Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

A method for transferring NASTRAN data between dissimilar computers

The NASTRAN computer program is capable of executing on three different types of computers: (1) the CDC 6000 series, (2) the IBM 360-370 series, and (3) the Univac 1100 series. A typical activity requiring transfer of data between dissimilar computers is the analysis of a large structure such as the space shuttle by substructuring. Models of portions of the vehicle which have been analyzed by subcontractors using their computers must be integrated into a model of the complete structure by the prime contractor on his computer. Presently the transfer of NASTRAN matrices or tables between two different types of computers is accomplished by punched cards or a magnetic tape containing card images. These methods of data transfer do not satisfy the requirements for intercomputer data transfer associated with a substructuring activity. To provide a more satisfactory transfer of data, two new programs, RDUSER and WRTUSER, were created.

Rogers, J. L., Jr.↗

Ground Operations Aerospace Language (GOAL). Volume 1: Study overview

A series of NASA and Contractor studies sponsored by NASA/KSC resulted in a specification for the Ground Operations Aerospace Language (GOAL). The Cape Kennedy Facility of the IBM Corporation was given the responsibility, under existing contracts, to perform an analysis of the Language Specification, to design and develop a GOAL Compiler, to provide a specification for a data bank, to design and develop an interpretive code translator, and to perform associated application studies.

Source record↗

Shuttle mission simulator requirements report, volume 1, revision C

The contractor tasks required to produce a shuttle mission simulator for training crew members and ground personnel are discussed. The tasks will consist of the design, development, production, installation, checkout, and field support of a simulator with two separate crew stations. The tasks include the following: (1) review of spacecraft changes and incorporation of appropriate changes in simulator hardware and software design, and (2) the generation of documentation of design, configuration management, and training used by maintenance and instructor personnel after acceptance for each of the crew stations.

Burke, J. F.↗

Apollo experience report: Problem reporting and corrective action system

The Apollo spacecraft Problem Reporting and Corrective Action System is presented. The evolution from the early system to the present day system is described. The deficiencies and the actions taken to correct them are noted, as are management controls for both the contractor and NASA. Significant experience gained from the Apollo Problem Reporting and Corrective Action System that may be applicable to future manned spacecraft is presented.

Adams, T. J.↗

Measurement and analysis of force-time outputs of pyrotechnic nuts

The dynamic loadings produced by two standard pyrotechnic nuts were compared with loadings produced by four recently developed low-shock nuts. The nuts were manufactured by separate contractors. Each nut was given a number designation, the number having no special significance. The results show that the use of the Hopkinson bar to measure force-time outputs of the nuts at stud and housing sides aided greatly in understanding the events occurring in the nuts. Acceleration data appear to be dependable, for the most part, but of more limited value. The low-shock designs show considerable improvement over the standard designs above 4,000 Hz when the results are plotted in shock spectrum form. They involve some penalties with regard to weight and cost.

Neubert, V. H.↗

Broadband power amplifier tube: Klystron tube 5K70SK-WBT and step tuner VA-1470S

The design concept, the fabrication, and the acceptance testing of a wide band Klystron tube and remotely controlled step tuner for channel selection are discussed. The equipment was developed for the modification of an existing 20 KW Power Amplifier System which was provided to the contractor as GFE. The replacement Klystron covers a total frequency range of 2025 to 2120 MHz and is tuneable to six (6) each channel with a band width of 22 MHz or greater per channel. A 5 MHz overlap is provided between channels. Channels are selected at the control panel located in the front of the Klystron magnet or from one of three remote control stations connected in parallel with the step tuner. Included in this final report are the results of acceptance tests conducted at the vendor's plant and of the integrated system tests.

Cox, H. R.↗

The interaction of spacecraft high voltage power systems with the space plasma environment

The development of spacecraft with electrical loads that require high voltage power is discussed. The high voltage solar array has been considered for supplying d.c. power directly to high voltage loads such as ion thrusters and communication tubes without intermediate power processing. Space power stations for transferring solar power to earth are being studied in the 40 kilovolt, multikilowatt regime. Analytical and experimental studies have determined that with the advent of high voltage power, new problems will arise through the interaction of the high voltage surfaces with the charged particle environment of space. The interactive environment has been identified and duplicated to some extent in simulation facilities at NASA-Lewis Research Center and at several contractor locations.

Domitz, S.↗

Apollo Soyuz test project. USA-USSR, fact sheet

The Apollo Soyuz Test Project (ASTP) is discussed. The United States and the Soviet Union have agreed to develop compatible rendezvous and docking systems which will provide a basis for docking and rescue on future spacecraft of both nations. The ASTP mission will include testing the rendezvous system in orbit, verifying techniques for transfer of astronauts and cosmonauts, and conducting experiments while docked and undocked. Diagrams of the spacecraft and systems involved in the tests are presented. The prime contractors for the equipment are identified. Biographical data on the astronauts participating in the program are provided.

Source record↗

Cables and connectors: A compilation

A compilation is presented that reflects the uses, adaptation, and maintenance plus service, that are innovations derived from problem solutions in the space R and D programs, both in house and by NASA and AEC contractors. Data cover: (1) technology revelant to the employment of flat conductor cables and their adaptation to and within conventional systems, (2) connectors and various adaptations, and (3) maintenance and service technology, and shop hints useful in the installation and care of cables and connectors.

Source record↗

Engineering studies related to the GEOS-C radar altimeter

Experiment requirements, technical characteristics, and GEOS-C radar altimeter related analyses are discussed along with results of a study on engineering test data requirements. Statistical analyses related to determination of wave height resolution achievable as a function of system characteristics and averaging period are described, in addition to a discussion on the desirability of using computer procedures to compensate for altitude tracker time-jitter. Data processing considerations for the GEOS-C system are examined. An extensive analysis of the spatial filter effect is given and results of a computation of geoidal power spectral density, based on Skylab altimeter data, is displayed and interpreted in terms of projected GEOS-C random errors. This information is then used in deriving minimum-mean-square filter procedures for both geoid undulation and slope data. The characteristics of mean received waveforms as a function of off-nadir angle are used to obtain tracker bias as a function of sea state and pointing angle. The angle estimation process proposed by the GEOS-C hardware contractor is also investigated from a standpoint of achievable angular resolution.

Miller, L. S.↗

Machine tools and fixtures: A compilation

Innovations developed by NASA, AEC, and their contractors concerning tools, adaptors, jigs, and fixtures useful in machining a wide variety of materials are presented.

Source record↗

The Saturn management concept

Management of the Saturn launch vehicles was an evolutionary process, requiring constant interaction between NASA Headquarters, the Marshall Space Flight Center (particularly the Saturn 5 Program Office), and the various prime contractors. Successful Saturn management was a blend of the decades of experience of the von Braun team, management concepts from the Army, Navy, Air Force, and Government, and private industry. The Saturn 5 Program Office shared a unique relationship with the Apollo Program Office at NASA Headquarters. Much of the success of the Saturn 5 Program Office was based on its painstaking attention to detail, emphasis on individual responsibilities (backed up by comprehensive program element plans and management matrices), and a high degree of visibility as embodied in the Program Control Center.

Bilstein, R. E.↗

Space Shuttle - The new baseline

Recent design alterations and refinements in the Space Shuttle program are considered with particular attention to the present baseline Shuttle configurations, performance characteristics, mission profiles, and flight and ground operations. Hardware and software development and testing, propulsion systems, entry trajectory events, and payload capability are covered. The refined Space Shuttle system design is characterized as one reflecting firm technical and economic considerations. Systems development is well under way, with all major contractors progressing on schedule.

Malkin, M. S.↗

Power metallurgy approaches to high temperature components for gas turbine engines

Work conducted by NASA and NASA contractors on prealloyed superalloy powders and materials strengthened by oxide dispersion is reviewed. Fabrication, tensile strength, superplasticity, grain growth control, stress rupture life, and grain-size and dispersion-level effects are covered. Distinct strength advantages of powder metallurgy superalloys over conventional wrought alloys are noted.

Probst, H. B.↗

MSFC engineering support to Skylab operations

Major engineering support provided during the Skylab mission from the Marshall Space Flight Center and its contractors to the Mission Control Center at Houston was essential to Skylab success. The need for this type of support was anticipated during premission preparations due to the complexity and first-flight nature of the Skylab, but the requirements were greatly magnified by the problems encountered early in the mission. The MFSC engineering support organization and its interface to the Mission Control Center is described. The importance of close cooperation between the operating and engineering organizations in this type of mission is discussed. Illustrations are given from more than 1800 systems analysis actions worked out during the nine-month Skylab mission by more than 600 support engineers.

Kurtz, H. F., Jr.↗

Apollo 6, Anomaly Report No. 6: Abnormal Structural Performance During Launch Phase

Approximately 2 minutes 13 seconds after lift-off of the Apollo 6 mission, abrupt changes of strain, vibration, and acceleration measurements were indicated in the S-IVB, instrument unit, adapter, lunar module, and command and service modules; photographs showed objects coming from the area of the adapter. The adapter, however, continued to sustain the required loads with no impairment of the mission. The investigation was first focused upon the understanding of the coupled vibration modes and characteristics of the launch vehicle and spacecraft.' Extensive test programs were conducted. It was eventually concluded that the adapter failure was not caused by vibration. Extensive study of the airborne photography and other evidence indicated that a large area of the adapter had lost inner facesheet from the honeycomb sandwich panels. Loads and stresses resulting from vibration were determined to be insufficient to initiate such a failure. The investigation was then directed toward determining the range of pressures that could have been trapped in the Apollo 6 adapter sandwich panels, and toward determining the tolerance of the panels to withstand pressure with various degrees of flaws such as adhesive voids and facesheet dents. The degradation effects of moisture and heat exposure on the adhesive strength were also studied and tested. These tests and analyses led to the conclusion that pressure internal to the sandwich panels could have caused the failure, if a large flaw existed. The pressure buildup would have been caused by aerodynamic heating effects on air and moisture trapped in the panel. The probable cause of the failure was found in the original ultrasonic inspection scan record of the affected adapter panel. In the center of the region where the adapter failed, horizontally along the station 709 panel splice, the record contained two thick anomalous lines extending several feet. Without an X-ray record of this region, the significance of this particular scan record cannot be fully understood. However, since all other evidence had indicated that the adhesive had to be weakened in a rather large area to initiate the failure, the investigation was focused intently upon the station 709 splices of other adapters. Sufficient information was developed to verify that deficient assembly techniques have consistently resulted in abnormalities in the structure at this station. These abnormalities were identified in adapters 12, 13, 14, 15, and 16. Before the splice abnormalities were pinpointed, corrective action was taken to reduce pressure "buildup in the honeycomb panels and to reduce heat degrading effects on the adhesive. This was done by drilling vent holes in the inner facesheet and covering the outer facesheet with cork. The adapters having identified abnormalities in the station 709 splice are being repaired, and the contractor is investigating ways of avoiding these -abnormalities in panels yet to be bonded.

Source record↗

Earth Observatory Satellite system definition study. Report no. 2: Instrument constraints and interface specifications

The instruments to be flown on the Earth Observatory Satellite (EOS) system are defined. The instruments will be used to support the Land Resources Management (LRM) mission of the EOS. Program planning information and suggested acquisition activities for obtaining the instruments are presented. The subjects considered are as follows: (1) the performance and interface of the Thematic Mapper (TM) and the High Resolution Pointing Imager (HRPI), (2) procedure for interfacing the TM and HRPI with the EOS satellite, (3) a space vehicle integration plan suggesting the steps and sequence of events required to carry out the interface activities, and (4) suggested agreements between the contractors for providing timely and equitable solution of problems at minimum cost.

Source record↗

The pioneer projects: Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗