Search NASA⌕ Search

SEARCH · Search NASA

Results for “Action Potentials”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Enhancing Early Systems R&D Capabilities with Systems —Theoretic Process Analysis

Systems engineering today faces a wide array of challenges, ranging from new operational environments to disruptive technological — necessitating approaches to improve research and development (R&D) efforts. Yet, emphasizing the Aristotelian argument that the “whole is greater than the sum of its parts” seems to offer a conceptual foundation creating new R&D solutions. Invoking systems theoretic concepts of emergence and hierarchy and analytic characteristics of traceability, rigor, and comprehensiveness is potentially beneficial for guiding R&D strategy and development to bridge the gap between theoretical problem spaces and engineering-based solutions. In response, this article describes systems–theoretic process analysis (STPA) as an example of one such approach to aid in early-systems R&D discussions. STPA—a ‘top-down’ process that abstracts real complex system operations into hierarchical control structures, functional control loops, and control actions—uses control loop logic to analyze how control actions (designed for desired system behaviors) may become violated and drive the complex system toward states of higher risk. By analyzing how needed controls are not provided (or out of sequence or stopped too soon) and unneeded controls are provided (or engaged too long), STPA can help early-system R&D discussions by exploring how requirements and desired actions interact to either mitigate or potentially increase states of risk that can lead to unacceptable losses. This article will demonstrate STPA's benefit for early-system R&D strategy and development discussion by describing such diverse use cases as cyber security, nuclear fuel transportation, and US electric grid performance. Together, the traceability, rigor, and comprehensiveness of STPA serve as useful tools for improving R&D strategy and development discussions. In conclusion, leveraging STPA as well as related systems engineering techniques can be helpful in early R&D planning and strategy development to better triangulate deeper theoretical meaning or evaluate empirical results to better inform systems engineering solutions.

42 ENGINEERING↗

Floodplain and Wetland Assessment for the Mortandad Wetland Enhancement and the DP Dissipater Projects at Los Alamos National Laboratory

This floodplain and wetland assessment was prepared in accordance with 10 Code of Federal Regulations (CFR) 1022 Compliance with Floodplain and Wetland Environmental Review Requirements, which was promulgated to implement the U.S. Department of Energy (DOE) requirements under Executive Order 11988 Floodplain Management and Executive Order 11990 Wetlands Protection. According to 10 CFR 1022, a 100-year floodplain is defined as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands” and a wetland is defined as “an area that is inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances does support, a prevalence of vegetation typically adapted for life in saturated soil conditions, including swamps, marshes, bogs, and similar areas.” In this action, DOE is proposing two projects to improve wetland and floodplain function at Los Alamos National Laboratory (LANL). The proposed work will comply with corrective action requirements under the Settlement Agreement and Stipulated Final Compliance Order (Settlement Agreement)1 Number HWB-14-20. The first project is located in Technical Areas (TA)-03 in upper Mortandad Canyon. The upper Mortandad wetlands have existing stormwater controls that need to be rehabilitated. Head-cut formation is occurring at the downstream portion of the wetland. This project will repair damages to the wetland and reduce the future erosion potential. The second project is located in TA-21 in Delta Prime (DP) Canyon. The intent of the DP Dissipater Project in DP Canyon is to install stormwater control structures in DP Canyon to retain low channel flows and reduce downstream sediment transport as well as peak flows during low and moderate storm events. Due to increased erosion, the stream bank in this area has unstable vertical walls within the stream channel. The DOE prepared this floodplain and wetland assessment to evaluate the potential impacts of implementing the proposed actions within the wetland and floodplain, as required by 10 CFR 1022.

54 ENVIRONMENTAL SCIENCES↗

CD40 agonist converting CTL exhaustion via the activation of the mTORC1 pathway enhances PD-1 antagonist action in rescuing exhausted CTLs in chronic infection

Expansion of PD-1-expressing CD8{sup +} cytotoxic T lymphocytes (CTLs) and associated CTL exhaustion are chief issues for ineffective virus-elimination in chronic infectious diseases. PD-1 blockade using antagonistic anti-PD-L1 antibodies results in a moderate conversion of CTL exhaustion. We previously demonstrated that CD40L signaling of ovalbumin (OVA)-specific vaccine, OVA-Texo, converts CTL exhaustion via the activation of the mTORC1 pathway in OVA-expressing adenovirus (AdVova)-infected B6 mice showing CTL inflation and exhaustion. Here, we developed AdVova-infected B6 and transgenic CD11c-DTR (termed AdVova-B6 and AdVova-CD11c-DTR) mice with chronic infection, and assessed a potential effect of CD40 agonist on the conversion of CTL exhaustion and on a potential enhancement of PD-1 antagonist action in rescuing exhausted CTLs in our chronic infection models. We demonstrate that a single dose of anti-CD40 alone can effectively convert CTL exhaustion by activating the mTORC1 pathway, leading to CTL proliferation, up-regulation of an effector-cytokine IFN-γ and the cytolytic effect in AdVova-B6 mice. Using anti-CD4 antibody and diphtheria toxin (DT) to deplete CD4{sup +} T-cells and dendritic cells (DCs), we discovered that the CD40 agonist-induced conversion in AdVova-B6 and AdVova-CD11c-DTR mice is dependent upon host CD4{sup +} T-cell and DC involvements. Moreover, CD40 agonist significantly enhances PD-1 antagonist effectiveness in rescuing exhausted CTLs in chronic infection. Taken together, our data demonstrate the importance of CD40 signaling in the conversion of CTL exhaustion and its ability to enhance PD-1 antagonist action in rescuing exhausted CTLs in chronic infection. Therefore, our findings may positively impact the design of new therapeutic strategies for chronic infectious diseases. - Highlights: • Anti-CD40 agonistic Ab can convert CTL exhaustion in chronically infected mice. • The conversion relies on the activation of the mTORC1 pathway in exhausted CTLs. • The conversion depends on the involvement of host DCs and CD4{sup +} T cells. • Anti-CD40 Ab enhances the effect of PD-1 blockade in rescuing CTL exhaustion.

60 APPLIED LIFE SCIENCES↗

Erythropoietin and carbamylated erythropoietin promote histone deacetylase 5 phosphorylation and nuclear export in rat hippocampal neurons

Erythropoietin (EPO) produces neurotrophic effects in animal model of neurodegeneration. However, clinical use of EPO is limited due to thrombotic risk. Carbamylated EPO (cEPO), devoid of thrombotic risk, has been proposed as a novel neuroprotective and neurotrophic agent although the molecular mechanisms of cEPO remain incomplete. Here, we show a previously unidentified role of histone deacetylase 5 (HDAC5) in the actions of EPO and cEPO. EPO and cEPO regulate the HDAC5 phosphorylation at two critical sites, Ser259 and Ser498 through a protein kinase D (PKD) dependent pathway. In addition, EPO and cEPO rapidly stimulates nuclear export of HDAC5 in rat hippocampal neurons which expressing HDAC5-GFP. Consequently, EPO and cEPO enhanced the myocyte enhancer factor-2 (MEF2) target gene expression. Taken together, our results reveal that EPO and cEPO mediate MEF2 target gene expression via the regulation of HDAC5 phosphorylation at Ser259/498, and suggest that HDAC5 could be a potential mechanism contributing to the therapeutic actions of EPO and cEPO.

60 APPLIED LIFE SCIENCES↗

State Regulatory Opportunities to Advance Distributed Energy Resource Aggregations in Wholesale Markets

The report discusses how state regulators can promote the participation of DERs in wholesale markets, including complementary actions that they can take to support Federal Energy Regulatory Commission Order 2222 implementation. It also summarizes wholesale market operators’ Order 2222 compliance and associated compliance challenges along with potential state regulator roles. The report identifies actions that state regulators can take to accelerate DER aggregations providing grid services.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Autonomous Control of Space Nuclear Reactors

Nuclear reactors to support future robotic and manned missions impose new and innovative technological requirements for their control and protection instrumentation. Long-duration surface missions necessitate reliable autonomous operation, and manned missions impose added requirements for failsafe reactor protection. There is a need for an advanced instrumentation and control system for space-nuclear reactors that addresses both aspects of autonomous operation and safety. The Reactor Instrumentation and Control System (RICS) consists of two functionally independent systems: the Reactor Protection System (RPS) and the Supervision and Control System (SCS). Through these two systems, the RICS both supervises and controls a nuclear reactor during normal operational states, as well as monitors the operation of the reactor and, upon sensing a system anomaly, automatically takes the appropriate actions to prevent an unsafe or potentially unsafe condition from occurring. The RPS encompasses all electrical and mechanical devices and circuitry, from sensors to actuation device output terminals. The SCS contains a comprehensive data acquisition system to measure continuously different groups of variables consisting of primary measurement elements, transmitters, or conditioning modules. These reactor control variables can be categorized into two groups: those directly related to the behavior of the core (known as nuclear variables) and those related to secondary systems (known as process variables). Reliable closed-loop reactor control is achieved by processing the acquired variables and actuating the appropriate device drivers to maintain the reactor in a safe operating state. The SCS must prevent a deviation from the reactor nominal conditions by managing limitation functions in order to avoid RPS actions. The RICS has four identical redundancies that comply with physical separation, electrical isolation, and functional independence. This architecture complies with the safety requirements of a nuclear reactor and provides high availability to the host system. The RICS is intended to interface with a host computer (the computer of the spacecraft where the reactor is mounted). The RICS leverages the safety features inherent in Earth-based reactors and also integrates the wide range neutron detector (WRND). A neutron detector provides the input that allows the RICS to do its job. The RICS is based on proven technology currently in use at a nuclear research facility. In its most basic form, the RICS is a ruggedized, compact data-acquisition and control system that could be adapted to support a wide variety of harsh environments. As such, the RICS could be a useful instrument outside the scope of a nuclear reactor, including military applications where failsafe data acquisition and control is required with stringent size, weight, and power constraints.

Merk, John↗

Potential description of the charmonium from lattice QCD

We present spin-independent and spin-spin interquark potentials for charmonium states, that are calculated using a relativistic heavy quark action for charm quarks on the PACS-CS gauge configurations generated with the Iwasaki gauge action and 2+1 flavors of Wilson clover quark. The interquark potential with finite quark masses is defined through the equal-time Bethe-Salpeter amplitude. The light and strange quark masses are close to the physical point where the pion mass corresponds to M{sub π} ≈ 156(7) MeV, and charm quark mass is tuned to reproduce the experimental values of η{sub c} and J/ψ states. Our simulations are performed with a lattice cutoff of a{sup −1} ≈ 2.2 GeV and a spatial volume of (3 fm){sup 3}. We solve the nonrelativistic Schrödinger equation with resulting charmonium potentials as theoretical inputs. The resultant charmonium spectrum below the open charm threshold shows a fairly good agreement with experimental data of well-established charmonium states.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Naloxone inhibits and morphine potentiates the adrenal steroidogenic response to ACTH

The administration of morphine to hypophysectomized rats potentiated the steroidogenic response of the adrenal cortex to exogenous adrenocorticotrophic hormone (ACTH) in a dose-dependent fashion. Conversely, the opiate antagonist naloxone inhibited the adrenal response to ACTH. Naloxone pretreatment also antagonized the potentiating effect of morphine on ACTH-induced steroidogenesis in a dose-dependent manner. Neither morphine nor naloxone, administered to hypophysectomized rats, had any direct effect on adrenal steroidogenesis. These adrenal actions were stereospecific since neither the (+)-stereoisomer of morphine, nor that or naloxone, had any effect on the adrenal response to ACTH. The administration of human beta-endorphin to hypophysectomized rats had no effect on the adrenal corticosterone concentration nor did it alter the response of the adrenal gland to ACTH. These results indicate that morphine can potentiate the action of ACTH on the adrenal by a direct, stereospecific, dose-dependent mechanism that is prevented by naloxone pretreatment and which may involve competition for ACTH receptors on the corticosterone-secreting cells of the adrenal cortex.

NASA Program Biomedical Research↗

Note on tachyon actions in string theory

A number of spacetime fields in string theory (notably the metric, dilaton, bosonic and type 0 bulk closed-string tachyon, and bosonic open-string tachyon) have the following property: whenever the spacetime field configuration factorizes in an appropriate sense, the matter sector of the world-sheet theory factorizes into a tensor product of two decoupled theories. Since the beta functions for such a product theory necessarily also factorize, this property strongly constrains the form of the spacetime action encoding those beta functions. We show that this constraint alone--without needing actually to compute any of the beta functions--is sufficient to fix the form of the two-derivative action for the metric-dilaton system, as well as the potential for the bosonic open-string tachyon. We also show that no action consistent with this constraint exists for the closed-string tachyon coupled to the metric and dilaton.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada Test Site, Nevada, Revision 0

Corrective Action Unit 367 is located in Area 10 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 367 comprises the four corrective action sites (CASs) listed below: • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-09-03, Mud Pit • 10-45-03, Uncle Crater Site The CASs in CAU 367 are being investigated because hazardous and/or radioactive contaminants may be present in concentrations that exceed risk-based corrective action (RBCA) levels. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting CAAs. The scope of the corrective action investigation for CAU 367 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Collect and submit environmental samples for laboratory analysis to determine the area where TED at the site exceeds FALs (i.e., corrective action boundary). • Evaluate TED to potential receptors in areas along Mercury Highway that have been impacted by a release of radionuclides from the Sedan test. • Collect and submit environmental samples for laboratory analysis related to the drilling mud within CAS 10-09-03, Mud Pit, and any encountered stains or waste as necessary to determine whether COCs are present. • If COCs are present, collect additional step-out samples to define the extent of the contamination. • Collect samples of investigation-derived waste, as needed, for waste management purposes.

54 ENVIRONMENTAL SCIENCES↗

Regaining Lost Separation in a Piloted Simulation of Autonomous Aircraft Operations

NASA is currently investigating a new concept of operations for the National Airspace System, designed to improve capacity while maintaining or improving current levels of safety. This concept, known as Distributed Air/Ground Traffic Management (DAG-TM), allows appropriately equipped autonomous aircraft to maneuver freely for flight optimization while resolving conflicts with other traffic and staying out of special use airspace and hazardous weather. While Airborne Separation Assurance System (ASAS) tools would normally allow pilots to resolve conflicts before they become hazardous, evaluation of system performance in sudden, near-term conflicts is needed in order to determine concept feasibility. If an acceptable safety level can be demonstrated in these situations, then operations may be conducted with lower separation minimums. An experiment was conducted in NASA Langley s Air Traffic Operations Lab to address issues associated with resolving near-term conflicts and the potential use of lower separation minimums. Sixteen commercial airline pilots flew a total of 32 traffic scenarios that required them to use prototype ASAS tools to resolve close range pop-up conflicts. Required separation standards were set at either 3 or 5 NM lateral spacing, with 1000 ft vertical separation being used for both cases. Reducing the lateral separation from 5 to 3 NM did not appear to increase operational risk, as indicated by the proximity to the intruder aircraft. Pilots performed better when they followed tactical guidance cues provided by ASAS than when they didn't follow the guidance. As air-air separation concepts are evolved, further studies will consider integration issues between ASAS and existing Airborne Collision Avoidance Systems (ACAS).These types of non-normal events will require the ASAS to provide effective alerts and resolutions prior to the time that an Airborne Collision Avoidance System (ACAS) would give a Resolution Advisory (RA). When an RA is issued, a pilot must take immediate action in order to avoid a potential near miss. The Traffic Alert and Collision Avoidance System (TCAS) II currently functions as an ACAS aboard commercial aircraft. Depending on the own aircraft s altitude, TCAS only issues RA s 15-35 seconds prior to the Closest Point of Approach (CPA). Prior to an RA, DAG-TM pilots operating autonomous aircraft must rely solely on ASAS for resolution guidance. An additional area of DAG-TM concept feasibility relates to a potential reduction in separation standards. Lower separation standards are likely needed in order to improve NAS efficiency and capacity. Current separation minimums are based in large part on the capabilities of older radar systems. Safety assessments are needed to determine the feasibility of reduced separation minimums. They will give strong consideration to surveillance system performance, including accuracy, integrity, and availability. Candidate surveillance systems include Automatic Dependent Surveillance-Broadcast (ADS-B) and multi-lateration systems. Considering studies done for Reduced Vertical Separation Minimums (RVSM) operations, it is likely that flight technical errors will also be considered. In addition to a thorough evaluation of surveillance system performance, a potential decision to lower the separation standards should also take operational considerations into account. An ASAS Safety Assessment study identified improper maneuvering in response to a conflict (due to ambiguous or improper resolution commands or a pilot s failure to comply with the resolution) as a potential safety risk. If near-term conflicts with lower separation minimums were determined to be more challenging for pilots, the severity of these risks could be even greater.

Barhydt, Richard↗

Calcium dependence of rapid auxin action in maize roots

We investigated the interaction of Ca2+ and auxin on root elongation in seedlings of Zea mays L. The seedlings were raised either in the presence of Ca2+ (high calcium; HC = imbibed and raised in 10 millimolar CaCl2), in the absence of additional Ca2+ (intermediate calcium; IC = imbibed and raised in distilled H2O, calcium supply from seed only), or without additional Ca2+ and subsequently depleting them of Ca2+ (low calcium; LC = imbibed and raised in distilled H2O and subsequently treated with 1 millimolar ethyleneglycol-bis-[beta-aminoethylether]-N,N,N',N'-tetraacetic acid [EGTA]). Exposure of roots of either HC or IC seedlings to auxin concentrations from 0.1 to 10 micromolar resulted in strong inhibition of elongation. In roots of LC seedlings, on the other hand, auxin concentrations as high as 10 micromolar caused only slight inhibition of elongation. Adding 0.5 millimolar Ca2+ to LC roots in the presence of IAA allowed normal expression of the inhibitory action of the hormone. Inhibition of elongation in IC roots by indoleacetic acid was reversible upon treatment of the roots with 1 millimolar EGTA. The inhibitory action of auxin could then be re-established by supplying 0.5 millimolar Ca2+. The data indicate that Ca2+ may be necessary to the growth-regulating action of auxin. The significance of this finding is discussed with respect to the potential role of Ca2+ as a second messenger of auxin action and the relevance of this model to recent evidence for gravi-induced redistribution of Ca2+ and its role in establishing gravitropic curvature.

Non-NASA Center↗

Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428

The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS under the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of remedial alternatives for the IWCS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consumer Views on Transportation and Advanced Vehicle Technologies

Vehicle manufacturers, U.S. Department of Energy laboratories, universities, private researchers, and organizations from countries around the globe are pursuing advanced vehicle technologies that aim to reduce gasoline and diesel consumption. This report details study findings of broad American public sentiments toward issues surrounding advanced vehicle technologies and is supported by the U.S. Department of Energy Vehicle Technology Office (VTO) in alignment with its mission to develop and deploy these technologies to improve energy security, increase mobility flexibility, reduce transportation costs, and increase environmental sustainability. Understanding and tracking consumer sentiments can influence the prioritization of development efforts by identifying barriers to and opportunities for broad acceptance of new technologies. Predicting consumer behavior toward developing technologies and products is inherently inexact. A person's stated preference given in an interview about a hypothetical setting may not match the preference that is demonstrated in an actual situation. This difference makes tracking actual consumer actions ultimately more valuable in understanding potential behavior. However, when developing technologies are not yet available and actual behaviors cannot be tracked, stated preferences provide some insight into how consumers may react in new circumstances. In this context this report provides an additional source to validate data and a new resource when no data are available. This report covers study data captured from December 2005 through June 2015 relevant to VTO research efforts at the time of the studies. Broadly the report covers respondent sentiments about vehicle fuel economy, future vehicle technology alternatives, ethanol as a vehicle fuel, plug-in electric vehicles, and willingness to pay for vehicle efficiency. This report represents a renewed effort to publicize study findings and make consumer sentiment data available to researchers, policy makers, and the public. Planned reports will follow detailing data from new studies targeting the primary challenges to and opportunities for advanced vehicle technology deployment. The effort continually refines study content to maintain and improve the relevance and validity of results.

33 ADVANCED PROPULSION SYSTEMS↗

Phased Construction Completion Report for Bldg. K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park, Oak Ridge, Tennessee

This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for the CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The site will be investigated based on the data quality objectives (DQOs) developed on July 6, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for the Baneberry site. The primary release associated with Corrective Action Unit 365 was radiological contamination from the Baneberry nuclear test. Baneberry was an underground weapons-related test that vented significant quantities of radioactive gases from a fissure located in close proximity to ground zero. A crater formed shortly after detonation, which stemmed part of the flow from the fissure. The scope of this investigation includes surface and shallow subsurface (less than 15 feet below ground surface) soils. Radionuclides from the Baneberry test with the potential to impact groundwater are included within the Underground Test Area Subproject. Investigations and corrective actions associated with the Underground Test Area Subproject include the radiological inventory resulting from the Baneberry test.

54 ENVIRONMENTAL SCIENCES↗

The Integrated Basin-Scale Opportunity Assessment Initiative: Pilot Assessment for the Deschutes River Basin

In 2010, the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office provided funding to Pacific Northwest National Laboratory, Oak Ridge National Laboratory (ORNL), and Argonne National Laboratory to develop an approach for assessing a river basin as an integrated system within the context of existing uses and environmental conditions to identify opportunities for sustainable hydropower development and environmental improvements. Called the Integrated Basin-Scale Opportunity Assessment Initiative (BSOA Initiative), the project is one of seven action items of the March 24, 2010 Memorandum of Understanding (MOU) for Sustainable Hydropower. Early efforts of the BSOA Initiative focused on forming a National Steering Committee, identifying potential basins for opportunity assessments, methodologies for stakeholder engagement, existing and needed analytical tools, barriers to the opportunity assessment process, and significant data gaps. One of the key outcomes was identifying a need for better collaborative decision-making tools that can be used by stakeholders. In response to this need, the Basin-Scale Project Team chose a scenario-based modeling approach for assessing hydropower, environmental, and other water-use opportunities. The approach involved the development of a daily hydrologic model for the Upper Deschutes River and Lower Crooked River subbasins to simulate alternative water management scenarios. Two example scenarios were constructed to demonstrate the use of the hydrologic model to explore three management goals in the Deschutes Basin: 1) increasing hydropower assets by adding new generation at existing dams or diversions and in existing irrigation canals or conduits, 2) increasing instream flows to benefit fish and aquatic ecosystems, and 3) maintaining existing water uses (primarily irrigation). Actions to achieve these goals were simulated by incrementally increasing minimum flow requirements during the storage season and reducing water demands during the irrigation season, while simulating hydropower generation at non-powered dams and in irrigation canals. As part of the effort to demonstrate scenario-based modeling, the project team also developed a web-based data-visualization interface for synthesizing modeling results. The interface allows users to view model results in raw form (daily flow) or in the form of value-based metrics that are based on specific information needs expressed by stakeholders (e.g., how often flow exceeds a conservation flow target at a certain location). In addition to the modeling efforts, 29 potential hydropower sites (14 non-powered dams, 15 canal/conduit sites) were evaluated for their technical and economic feasibility using ORNL’s Hydropower Energy and Economic Assessment tool. Results of the feasibility assessment indicated that eight of the sites (four non-powered dams, four canals/conduits) may be feasible and could add approximately 19 megawatts (MW) of hydroelectric capacity in the basin and generate over 78 gigawatt-hours (GWh) of energy per year. The approach presented here is intended to encourage consideration of methods that emphasize exploration of a range of potential management actions that may achieve a better balance among multiple, and often conflicting, management goals. It is important to consider the approach as an iterative and collaborative process focused on moving debates beyond agreement about an exact target that is acceptable to all parties to a discussion of how stakeholders can better understand how achieving their goals interacts with the achievement of goals by other stakeholder groups. By exploring the results of the model in this way, stakeholders are more likely to narrow the bounds of interest so that more in-depth analysis can be completed.

13 HYDRO ENERGY↗