Search NASA⌕ Search

SEARCH · Search NASA

Results for “workforce”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

2008 ESMD Space Grant Faculty Project

Objectives of this project was to: Gather senior design project ideas and internship opportunities: Relative to space explorationnd In support of the ESMD Space Grant Student Project Support NASAs Educational Framework Outcome 1: Contribute to the development of the STEM workforce

Murphy, Gloria↗

Educational Experiences of Embry-Riddle Students through NASA Research Collaboration

NASA's educational programs benefit students while increasing the overall productivity of the organization. The NASA Graduate Student Research Program (GSRP) awards fellowships for graduate study leading to both masters and doctoral degrees in several technical fields, while the Cooperative Education program allows undergraduate and graduate students the chance to gain work experience in the field. The Mission Analysis Branch of the Expendable Launch Vehicles Division at NASA Kennedy Space Center has utilized these two programs with students from Embry-Riddle Aeronautical University to conduct research in modeling and developing a parameter estimation method for spacecraft fuel slosh using simple pendulum analogs. Simple pendulum models are used to understand complicated spacecraft fuel slosh behavior. A robust parameter estimation process will help to identiFy the parameters that will predict the response fairly accurately during the initial stages of design. NASA's Cooperative Education Program trains the next wave of new hires while allowing graduate and undergraduate college students to gain valuable "real-world" work experience. It gives NASA a no risk capability to evaluate the true performance of a prospective new hire without relying solely on a paper resume, while providing the students with a greater hiring potential upon graduation, at NASA or elsewhere. In addition, graduate students serve as mentors for undergrad students and provide a unique learning environment. Providing students with a unique opportunity to work on "real-world" aerospace problems ultimately reinforces their problem solving abilities and their communication skills (in terms of interviewing, resume writing, technical writing, presentation, and peer review) that are vital for the workforce to succeed.

Schlee, Keith↗

Oxygen Sensors Monitor Bioreactors and Ensure Health and Safety

In order to cultivate healthy bacteria in bioreactors, Kennedy Space Center awarded SBIR funding to Needham Heights, Massachusetts-based Polestar Technologies Inc. to develop sensors that could monitor oxygen levels. The result is a sensor now widely used by pharmaceutical companies and medical research universities. Other sensors have also been developed, and in 2013 alone the company increased its workforce by 50 percent.

Source record↗

The Space Launch System: NASA's Exploration Rocket

Powerful, versatile, and capable vehicle for entirely new missions to deep space. Vital to NASA's exploration strategy and the Nation's space agenda. Safe, affordable, and sustainable. Engaging the U.S. aerospace workforce and infrastructure. Competitive opportunities for innovations that affordably upgrade performance. Successfully meeting milestones in preparation for Preliminary Design Review in 2013. On course for first flight in 2017.

Blackerby, Christopher↗

Development of Autonomous Aerobraking - Phase 2

Phase 1 of the Development of Autonomous Aerobraking (AA) Assessment investigated the technical capability of transferring the processes of aerobraking maneuver (ABM) decision-making (currently performed on the ground by an extensive workforce and communicated to the spacecraft via the deep space network) to an efficient flight software algorithm onboard the spacecraft. This document describes Phase 2 of this study, which was a 12-month effort to improve and rigorously test the AA Development Software developed in Phase 1. Aerobraking maneuver; Autonomous Aerobraking; Autonomous Aerobraking Development Software; Deep Space Network; NASA Engineering and Safety Center

Murri, Daniel G.↗

Modeling the Skills and Practices of Scientists through an “All-Inclusive” Comparative Planetology Student Research Investigation

To effectively prepare the nation's future Science, Technology, Engineering, and Mathematics (STEM) workforce, students in today's classrooms need opportunities to engage in authentic experiences that model skills and practices used by STEM professionals. Relevant, real-world authentic research experiences allow students to behave as scientists as they model the process of science. This enables students to get a true sense of STEM-related professions and also allows them to develop the requisite knowledge, skills, curiosity, and creativity necessary for success in STEM careers. Providing professional development and opportunities to help teachers infuse research in the classroom is one of the primary goals of the Expedition Earth and Beyond (EEAB) program. EEAB, facilitated by the Astromaterials Research and Exploration Science (ARES) Directorate at the NASA Johnson Space Center, is an Earth and planetary science education program designed to inspire, engage, and educate teachers and students in grades 5-12 by getting them actively involved with exploration, discovery, and the process of science. The program combines the expertise of scientists and educators to ensure the professional development provided to classroom teachers is scientifically valid and also recognizes classroom constraints. For many teachers, facilitating research in the classroom can be challenging. In addition to addressing required academic standards and dealing with time constraints, challenges include structuring a research investigation the entire class can successfully complete. To build educator confidence, foster positive classroom research experiences, and enable teachers to help students model the skills and practices of scientists, EEAB has created an "allinclusive" comparative planetology research investigation activity. This activity addresses academic standards while recognizing students (and teachers) potentially lack experience with scientific practices involved in conducting research. Designed as an entry level research engagement investigation, the activity introduces, illustrates, and teaches the skills involved in each step of the research process. Students use astronaut photos, provided through the ARES Crew Earth Observations (CEO) payload on the International Space Station (ISS) as well as remote sensing imagery of other planetary worlds. By including all the necessary tools to complete the investigation, students can focus on gaining experience in the process of science. Additionally, students are able to extend their experience of modeling the skills and practices of scientists through the opportunity to request new data of Earth from the ISS. Professional development offered through in-person and webinar trainings, along with the resources provided, enable educators to gain first-hand experience implementing a structured research investigation in the classroom. Through data and feedback collected from teachers, this type of "all-inclusive" investigation activity aims to become a model that can be utilized for other research topics and STEM disciplines.

Graff, Paige↗

Climate Variability and Impact at NASA's Marshal Space Flight Center

Climate analysis for the Southeast U. S. has indicated that inland regions have experienced an average temperature increase of 2F since 1970. This trend is generally characterized by warmer winters with an indication of increased precipitation in the Fall season. Extended periods of limited rainfall in the Spring and Summer periods have had greater areal coverage and, at other times the number of precipitation events has been increasing. Climate model projections for the next 10-70 years indicate warmer temperatures for the Southeast U.S., particularly in the Spring and Summer, with some indication of more extremes in temperature and precipitation as shown in the table below. The realization of these types of regional climate changes in the form of extended heat waves and droughts and their subsequent stress on facilities, infrastructure, and workforce could have substantial impact on the activities and functions of NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama. This presentation will present the results of an examination of the 100 year temperature and precipitation record for MSFC. Local warming has cause an increase in daily maximum and minimum temperatures by nearly 3F, with a substantial increase in the number of maximum temperatures exceeding 90F and a decrease in the number of days with minimum temperatures below freezing. These trends have substantial impact of the number of heating / cooling degree days for the area. Yearly precipitation totals are inversely correlated with the change in mean temperature and the frequency of heavy rain events has remain consistent with the changes in yearly totals. An extended heat wave index was developed which shows an increase in frequency of heat waves over the last 35 years and a subsequent reduction in precipitation during the heat waves. This trend will contribute to more intense drought conditions over the northern Alabama region, increasing the potential of destructive wildfires in and around the Center. MSFC has begun using this climate change information to adapt short-term and long-term plans for Center operations.

Smoot, James L.↗

Creating a Prototype Web Application for Spacecraft Real-Time Data Visualization on Mobile Devices

Mobile devices (smart phones, tablets) have become commonplace among almost all sectors of the workforce, especially in the technical and scientific communities. These devices provide individuals the ability to be constantly connected to any area of interest they may have, whenever and wherever they are located. The Huntsville Operations Support Center (HOSC) is attempting to take advantage of this constant connectivity to extend the data visualization component of the Payload Operations and Integration Center (POIC) to a person's mobile device. POIC users currently have a rather unique capability to create custom user interfaces in order to view International Space Station (ISS) payload health and status telemetry. These displays are used at various console positions within the POIC. The Software Engineering team has created a Mobile Display capability that will allow authenticated users to view the same displays created for the console positions on the mobile device of their choice. Utilizing modern technologies including ASP.net, JavaScript, and HTML5, we have created a web application that renders the user's displays in any modern desktop or mobile web browser, regardless of the operating system on the device. Additionally, the application is device aware which enables it to render its configuration and selection menus with themes that correspond to the particular device. The Mobile Display application uses a communication mechanism known as signalR to push updates to the web client. This communication mechanism automatically detects the best communication protocol between the client and server and also manages disconnections and reconnections of the client to the server. One benefit of this application is that the user can monitor important telemetry even while away from their console position. If expanded to the scientific community, this application would allow a scientist to view a snapshot of the state of their particular experiment at any time or place. Because the web application renders the displays that can currently be created with the POIC ground system, the user can tailor their displays for a particular device using tools that they are already trained to use.

Lang, Jeremy S.↗

America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing

The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.

Birkenstock, Benjamin↗

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable Exploration

Development of NASA's Space Launch System exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated for December 2017. In recognition of the current fiscal realities, SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. Current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. It is this version that will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. This configuration is also designed to evolve to 130 t lift capability that offers several benefits, such as reduced mission costs, simplified payload design, faster trip times, and lower overall risk for missions of national significance. The SLS Program formally transitioned from the formulation phase to implementation during the past year, passing its Preliminary Design Review in 2013 and completion of Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015. Among the Program's many accomplishments are manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and the main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. The result is a launch vehicle that will carry human and robotic exploration on the history-making missions in the coming decades. This paper will discuss the program and technical successes over the past year and provide a look at the milestones and challenges ahead.

Askins, Bruce↗

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable, Exploration

Development of NASA's Space Launch System (SLS) exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated December 2017. SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. For the United States current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. This version will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. SLS is designed to evolve to a 130 t lift capability that can reduce mission costs, simplify payload design, reduce trip times, and lower overall risk. Each vehicle element completed its respective Preliminary Design Reviews, followed by the SLS Program. The Program also completed the Key Decision Point-C milestone to move from formulation to implementation in 2014. NASA hasthorized the program to proceed to Critical Design Review, scheduled for 2015. Accomplihments to date include: manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. This paper will discuss SLS Program successes over the past year and examine milestones and challenges ahead. The SLS Program and its elements are managed at NASA's Marshall Space Flight Center (MSFC).

Askins, Bruce R.↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Dorothy Jorgensen - Co-Op Tour Summary

NASA is a household name in this day and age, known commonly as America's government-run powerhouse of innovation and space exploration. It is a common dream for students to be a part of NASA's workforce, but I did not realize that it was my dream until I found that I could not imagine working anywhere else. From August to December, I had the privilege of a co-op tour with NASA at the Johnson Space Center. The National Aeronautics and Space Administration (NASA) first formed in the early hysteria of the Cold War, and in its early days it received enormous funding and political support. It was America's response to the Russian Sputnik, which was a not only a stark symbol of what was suddenly possible, but also of how far behind the United States had fallen in the race for technology. The political atmosphere in the world has since changed, but NASA's drive to push the boundaries of the impossible has not faded: NASA's primary mission has been exploration for the betterment of mankind, and it works towards that mission to this day. The specific NASA site that I worked in was by a coast near Houston, TX, at the Johnson Space Center (Figure 1). I was led on my first day of work to a building dedicated to Structural Engineering (Building 13), which was where I would be spending most of my time in the months to come. It was here that I had my desk and cubicle, and would later do the bulk of my computer modeling and theoretical planning. Later that day we traveled to the Vibrations and Acoustics Test Facility (Building 49), and here I was shown the parts we would use for our technical project and the locations we would work in. I worked in the Loads and Dynamics Branch of the Structural Engineering Division, in the Engineering Directorate.

Jorgensen, Dorothy↗

NASA's Space Launch System: Momentum Builds Toward First Launch

NASA's Space Launch System (SLS) is gaining momentum toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. It will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017. Its first crewed flight follows in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. The SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015. In the NASA project life cycle process, SLS has completed 50 percent of its major milestones toward first flight. Every SLS element manufactured development hardware for testing over the past year. Accomplishments during 2013/2014 included manufacture of core stage test articles, preparations for qualification testing the solid rocket boosters and the RS-25 main engines, and shipment of the first flight hardware in preparation for the Exploration Flight Test-1 (EFT-1) in 2014. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd A.↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

Open Innovation at NASA: A New Business Model for Advancing Human Health and Performance Innovations

This paper describes a new business model for advancing NASA human health and performance innovations and demonstrates how open innovation shaped its development. A 45 percent research and technology development budget reduction drove formulation of a strategic plan grounded in collaboration. We describe the strategy execution, including adoption and results of open innovation initiatives, the challenges of cultural change, and the development of virtual centers and a knowledge management tool to educate and engage the workforce and promote cultural change.

Davis, Jeffrey R.↗

Enabling the Capture and Sharing of NASA Technical Expertise Through Communities of Practice

Historically, engineers at the National Aeronautics and Space Administration (NASA) had few opportunities or incentives to share their technical expertise across the Agency. Its center- and project- focused culture often meant that knowledge never left organizational and geographic boundaries. With increasingly complex missions, the closeout of the Shuttle Program, and a new generation entering the workforce, developing a knowledge sharing culture became critical. To address this need, the Office of the Chief Engineer established communities of practice on the NASA Engineering Network. These communities were strategically aligned with NASA's core competencies in such disciplines as avionics, flight mechanics, life support, propulsion, structures, loads and dynamics, human factors, and guidance, navigation, and control. This paper describes the process used to identify and develop communities, from establishing simple websites that compiled discipline-specific resources to fostering a knowledge-sharing environment through collaborative and interactive technologies. It includes qualitative evidence of improved availability and transfer of knowledge. It focuses on pivotal capabilities that increased knowledge exchange such as a custom-made Ask An Expert system, community contact lists, publication of key resources, and submission forms that allowed any user to propose content for the sites. It discusses the peer relationships that developed through the communities and the leadership and infrastructure that made them possible.

Topousis, Daria E.↗