Search NASA⌕ Search

SEARCH · Search NASA

Results for “quality monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

L-Basin Microbial Monitoring Program - Evaluation of 20 Years of Monitoring

The SRNL L-Basin corrosion surveillance and microbial monitoring programs provide early detection and characterization of corrosion attack to the fuel and storage system materials resulting from prolonged exposure to the L-Basin water environment and of changes to and impact of the diverse microbial population, respectively. The early detection of corrosion allows for adjustment of the water quality, engineering management, and fuel storage configurations to mitigate excessive corrosion attack. While microbial influenced corrosion in L-Basin has not been detected, tracking and understanding the effect of microbial populations on the stored fuel and basin water will aid in identifying remedial measures to mitigate any detrimental impact. This report reviews the microbial monitoring activities since initial characterizations in the mid-1990s.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Indoor air quality in California homes with code-required mechanical ventilation

Data were collected in 70 detached houses built in 2011-2017 in compliance with the mechanical ventilation requirements of California's building energy efficiency standards. Each home was monitored for a 1-week period with windows closed and the central mechanical ventilation system operating. Pollutant measurements included time-resolved fine particulate matter (PM 2.5 ) indoors and outdoors and formaldehyde and carbon dioxide (CO 2 ) indoors. Time-integrated measurements were made for formaldehyde, NO 2 , and nitrogen oxides (NO X ) indoors and outdoors. Operation of the cooktop, range hood, and other exhaust fans was continuously recorded during the monitoring period. Onetime diagnostic measurements included mechanical airflows and envelope and duct system air leakage. All homes met or were very close to meeting the ventilation requirements. On average, the dwelling unit ventilation fan moved 50% more airflow than the minimum requirement. Pollutant concentrations were similar to or lower than those reported in a 2006-2007 study of California new homes built in 2002-2005. Mean and median indoor concentrations were lower by 44% and 38% for formaldehyde and 44% and 54% for PM 2.5 . Ventilation fans were operating in only 26% of homes when first visited, and the control switches in many homes did not have informative labels as required by building standards.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Air quality impacts from the development of unconventional oil and gas well pads: Air toxics and other volatile organic compounds

Unconventional oil and natural gas development (UOGD) has expanded rapidly across the United States in recent decades and raised concerns about associated air quality impacts. While significant effort has been made to quantify methane emissions, relatively few observations have been made of Volatile Organic Compounds (VOCs), especially during drilling and completion of new wells. Extensive air monitoring during development of several large, multi-well pads in Broomfield, Colorado, in the Denver-Julesburg Basin, provides a novel opportunity to examine changes in local air toxics and other VOC concentrations during well drilling and completions and production. These operations offer an especially useful case to study as several management practices were implemented to reduce emissions (e.g., electrified, grid-powered drill rigs and closed loop fluid handling systems to reduce truck traffic and limit fluid handling on the pad). With simultaneous measurements of methane and 50 VOCs from October 2018 to December 2022 at as many as 19 sites near well pads, in adjacent neighborhoods, and at a more distant reference location, we identify impacts from each phase of well development and production. Use of weekly, time-integrated canisters, a Proton Transfer Reaction Mass Spectrometer (PTR-MS), continuous photoionization detectors (PID) to trigger canister collection upon detection of VOC-rich plumes, and an instrumented vehicle, provided a powerful suite of measurements to characterize both transient plumes and longer-term changes in air quality. Prior to the start of well development, VOC gradients were small across Broomfield. Once drilling commenced, concentrations of oil and gas (O&G) related VOCs, including alkanes and aromatics, increased around active well pads. Concentration increases were clearly apparent during certain operations, including drilling, coil tubing/millout operations, and production tubing installation. Emissions of C 8 –C 10 n-alkanes during drilling operations highlighted the importance of VOC emissions from synthetic drilling mud chosen to reduce odor impacts. More than 90 samples were collected of transient plumes. Using composition measurements, meteorological data, and information about well pad activities, these plumes were connected with specific UOGD operations including drilling, flowback, and production equipment maintenance. The chemical signatures of these plumes differed by operation type (e.g., C 8 –C 10 n-alkanes constituted a larger fraction of measured VOCs in drilling-related plumes). Concentrations of individual, oil and gas-related VOCs in these plumes were often several orders of magnitude higher than in background air, with maximum ethane and benzene concentrations of 79,600 and 819 ppbv, respectively. Because these plumes typically impact a monitoring site for just several minutes, they are easily missed by slower-responding instruments. Study measurements highlight future emission mitigation opportunities during UOGD operations, including better control of emissions from shakers that separate drill cuttings from drilling mud, production separator maintenance operations, and periodic emptying of sand cans during flowback operations.

54 ENVIRONMENTAL SCIENCES↗

2024 OES-Environmental 2024 State of the Science Report, Chapter 8: Marine Renewable Energy Data and Information Systems

As the marine renewable energy (MRE) sector grows, large amounts of environmental and technical data and information are being collected. When these data and information are openly available, they can be used to guide research and development, inform responsible siting and consenting of projects, and increase stakeholder understanding through transparency. For example, quality environmental data collected during the siting, consenting, construction, operation, and decommissioning of MRE projects can all play key roles in better characterizing baseline conditions, developing effective monitoring and mitigation strategies, and retiring environmental risks through data transferability (see Chapter 6). Ensuring that these data and information are easily discoverable and accessible will help the MRE sector make informed decisions and coexist in an increasingly busy ocean environment.

16 TIDAL AND WAVE POWER↗

AgroIBIS VSF Farmed Pothole Ponding Model Runs

This data set includes modeled (AgroIBIS-VSF) output of crop yield for miscanthus and a corn/soybean rotation in .nc format. Input includes the precipitation scenarios (.csv) used to generate the runs, and supplemental observed yield monitor data (.csv) from the research area of interest.

Agricultural Hydrology (Drainage, Flooding, Irriga↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Report Q3FY21 - High-Resolution 3D Acoustic Borehole Integrity Monitoring

Real-time, in-situ, high spatial resolution (sub-cm) imaging of the near-borehole environment would revolutionize wellbore diagnostics and integrity assessment by direct observation of defects. It is becoming increasingly apparent, that better understanding of the near-wellbore environment is required to meet the safety and operational needs in challenging environments such as those present in subsurface energy extraction (geothermal) and storage (CO 2 sequestration) applications. Therefore, it is important to have a more robust ability to image the near-borehole and reliably detect defects. It was proposed to further develop and improve our advanced 3D imaging system to evaluate casing defects (e.g. corrosion) and cement quality in either open- or cased-borehole with the ultimate goal to develop a commercially deployable technology. The system consists of a unique acoustic source (LANL) and advanced inversion techniques for image processing (LANL, ORNL). This system will provide comprehensive borehole integrity monitoring with improved resolution over existing techniques. As an application of this imaging system, we will characterize the effectiveness of next-generation wellbore completion technology (NETL, SNL), and will demonstrate that, unlike current technology, the proposed approach can successfully characterize foamed cements.

42 ENGINEERING↗

A deep learning framework for layer-wise porosity prediction in metal powder bed fusion using thermal signatures

Abstract Part quality manufactured by the laser powder bed fusion process is significantly affected by porosity. Existing works of process–property relationships for porosity prediction require many experiments or computationally expensive simulations without considering environmental variations. While efforts that adopt real-time monitoring sensors can only detect porosity after its occurrence rather than predicting it ahead of time. In this study, a novel porosity detection-prediction framework is proposed based on deep learning that predicts porosity in the next layer based on thermal signatures of the previous layers. The proposed framework is validated in terms of its ability to accurately predict lack of fusion porosity using computerized tomography (CT) scans, which achieves a F1-score of 0.75. The framework presented in this work can be effectively applied to quality control in additive manufacturing. As a function of the predicted porosity positions, laser process parameters in the next layer can be adjusted to avoid more part porosity in the future or the existing porosity could be filled. If the predicted part porosity is not acceptable regardless of laser parameters, the building process can be stopped to minimize the loss.

42 ENGINEERING↗

Statistical Performance of Forced Oscillation Detectors in the Presence of Missing Measurements

In bulk power systems, measurement-based monitoring for large oscillations can help maintain system reliability. One of the challenges encountered in a recent field demonstration was the unavailability of measurements due to underlying measurement quality or communication problems. During the demonstration, the oscillation detector ignored a measurement location if even 10 seconds of data was missing. To extend the detector's ability to operate in these conditions, this paper evaluates the impact of three methods for addressing missing data. The strengths and weaknesses of each approach are evaluated using theoretical expressions for the probability of detection along with results from simulated data and publicly available field measurements. Based on these results, a suitable approach is identified that can extend the oscillation detector's performance when large segments of data are missing.

Follum, James D.↗

High-Resolution 3D Acoustic Borehole Integrity Monitoring (Final Report)

Real-time, in-situ, high spatial resolution (sub-cm) imaging of the near-borehole environment would revolutionize wellbore diagnostics and integrity assessment by direct observation of defects. It is becoming increasingly apparent, that better understanding of the near-wellbore environment is required to meet the safety and operational needs in challenging environments such as those present in subsurface energy extraction (geothermal) and storage (CO2 sequestration) applications. Therefore, it is important to have a more robust ability to image the near-borehole and reliably detect defects. It was proposed to further develop and improve our advanced 3D imaging system to evaluate casing defects (e.g. corrosion) and cement quality in either open- or cased-borehole with the ultimate goal to develop a commercially deployable technology. The system consists of a unique acoustic source (LANL) and advanced inversion techniques for image processing (LANL, ORNL). This system will provide comprehensive borehole integrity monitoring with improved resolution over existing techniques. As an application of this imaging system, we will characterize the effectiveness of next-generation wellbore completion technology (NETL, SNL), and will demonstrate that, unlike current technology, the proposed approach can successfully characterize foamed cements.

42 ENGINEERING↗

STILGAR End-of-Project Report

The Subsurface Tunnel Imaging LeveraGed by Analysis of Rayleigh wave ellipticity (STILGAR) project demonstrated an integrated geophysical approach for detecting, locating, and characterizing underground structural changes using dense seismic arrays and advanced inversion techniques. Field campaigns were conducted at two operational mines—the Redmond salt mine (Utah) and Graymont Pleasant Gap limestone mine (Pennsylvania)—providing real-world testbeds for monitoring anthropogenic subsurface activity. At the Redmond salt mine, seismic interferometry combined with back-projection inversion successfully identified continuous, low-amplitude signals from mining operations. The approach differentiated stationary from migrating anthropogenic sources, captured daily operational cycles, and validated the potential of passive seismic monitoring for remote detection of underground activity. At the Graymont Pleasant Gap mine, two dense seismic deployments in the spring and fall of 2023 generated over 4 TB of high-resolution data. Key outcomes included the relocation of 199 underground and 8 surface explosions with accuracies within tens of meters and the development of a 3D P-wave velocity model using the triple-difference tomography algorithm (tomoTD) that resolved major structural features such as the mine entrance, low-velocity tunnels, and roof-collapse areas. Ambient noise cross-correlation and back-projection analyses revealed persistent sources linked to ongoing mining activity, whereas horizontal-to-vertical spectral ratio (HVSR) and ellipticity studies confirmed stable site responses across seasons and identified soil thickness trends consistent with regional erosional and depositional processes. Checkerboard and sensitivity tests further validated the robustness of the tomographic results. Overall, the findings emphasize that although significant progress has been made in subsurface imaging, further work is needed to enhance the detection and localization of underground structures. Accurate imaging requires higher frequencies, yet anthropogenic sources tend to dominate the seismic record at those frequencies, and high-frequency surface waves are affected by higher modes that complicate interpretation. The improved detection and localization of human-induced signals enabled detailed temporal and spatial mapping of daily mine operations, demonstrating the feasibility of continuous anthropogenic source monitoring. Sensitivity to signals from nontraditional sources, such as fan operations, highlights the broader applicability of this approach to other industrial environments in which continuous and impulsive signals are present. The field campaigns produced a substantial volume of high-quality seismic data, supporting the development and testing of new methods for seismic source characterization and subsurface imaging. Future deployments should include sensors capable of recording lower frequencies to probe deeper structures, increase bandwidth to enhance resolution and sensitivity to both shallow and deep targets, and collect additional large-scale datasets to refine imaging and source characterization techniques. Moreover, conducting 3D modeling studies of seismic wavefields at higher frequencies will provide a better understanding of wave scattering and cavity–wavefield interactions in complex underground environments. In conclusion, the STILGAR project demonstrated that integrated seismic monitoring can effectively characterize underground operations, capturing both natural and anthropogenic signals. The approaches developed provide a foundation for improved detection, localization, and imaging of subsurface structures and are directly transferable to broader industrial monitoring applications.

58 GEOSCIENCES↗

High-Resolution 3D Acoustic Borehole Integrity Monitoring (Research Performance Progress Report Q2 2021)

Real-time, in-situ, high spatial resolution (sub-cm) imaging of the near-borehole environment would revolutionize wellbore diagnostics and integrity assessment by direct observation of defects. It is becoming increasingly apparent, that better understanding of the near-wellbore environment is required to meet the safety and operational needs in challenging environments such as those present in subsurface energy extraction (geothermal) and storage (CO2 sequestration) applications. Therefore, it is important to have a more robust ability to image the near-borehole and reliably detect defects. It was proposed to further develop and improve our advanced 3D imaging system to evaluate casing defects (e.g. corrosion) and cement quality in either open- or cased-borehole with the ultimate goal to develop a commercially deployable technology. The system consists of a unique acoustic source (LANL) and advanced inversion techniques for image processing (LANL, ORNL). This system will provide comprehensive borehole integrity monitoring with improved resolution over existing techniques. As an application of this imaging system, we will characterize the effectiveness of next-generation wellbore completion technology (NETL, SNL), and will demonstrate that, unlike current technology, the proposed approach can successfully characterize foamed cements.

15 GEOTHERMAL ENERGY↗

Proxy quality control of biomass particles using thermogravimetric analysis and Gaussian process regression models

Abstract The temperature experienced by reactants during preparation in a reactor is a key component in determining the yield and homogeneity of usable chemical products such as biomass particles. Thermocouples with sensors can be used to monitor spatial temperature gradients within reactors but these sensors are often too expensive and/or invasive. The present work proposes a strategy to identify optimal machine learning models to infer the maximum effective temperature experienced by particles during oxidative biomass torrefaction using key thermochemical combustion parameters. The maximum rate of weight loss, the corresponding temperature, and fixed carbon content on a dry‐ash‐free basis are used as literature‐based predictor variables obtained from thermogravimetric analysis. The evaluation of 24 machine‐learning models using the standard tenfold cross‐validation method suggests that the exponential Gaussian process regression (GPR) model is the most effective, followed by other GPR models. These high‐performing GPR models were also utilized to predict the effective preparation temperature distribution of reactor‐produced biomass particles under eight conditions of varying residence time and air‐to‐biomass ratio. The effective preparation temperature and residence time of individual biomass particles were then encoded into the torrefaction severity factor and used to estimate the energy yield of the reactor output as a novel quality control method. © 2023 The Authors. Biofuels, Bioproducts and Biorefining published by Society of Industrial Chemistry and John Wiley & Sons Ltd.

09 BIOMASS FUELS↗

Seasonal and tidal variations in hydrologic inputs drive salt marsh porewater nitrate dynamics

Salt marshes remove terrestrially derived nutrients en route to coasts. While these systems play a critical role in improving water quality, we still have a limited understanding of the spatiotemporal variability of biogeochemically reactive solutes and processes within salt marshes. We implemented a high-frequency sampling system to monitor sub-hourly nitrate (NO$^{–}_{3}$) concentrations in salt marsh porewater at Elkhorn Slough in central California, USA. We instrumented three marsh positions along an elevation gradient subjected to different amounts of tidal inundation, which we predicted would lead to varied biogeochemical characteristics and hydrological interactions. At each marsh position, we continuously monitored porewater NO$^{–}_{3}$ concentrations at depths of 10, 30, and 50 cm and porewater levels measured at 70 cm depth over seven deployments of ~10 days each that spanned seasonal wet/dry periods common to Mediterranean climates. We quantified tidal event hysteresis between NO$^{–}_{3}$ and water level to understand how NO$^{–}_{3}$ concentrations and sources fluctuate across tidal cycles. In dry periods, the NO$^{–}_{3}$-porewater level relationship indicated that the NO$^{–}_{3}$ source was likely estuarine surface water that flooded the transect during high tides and the salt marsh was a NO$^{–}_{3}$ sink. In wet periods, the NO$^{–}_{3}$-porewater level relationship suggested the salt marsh was a source of NO$^{–}_{3}$. Finally, these findings suggest that tidal and seasonal hydrologic fluxes together control NO$^{–}_{3}$ porewater dynamics and export and influence ecological processes in coastal environments.

54 ENVIRONMENTAL SCIENCES↗

Effects of digital fringe projection operational parameters on detecting powder bed defects in additive manufacturing

Additive manufacturing is a technology transforming traditional production timelines. Specifically, metal additive manufacturing (MAM) has been increasingly adopted by a variety of industries, not only to prototype, but also to fulfill full production scale applications with much lower lead times. Like any maturing manufacturing technology, developments in verifying and validating processes are necessary to support continuous growth. Due to the complex nature of MAM, part quality and repeatability remain integral challenges that inhibit further adoption of MAM for critical component production. In this study, we present data taken from a developing in-process monitoring system designed to measure and detect powder bed defects (PBDs) in powder bed fusion MAM systems using surface height maps created with structured light illumination. We showcase the feasibility of the monitoring technique for in-process implementation by detecting streak PBDs with varying severities (height, width) created in a lab environment. We present results of powder bed measurements for varying experimental parameters of the structured light system such as illumination angle, illumination pattern, and number of illuminations. We also present an expression used to determine experimental height noise based on input parameters for PBD detection based on the instrument transfer function of the structured light monitoring system for arbitrary pixel intensity noise contributions. In conclusion, with the results of PBD detection across multiple experimental measurement parameters, we provide a best practices approach to in-process implementation of the monitoring system in powder bed fusion manufacturing.

36 MATERIALS SCIENCE↗

Review of New or Modified Radioactive Air Emission Sources

This Environmental Protection and Compliance (EPC), Compliance Programs (CP) Quality Procedure (QP) describes the process for review and evaluation of new and modified sources of radioactive air emissions to determine the requirements for pre-construction approval, stack monitoring, stack sampling system upgrade, ambient air monitoring, and the implementation of As Low As Reasonably Achievable (ALARA) principles. These requirements are specified in 40 CFR 61 Subpart H and by DOE Order 458.1, Radiation Protection of the Public and the Environment.

61 RADIATION PROTECTION AND DOSIMETRY↗

A profile monitor for proton radiography experiments at the Los Alamos Neutron Science Center

The Proton Radiography (pRad) facility at the Los Alamos Neutron Science Center utilizes pulses of protons delivered by the 800 MeV linear accelerator to produce a series of radiographic images to study the dynamic behavior of materials under extreme conditions. Radiographs taken with an empty field of view, or beam pictures, are used to normalize transmission. However, because the center of the proton beam shifts between pulses, an in situ method for measuring beam position is required to normalize images for beam movement to perform absolute radiography. The beam profile monitor described here uses an array of scintillating fibers positioned in the beam path to produce light proportional to beam intensity across the beam cross section. This light is detected using fast photodiodes and a digital oscilloscope, providing a response time of several nanoseconds—suitable for measuring the 50-ns proton pulses used in pRad. The profile monitor achieves a measured position precision of 40 μm and an intensity precision of 0.7%, allowing for beam movement corrections to be applied to images, thereby improving data accuracy and image quality.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Use of Convolutional Neural Network Image Classification and High-Speed Ion Probe Data Toward Real-Time Detonation Characterization in a Water-Cooled Rotating Detonation Engine

As rotating detonation engines (RDEs) progress in maturity, the importance of monitoring advancements toward development of active control becomes more critical. Experimental RDE data processing at time scales which satisfy real-time diagnostics will likely require the use of machine learning. This study aims to develop and deploy a novel real-time monitoring technique capable of determining detonation wave number, direction, frequency, and individual wave speeds throughout experimental RDE operational windows. To do so, the diagnostic integrates image classification by a convolutional neural network (CNN) and ionization current signal analysis. Wave mode identification through single-image CNN classification bypasses the need to evaluate sequential images and offers instantaneous identification of the wave mode present in the RDE annulus. Here, real-time processing speeds are achieved due to low data volumes required by the methodology, namely one short-exposure image and a short window of sensor data to generate each diagnostic output. The diagnostic acquires live data using a modified experimental setup alongside Pylon and PyDAQmx libraries within a python data acquisition environment. Lab-deployed diagnostic results are presented across varying wave modes, operating conditions, and data quality, currently executed at 3–4 Hz with a variety of iteration speed optimization options to be considered as future work. These speeds exceed that of conventional techniques and offer a proven structure for real-time RDE monitoring. The demonstrated ability to analyze detonation wave presence and behavior during RDE operation will certainly play a vital role in the development of RDE active control, necessary for RDE technology maturation toward industrial integration.

42 ENGINEERING↗