements for the solar ephemeris. The need to achieve and maintain geosynchronous orbit (GEO) drove the need for high-efficiency propulsive systems and appropriate attitude control. The main engine provided high specific impulse for the maneuvers to attain GEO, while the smaller ACS thrusters managed the disturbance torques of the larger engine and provided the capability for much smaller adjustment burns on orbit. SDO s large solar profile means that solar radiation pressure is a large torque disturbance, and the momentum buildup from this disturbance and the GEO altitude drives the ACS to use thrusters to manage vehicle momentum. The demanding data capture budget for the mission, however, requires SDO to avoid frequent thruster maneuvers, while concerns about on-orbit jitter restrict the maximum desired wheel speeds desired from the RWAs. The plan for on-orbit wheel speed and momentum management will be discussed as well as what is now being done in operation after the jitter environment was characterized. The SDO ACS hardware complement is single-fault tolerant. Two main processors carry virtually identical copies of the command and data handling and ACS software, and two identical attitude control electronics (ACE) boxes carry Coldfire processors with contingency ACS software and other hardware interface cards; the ACE structure allows reaction wheels to be commanded by the Sun-pointing Safehold independent of the Mil Std 1553 data bus. The sixteen Adcole CSSs are grouped into primary and backup sets of eight sensors, each set providing the ability to calculate a sun vector. Each set of eight eyes provides full 4 -steradian coverage. The Adcole DSS comprises an optics head and a separate electronics box providing a 1553 data interface. The electronics box is mounted inside the Faraday cage created by the spacecraft bus module. The DSS head with its 32- deg square FOV is mounted on the instrument module with its boresight along the spacecraft X axis, nearly aligned with the Sun during observations. Adcole has designed the DSS calibration parameters so that the accuracy is 0.24 arcminutes within 10 deg of the boresight, and diminishes to 3 arcminutes as the Sun moves towards the edges of its FOV . This DSS calibration scheme provides higher accuracy attitude determination over the range of the instrument calibration maneuvers.

Morgenstern, Wendy M.↗

Single Frequency GPS Orbit Determination for Low Earth Orbiters

A number of missions in the future are planning to use GPS for precision orbit determination. Cost considerations and receiver availability make single frequency GPS receivers attractive if the orbit accuracy requirements can be met.

GPS global positioning satellite GPS/MET orbit det↗

Juno at Jupiter: The Mission and Its Path to Unveiling Secrets of the History of the Solar System

The Juno mission is described, focusing on its orbits at Jupiter, how the plan evolved, and science return so far. Juno is a NASA New Frontiers spacecraft in a near-polar highly elliptical 53-day orbit at Jupiter. Since arrival in July 2016, it has used 9 science investigations to study the planet’s atmospheric composition and structure, magnetic and gravity fields, and polar and extended magnetosphere. A radiation monitoring investigation contributes to our understanding of Jupiter’s environment. Juno’s primary science goal is to understand the origin and evolution of Jupiter, to shed light on how the Earth and other planets formed. Baseline objectives will be satisfied with 32 science orbits, a spin-stabilized solar powered spacecraft, an electronics vault for radiation shielding, and a robust payload with microwave receivers, X- and Ka-band radio science hardware, vector magnetometers, high- and low-energy charged particle detectors, radio and plasma wave antennas, UV and IR spectroscopic imagers, and a visible light camera for public outreach. Observations are made in a limited number of orientations, including Gravity Science (spin axis and main antenna pointing to Earth), and microwave atmospheric sounding (spin plane passing through Jupiter’s center). Prime science data are collected near closest approach (perijove), plus calibrations, occasional remote sensing, and continued magnetospheric observations in the outer parts of the orbit. Juno’s mission plan has evolved since the 2005 proposal due to design and ops choices, e.g., mission design (cruise or early orbital trajectory), orbit period (11, 14, then 53 days), perijove attitudes (2 or more), and DSN coverage (34- and 70-m stations). Choices were partly motivated by the effect on science return. Selected preliminary science results are summarized, including the benefits of decisions as the plan evolved. Juno has begun to unveil Jupiter – peeling apart its interior by measuring gravity and magnetic fields, using microwaves to probe its atmosphere down to 100s of km, exploring its polar and extended magnetosphere, and imaging the poles for the first time. In doing so, it is revealing secrets of the history of the Earth and solar system.

Stephens, Stuart K.↗

Planning systems for pioneer mission control

Information on planning systems for Pioneer Mission control is given in viewgraph form. Information is given on flight operations, planning procedures, operation of the spacecraft past the original design scope, the Pioneer Venus Orbiter expert system, and planning future long-term missions.

Smith, Marcie↗

Trajectory Design Considerations for Lunar Surface to Near Rectilinear Halo Orbit Rendezvous

NASA’s Artemis program plans to use a 9:2 resonant southward Near-Rectilinear Halo Orbit (NRHO) at the Earth-Moon’s L2 libration point to stage assets for a sustained lunar exploration campaign. This architecture includes the use of the Gateway space station positioned in this orbit. While the proximity operations in the NRHO are similar to field-free space dynamics, the far-field rendezvous aspect of the problem is more complicated. We analyze the key drivers of the ΔV performance of the far-field rendezvous problem from low lunar orbit to the Gateway. We find that lunar latitudinal libration is a driving factor to ΔV performance for surface ascent missions that rendezvous with the NRHO, and that transfer time from low lunar orbit to NRHO affects more aspects of the geometry and performance than expected from rendezvous in Keplerian orbits.

NRHO↗

Dawn Statistical Maneuver Design for Vesta Operations

In July of 2011 the Dawn spacecraft is scheduled to begin orbital operations at Vesta, a large main-belt asteroid. Dawn is a NASA Discovery mission that uses solar-electric low-thrust ion propulsion for both interplanetary cruise and orbital operations. Navigating between the Dawn project's four targeted science orbits at Vesta requires a plan that accounts for uncertainties not only in thrust execution, orbit determination, and other spacecraft forces, but also large uncertainties in characteristics of Vesta - such as the asteroid's gravity field and pole orientation. Accommodating these uncertainties requires strategic use of low-thrust maneuvers reserved for statistical trajectory corrections. This paper describes the placement and evaluation of low-thrust statistical maneuvers during two key phases of the Vesta mission along with a discussion of the tools, constraints, and methods used to plan those maneuvers.

Solar Electric Propulsion↗

SRMS Assisted Docking and Undocking for the Orbiter Repair Maneuver

As part of the Orbiter Repair Maneuver (ORM) planned for Return to Flight (RTF) operations, the Shuttle Remote Manipulator System (SRMS) must undock the Orbiter, maneuver it through a complex trajectory at extremely low rates, present it to an EVA crewman at the end of the Space Station Remote Manipulator System to perform the Thermal Protection System (TPS) repair, and then retrace back through the trajectory to dock the Orbiter with the Orbiter Docking System (ODS). The initial and final segments of this operation involve the interaction between the SRMS, ISS, Orbiter and ODS. Previously, a technique entitled "SRMS assisted docking" for installation of a payload to the ODS had been developed and was utilized for the Russian provided Docking Module on STS-74 during Shuttle-Mir missions and both the Node 1 and FGB elements on STS-88/Flight 2A. This procedure consisted of the SRMS grappling the respective payload, maneuvering it to a pre-install position inches above the ODS Androgynous Peripheral Attachment System (APAS) ring, commanding the SRMS into Test mode (which allows brakes-off motion of the joints), and then down-firing Primary Reaction Control System (PRCS) jets in order to effect a capture of the APAS latches. Once a successful capture had been achieved, then the AP AS was operated through its nominal retraction sequence to complete the mating sequence. While this technique can once again be used for the tail end docking portion of the ORM, the initial undocking of the orbiter and ISS vehicles with the assistance of the SRMS has yet to be attempted on orbit. The objective here is to determine the most efficient means to separate or extract the vehicles. Two techniques were analyzed in support of RTF: (1) the 'nominal' demating from the mated interface, and (2) the SRMS performing the operation (either in an active or passive fashion). In the first operation, the demating process would replicate standard undocking operations, with the exception that the SRMS is allowed to arrest the resulting motion. The second operation would be to extend the APAS ring to a ready to dock position, open the capture latches, and then detach the vehicles using the SRMS either actively or passively. In the active case, the APAS ring is extended and latched, and the SRMS is commanded to pull the two interfaces apart (assuming that the effective pull force of the SRMS can overcome the spec values of the combined latch resistance). In the passive case, the SRMS brakes are engaged and the AP AS mechanism is commanded to retract, pulling the two interfaces apart. Since the emphasis of both STS-74 and STS-88 had solely been on the installation operation, as opposed to the separation operation, two new models required development and incorporation within simulation tools designed to analyze those scenarios. These enhancements included: (1) a detailed demating dynamics model to characterize the pusher spring characteristics during undocking, and (2) contact and mechanical system modeling of the back side of the latches to represent unlatching dynamics. This paper first provides an overview of the Monte-Carlo screening analysis for the installation (both nominal and contingency), including the variation of separation distance, misalignment conditions, SRMS joint/brake parameter characteristics, and PRCS jet combinations and corresponding thrust durations. The resulting 'optimum' solution is presented based on trade studies between predicted capture success and integrated system loads. This paper then discusses the upgrades to the APAS math model associated with the new SRMS assisted undocking technique and reviews simulation results for various options investigated for either the active and passive separation of the ISS from the Orbiter.

Space Station Remote Manipulator System↗

Juno Trajectory Redesign Following PRM Cancellation

In October 2016, the Juno spacecraft was operating in 53.5-day capture orbits and final preparations were underway for a Period Reduction Maneuver (PRM) to achieve the planned 14-day science orbits. However, one week before PRM execution, a main engine propulsion system anomaly prompted an indefinite PRM delay and immediate updates to the Juno reference trajectory. This paper outlines stopgap trajectory design activities immediately following PRM delay and longer-term trajectory redesign considerations including various possible PRM epochs, orbit period, longitude grid characteristics, and eclipse avoidance strategies that culminated in the decision to cancel PRM and adopt a new 53-day reference trajectory.

Bordi, John J.↗