Power Supply Changes for NSTX Resistive Wall Mode Coils

The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physics Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. Prior to 2004, the NSTX power system was feeding twelve (12) circuits in the machine. In 2004 the Resistive Wall Mode (RWM) Coils were installed on the machine to correct error fields. There are six of these coils installed around the machine in the mid-plane. Since these coils need fast and accurate controls, a Switching Power Amplifier (SPA) with three sub-units was procured, installed and commissioned along with other power loop components. Two RWM Coils were connected in series and fed from one SPA sub-unit. After the initial RWM campaign, operational requirements evolved such that each of the RWM coils now requires separate power and control. Hence a second SPA with three sub-units has been procured and installed. The second unit is of improved design and has the controls and power components completely isolated. The existing thyristor rectifier is used as DC Link to both of the Switching Power Amplifiers. The controls for the RWM are integrated into the overall computer control of the DC Power systems for NSTX. This paper describes the design changes in the RWM Power system for NSTX.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost Control Best Practices for Net Zero Energy Building Projects: Preprint

For net zero energy (NZE) buildings to become the norm in commercial construction, it will be necessary to design and construct these buildings cost effectively. While industry leaders have developed workflows (for procurement, design, and construction) to achieve cost-effective NZE buildings for certain cases, the expertise embodied in those workflows has limited penetration within the commercial building sector. Documenting cost control best practices of industry leaders in NZE and packaging those strategies for adoption by the commercial building sector will help make the business case for NZE. Furthermore, it will promote market uptake of the innovative technologies and design approaches needed to achieve NZE. This paper summarizes successful cost control strategies for NZE procurement, design, and construction that key industry users (such as building owners, architects, and designers) can incorporate into their everyday workflows. It will also evaluate the current state of NZE economics and propose a path forward for greater market penetration of NZE buildings. By demonstrating how to combine NZE technologies and design approaches into an overall efficiency package that can be implemented at minimal (zero, in certain cases) incremental capital cost, the domain of NZE design and construction can be expanded from a niche market to the commercial construction mainstream.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Performance Residential Housing Units at U.S. Coast Guard Base Kodiak: Preprint

The United States Coast Guard (USCG) constructs residential housing throughout the country using a basic template that must meet the minimum Leadership in Energy and Environmental Design (LEED) Silver criteria or better for the units. In Kodiak, Alaska, USCG is procuring between 24 and 100 residential multi-family housing units. Priorities for the Kodiak project were to reduce overall energyconsumption by at least 20% over existing units, improve envelope construction, and evaluate space heating options. USCG is challenged with maintaining similar existing units that have complicated residential diesel boilers. Additionally, fuel and material costs are high in Kodiak. While USCG has worked to optimize the performance of the housing units with principles of improved buildingenvelope, the engineers realize there are still opportunities for improvement, especially within the heating, ventilation, and air conditioning (HVAC) system and different envelope measures. USCG staff also desires to balance higher upfront project costs for significantly reduced life-cycle costs of the residential units that have an expected lifetime of 50 or more years. To answer thesequestions, this analysis used the residential modeling tool BEoptE+ to examine potential energy- saving opportunities for the climate. The results suggest criteria for achieving optimized housing performance at the lowest cost. USCG will integrate the criteria into their procurement process. To achieve greater than 50% energy savings, USCG will need to specify full 2x 6 wood stud R-21 insulationwith two 2 inches of exterior foam, R-38 ceiling insulation or even wall insulation in the crawl space, and R-49 fiberglass batts in a the vented attic. The air barrier should be improved to ensure a tight envelope with minimal infiltration to the goal of 2.0 ACH50. With the implementation of an air source heat pump for space heating requirements, the combination of HVAC and envelope savings inthe residential unit can save up to 58% in source energy over existing residential units.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Geography of Green Power

Green power refers to the voluntary purchase of renewable electricity by retail electricity customers. Green power is unlike compliance-based renewable energy procurement imposed by law or regulation. In 2016, over six million customers procured about 95 million megawatt-hours (MWh) of green power in the United States, which represents about 28% of all U.S. renewable energy sales, excluding large hydropower. In this fact sheet, we use available data to illustrate the geography of green power demand (in terms of number of customers) and supply (in terms of MWh of generation) by state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chapter 4 - Environmental Sustainability Aspects of Forest Biomass Mobilisation. In the book Mobilisation of Forest Bioenergy in the Boreal and Temperate Biomes

The environmental sustainability of forest biomass procurement needs to be well understood, as the capacity of ecosystems to provide biomass without negative impacts on ecological functioning limits the biomass potential. Emerging bioenergy markets typically first take advantage of secondary residue streams of various wood processing industries and tertiary end-of-life residues. The use of these secondary and tertiary wood resources is not likely to compromise the environmental sustainability of forests. When these resources in any region become scarce or fully utilized, primary residues (i.e., by-products of forestry harvesting operations and silvicultural practices) such as branches, tops, and non-merchantable trees become increasingly targeted as feedstock sources. Forest biomass procurement in the boreal and temperate biomes should therefore not be analyzed as a stand-alone activity, but rather as an intensification of land use and of forest management, in which tree parts and trees are harvested in addition to conventional forest product fractions. Thus, principles of protection and sustainability should remain the same whether forests are managed for conventional forest products only or also for biomass for energy. Some modifications may be needed to properly identify and find mitigation strategies for sensitive conditions where field evidence suggests that the incremental removal of biomass or other forms of intensive management may not be sustainable. Silvicultural practices such as fertilization, competition control, and soil preparation are options to manage the microenvironment, tree growing conditions, and prevent or mitigate negative impacts. Moreover, landscape management regulations should be put in place to ensure that sufficient biodiversity-important features such as dead wood, aging stands, corridors, etc. are preserved. Special attention should then be directed to trees and stands with high biodiversity values or those important for maintaining ecosystem services which, without a bioenergy market, would have been left uncut. Applying the concept of adaptive forest management, ecological monitoring following harvesting operations, scientific field testing and modeling should be combined to produce better knowledge that could help improve practices. The forestry sector needs to start adapting to a future situation where it is expected to provide conventional forest products, biomaterials and bioenergy. To achieve this, good governance mechanisms such as landscape-level land use planning and science-based improvements of practices will become increasingly important to ensure sustainable forest product supply chains.

09 BIOMASS FUELS↗

Constant Rate Production: DOE Approach to Meeting NASA Needs for RPS for Nuclear-Enabled Launches.

The use of radioisotope power systems (RPS) for nuclear-enabled NASA missions is a long-standing arrangement between DOE and NASA. The requirements for the power system come from NASA, while DOE performs the procurement, fueling, testing and delivery. Recent examples include Mars Science Laboratory and New Horizons. A challenge has been interplay between the schedule for RPS availability from DOE versus the schedule NASA has for competitively selected missions. By mutual agreement, the actual operations to procure an RPS and prepare it for fueling, has always waited until the final selection of a mission. This timeline for a New Frontiers class mission leaves approximately 5-6 years from the time of final mission selection to the actual launch date. The number of RPS used for a Frontier class mission can be 1 to 3 units, i.e., the recent New Frontiers-2025 announcement of opportunity published in December 2016. If 1 or 2 units are needed for a specific mission, the timeline from the decision point to the launch date is a challenge, but doable. The activities taking place in this timeframe would include manufacturing the power system, producing the fuel, and performing the assembly/testing and delivery operations. If the mission selected requires 3 RPS the logistics of accomplishing all activities during the 5-6 years is problematic. The challenge involves appropriate resourcing for plutonium production, heat source production and assembly/testing operations. Typically, the time between RPS-enabled missions involve staffing attrition and reduction at the heat source production and the assembly/testing facilities that can be down to 60-75 percent of peak staffing levels to reduce costs. The duration for increasing staffing in these areas, which includes hiring, nuclear workforce training and obtaining the appropriate security clearance is 2 years. Taking account for this 2 years and the 6 months prior to launch arrival of the RPS at Kennedy Space Center erodes too much of the 5-6 years to comfortably support the use of 3 RPS on a mission and doesn't leave much schedule margin for a 2 RPS unit mission. To provide better support for NASA nuclear-enabled missions a different approach was devised, constant rate production. This involves a higher level of base capability at Los Alamos National Laboratory (LANL), Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) to provide a stabilized work force. This will enable 10-15 heat sources to be produced annually at LANL, and subsequently shipped to the INL to be placed into a stable intermediate form that enables storage for up to several years that leads to quick production of general purpose heat source modules when a mission is selected. The up-front production of Pu-238 at ORNL is maintained so that there is material constantly in the pipeline. Production of key specialized components at ORNL is also maintained using this model. This allows for a reduction of risk to the nuclear-enabled missions, yet always having quantities of hardware available “on the shelf” to support production of RPS for NASA.

99 GENERAL AND MISCELLANEOUS↗

The Geography of Green Power (2017 Data)

Green power refers to the voluntary purchase of renewable electricity by retail electricity customers, as opposed to renewable energy procurement to comply with mandates imposed by law or regulation. In 2017, over five million customers procured about 113 million megawatt-hours (MWh) of green power in the United States, which represents about 27% of all U.S. renewable energy sales, excluding large hydropower. In this fact sheet, we use available data to illustrate the geography of green power demand (in terms of number of customers) and supply (in terms of MWh of generation) by state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Utility Green Tariff Programs in the U.S.: Overview and Opportunities for Cost Savings

Federal agencies may want to procure renewable energy from an off-site generator. Green tariffs allow large utility customers in traditionally regulated states to procure renewable energy from their utility through a special tariff for energy from a specific renewable energy project, typically through a long-term contract. Some of these green tariffs provide customers with cost savings. The webinar will explain how these tariffs are structured, how to evaluate cost savings potential and what agencies need to consider when examining this purchasing option.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Transfer of Improved Cavity Processing Protocols to Industry for LCLS-II: N-Doping and Electropolishing

Based on the R&D efforts of colleagues at FNAL, Cornell, and JLab, the LCLS-II project adopted a modification to the rather standard niobium SRF cavity surface processing protocol that incorporates a high temperature diffusion doping with nitrogen gas. This change was motivated by the resulting higher Q0 and the prospect of significantly lower cryogenic heat load for LCLS-II. JLab is responsible for managing the cavity procurement for the LCLS-II project. The first phase of the procurement action is to transfer the nitrogen-doping protocol to the industrial vendors. We also seek to exploit improvements in understanding of the niobium electropolishing process as part of the production processing of the TESLA-style LCLS-II cavities. We report on the technology transfer activities and progress toward the envisaged performance demonstration of vendor-processed cavities.

Reece, Charles E.↗

ESPC ESA Training Series: Site-Specific/Stand-Alone Contract Vehicle

This webinar provides instructions and resources for financing distributed energy projects (e.g., on–site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the site–specific/stand–alone contract vehicle. The site–specific/stand–alone contract vehicle is a procurement process using a request for proposal (RFP). Topics covered during the webinar include forming a strong project team, validating the feasibility of the distributed energy project at a site, acquisition planning, RFP development, procurement, proposal evaluation and contract award, and the construction and performance period. This webinar also provides an overview of the resources available in the ESPC ESA Toolkit, such as checklists and templates.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Fabrication experience of the pre-production PIP-II SSR2 cavities at Fermilab

The Proton Improvement Plan-II (PIP-II, [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The mechanical design of the jacketed cavity has been finalized and it will be presented in this paper along with fabrication and processing experience. The importance of interfaces, quality controls and procurement aspects in the design phase will be remarked as well as lessons learned during the fabrication process. Furthermore, development studies will be presented together with other design validation tests.

43 PARTICLE ACCELERATORS↗

Techno-Economic Analysis

This National Energy Technology Laboratory presentation was given at the Carbon Conversion Procurement Grant Program Regional Workshops. The workshops are organized collaboratively by the DOE Office of Fossil Energy and Carbon Management and the United States Energy Association. There are a series of four workshops scheduled: 1) August 30, 2022 in Knoxville, TN (University of Tennessee) 2) September 13, 2022 in Emeryville, CA (Lawrence Berkeley National Laboratory 3) September 27, 2022 in New York, NY (Orrick, Herrington, & Sutcliffe LLP) 4) October 18, 2022 in Minneapolis, MN (TBD) The intent of the workshop is to provide potential applicants with background on the Procurement Grants program and the types of information requested. The specific purpose of this presentation is to give a high-level overview of techno-economic analysis to an audience that has little to no experience conducting them. The intent is to help the audience understand why techno-economic analysis is requested in the application process and to educate on its utility.

Hackett, Gregory↗

Advancing Federal Infrastructure Through Innovation: Selecting Electric Vehicle Charging Infrastructure Wisely

The Biden Administration's issuance of Executive Orders directly addressing and accelerating Federal fleet electrification places an onus on both fleet and facility managers. This panel will help fleet and facility personnel understand how to select EVSE infrastructure in terms of implementation, energy management, and costs of procurement, installation/deployment, and electricity. The panel will cover technology aspects to include managed EVSE, bi-directional charging, implications on local electrical systems and storage needs in certain cases to buffer power demand. Discussion will include various considerations relevant to ensuring adequate EVSE, balancing infrastructure needs, and upgrades with fleet needs. The panelists will discuss how to provide sufficient infrastructure support, including which stakeholders to involve, procurement impediments, easement locations, and requirements that arise during the design and implementation process.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

An Initial Evaluation of the Elevated-Temperature Cyclic Properties of Optimized 316H Stainless Steel Fabricated by Powder Metallurgy Hot Isostatic Pressing

Powder metallurgy hot isostatic pressing (PM-HIP) is a mature advanced manufacturing technology, which can consolidate metallic powder under high temperature and pressure to generate near-net shape components. This process can lower production costs and reduce component lead times for nuclear reactor construction and can be readily deployed in the near term for microreactor components because of their smaller size. The purpose of this work is to continue the evaluation of elevated-temperature cyclic material properties for PM-HIP 316H stainless steel. Prior scoping results have shown that the commercially procured PM-HIP stainless-steel materials have reduced creep-fatigue performance compared to wrought 316 stainless steels. To better understand how PM-HIP processed material properties compare to traditional manufacturing methods, additional billets of PM-HIP 316H stainless steel were procured and tested. This testing is necessary to understand how elevated-temperature properties are influenced by the PM-HIP process and what data are needed for incorporating PM HIP 316H into the American Society of Mechanical Engineers Boiler Pressure Vessel Code, Section III, Division 5 for high temperature reactor construction. Specifically, an additional PM-HIP 316H stainless steel billet with lower oxygen and nitrogen concentrations was fabricated by the Nuclear Advanced Manufacturing Research Centre of the United Kingdom and tested to understand if elevated-temperature cyclic properties can be improved. The creep-fatigue resistance of the material from this new billet did not show appreciable improvement compared to prior testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Practical Application of Integrated Systems Engineering and Project Management on a Complex EPC Project - 17207

This paper introduces how an integrated set of Systems Engineering (SE) and Project Management (PM) processes were applied in a practical way, to address the challenges on a complex, highly technical, Engineering Procurement Construction project within the nuclear field. This approach was inspired by: - the principles contained in a Community of Practice on Lean in Program Management jointly established in May 2012 by MIT, PMI and INCOSE; - an opportunity to apply international standard ISO/IEC 15288:2008(E) Systems and software engineering - System life cycle processes on a real-life situation; - and the belief that there is great value in applying Systems Engineering and Project Management in an integrated manner on a project. The project offering this opportunity was the Detail Engineering, Procurement, Construction and Cold Commissioning (EPC) of the Silo Direct-encapsulation Plant (SDP). This project was undertaken by the Joint Venture (JV) formed by Areva, Mace and Atkins (a.m.a. Nuclear Ltd). Unfortunately, early termination of the project, at a stage when only a part of the processes and tools were being implemented, did not allow this integrated approach to be demonstrated in full. However, the benefits achieved in the early stages in aligning and forming an integrated project execution team, showed potential for great benefits. This paper covers an introductory analysis of the situation, the successes and benefits achieved from implementing an integrated SE - PM approach up to the stage when the project was terminated, and possible path forward had the project continued. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Immobilized Low-Activity Waste Transportation System - 18496

The transportation of radioactive immobilized low-activity waste (ILAW) containers at the United States Department of Energy's (DOE) Hanford site is planned with a new ILAW transporter system. A project will design, procure, and fabricate components to support the safe and efficient transport of the radioactive ILAW containers, generated at the Hanford Tank Waste Treatment and Immobilization Plant (WTP), Low-Activity Waste (LAW) production facility, to the Integrated Disposal Facility (IDF) final disposal site. Prototype design was completed in fiscal year (FY) 2017. Fabrication of the transportation trailer/pallet system is occurring in FY2018, with testing to be completed in early FY2019. Any design modification will be incorporated into the design, and procurement of additional systems will then occur, to support WTP LAW hot commissioning, as soon as 2022. This project is implemented by the DOE tank farm contractor, Washington River Protection Solutions LLC (WRPS), with primary prototype design and fabrication being performed by SNC-Lavalin (Atkins). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗